Karla Ellis is the Regulatory point-of-contact for this permit application from the Clackamas County Dept. of Transportation for work impacting the Sandy River, near Welches, Ore.
PUBLIC NOTICE for Permit Application
Issue Date: August 11, 2014
Expiration Date: September 10, 2014
US Army Corps of Engineers No: NWP-2014-300
30-Day Notice Oregon Department of State Lands No: Unknown
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Karla G. Ellis karla.g.ellis@usace.army.mil
P.O. Box 2946
Portland, OR 97208-2946
Applicant: Joel Howie, Clackamas County Dept. of Transportation and Development
150 Beavercreek Rd., Oregon City, OR 97045
Location: The proposed project is located along East Barlow Trail Road, Milepost 6, near Welches, Clackamas County, Oregon (Sections 33 and 34, Township 2 South, Range 7 East).
Waterway: Sandy River
Project Description: The proposed project involves bank stabilization, including a riprap revetment, Mechanically Stabilized Earth (MSE) wall, large woody debris (LWD) installation and plantings.
The project would involve work along a 360 linear foot section of the Sandy River. Work area isolation will take place over an area measuring 460 linear feet. A revetment measuring approximately 360 feet long by 30 feet wide (20 feet high) and approximately 5 feet thick would be constructed using Class 10,000 riprap. The revetment would extend from the 25-year flood event river stage to scour depth. The riprap revetment would include seven pieces of LWD with attached rootwads. Three pieces of LWD would be placed in close proximity on the upstream end of the project and the remaining four pieces would be spaced along the downstream end of the work area. Willow pole bundles would be incorporated into the revetment at or below the Ordinary High Water (OHW) mark. A total of 1,443 cubic yards (CY) of riprap would be placed, of which 713 cubic yards would be placed below OHW and 730 CY above OHW, outside of Corps jurisdiction.
The application states the slope of the revetment would be constructed at a 1:1.5 ratio. To avoid channel encroachment, installation of the revetment will necessitate an MSE wall at the top of the revetment. The design would not incorporate top dressing with soil above the OHW elevation, due to concern over the viability of plantings and the loss of soil during high flow events. Plantings would consist of 220 willow pole bundles incorporated within the riprap during revetment construction and upland site restoration plantings.
To facilitate work area isolation, a total of 261 CY of sand bags would be temporarily placed below the OHW over a distance of 460 linear feet.
A total of 3,834 CY of fill material would be placed over an area measuring 0.405 acre, and a total of 3,834 CY of material would be removed for the entire project. Removal and fill volumes include temporary isolation measures and reworking of native bed materials.
Mitigation: To compensate for impacts to the aquatic environment, the applicant proposes the large woody debris, willow bundles, and native upland plantings.
If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The purpose of the project is to stabilize the bank adjacent to East Barlow Trail Road.
Drawings: Twenty (20) drawings are attached and labeled Corps No. NWP-2014-300.
Additional information may be obtained from Karla G. Ellis, Project Manager, U.S. Army Corps of Engineers, at 503-808-4377 or email karla.g.ellis@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) has been completed by the Federal Highways Administration.
Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat.
The project area is within the known range of protected species. We will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning EFH will be considered in our final assessment of the described work.
Cultural resources: An initial evaluation of the proposed project area indicates that the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
CLACKAMAS COUNTY
~«"'~"
"""
-- - - -- "-"<:'"""'"'~'"''
DJEP AR TMJENT
TRANSPORTATION AND DJEVJELOPMJENT
PLANS FOR PROPOSED PROJECT
SCOPE OF WORK
EAST BARLOW TRAIL ROAD
RESTORATION IMPROVEMENTS PROJECT
ClACKAMAS COUNTY
_ _ _ 2015
Overafi Length Of Project- 0.09 Miles
I
I
.CO!fSUWNG
~;::!:;!:;
"""
""·
1.0
/
I
Basin1a
2978 SQFT
crl
a3
a3
a)
~I
II~
~hfc
;3:-i
18/;i
'Trealment of 8,473 SQFT
3,865 SQFT: Drainage Curb Guardrail
STA 13+70 to STA 17+00
2,465 SQFT: Inlet STA 13+00 LT
~ C/JIISI/I.TINB
~ E!IBIN£ff1S
~
-·-·-
EAST BARLOW TRAIL ROAD
RESTORATION IIIPIIOVUIEIITS PROJECT
CLACKAMAS COUNTY
0.41QI'I'&4 Ely · MOfthew f'!'!f!il;:>&
Cr>e~OO:ay
FOCHJRE
2
8'wldth
J'wldfh
Vegetated filter s!rip
AggreijiiliiilidiJiifer
QI.KIIity~lng.
use perm. .seed mix He. 1
wtth wheal hybrid a.s
n~ry
SECT ON A2-A2
&
~
High flows lJytxJ.5s
to down.stream
"""""yar>C8
.
...
to
ooflet
LA2
~
EAST BARLOW TRAIL ROAD
RESTORATION IIIIPROYEIIENTS PROJECT
1----------- LIW}fh ILl' 250'---------.....J
CLACKAMAS COt.JNTY
PLAN
0"-i~
Cl'te~<'id
Sy
AA~y ~s
·B
Oroft&\1 a1 · W:y '5dw"l&f'illi,!'"
BlOSLOPE DETAIL
FIG\,0£
IIIIAIIUU DETAILS
c:\obec\pwobec01\dms91344\070039f _FiQure 3.dt1
4/29/2014
AM
3
SWALE:
{
Not
to
&rule
1Fig.2J
r
OREGON DEPARTMENT OF TRANSPORTATION
---·-M<
EAST BARLOW TRAIL ROAD
RESTORATION IIIPROVEMEIITS PROJECT
CLACKAMAS COUNTY
DIIAIIUU DETAILS
c: \obec\pwobec01\dms973"'1
4/29/2014
""""
4
I
I
IOIJOOI rtNetment
Uffllt!as reJOCt:Jf&::J prior to construct/on
al
o5
VJ
0+
- Z /83 cv. yd.
o5
o5
protect
o5
o5
ro
--1
0
+
+
0
0
0
0
LEGEND
Ls
......
IJHW
.... fllllll' . . fllllll" . . . . . ,
.... ,
WON·
....
' ....
' ·' ·
'·
'
' ....
'
.
'~·\
EAST BARLOW TRAIL ROAD
RESTORATION IIIPIIOYEIIEIITS PROJECT
ClACKAMAS COUNTY
0&$1\;1W'dfi)'
(MciKeO ay
0<-.:d'"ted By
An!r7~&
e.tn
We~lto
C.N"i $ChrSCALE IN FEET
PROJECT IIPACT SUIIARY
THE FllENAME LOCATION
tl#t>ill'tPJi'l>'ti!>tl-!llli'i\'lt#UW.U#ItJI;IU"IIt!;.#
DD·MMM·YYYY
HH:MM
...
""''
NOTE: the exact stationing of willow
bundles and
wood will depend on
site conditions
construction. Please
refer to Sheet 3.0 in
C for the large
drawing, and refer to Sheet
0 for the willow bundle
typical.
of permanent removal and !ill
the OH\1\/M of !he Sandy
Includes existing channel bed
nd bank excavation and installation
f riprap blanket to scour
hannel from OH\1\/M to
will be re-contoured to existing
using the temporarily excavated
channel materials.
~
~
1424
1422
1420
14!8
~
_l .,..,.=-=~~~~:Jt..;;::-.
142'4
1422
14l0
1418
!4Hi ...
1416
1414
141-!t
1412
1412
14H)
t4l0
1408
1408
1406
1406
1404
1404
1402
1402
1400
1-100
1398
1398
1396
1396
1394
1394
1392
1392
1390
1390
1388
1388
l)S·L~~~~~~~~~~~
1386
!364
1394
1382
.11382
1380
·25
·20
·IS
·10
·5
10
IS
20
25
30
35
40
45:
so
~s
60
65
70
75
80
es
90
95
100
105
110
IS
120
1380
125
13+90.00
Cross Section l
03/0712014
NOTE: the exact s!alionino of willow
bundles and
wood will depend on
site conditions
construction. Please
refer to Sheet 3.0 in Exhibit C for the large
and refer to Sheet
willow bundle
typical.
...:
~
....,
ct:
142"2"
1420
../
t4!8
1416.
-
..___
-../
1
~
"'
"-l
"-l
I
~~
~
7S 4.J
~
t-424
~
·~
"-l
Area of permanent removal and till
below the OHINM of the Sandy
River. Includes existing channel bed
and bank excavation and installation
of riorao blanket to scour depth.
from OHINM to existing toe
will be re-contoured to existing form
using the temporarily excavated
channel materials.
i~
14124
!422
14l0
'
1 .. ~------
1416
,
l4t6
t:l
1414
1414
1412
1412
1410
!410
1400
1408
1400
141)&
1404
1404
1402
1402
1400
1400
ll·a
1398
r~-~~--~--~--~~---·+···········~--
1396
1396
1394
1394
t3'91
1392
1390
1390
1386
1388
1386
1386
l384
1384
1382
·50
·45
·40
·3S
·30
·25
·20
·05
·10
·S
10
15
20
25
14+50.00
30
35
40
··
50
55
60
65
TO
15
eo
es
90
95
1382
JOO
Cr"OSS Section 2
03/07/2014
NOTE: the exact
of willow
bundles and large wood will depend on
site conditions during construction. Please
refer to Sheet 3.0 in Exhibit C for the large
drawing, and refer to Sheet
·oody
D for the willow bundle
GN-3 in
!Area
removal and fill
below
OHWM of the Sandy
River. Includes existing channel bed
and bank excavation and installation
of riprap blanket to scour depth.
Channel from OHWM to existing toe
will be re-contoured to existing
using the
excavated
channel m~''"'"'"'"
~
tJ
1424
1422
~
-----
1420
1418
1416
1424
142'2'
L
1420
1416
1416
lo!ll4
1414
1412
1412
t4t0
l410
1408
1408
1406
140>1
,.,.
1402
1402
1400
1400
1406
1395
!398
1396
1.396
tl94
1394
1392
1392
1390
i390
1368
138{1
13196
1386
1384
·SO
·45
··o
·3>
·30
·25
·20
·15
·10
·S
0
10
"
20
25
14+90.00
30
35
<0
45
so
55
..,
65
70
75
80
··
1384
90
95
100
Cross Sect ion 3
03107/2014
NOTE: the exact stationing of willow
bundles and large wood will depend on
ditions
construction. Please
C for the large
Sheet 3.0 in
drawing, and refer to Sheet
D for !he willow bundle
Area of permanent removal and fill
below the OHWM of the Sandy
River. Includes existing channel bed
and bank excavation and installation
of riprap blanket to scour depth.
Channel from OHWM to
will be re-contoured to existing
using the temporarily excavated
channel materials.
~
1424
~
J422
1420
-....--~
!418
1424
1422
j_
..........
142'0
t4Ul
l4t£
1416
1414
1414
1412'
1412
t-410
1410
1408
1408
1406
14()6
1404
1404
1402
l402
1400
HOO
-
1398
1)96
1396
1396
13941
1394
t3'92
1392
1}90
13910
1388
nee
!366
1386
1384
·SO
··s
·40
·35
-30
·25
·20
·IS
·10
-s
10
IS
20
25
I S·20.00
30
35
40
45
so
ss
·o
··
L)B-4
TO
75
80
as
90
95
100
Cross Sect 1on 4
03/07/2014
on
Please
refer to Sheet 3.0 in
C for the large
:woody
drawing, and refer to Sheet
GN-3 in
D for the willow bundle
typical.
removal and fill
.,.,ti
~
"
1424
~ ~
!4~4
1422
!42'2
l.!\120
1420
1418
1418
!416
t4i6
14!4
1414
1412
14!2
!410
1410
1408
1406
141)S
1406
1404
140<
!402
1402
----
1400 ~-
1398
1400
1398
1:596
1396
1394
1394
1392
1.392
1390
1390
l388
1388
1386
llSE.
-so
-45
-40
-35
-30
-25
·20
·15
·10
·5
10
15
20
25
30
35
40
45
50
55
60
65
TO
75
80
85
90
95
100
15+70.00
Cross Section 5
03/0712014
~
-~
.'?'
CJ
CJ
"
"
CJ
"'
I
1424
<:::
1414
1422
--
-
1420
1418
1416
1424
a::
··n
NOTE: drawings scaled for 11 x17
Scale will change for 8.5x11 printing.
1420
1418
141t
1414
14!2'
141.2
1<1!10
1408
1406
1404
1402
1400
13'91)
1196
14'10
NOTE: the exact ""'"''""' ·t~_ of willow
bundles and large wood
depend on
site conditions during construction. Please
refer to Sheet 3.0 in Exhibit C for the large
woody typical drawing, and refer to Sheet
GN-3 in Exhibit D for the willow bundle
typical.
1408
1406
-
141M
1402
1400
'1398
1396
1394
1394
1392
1392
1390
1368
·!0
ll':i!O
-·s
·40
·)~
·30
·2~
·20
·IS
·10
-~
0
~
10
IS
25
20
lO
35
·a
45
~0
ss
~
CJ
14.24
1422
1420
1418
1416
Area of permanent removal and fill
below the OH\I\II'vt of the Sandy
River. Includes existing channel bed
and bank excavation and installation
blanket to scour
of
from OH\I\II'vt to
toe
will be re-contoured to existing form
using the temporarily excavated
channel materials.
1386
90
95
100
1424
l422
!420
14!8
1416
1414
1414
1412
1412
14H)
1410
1400
1408
1406
1406
1404
1404
141)2
1402
1400
Riprap blanket
1398
1398
1396
1396
1394
1394
1392
1392
1390
1390
1388
·50
·45
·40
·35
·lO
·>5
·20
.,.
·10
·5
0
s
10
"
20
.
16+70.00
STA. 16+70 TO STA. 16+80
30
35
40
··
50
55
60
··
TO
15
80
··
90
95
1388
100
SCALE 1"=10'
Cr'"oss Section 6
0310712014
1rt
~~
~
I
STA. "8" 17+00 To STA.
·s·
18+00
STA.
fFor surfocl(}(} details not shown, see section
·s·
I
14+75 To STA. "B" 16+50
teiCA~~J
EAST BARLOW TRAIL ROAD
STA. HBU 13+00 To STA. usn 13+90
·HBH 13+90 To
"B" 14+25
···B" 17+00 To
HBH 18+00
Rlprap ge:otextile.
type 2
STA. "B" 16+75 To STA. "B" 17+00
'
E:xtg.
RIW
R!PRAP
STA. us" 13+64 To STA.
18'=J2'
IJIJifl-layer pymt. CMst.
..
~~=dr~
51.1A
~"\!
1
'.
·.I
a
'
tFor details. :ree silt. 3.0!
...c
t' "'"~"'"
F't · ~. ·-·~nv.
e "' . .
I
.
a
"
.0
o
.. o
.o
A
.a!!'!
EAST BARLOW TRAIL ROAD
RESTORATION IIIPROVEMENTS PROJECT
CLACKAMAS COt.mT'f
De$i~fly
McHtlOw i>n.llllpe.
tnecl<.eday
SH££T
NO.
STA.
TYPICAL UCTIOU
2.0
/
/
a5
{
a5
.to
i-
0
c6
U1
i-
0
"8" LINE
d
0
0
~
-.;
i-
0
0
-JVSI:.mdyRJvef
RIPRAP CLASS 10,000 REVETMENT
r-------vor.zo·to
8s
SCour elevation
geotextile.
EAST BARLOW TRAIL ROAD
RESTORATION IIIPROVEIIENTS PROJECT
CLACKAMAS COUNTY
IJ45!~By
.WCH.......,I?h!IH_,3-
0teeke0 6y
SETION A-A
WOODY DEBRIS DETAIL
IIEUIL8
~
.·.
"""
3.0
Exhibit D
Tree Removal and Site Restoration Plan Sheets
East Barlow Trail Road Restoration Improvements Project
Clackamas County, Oregon
4
December 2013
TREE PROTECTION NOTES:
Install troo protection fence at existing trees, or
construction, per Tree Protection Detail. Fencing shall
be protected within the critical root zone
EXISTING DECIDUOUS TREE
TO BE REMOVED
3. The CRZ for trees
trunk.
4~
diame-ter or smaller shall be an area with a radius at least 5' from the
4. The CRZ for trees over 4" diameter shall be an area with a radius of at least 18"' from the
trunk for every 1"' of diameter size.
Temp.
fencing
5. No soil grade changes or compaction shall take place within the CRZ, except as dlrect:ed.
6' max.
--+--Between stakes
6, If work is done within the CRZ, care must be taken to minimize root disturbance. Special
care shaD bo taken durlng excavation.
7. Mdltlonal protective fenclng may be required when the work area is within the CRZ of trees.
protection
(CRZ)
TREE PROTEC110N fENONG DETAil
1101' 10 seA!£
DS/DS/98
~
f-.,
~~G.$'
L:\Holly\Desktop\MLA\OBEC\PROJECTS\6m1ow Trail Rd\Documents\Drawings\CurrenfiGN.dwg
25-Jun-2014 -12:17PM
EAST BARLOW TRAIL ROAD
O<dSy-tlt>U1K~o
TREE REMOVAL AND PROTECTION PLAN
EXiSTING 'fREE, TYP-
I
S1ZE
SCALE:
40'
PLANTING NOTES:
S!TE RESTORATION PLANTING lEGEND
COMMON NAME
I
Q\JAN11TY
of disturbance in field prior to commencement of construction.
imits exceed plan areas, notify owner's representative prior to
LOCATION
construction, to rectify approved
10.
construction.
approval before commencement
11. See Sheet GN~3 for planting details.
0
®
@ I
0
12. Provide browse protection for ali container plants, See detail, sheet GN-3.
Acer clrdnatum
Gau!th~rlo
13. Disturbed areas beyond those shown shall be seeded
Specifications and in accordance with the Planting
Held.
shol!on
Holodiscus discolor
14. Mulch and tackffior shall be utilized during aU seeding applications.
4. Planting locations are based on available horizontal and vertical survey data. Field
conditions mav varv. Verify survey limits orior to construction. Locate and adjust ali
Po!ysUchum munltum
manually or by other approved method, as necessal)', to
albus
Ripodon Mix
CLACKAMAS COUNTY
N/A
GN-3.
Up!and Mix
Water Quollty Mix
N/A
N/A
H:\Desklop\MU\IOBECIPROJECTS\Barlow Trail Rd\Occuments\Drawings\Curreni\GN.dwg
Daelgf'li!ldSy
~yKoncl.tkio
0!~9y-
8. Shrubs shall be placed in a random, natural pattem.
In accordance with the ODOT 2008 Oregon Standard
Construction and the project speciDc Special Provisions,
09-Apr-2014 -11:45AM
Mlt6Gll/JaMI
Drott.:!By-~yKfPlA~
SLOPED AREA TREE/SHRUB PLANliNG
ro SCALE
TREE PLANTING
NOT ro SCALE
NOT
-~
SHRUB f>LANl!NG
ro SCALE
(All lmms exceyt bar.,.oot)
NOT
RIPR AP S1REAMBANK, TYP-
-- -- -- -- --
-- -- -- -- -- -
OHW.
BROWSE PROTECliON
NOT TO SCALE
DORMANT SUD
,....
u
/:!
A~ci:'
05108JSTAKE CUTTING DETAIL
WILLOW BUNDLE INSTALLATION
NOT TO SCALE
NOT TO SCALE
H:\Desktop\MLAIOBEC\PROJECTS\Bariow Trail Rd\Documents\Drnwlngs\Current\GN.dwg
09-Apr-2014 -1 1:50AM
CLACKAMAS COUNTY
~«!Sy
HdlyKandzltrli~By-MikeG&!b'\RESTORATION
Exhibit E
Erosion and Sediment Control Plan, Stormwater Management Plan, and
Turbidity Monitoring Plan
East Barlow Trail Road Restoration Improvements Project
Clackamas County, Oregon
5
December 2013
2.
J.
4,
Or Comprx!lon
CRZ, Except As
5. If Work Is f.X>mi Within Tlio CRZ. Core IIU$1
Be Taten To Mltu'mlze Root Dl.sturtxmc.a. $pec!6' lietal 'T" Fence
6. Adtilt!onTYPICAL TREE PROTECTION
FENCING DETAIL
TEMPORARY FENC NG
GENERAL /IOTES.
Of
sr ANOARO
Entrona'JlS
Clean
At The Toe
Tlio
Tlio
Of FiJJ Slopes In Areas Where Sedlment-Loden Watu Has A Potentia! Of Entering
RIW.
pw: \ \PWCS01E. oblc.com:PW08EC0l\Document s\OBEC\Pro ject s\0070\0070-0039.00\CAO\Roodway\Pl ons\07003'3f ~GA.dqn
Ill
Ill
0
Ill
0
0
0
Ill
II
0
0
Ill
0
DRAWIIIIiS
RDJOOO
R0/005
ROI0/0
ROI0/5
RDI020
ConstrtJCtlon Entrance
Clleck Dam
Inlet Pro!ectiM Type /.2J
Inlet Profect!Cil Type 4
In/of Protection
5
RO 1025
500/tne~Jt
RDIOJO
RO/OJ5
RD 1040
F/D/045
RD/050
FID/055
Sedlment BrJrrter
2.4
Sedl"""'t Bcm'er
J
Sediment Fenre 5uDoorled.IUn·SIJ£'/X!f'le4
TMI{J()rary Slope
Temporary Scour Bosin
llalling
R0/000
Tire Wash TJifXJ 1
Defcul t
4/!7/2014
Border
Cl-·-=·
1
PM
UOSIOII CIIIITROL DUAIU
/
456' rAppro11.J
opf)rotxlate for protecting
I
390'
@ Con.st. Inlet protection, type 4
- 2 ea.
Canst. sediment txJrrier. type J
88'
rs..e drg. no. RD/0351
0
cO
cO
VJ
0+
o5
protect
o5
o5
sq.yd,
G) Canst. temp. oronr;e protec.ttve fencing
- 260'
(Approx.J
fFor details. see Sht. GAi
LEGEND
IT>
0
+
U1
0
0
+
0
0
/
,..,
Flfl:stape
__
CIJtsltJ~
'
sediment fence. supportied
I""""'JZ'" Sediment barrier. Type
-
Ill -
1111
J
Orange protective f enre
UaWng
wart area isclatlon
Constructi'on entrance
Rer;ulafFJd warlt area
Riprap. Closs 10.000
No work area
r-J
/
/
~
Approx. o.HJN.
"'
'L
EAST BARLOW TRAil ROAD
RESTORATION IIIPROVEIIENTS PROJECT
CLACKAMAS COUNlY
()etp.if,)'>ed By
MoJtthelo' f'h!l!iP$
ttw111:.ked Sy
Droft$d ay
SCALE IN FEET
N(Jf£,
remt:NSI<&T
UUIOII CONTROL PLAII
, .... z~2
PUBLIC NOTICE
Oregon Department of Environmental Quality
Water Quality 401 Certification
Corps of Engineers No: NWP-2014-300
Notice Issued: August 11, 2014
Oregon Department of State Lands No: Unknown Written Comments Due: September 11, 2014
WHO IS THE APPLICANT: Joel Howie, Clackamas County Department of Transportation and
Development 150 Beavercreek Road, Oregon City, Oregon 97045
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed
project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for
Federal permits or licenses to provide the Federal agency a water quality certification from the State of
Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on
the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a
result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W.
4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are readily
accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at 503-229-5552.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at 503-229-6030 or toll free within Oregon at 800-452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 800-735-2900.
PUBLIC PARTICIPATION:
Public hearing: Oregon Administrative Rule 340-48-0032 (2) states that " The Corps provides public
notice of and opportunity to comment on the applications, including the application for certification,
provided that the department (DEQ), in its discretion, may provide additional opportunity for public
comment, including public hearing."
Corps No. NWP-2014-300
Page 1 of 2
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on
page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail: Oregon Dept. of Environmental Quality, Northwest Region
2020 S.W. 4th Ave., Ste. 400
Portland, OR 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax: 503-229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through version
7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties,
DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed, issued
with conditions, or denied. You will be notified of DEQ's final decision if you submit comments
during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at
the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Contact DEQ Office of Communications and Outreach at 503-229-5317 or
toll-free within Oregon at 800-452-4011 to request an alternate format. People with hearing
impairment can get help by calling the Oregon Telecommunications Relay Service at 800-735-2900.
Corps No. NWP-2014-300
Page 2 of 2