Karla Ellis is the Regulatory point-of-contact for this permit application from the Clackamas County Dept. of Transportation for work impacting the Sandy River, near Welches, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: August 11, 2014 Expiration Date: September 10, 2014 US Army Corps of Engineers No: NWP-2014-300 30-Day Notice Oregon Department of State Lands No: Unknown

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Karla G. Ellis karla.g.ellis@usace.army.mil P.O. Box 2946 Portland, OR 97208-2946

Applicant: Joel Howie, Clackamas County Dept. of Transportation and Development 150 Beavercreek Rd., Oregon City, OR 97045

Location: The proposed project is located along East Barlow Trail Road, Milepost 6, near Welches, Clackamas County, Oregon (Sections 33 and 34, Township 2 South, Range 7 East).

Waterway: Sandy River

Project Description: The proposed project involves bank stabilization, including a riprap revetment, Mechanically Stabilized Earth (MSE) wall, large woody debris (LWD) installation and plantings.

The project would involve work along a 360 linear foot section of the Sandy River. Work area isolation will take place over an area measuring 460 linear feet. A revetment measuring approximately 360 feet long by 30 feet wide (20 feet high) and approximately 5 feet thick would be constructed using Class 10,000 riprap. The revetment would extend from the 25-year flood event river stage to scour depth. The riprap revetment would include seven pieces of LWD with attached rootwads. Three pieces of LWD would be placed in close proximity on the upstream end of the project and the remaining four pieces would be spaced along the downstream end of the work area. Willow pole bundles would be incorporated into the revetment at or below the Ordinary High Water (OHW) mark. A total of 1,443 cubic yards (CY) of riprap would be placed, of which 713 cubic yards would be placed below OHW and 730 CY above OHW, outside of Corps jurisdiction.

The application states the slope of the revetment would be constructed at a 1:1.5 ratio. To avoid channel encroachment, installation of the revetment will necessitate an MSE wall at the top of the revetment. The design would not incorporate top dressing with soil above the OHW elevation, due to concern over the viability of plantings and the loss of soil during high flow events. Plantings would consist of 220 willow pole bundles incorporated within the riprap during revetment construction and upland site restoration plantings.

To facilitate work area isolation, a total of 261 CY of sand bags would be temporarily placed below the OHW over a distance of 460 linear feet.

A total of 3,834 CY of fill material would be placed over an area measuring 0.405 acre, and a total of 3,834 CY of material would be removed for the entire project. Removal and fill volumes include temporary isolation measures and reworking of native bed materials.

Mitigation: To compensate for impacts to the aquatic environment, the applicant proposes the large woody debris, willow bundles, and native upland plantings.

If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The purpose of the project is to stabilize the bank adjacent to East Barlow Trail Road.

Drawings: Twenty (20) drawings are attached and labeled Corps No. NWP-2014-300.

Additional information may be obtained from Karla G. Ellis, Project Manager, U.S. Army Corps of Engineers, at 503-808-4377 or email karla.g.ellis@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) has been completed by the Federal Highways Administration.

Essential fish habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat.

The project area is within the known range of protected species. We will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning EFH will be considered in our final assessment of the described work.

Cultural resources: An initial evaluation of the proposed project area indicates that the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

CLACKAMAS COUNTY ~«"'~"

"""

-- - - -- "-"<:'"""'"'~'"''

DJEP AR TMJENT

TRANSPORTATION AND DJEVJELOPMJENT PLANS FOR PROPOSED PROJECT

SCOPE OF WORK

EAST BARLOW TRAIL ROAD RESTORATION IMPROVEMENTS PROJECT ClACKAMAS COUNTY

_ _ _ 2015

Overafi Length Of Project- 0.09 Miles

I

I .CO!fSUWNG

~;::!:;!:;

""" ""·

1.0

/

I Basin1a 2978 SQFT

crl

a3

a3

a)

~I

II~

~hfc

;3:-i

18/;i

'Trealment of 8,473 SQFT 3,865 SQFT: Drainage Curb Guardrail STA 13+70 to STA 17+00 2,465 SQFT: Inlet STA 13+00 LT

~ C/JIISI/I.TINB ~ E!IBIN£ff1S

~

-·-·-

EAST BARLOW TRAIL ROAD RESTORATION IIIPIIOVUIEIITS PROJECT CLACKAMAS COUNTY 0.41QI'I'&4 Ely · MOfthew f'!'!f!il;:>& Cr>e~OO:ay

FOCHJRE

2

8'wldth

J'wldfh Vegetated filter s!rip

AggreijiiliiilidiJiifer

QI.KIIity~lng.

use perm. .seed mix He. 1 wtth wheal hybrid a.s n~ry

SECT ON A2-A2

&

~

High flows lJytxJ.5s

to down.stream

"""""yar>C8

.

...

to ooflet

LA2

~

EAST BARLOW TRAIL ROAD RESTORATION IIIIPROYEIIENTS PROJECT

1----------- LIW}fh ILl' 250'---------.....J

CLACKAMAS COt.JNTY

PLAN 0"-i~ Cl'te~<'id

Sy

AA~y ~s

·B

Oroft&\1 a1 · W:y '5dw"l&f'illi,!'"

BlOSLOPE DETAIL

FIG\,0£

IIIIAIIUU DETAILS c:\obec\pwobec01\dms91344\070039f _FiQure 3.dt1

4/29/2014

AM

3

SWALE: {

Not

to

&rule

1Fig.2J

r

OREGON DEPARTMENT OF TRANSPORTATION

---·-M<

EAST BARLOW TRAIL ROAD

RESTORATION IIIPROVEMEIITS PROJECT CLACKAMAS COUNTY

DIIAIIUU DETAILS c: \obec\pwobec01\dms973"'1

4/29/2014

"""" 4

I

I

IOIJOOI rtNetment

Uffllt!as reJOCt:Jf&::J prior to construct/on

al

o5

VJ

0+

- Z /83 cv. yd.

o5

o5

protect

o5

o5

ro

--1

0

+

+

0

0 0

0

LEGEND

Ls ......

IJHW

.... fllllll' . . fllllll" . . . . . ,

.... ,

WON·

....

' ....

' ·' · '· '

' ....

'

.

'~·\

EAST BARLOW TRAIL ROAD RESTORATION IIIPIIOYEIIEIITS PROJECT ClACKAMAS COUNTY 0&$1\;1W'dfi)' (MciKeO ay

0<-.:d'"ted By

An!r7~&

e.tn

We~lto

C.N"i $Chr

SCALE IN FEET

PROJECT IIPACT SUIIARY THE FllENAME LOCATION

tl#t>ill'tPJi'l>'ti!>tl-!llli'i\'lt#UW.U#ItJI;IU"IIt!;.#

DD·MMM·YYYY

HH:MM

... ""''

NOTE: the exact stationing of willow bundles and wood will depend on site conditions construction. Please refer to Sheet 3.0 in C for the large drawing, and refer to Sheet 0 for the willow bundle typical. of permanent removal and !ill the OH\1\/M of !he Sandy Includes existing channel bed nd bank excavation and installation f riprap blanket to scour hannel from OH\1\/M to will be re-contoured to existing using the temporarily excavated channel materials.

~

~ 1424

1422 1420 14!8

~

_l .,..,.=-=~~~~:Jt..;;::-.

142'4

1422

14l0 1418

!4Hi ...

1416

1414

141-!t

1412

1412

14H)

t4l0

1408

1408

1406

1406

1404

1404

1402

1402

1400

1-100

1398

1398

1396

1396

1394

1394

1392

1392

1390

1390

1388

1388

l)S·L~~~~~~~~~~~

1386

!364

1394

1382

.11382

1380 ·25

·20

·IS

·10

·5

10

IS

20

25

30

35

40

45:

so

~s

60

65

70

75

80

es

90

95

100

105

110

IS

120

1380

125

13+90.00

Cross Section l

03/0712014

NOTE: the exact s!alionino of willow bundles and wood will depend on site conditions construction. Please refer to Sheet 3.0 in Exhibit C for the large and refer to Sheet willow bundle typical.

...:

~ ...., ct:

142"2"

1420 ../

t4!8 1416.

-

..___ -../

1

~

"'

"-l

"-l

I

~~ ~ 7S 4.J

~

t-424

~

·~

"-l

Area of permanent removal and till below the OHINM of the Sandy River. Includes existing channel bed and bank excavation and installation of riorao blanket to scour depth. from OHINM to existing toe will be re-contoured to existing form using the temporarily excavated channel materials.

i~

14124

!422

14l0

'

1 .. ~------

1416

,

l4t6

t:l

1414

1414

1412

1412

1410

!410

1400

1408

1400

141)&

1404

1404

1402

1402

1400

1400

ll·a

1398

r~-~~--~--~--~~---·+···········~--

1396

1396

1394

1394

t3'91

1392

1390

1390

1386

1388

1386

1386

l384

1384

1382

·50

·45

·40

·3S

·30

·25

·20

·05

·10

·S

10

15

20

25

14+50.00

30

35

40

··

50

55

60

65

TO

15

eo

es

90

95

1382 JOO

Cr"OSS Section 2

03/07/2014

NOTE: the exact of willow bundles and large wood will depend on site conditions during construction. Please refer to Sheet 3.0 in Exhibit C for the large drawing, and refer to Sheet ·oody D for the willow bundle GN-3 in

!Area removal and fill below OHWM of the Sandy River. Includes existing channel bed and bank excavation and installation of riprap blanket to scour depth. Channel from OHWM to existing toe will be re-contoured to existing using the excavated channel m~''"'"'"'"

~

tJ 1424 1422

~

-----

1420 1418

1416

1424

142'2'

L

1420 1416 1416

lo!ll4

1414

1412

1412

t4t0

l410

1408

1408

1406 140>1

,.,.

1402

1402

1400

1400

1406

1395

!398

1396

1.396

tl94

1394

1392

1392

1390

i390

1368

138{1

13196

1386 1384

·SO

·45

··o

·3>

·30

·25

·20

·15

·10

·S

0

10

"

20

25 14+90.00

30

35

<0

45

so

55

..,

65

70

75

80

··

1384 90

95

100

Cross Sect ion 3

03107/2014

NOTE: the exact stationing of willow bundles and large wood will depend on ditions construction. Please C for the large Sheet 3.0 in drawing, and refer to Sheet D for !he willow bundle

Area of permanent removal and fill below the OHWM of the Sandy River. Includes existing channel bed and bank excavation and installation of riprap blanket to scour depth. Channel from OHWM to will be re-contoured to existing using the temporarily excavated channel materials.

~

1424

~

J422

1420

-....--~

!418

1424 1422

j_

..........

142'0 t4Ul

l4t£

1416

1414

1414

1412'

1412

t-410

1410

1408

1408

1406

14()6

1404

1404

1402

l402

1400

HOO

-

1398 1)96

1396 1396

13941

1394

t3'92

1392

1}90

13910

1388

nee

!366

1386

1384

·SO

··s

·40

·35

-30

·25

·20

·IS

·10

-s

10

IS

20

25

I S·20.00

30

35

40

45

so

ss

·o

··

L)B-4

TO

75

80

as

90

95

100

Cross Sect 1on 4

03/07/2014

on Please refer to Sheet 3.0 in C for the large :woody drawing, and refer to Sheet GN-3 in D for the willow bundle typical. removal and fill

.,.,ti

~

"

1424

~ ~

!4~4

1422

!42'2

l.!\120

1420

1418

1418

!416

t4i6

14!4

1414

1412

14!2

!410

1410

1408

1406

141)S

1406

1404

140<

!402

1402

----

1400 ~-

1398

1400 1398

1:596

1396

1394

1394

1392

1.392

1390

1390

l388

1388 1386

llSE.

-so

-45

-40

-35

-30

-25

·20

·15

·10

·5

10

15

20

25

30

35

40

45

50

55

60

65

TO

75

80

85

90

95

100

15+70.00

Cross Section 5

03/0712014

~

-~

.'?'

CJ

CJ

"

"

CJ

"'

I

1424

<:::

1414

1422

--

-

1420 1418

1416

1424

a::

··n

NOTE: drawings scaled for 11 x17 Scale will change for 8.5x11 printing.

1420 1418

141t 1414

14!2'

141.2

1<1!10

1408 1406 1404 1402

1400 13'91)

1196

14'10

NOTE: the exact ""'"''""' ·t~_ of willow bundles and large wood depend on site conditions during construction. Please refer to Sheet 3.0 in Exhibit C for the large woody typical drawing, and refer to Sheet GN-3 in Exhibit D for the willow bundle typical.

1408 1406

-

141M 1402 1400 '1398

1396

1394

1394

1392

1392

1390 1368

·!0

ll':i!O

-·s

·40

·)~

·30

·2~

·20

·IS

·10

-~

0

~

10

IS

25

20

lO

35

·a

45

~0

ss

~

CJ 14.24 1422

1420 1418 1416

Area of permanent removal and fill below the OH\I\II'vt of the Sandy River. Includes existing channel bed and bank excavation and installation blanket to scour of from OH\I\II'vt to toe will be re-contoured to existing form using the temporarily excavated channel materials.

1386

90

95

100

1424

l422

!420 14!8 1416

1414

1414

1412

1412

14H)

1410

1400

1408

1406

1406

1404

1404

141)2

1402

1400

Riprap blanket

1398

1398

1396

1396 1394

1394

1392

1392

1390

1390

1388 ·50

·45

·40

·35

·lO

·>5

·20

.,.

·10

·5

0

s

10

"

20

.

16+70.00

STA. 16+70 TO STA. 16+80

30

35

40

··

50

55

60

··

TO

15

80

··

90

95

1388 100

SCALE 1"=10' Cr'"oss Section 6

0310712014

1rt

~~ ~

I

STA. "8" 17+00 To STA.

·s·

18+00

STA.

fFor surfocl(}(} details not shown, see section

·s·

I

14+75 To STA. "B" 16+50

teiCA~~J

EAST BARLOW TRAIL ROAD STA. HBU 13+00 To STA. usn 13+90 ·HBH 13+90 To "B" 14+25 ···B" 17+00 To HBH 18+00

Rlprap ge:otextile. type 2

STA. "B" 16+75 To STA. "B" 17+00 ' E:xtg. RIW

R!PRAP STA. us" 13+64 To STA.

18'=J2'

IJIJifl-layer pymt. CMst.

..

~~=dr~ 51.1A ~"\! 1

'.

·.I a

'

tFor details. :ree silt. 3.0!

...c

t' "'"~"'" F't · ~. ·-·~nv. e "' . .

I

.

a

"

.0

o

.. o

.o

A

.a!!'!

EAST BARLOW TRAIL ROAD RESTORATION IIIPROVEMENTS PROJECT CLACKAMAS COt.mT'f De$i~fly

McHtlOw i>n.llllpe.

tnecl<.eday

SH££T NO.

STA.

TYPICAL UCTIOU

2.0

/

/

a5 {

a5

.to i-

0

c6

U1 i-

0

"8" LINE

d

0 0

~

-.; i-

0

0

-JVSI:.mdyRJvef

RIPRAP CLASS 10,000 REVETMENT

r-------vor.zo·to

8s

SCour elevation geotextile.

EAST BARLOW TRAIL ROAD RESTORATION IIIPROVEIIENTS PROJECT CLACKAMAS COUNTY IJ45!~By

.WCH.......,I?h!IH_,3-

0teeke0 6y

SETION A-A WOODY DEBRIS DETAIL

IIEUIL8

~

.·. """ 3.0

Exhibit D Tree Removal and Site Restoration Plan Sheets East Barlow Trail Road Restoration Improvements Project Clackamas County, Oregon

4

December 2013

TREE PROTECTION NOTES: Install troo protection fence at existing trees, or construction, per Tree Protection Detail. Fencing shall be protected within the critical root zone EXISTING DECIDUOUS TREE TO BE REMOVED

3. The CRZ for trees trunk.

4~

diame-ter or smaller shall be an area with a radius at least 5' from the

4. The CRZ for trees over 4" diameter shall be an area with a radius of at least 18"' from the

trunk for every 1"' of diameter size. Temp.

fencing

5. No soil grade changes or compaction shall take place within the CRZ, except as dlrect:ed. 6' max.

--+--Between stakes

6, If work is done within the CRZ, care must be taken to minimize root disturbance. Special care shaD bo taken durlng excavation. 7. Mdltlonal protective fenclng may be required when the work area is within the CRZ of trees.

protection (CRZ)

TREE PROTEC110N fENONG DETAil 1101' 10 seA!£

DS/DS/98

~

f-.,

~~G.$'

L:\Holly\Desktop\MLA\OBEC\PROJECTS\6m1ow Trail Rd\Documents\Drawings\CurrenfiGN.dwg

25-Jun-2014 -12:17PM

EAST BARLOW TRAIL ROAD O<dSy-tlt>U1K~o

TREE REMOVAL AND PROTECTION PLAN

EXiSTING 'fREE, TYP-

I S1ZE

SCALE:

40'

PLANTING NOTES:

S!TE RESTORATION PLANTING lEGEND

COMMON NAME

I

Q\JAN11TY

of disturbance in field prior to commencement of construction. imits exceed plan areas, notify owner's representative prior to

LOCATION

construction, to rectify approved

10. construction. approval before commencement 11. See Sheet GN~3 for planting details.

0 ®

@ I 0

12. Provide browse protection for ali container plants, See detail, sheet GN-3.

Acer clrdnatum Gau!th~rlo

13. Disturbed areas beyond those shown shall be seeded Specifications and in accordance with the Planting Held.

shol!on

Holodiscus discolor

14. Mulch and tackffior shall be utilized during aU seeding applications. 4. Planting locations are based on available horizontal and vertical survey data. Field conditions mav varv. Verify survey limits orior to construction. Locate and adjust ali

Po!ysUchum munltum

manually or by other approved method, as necessal)', to

albus

Ripodon Mix

CLACKAMAS COUNTY

N/A

GN-3. Up!and Mix Water Quollty Mix

N/A N/A

H:\Desklop\MU\IOBECIPROJECTS\Barlow Trail Rd\Occuments\Drawings\Curreni\GN.dwg

Daelgf'li!ldSy

~yKoncl.tkio

0!~9y-

8. Shrubs shall be placed in a random, natural pattem.

In accordance with the ODOT 2008 Oregon Standard Construction and the project speciDc Special Provisions, 09-Apr-2014 -11:45AM

Mlt6Gll/JaMI

Drott.:!By-~yK

f

PlA~

SLOPED AREA TREE/SHRUB PLANliNG ro SCALE

TREE PLANTING NOT ro SCALE

NOT

-~

SHRUB f>LANl!NG ro SCALE

(All lmms exceyt bar.,.oot)

NOT

RIPR AP S1REAMBANK, TYP-

-- -- -- -- --

-- -- -- -- -- -

OHW.

BROWSE PROTECliON NOT TO SCALE DORMANT SUD

,.... u

/:! A~ci:'

05108J

STAKE CUTTING DETAIL

WILLOW BUNDLE INSTALLATION

NOT TO SCALE

NOT TO SCALE

H:\Desktop\MLAIOBEC\PROJECTS\Bariow Trail Rd\Documents\Drnwlngs\Current\GN.dwg

09-Apr-2014 -1 1:50AM

CLACKAMAS COUNTY ~«!Sy

HdlyKandzltrli

~By-MikeG&!b'\

RESTORATION

Exhibit E Erosion and Sediment Control Plan, Stormwater Management Plan, and Turbidity Monitoring Plan East Barlow Trail Road Restoration Improvements Project Clackamas County, Oregon

5

December 2013

2.

J.

4,

Or Comprx!lon CRZ, Except As

5. If Work Is f.X>mi Within Tlio CRZ. Core IIU$1 Be Taten To Mltu'mlze Root Dl.sturtxmc.a. $pec!

6' lietal 'T" Fence

6. Adtilt!on

TYPICAL TREE PROTECTION

FENCING DETAIL

TEMPORARY FENC NG GENERAL /IOTES. Of

sr ANOARO

Entrona'JlS Clean

At The Toe

Tlio Tlio

Of FiJJ Slopes In Areas Where Sedlment-Loden Watu Has A Potentia! Of Entering

RIW. pw: \ \PWCS01E. oblc.com:PW08EC0l\Document s\OBEC\Pro ject s\0070\0070-0039.00\CAO\Roodway\Pl ons\07003'3f ~GA.dqn

Ill Ill 0 Ill 0 0 0 Ill II 0 0 Ill 0

DRAWIIIIiS

RDJOOO R0/005 ROI0/0 ROI0/5 RDI020

ConstrtJCtlon Entrance Clleck Dam Inlet Pro!ectiM Type /.2J Inlet Profect!Cil Type 4 In/of Protection 5

RO 1025

500/tne~Jt

RDIOJO RO/OJ5 RD 1040 F/D/045 RD/050 FID/055

Sedlment BrJrrter 2.4 Sedl"""'t Bcm'er J Sediment Fenre 5uDoorled.IUn·SIJ£'/X!f'le4 TMI{J()rary Slope Temporary Scour Bosin llalling

R0/000

Tire Wash TJifXJ 1

Defcul t

4/!7/2014

Border

Cl-·-=·

1

PM

UOSIOII CIIIITROL DUAIU

/

456' rAppro11.J opf)rotxlate for protecting

I

390'

@ Con.st. Inlet protection, type 4

- 2 ea.

Canst. sediment txJrrier. type J

88'

rs..e drg. no. RD/0351

0 cO cO

VJ

0+

o5

protect

o5

o5

sq.yd,

G) Canst. temp. oronr;e protec.ttve fencing

- 260'

(Approx.J

fFor details. see Sht. GAi

LEGEND IT>

0

+

U1

0 0

+

0 0

/

,..,

Flfl:stape

__

CIJtsltJ~

' sediment fence. supportied

I""""'JZ'" Sediment barrier. Type -

Ill -

1111

J

Orange protective f enre UaWng

wart area isclatlon Constructi'on entrance Rer;ulafFJd warlt area

Riprap. Closs 10.000

No work area

r-J

/ /

~

Approx. o.HJN.

"'

'L

EAST BARLOW TRAil ROAD RESTORATION IIIPROVEIIENTS PROJECT CLACKAMAS COUNlY ()etp.if,)'>ed By

MoJtthelo' f'h!l!iP$

ttw111:.ked Sy Droft$d ay

SCALE IN FEET

N(Jf£,

remt:N

SI<&T

UUIOII CONTROL PLAII

, .... z~2

PUBLIC NOTICE Oregon Department of Environmental Quality Water Quality 401 Certification Corps of Engineers No: NWP-2014-300 Notice Issued: August 11, 2014 Oregon Department of State Lands No: Unknown Written Comments Due: September 11, 2014

WHO IS THE APPLICANT: Joel Howie, Clackamas County Department of Transportation and Development 150 Beavercreek Road, Oregon City, Oregon 97045 LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at 503-229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at 503-229-6030 or toll free within Oregon at 800-452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 800-735-2900.

PUBLIC PARTICIPATION: Public hearing: Oregon Administrative Rule 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing."

Corps No. NWP-2014-300

Page 1 of 2

Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail: Oregon Dept. of Environmental Quality, Northwest Region 2020 S.W. 4th Ave., Ste. 400 Portland, OR 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax: 503-229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Contact DEQ Office of Communications and Outreach at 503-229-5317 or toll-free within Oregon at 800-452-4011 to request an alternate format. People with hearing impairment can get help by calling the Oregon Telecommunications Relay Service at 800-735-2900.

Corps No. NWP-2014-300

Page 2 of 2

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas