You can copy from here when filling out the rest of the page.
The purpose of this addendum is to inform interested parties that the applicant has amended project plans to include water intake and outfalls.
Public Notice, MVN-2014-1211, dated July 14, 2014, described work proposed by CCI Port Nickel, LLC. The project proposes to dredge for the expansion of an existing dock and clear, grade, excavate, and deposit fill for the construction of a methanol manufacturing facility and piperack and the demolition and removal of existing dock structures. The footprint of the proposed manufacturing facility has been oriented within a non-wetland area. Dredging, demolition, and removal of existing dock structures shall be conducted by barge mounted equipment. Work conducted within the batture shall be temporary and construction equipment will be operated on mats. No excavation or fill is required within the batture, located on the left descending bank of the Mississippi River, at about 76.5 miles above Head of Passes, at 3607 English Turn Road, in Braithwaite, Louisiana, in Plaquemines Parish.