PROPOSED BAYOU FISHER MITIGATION BANK, AMENDMENT ONE IN POINTE COUPEE PARISH
NAME OF APPLICANT: Delta Land Services, LLC, 1090 Cinclare Drive, Port Allen, Louisiana 70767.
LOCATION OF WORK: The project area is located in Sections 36, 39 and 40 of Township 2 South, Range 7 East between the Atchafalaya and Mississippi Rivers approximately four miles northwest of Innis in Pointe Coupee Parish, Louisiana. The approximate center point of the project area is located at Latitude 30.9076° North and Longitude 91.7481° West.
CHARACTER OF WORK: The Sponsor proposes to establish an addendum to the existing Bayou Fisher Wetland Mitigation Bank to include the re-establishment of 243.7 acres of bottomland hardwoods and 120.1 acres of baldcypress swamp. The Sponsor will reforest the site with an assemblage of species indicative of bottomland hardwood and baldcypress swamp wetland forests in this area. Additional details of the proposed restoration plan are attached for review in the Amendment One of the Mitigation Banking Instrument.
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
P. O. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
August 18, 2014
REPLY TO
ATTENTION OF:
Operations Division
Regulatory Branch
Project Manager
Stephen D. Pfeffer
(504) 862-2099
SUBJECT: MVN-2013-02342-MS
PUBLIC NOTICE
Interested parties are hereby notified that an application has been received by the
District engineer for a Department of the Army permit to authorize the following
pursuant to ( ) Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat.
1151; 33 USC 403); and/or (X) Section 404 of the Clean Water Act (86 Stat. 816; 33
USC 1344).
PROPOSED BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
IN POINTE COUPEE PARISH
NAME OF APPLICANT: Delta Land Services, LLC, 1090 Cinclare Drive, Port Allen,
Louisiana 70767.
LOCATION OF WORK: The project area is located in Sections 36, 39 and 40 of Township 2
South, Range 7 East between the Atchafalaya and Mississippi Rivers approximately four miles
northwest of Innis in Pointe Coupee Parish, Louisiana. The approximate center point of the
project area is located at Latitude 30.9076° North and Longitude 91.7481° West.
CHARACTER OF WORK: The Sponsor proposes to establish an addendum to the existing
Bayou Fisher Wetland Mitigation Bank to include the re-establishment of 243.7 acres of
bottomland hardwoods and 120.1 acres of baldcypress swamp. The Sponsor will reforest the
site with an assemblage of species indicative of bottomland hardwood and baldcypress
swamp wetland forests in this area. Additional details of the proposed restoration plan are
attached for review in the Amendment One of the Mitigation Banking Instrument.
The comment period will close 30 days from the date of this public notice
advertisement. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons therefore, are being solicited from anyone having
interest in this permit request.
-2Letters must reference the applicant's name and the subject number, be addressed and
mailed to the above address, ATTENTION: REGULATORY BRANCH.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the proposed activity on the public interest.
That decision will reflect the national concern for both protection and utilization of
important resources. The benefit that reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food
and fiber production, mineral needs, consideration of property ownership and, in
general, the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be
considered by the Corps of Engineers to determine whether to issue, modify, condition
or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used
to determine the need for a public hearing and to determine the overall public interest of
the proposed activity.
No properties listed in the National Register of Historic Places are near the proposed
work. The possibility exists that the proposed work may damage or destroy presently
unknown archeological, scientific, pre-historical or historical sites or data. Copies of this
notice are being sent to the State Archeologist and the State Historic Preservation
Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Department of Interior nor affect any habitat designated as
critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnus-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the alteration of 0 acres of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would
not have a substantial adverse impact on EFH or federally managed fisheries in the
Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
-3-
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency and
certification that the proposed activity will not violate applicable water quality standards
will be required from the Louisiana Department of Environmental Quality, Office of
Water Resources, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Martin S. Mayer
Chief, Regulatory Branch
BANKING INSTRUMENT AMENDMENT ONE
BAYOU FISHER MITIGATION BANK
Bottomland Hardwood Re-establishment Project
Pointe Coupee Parish, Louisiana
Sponsored By:
Delta Land Services, LLC
1090 Cinclare Drive
Port Allen, Louisiana 70767
Prepared:
July 10, 2014
TABLE OF CONTENTS
I.
PURPOSE OF MBI .............................................................................................. 1
II.
LOCATION AND OWNERSHIP OF BANK PROPERTY (PROPERTY)....... 1
A.
B.
C.
D.
PROPERTY LOCATION .................................................................................................................. 1
PROPERTY OWNERSHIP ................................................................................................................ 1
PROPERTY LEGAL DEFINITION ..................................................................................................... 1
RECORDED LIENS, ENCUMBRANCES, EASEMENTS, SERVITUDES OR RESTRICTIONS ......................... 8
III. RESPONSIBILITIES OF PARTIES ................................................................... 8
IV. GOALS AND OBJECTIVES ............................................................................... 8
V.
PERFORMANCE STANDARDS ........................................................................ 8
VI. MONITORING PLAN AND REPORTING PROTOCOLS .............................. 8
VII. CONTINGENCIES AND REMEDIAL ACTIONS ............................................ 9
VIII. INSPECTION BY IRT AND HOLDER .............................................................. 9
IX. FINANCIAL PROTECTION .............................................................................. 9
X.
LONG-TERM PROTECTION AND MAINTENANCE .................................... 9
XI. BANK USE ........................................................................................................... 9
A.
B.
C.
D.
E.
F.
G.
BANK SERVICE AREA .................................................................................................................. 9
PROJECTS ELIGIBLE TO USE THE BANK ....................................................................................... 10
DETERMINATION OF BANK CREDITS ........................................................................................... 10
SCHEDULE OF CREDIT AVAILABILITY ......................................................................................... 10
CREDIT TRANSACTIONS ............................................................................................................. 10
REQUIREMENTS FOR INITIAL CREDIT RELEASE ........................................................................... 10
SUBSEQUENT CREDIT RELEASES ................................................................................................ 11
XII. MODIFICATION OF THIS MBI...................................................................... 11
XIII. TRANSFER OF PROPERTY OR SPONSORSHIP ......................................... 11
XIV. ESTABLISHMENT OF STEWARD ................................................................. 11
XV. BANK LIFE ........................................................................................................ 11
XVI. OTHER PROVISIONS ...................................................................................... 11
Attachment A Maps
Attachment B Final Title Report/Opinion
Attachment C Mitigation Work Plan
Attachment D Acceptance Letter
i
MITIGATION BANKING INSTRUMENT
AMENDMENT ONE
Bayou Fisher Mitigation Bank
The following represents the first amendment (Amendment One) to the Bayou Fisher
Mitigation Bank (Bank) of which the Mitigation Banking Instrument (MBI) was approved by the
U.S. Army Corps of Engineers, New Orleans District (CEMVN) on July 5, 2014. This
amendment follows all provisions provided for in the MBI with the exception of those
specifically provided for in this Mitigation Work Plan (MWP). This amendment follows
procedures as described in Section XII.A of the July 5, 2014 MBI. This amendment is made
and entered into by and among Delta Land Services, LLC (Sponsor), Mr. Danny Deshotels and
Mrs. Janie Bacque Deshotels (Owners) and the Interagency Review Team (IRT) composed of
the U.S. Army Corps of Engineers New Orleans District (CEMVN), Region VI of the U.S.
Environmental Protection Agency (EPA), the U.S. Fish and Wildlife Service (FWS), and the
Louisiana Department of Wildlife and Fisheries (LDWF). This MBI, Amendment One, is a
binding agreement among the parties and incorporates the detailed MWP and any other
attachments to the MBI, Amendment One, as a part hereof.
I.
Purpose of MBI
The Purpose of the MBI remains as defined in Section I of the July 5, 2014 MBI.
II.
Location and Ownership of Bank Property (Property)
A. Property Location
The Property Location is described in Section I of the Mitigation Work Plan (MWP)
B. Property Ownership
The property owner (Owner) remains as defined in Section II.B of the July 5, 2014 MBI.
C. Property Legal Definition
A certain tract or parcel of land designated as Bayou Fisher Mitigation Bank Amendment One
Conservation Servitude Area located in Sections Thirty Six (36), Thirty Nine (39) & Forty (40),
Township Two South (T-2-S), Range Seven East (R-7-E), Southeastern Land District, West of
the Mississippi River, Parish of Pointe Coupee, State of Louisiana, containing 16,050,379 Sq. Ft.
(368.466 Acres). Said tract or parcel is more particularly described as follows:
Commencing at a Point of Commencement (P.O.C.) being a found one-half inch diameter iron
pipe being at the common corner of Sections Thirty Five (35), Thirty Six (36), Forty (40) and
Forty One (41), Township Two South (T-2-S), Range Seven East (R-7-E); thence South
0°21'57" East along Section Line common to Sections Forty (40), Forty One (41), Forty Four
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
(44) and Forty Five (45), Township Two South (T-2-S), Range Seven East (R-7-E) a distance of
8004.00 feet to a found three inch diameter iron pipe; thence South 89°54'09" West a distance of
660.73 feet to a calculated point; thence North 00°06'53" East a distance of 4063.25 feet to a
calculated point; thence North 88°28'35" West a distance of 5.45 feet to a calculated point;
thence North 89°47'49" West a distance of 26.43 feet to a calculated point; thence North
89°47'48" West a distance of 220.13 feet to a calculated point being the Point of Beginning
(P.O.B.).
thence North 89°47'48" West a distance of 187.97 feet to a calculated point; thence North
89°54'42" West a distance of 67.26 feet to a calculated point; thence North 89°58'57" West a
distance of 578.45 feet to a calculated point; thence South 88°40'39" West a distance of 24.37
feet to a calculated point; thence North 76°33'30" West a distance of 17.68 feet to a calculated
point; thence North 83°49'03" West a distance of 25.57 feet to a calculated point; thence North
67°49'33" West a distance of 81.01 feet to a calculated point; thence North 80°03'36" West a
distance of 59.75 feet to a calculated point; thence North 75°49'30" West a distance of 343.15
feet to a calculated point; thence North 75°56'01" West a distance of 514.48 feet to a calculated
point; thence North 76°10'27' West a distance of 720.79 feet to a calculated point; thence North
89°47'33" West a distance of 34.88 feet to a calculated point; thence South 0°12'27" West a
distance of 634.17 feet to a calculated point; thence South 0°14'20" East a distance of 437.65
feet to a calculated point; thence South 0°36'54" East a distance of 60.68 feet to a calculated
point; thence South 89°31'34" West a distance of 33.26 feet to a calculated point; thence North
44°56'03" West a distance of 16.83 feet to a calculated point; thence North 68°50'59" West a
distance of 23.73 feet to a calculated point; thence North 79°18'13" West a distance of 326.76
feet to a calculated point; thence North 79°18'13" West a distance of 427.02 feet to a calculated
point; thence South 0°14'45" East a distance of 536.98 feet to a calculated point; thence North
89°59'47" West a distance of 1010.12 feet to a calculated point; thence North 90°00'00" West a
distance of 37.55' to a calculated point; thence North 1°21'55" East a distance of 759.84 feet to a
calculated point; thence North 0°52'04" East a distance of 1498.41 feet to a calculated point;
thence North 0°23'47" West a distance of 2287.81 feet to a calculated point; thence South
89°47'15" East a distance of 76.27 feet to a calculated point; thence North 28°05'09" East a
distance of 41.61 feet to a calculated point; thence North 38°38'18" East a distance of 46.95 feet
to a calculated point; thence North 48°04'39" East a distance of 57.72 feet to a calculated point;
thence North 50°19'10" East a distance of 63.39 feet to a calculated point; thence North
45°21'06" East a distance of 63.13 feet to a calculated point; thence North 34°46'53" East a
distance of 68.06 feet to a calculated point; thence North 28°58'09" East a distance of 183.64
feet to a calculated point; thence North 38°18'31" East a distance of 66.38 feet to a calculated
point; thence North 47°56'22" East a distance of 56.33 feet to a calculated point; thence North
68°53'51" East a distance of 30.10 feet to a calculated point; thence South 82°03'21" East a
distance of 70.04 feet to a calculated point; thence South 71°35'34" East a distance of 101.37
feet to a calculated point; thence South 74°51'01" East a distance of 67.26 feet to a calculated
point; thence South 80°03'07" East a distance of 35.41 feet to a calculated point; thence South
88°34'36" East a distance of 95.36 feet to a calculated point; thence South 86°30'38" East a
distance of 61.17 feet to a calculated point; thence South 74°13'09" East a distance of 15.92 feet
to a calculated point; thence South 70°13'59" East a distance of 26.13 feet to a calculated point;
thence South 64°32'11" East a distance of 26.88 feet to a calculated point; thence South
59°21'16" East a distance of 61.00 feet to a calculated point; thence South 53°18'38" East a
2
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
distance of 88.57 feet to a calculated point; thence South 55°08'43" East a distance of 12.34 feet
to a calculated point; thence South 65°43'12" East a distance of 14.68 feet to a calculated point;
thence South 76°17'36" East a distance of 18.32 feet to a calculated point; thence South
82°44'29" East a distance of 8.99 feet to a calculated point; thence North 89°59'34" East a
distance of 24.72 feet to a calculated point; thence South 89°50'05" East a distance of 12.34 feet
to a calculated point; thence North 76°28'43" East a distance of 7.48 feet to a calculated point;
thence North 71°06'50" East a distance of 20.90 feet to a calculated point; thence North
61°11'24" East a distance of 17.04 feet to a calculated point; thence North 48°42'43" East a
distance of 32.26 feet to a calculated point; thence North 29°30'48" East a distance of 64.66 feet
to a calculated point; thence North 22°01'42" East a distance of 68.29 feet to a calculated point;
thence North 36°39'19" East a distance of 24.79 feet to a calculated point; thence North
51°08'17" East a distance of 107.70 feet to a calculated point; thence North 46°57'08" East a
distance of 26.41 feet to a calculated point; thence North 61°46'31" East a distance of 21.87 feet
to a calculated point; thence North 78°01'35" East a distance of 13.21 feet to a calculated point;
thence South 84°56'34" East a distance of 24.62 feet to a calculated point; thence South
71°33'54" East a distance of 39.80 feet to a calculated point; thence South 73°43'13" East a
distance of 51.09 feet to a calculated point; thence South 84°18'09" East a distance of 57.29 feet
to a calculated point; thence South 63°30'03" East a distance of 10.40 feet to a calculated point;
thence South 29°44'42" East a distance of 27.99 feet to a calculated point; thence South
34°36'03" East a distance of 66.65 feet to a calculated point; thence South 24°05'15" East a
distance of 32.33 feet to a calculated point; thence South 28°19'23" East a distance of 58.58 feet
to a calculated point; thence South 23°03'30" East a distance of 125.85 feet to a calculated point;
thence North 65°48'51" East a distance of 35.39 feet to a calculated point; thence North
55°27'13" East a distance of 153.32 feet to a calculated point; thence North 51°40'00" East a
distance of 80.52 feet to a calculated point; thence South 67°54'20" East a distance of 37.09 feet
to a calculated point; thence South 50°35'17" East a distance of 51.53 feet to a calculated point;
thence South 41°48'42" East a distance of 76.38 feet to a calculated point; thence South
48°22'48" East a distance of 67.72 feet to a calculated point; thence South 53°46'12" East a
distance of 48.61 feet to a calculated point; thence South 55°44'19" East a distance of 48.37 feet
to a calculated point; thence South 63°37'03" East a distance of 99.75 feet to a calculated point;
thence South 61°07'59" East a distance of 82.39 feet to a calculated point; thence South
56°14'03" East a distance of 40.83 feet to a calculated point; thence South 47°08'15" East a
distance of 27.76 feet to a calculated point; thence South 44°56'07" East a distance of 35.20 feet
to a calculated point; thence South 40°50'54" East a distance of 29.93 feet to a calculated point;
thence South 38°51'35" East a distance of 50.39 feet to a calculated point; thence South
37°44'15" East a distance of 55.34 feet to a calculated point; thence South 32°07'03" East a
distance of 48.08 feet to a calculated point; thence South 26°46'13" East a distance of 72.78 feet
to a calculated point; thence South 27°55'15" East a distance of 132.06 feet to a calculated point;
thence South 33°09'21" East a distance of 68.29 feet to a calculated point; thence South
41°24'09" East a distance of 73.54 feet to a calculated point; thence South 54°28'56" East a
distance of 106.09 feet to a calculated point; thence South 61°15'23" East a distance of 156.86
feet to a calculated point; thence South 64°19'24" East a distance of 88.49 feet to a calculated
point; thence South 35°26'59" West a distance of 297.46 feet to a calculated point; thence South
56°11'15" East a distance of 68.90 feet to a calculated point; thence South 59°44'37" East a
distance of 241.19 feet to a calculated point; thence South 57°41'11" East a distance of 350.76
feet to a calculated point; thence South 55°21'56" East a distance of 108.40 feet to a calculated
3
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
point; thence North 18°13'43" East a distance of 480.28 feet to a calculated point; thence South
82°09'46" East a distance of 68.39 feet to a calculated point; thence North 89°03'51" East a
distance of 75.63 feet to a calculated point; thence North 86°11'11" East a distance of 64.43 feet
to a calculated point; thence North 87°07'31" East a distance of 56.03 feet to a calculated point;
thence North 88°20'07" East a distance of 46.15 feet to a calculated point; thence South
84°53'35" East a distance of 44.02 feet to a calculated point; thence South 79°05'49" East a
distance of 60.79 feet to a calculated point; thence South 69°58'14" East a distance of 55.46 feet
to a calculated point; thence South 69°08'38" East a distance of 53.33 feet to a calculated point;
thence South 75°15'40" East a distance of 110.92 feet to a calculated point; thence South
73°10'31" East a distance of 36.22 feet to a calculated point; thence South 76°25'55" East a
distance of 35.14 feet to a calculated point; thence South 00°07'53" East a distance of 2626.90
feet to a calculated point being the Point of Beginning (P.O.B.).
The perimeter of the Property is defined by the following coordinates in decimal degrees
(North American Datum of 1983 [NAD83]):
Latitude
30.91056117
Longitude
-91.74002478
Latitude
30.90333972
Longitude
-91.73997971
Latitude
30.90333972
Longitude
-91.74057511
Latitude
30.90333914
Longitude
-91.74078954
Latitude
30.90333416
Longitude
-91.74263368
Latitude
30.90333238
Longitude
-91.74271137
Latitude
30.90334352
Longitude
-91.74276637
Latitude
30.90335083
Longitude
-91.74284731
Latitude
30.90343414
Longitude
-91.74308683
Latitude
30.90346192
Longitude
-91.74327456
Latitude
30.90368965
Longitude
-91.74433622
Latitude
30.90402847
Longitude
-91.7459287
Latitude
30.90449505
Longitude
-91.74816206
Latitude
30.90449505
Longitude
-91.74827328
Latitude
30.90275165
Longitude
-91.74827328
Latitude
30.9023782
Longitude
-91.74826991
Latitude
30.90154856
Longitude
-91.74826241
Latitude
30.90138178
Longitude
-91.74825963
Latitude
30.90138069
Longitude
-91.74836567
Latitude
30.90141333
Longitude
-91.74840371
Latitude
30.90143665
Longitude
-91.74847436
Latitude
30.90160017
Longitude
-91.74949868
Latitude
30.90181386
Longitude
-91.75083729
Latitude
30.90033771
Longitude
-91.75082371
Latitude
30.90032773
Longitude
-91.75404398
Latitude
30.90032735
Longitude
-91.7541637
Latitude
30.90241562
Longitude
-91.75411488
4
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
30.90653462
30.90812264
30.90830114
30.91282379
30.91282379
30.91292491
30.91302602
30.91313246
30.91324423
30.91336663
30.9135529
30.91376578
30.91396326
30.91410686
30.91416642
30.91419416
30.91421896
30.91424109
30.91424118
30.91423416
30.91422219
30.91421325
30.91418593
30.91416593
30.9141551
30.91412815
30.91409927
30.91408048
30.91406401
30.91406254
30.91405927
30.91405596
30.91405845
30.91405317
30.91404827
30.91403708
30.91401303
30.9139815
30.91394873
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
5
-91.75406006
-91.75407957
-91.75408177
-91.75413733
-91.75389415
-91.75383211
-91.75373907
-91.75360259
-91.75344751
-91.75330484
-91.75315596
-91.7530257
-91.75289999
-91.75276941
-91.75269341
-91.75265508
-91.7526129
-91.7525471
-91.75251941
-91.7524437
-91.75236635
-91.7523147
-91.75222104
-91.7521515
-91.75211386
-91.75201878
-91.75190575
-91.75181157
-91.75170028
-91.75168365
-91.75158113
-91.75146949
-91.7513963
-91.75128939
-91.75119928
-91.75115271
-91.75107419
-91.75099667
-91.75092894
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
30.91389655
30.9138549
30.91377878
30.91373249
30.91371603
30.91370428
30.91370125
30.9137015
30.91370036
30.91370153
30.91370641
30.91372208
30.91372984
30.91374305
30.91375077
30.91380668
30.91396168
30.91413596
30.91416921
30.9142959
30.91437738
30.91442714
30.91445576
30.91446342
30.9144577
30.91442348
30.91438459
30.91436953
30.91435686
30.91429018
30.91413974
30.91405874
30.91391202
30.91374047
30.91359942
30.91362791
30.91368059
30.91387987
30.91401778
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
6
-91.75082897
-91.75076364
-91.75064722
-91.75056952
-91.75052679
-91.75047
-91.75044156
-91.75036274
-91.7503424
-91.7503234
-91.75030025
-91.75024773
-91.75022758
-91.75019996
-91.75018603
-91.75011272
-91.75001182
-91.74993089
-91.74990241
-91.74973374
-91.74961733
-91.749556
-91.74949468
-91.74945351
-91.7493753
-91.74925475
-91.74909821
-91.74891638
-91.74888664
-91.74884207
-91.74872076
-91.74867835
-91.74858584
-91.74850098
-91.74843064
-91.74835778
-91.74825936
-91.74792623
-91.74772543
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
30.91397977
30.91389024
30.91373425
30.91361111
30.91353252
30.91345806
30.91337325
30.91330914
30.91322847
30.91316642
30.91311471
30.91304646
30.91298441
30.91287685
30.91275689
30.9126452
30.91248593
30.91236183
30.91224393
30.91214672
30.91202676
30.91192127
30.91183233
30.91175373
30.91166686
30.91156137
30.91146416
30.91137108
30.91135213
30.91068282
30.91058684
30.9102548
30.90974227
30.90957378
30.91082931
30.91080434
30.91080848
30.91082089
30.91082916
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
7
-91.74761569
-91.74748839
-91.74732538
-91.74716346
-91.7470381
-91.74691033
-91.74671023
-91.74656558
-91.74639441
-91.74628593
-91.74622084
-91.74614128
-91.7460786
-91.74597734
-91.74586886
-91.74578689
-91.74569287
-91.74561813
-91.7455434
-91.74548313
-91.74539152
-91.74529267
-91.74520106
-91.74506847
-91.74492623
-91.74469962
-91.74449229
-91.74426567
-91.74422093
-91.74476941
-91.7446019
-91.74393628
-91.74298899
-91.74270391
-91.74223011
-91.74201398
-91.7417729
-91.74156798
-91.74138958
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
Latitude
30.9108333
30.91082296
30.91079193
30.91074022
30.91068851
30.91061198
30.9105835
30.91056117
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
Longitude
-91.74124252
-91.74110269
-91.74091224
-91.74074589
-91.74058678
-91.74024444
-91.74013378
-91.74002478
D. Recorded Liens, Encumbrances, Easements, Servitudes or Restrictions
Clear title to the Property has been documented by a title opinion (Attachment B)
generated by the Law Offices of Jewell & Jewell on July 2, 2014 and will be updated two weeks
prior to execution of the conservation servitude. According to the title opinion, two mortgages
exist on the property. One is in favor of Travelers Insurance Company and the other is in favor
of Metlife Insurance Company. These mortgages have been paid and are in the process of
cancellation in the title records therefore no mortgage will be in place at the time of the filing of
the conservation servitude described in Section X.A of the MBI. The Sponsor conducted a
review of the Louisiana Department of Natural Resources (LDNR) Strategic Online Natural
Resources Information System (SONRIS) database for oil and gas activity. This review revealed
no active or historic wells within or in close proximity to the Bank. The closest well location was
1.6 miles north of the Property and was abandoned in 1946.
III.
RESPONSIBILITIES OF PARTIES
The responsibilities of the parties are as described in Sections A through E of the July 5, 2014
MBI.
IV.
GOALS AND OBJECTIVES
Goals, objectives and contributions to overall watershed/regional functions provided by
the Bank Addendum are described in Section II of the MWP (Attachment C).
V.
PERFORMANCE STANDARDS
Performance standards used to measure the success of the Bank are described in Section VIII of
the MWP (Attachment C).
VI.
MONITORING PLAN AND REPORTING PROTOCOLS
Monitoring and reporting remain as defined in Sections VI.A and VI.B of the July 5, 2014
MBI. Monitoring and Reporting requirements are established in Section IX and Section X of the
MWP, respectively (Attachment C).
8
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
VII.
CONTINGENCIES AND REMEDIAL ACTIONS
Contingencies and remedial actions remain as defined in Section VII.A through Section
VII.E of the July 5, 2014 MBI. The Adaptive Management Plan is defined in Section XII of the
MWP (Attachment C).
VIII. INSPECTION BY IRT AND HOLDER
Inspection provisions remain as defined in the July 5, 2014 MBI.
IX.
FINANCIAL PROTECTION
A. The Sponsor agrees to provide Financial Assurances sufficient to ensure satisfactory
completion for the work described in the Mitigation Work Plan and the Adaptive Management
Plan. The estimate of funds, funding mechanism, and schedule of release are identified in Section
XIV. A of the MWP (Attachment C).
B. The Sponsor shall provide copies of annual status of the financial assurances to CEMVN
upon request and/or in their monitoring reports.
C. The financial assurances shall guarantee payment to a third party, as determined
appropriate by the CEMVN in consultation with the IRT, in the event that the Sponsor does not
fulfill its obligations to perform, as specified in this MBI.
D. Payment to Sponsor, or if necessary, to a third party as identified by CEMVN, of a
specified amount of the financial assurances shall be made upon written notification by CEMVN
to the financial institution.
X.
LONG-TERM PROTECTION AND MAINTENANCE
All provisions regarding the conservation servitude are defined in Section X.A of the July
5, 2014 MBI. The Long-Term Maintenance Plan is outlined in Section XIII of the MWP
(Attachment C). The funding of long-term maintenance is described in Section XIV.B of the
MWP (Attachment C).
XI.
BANK USE
Provisions governing bank use remain as defined in the Section XI of the July 5, 2014
MBI unless otherwise specified below.
A. Bank Service Area
The Bank Service Area remains as defined in Section XI.A of the July 5, 2014 MBI.
9
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
B. Projects Eligible to Use the Bank
Provisions for project eligible to use the bank remain as defined in Section XI.B of the July
5, 2014 MBI.
C. Determination of Bank Credits
Credit Determination is defined in Section XI.A of the MWP (Attachment C).
D. Schedule of Credit Availability
Credit release is tied to achieving all the milestones within the success criteria at specific
monitoring times as outlined in Section XI.B of the MWP (Attachment C).
E. Credit Transactions
Provisions for credit transactions remain as defined in Section XI.E of the July 5, 2014
MBI.
F. Requirements for Initial Credit Release
No credits will be released until the Sponsor has provided a signed statement stating that
all of the following requirements have been met and has provided copies of the following
executed documents, as appropriate:
1. Permits: Obtain all necessary permits or other authorizations needed to construct and
maintain the Bank. This MBI Amendment does not fulfill or substitute for such authorization.
2. Holder Qualifications: Evidence that the entity proposed to hold the conservation
servitude is a CEMVN approved Holder.
3. Conservation Servitude: A copy of the executed perpetual conservation servitude
with a copy of this MBI Amendment as recorded in the Mortgage and Conveyances Records
Office of the parish in which the Property is located.
4. Financial Assurance: Documentation establishing the C&E financial assurances
stipulated in Section IX and the Long-Term Maintenance and Protection endowment described in
Section X of this MBI.
5. Property Ownership: A title search that identifies all known encumbrances including
mortgages, liens, rights-of-way, servitudes, easements, etc. and documentation that the
conservation servitude is not subordinate to any other easement or major lien. Sponsor shall
provide a copy of the recorded document evidencing that any mortgages encumbering the property
have been subordinated to the conservation servitude.
10
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
6. Execution of MBI Amendment: MBI Amendment signed by the Owner, Sponsor and
CEMVN District Commander or his representative and approval by all participant IRT agencies;
and
7. Work Schedule: Submission of the timetable for implementing work identified in the
permit, MWP or elsewhere in this MBI Amendment.
G. Subsequent Credit Releases
Provisions for credit transactions remain as defined in Section XI.G of the July 5, 2014
MBI.
XII.
MODIFICATION OF THIS MBI
Modifications of this MBI, including minor modifications, addenda to the Bank,
exclusion of approved mitigation site, termination of the MBI, or termination of participation
remain as defined in Section XII of the July 5, 2014 MBI.
XIII. TRANSFER OF PROPERTY OR SPONSORSHIP
Transfer of Property or Sponsorship remains as defined in Section XIII of the July 5,
2014 MBI.
XIV. ESTABLISHMENT OF STEWARD
Establishment of Steward provisions remain as defined Section XIII of the July 5, 2014
MBI.
XV.
BANK LIFE
Provisions for Bank Life remain as defined in Section XIII of the July 5, 2014 MBI.
XVI. OTHER PROVISIONS
All other provisions remain as defined in Section XVI A through G of the July 5, 2014
MBI.
11
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
__________________________________________
DANNY DESHOTELS
OWNER
________________________
DATE
__________________________________________
JANIE BACQUE DESHOTELS
OWNER
________________________
DATE
12
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
__________________________________________
GEORGE GUERIN
DELTA LAND SERVICES, LLC
13
________________________
DATE
Bayou Fisher Mitigation Bank
Mitigation Banking Instrument
___________________________________________
MARTIN S. MAYER
CHIEF, REGULATORY BRANCH
14
________________________
DATE
ATTACHMENTS
ATTACHMENT A
MAPS
Red River Wildlife
Management Area
Lake Ophelia
National Wildlife
Refuge
Grassy Lake Wildlife
Management Area
Spring Bayou Wildlife
Management Area
Three Rivers Wildlife
Management Area
Pomme de Terre Wildlife
Management Area
Angola State
Penitentiary
Tunica Hills Wildlife
Management Area
«
¬
LA 1
Cat Island
National Wildlife
Refuge
£
¤
US 71
Thistlethwaite Wildlife
Management Area
Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, increment P Corp.,
GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance
Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, and the GIS User
Community
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank (507.8 Acres)
I
National Wildlife Refuges
State Lands
5
2.5
0
Miles
5
Bayou Fisher Mitigation Bank
Amendment One
VICINITY MAP
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F01_Vicinity_5mi.mxd
FIGURE 1
Copyright:© 2013 National Geographic Society, i-cubed
Bayou Fisher Mitigation Bank
Amendment One
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
2,000 1,000
I
0
Feet
USGS 7.5-Minute Quadrangle
2,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : --Date : 07/09/2014
Map : F02_USGS Quad.mxd
FIGURE 2
ATTACHMENT C
MITIGATION WORK PLAN
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
Contents
I. Bank Property Location ................................................................................................ 3
II. Objective ..................................................................................................................... 3
A. Aquatic Resource Type and Functions to be Restored/Enhanced/Preserved ......... 3
B. Watershed Contributions ......................................................................................... 4
III. Site Selection ............................................................................................................. 5
IV. Site Protection Instrument .......................................................................................... 6
V. Baseline Information .................................................................................................. 6
A. Land Use ................................................................................................................. 6
B. Soils ........................................................................................................................ 7
C. Hydrology ................................................................................................................ 7
D. Vegetation ............................................................................................................... 8
VI. Description of Work.................................................................................................... 8
A. Soils/Hydrologic Work Plan ..................................................................................... 8
B. Vegetation ............................................................................................................... 9
VII. Maintenance Plan .................................................................................................... 9
VIII. Performance Standards ....................................................................................... 10
A. Initial Success Criteria ........................................................................................... 10
B. Interim Success Criteria ........................................................................................ 10
C. Long-Term Success Criteria.................................................................................. 11
IX. Monitoring Requirements ......................................................................................... 12
A. Permanent circular monitoring stations ................................................................. 12
B. Transects .............................................................................................................. 13
C. Soil Profile ............................................................................................................. 13
D. Floristic Survey...................................................................................................... 14
E. Photographs .......................................................................................................... 14
F. Qualitative Analysis ............................................................................................... 14
G. Hydrologic Conditions ........................................................................................... 14
H. Ledgers ................................................................................................................. 14
X. Monitoring Reports.................................................................................................... 14
A. As-Built Report ...................................................................................................... 15
B. Initial Success Criteria Report ............................................................................... 15
C. Interim Success Criteria Report ............................................................................ 16
D. Long Term Success Criteria Report ...................................................................... 18
XI. Bank Credits .......................................................................................................... 20
A. Credit Determination ............................................................................................. 20
B. Schedule of Credit Availability ............................................................................... 20
XII. Adaptive management plan .................................................................................... 20
XIII. Long Term Protection and Maintenance ................................................................ 21
XIV. Funding ................................................................................................................. 21
A. Construction and Establishment (C&E) Funds ...................................................... 21
1. Estimate of C&E Funds Required .......................................................................... 21
B. Long Term Maintenance/Management Funds ....................................................... 22
Page 1 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
XV. Citations ................................................................................................................. 23
Attachment MWP-A-Tables and Figures
Attachment MWP-B-Cost Analysis Report
Attachment MWP-C-MCM
Page 2 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
I. Bank Property Location
The center point of the property is located at latitude 91.748071° North and longitude
30.907564° in Pointe Coupee Parish, Louisiana (Figure 1). The property is located in
the Atchafalaya Subbasin as identified by the U.S. Geological Survey (USGS)
Hydrologic Unit Code (HUC) 08080101 (Figure 2).
Driving directions to the site are as follows:
From U.S. Hwy 190 (Airline Highway), take the LA Hwy. 1 exit north towards New
Roads. Continue north for approximately 12.5 miles then turn left to remain on
LA Hwy. 1 (Hospital Road). Turn left at the end of Hospital Road onto LA Hwy. 1
north and continue for approximately 23.5 miles. Turn left onto and agricultural
road which is located approximately 150 feet before the location of where East
St. Mary Street intersect LA Hwy 1. Proceed approximately 1.33 miles into the
site.
II. Objective
A. Aquatic Resource Type and Functions to be Restored/Enhanced/Preserved
This Bank will re-establish 243.7 acres of bottomland hardwood forest (BLH) and 120.1
acres of baldcypress swamp (Swamp).
As defined by The Natural Communities of Louisiana by the Louisiana Department of
Wildlife and Fisheries and the Louisiana Natural Heritage program (LNHP), BLH forests are
forested, alluvial wetlands occupying broad floodplain areas that flank large river systems
(LNHP 2009). BLH forests may be called fluctuating water level ecosystems characterized
and maintained by a natural hydrologic regime of alternating wet and dry periods. These
forests support distinct assemblages of plants and animals associated with particular
landforms, soils, and hydrologic regimes. They are important natural communities for
maintenance of water quality, providing a very productive habitat for a variety of fish and
wildlife, and are important in regulation of flooding and stream recharge. Baldcypress Swamps
are forested, alluvial swamps growing on intermittently exposed soils. The soils are inundated
or saturated by surface water or groundwater on a nearly permanent basis throughout the
growing season except during periods of extreme drought. Bayous commonly intersect these
wetlands. There is a low floristic diversity. Baldcypress (Taxodium distichum) is the dominant
overstory species1. Many aquatic food webs depend on the input of allochthonous material in
the form of leaf litter or other organic debris that the wetland forest provides. Net primary
productivity of swamp forests seems to be increased by periodic flooding or increased water
flow and decreased by slow water movement or stagnation.
1
The above-referenced and all subsequent scientific plant nomenclature are derived from NRCS (2013)1
Page 3 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
B. Watershed Contributions
1. Watershed Need
The Bayou Fisher Mitigation Bank Amendment One (BFMB1) site is located within the
29,555-square mile Mississippi Delta Cotton and Feed Grains Region Land Resource Region
(LRR O) of the 38,865-square mile Southern Mississippi River Alluvium Major Land Resource
Area (MLRA 131A), the Mississippi Alluvial Plain Level III Ecoregion, and the Southern
Holocene Meander Belts Level IV Ecoregion (Natural Resources Conservation Service [NRCS]
2006, Omernik 1987, Environmental Protection Area [EPA] 2003). The site is also located
within the 838,000-acre Atchafalaya Basin. The Atchafalaya Basin is the largest river swamp
in the United States with significant amounts of forested wetlands and is over 100 miles in
length from the Old River Control Structure northeast of Simmesport, Louisiana, south to the
Atchafalaya River delta near Morgan City, Louisiana. Six threatened or endangered bird
species and 29 rookeries are known within the Atchafalaya Basin in addition to over 40
species of reptiles and 20 species of amphibians (Atchafalaya Basin Program [ABP] 2012).
The Atchafalaya watershed has historically been utilized for energy production and transfer
as evidenced by the numerous utility corridors which traverse it. The Atchafalaya watershed
has numerous sites associated with current and historic oil and gas exploration and
production. It is highly likely that future utilities will traverse this watershed as energy demands
increase. The Atchafalaya watershed, which stretches over 100 miles north and south, lies in
the middle of a major east-west energy corridor. The USGS describes over 78% of the
watershed's landmass (i.e. non open water) as being wetland with 69% in woody wetlands and
9% in emergent herbaceous wetlands (Multi-Resolution Land Characteristics Consortium
[MRLCC 2011]). Given the vast acreage of wetlands within the Atchafalaya watershed, it is
anticipated that activities within this watershed will have some type of unavoidable impact and
will require mitigation. A mitigation bank located within the Atchafalaya watershed could
compensate for unavoidable impacts within the Atchafalaya watershed which is consistent with
a watershed approach to compensatory mitigation. According to a review of the Regulatory Inlieu Fee and Bank Information Tracking System (RIBITS) from July 8, 2014, the Bayou Fisher
Mitigation Bank is the only approved mitigation bank located within the Atchafalaya watershed
(HUC 08080101) which lists this watershed as a primary service area.
2. Watershed Benefits
The approval and establishment of the BFMB1 would provide mitigation opportunity for
unavoidable impacts within the watershed as encouraged by 33 CFR § 332.3 (c)2.
The BFMB1 is compatible with several designated ecological, watershed and cultural
resource plans and programs. The BFMB is located within the 838,000-acre Atchafalaya Trace
State Heritage Area as designated by the Louisiana Legislature (La. R.S. 25:1222-1225). The
2
Federal Register Vol. 73, No. 70 titled Compensatory Mitigation Losses of Aquatic Resources
promulgated as a Final Rule by the Department of the Army, Corps of Engineers on April 10, 2008.
Page 4 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
region was designated as a National Heritage Area by the National Park Service (NPS) in
2006 due to its concentration of significant natural, scenic, cultural, historic and recreational
resources (Atchafalaya National Heritage Area 2012). The State Master Plan for the ABP was
developed in 1998 and was approved by the Louisiana Legislature in 1999. The restoration of
the BFMB1 is consistent with the mission statement of the State Master Plan which calls for
the restoration and conservation of natural habitats within the Atchafalaya Basin. Vegetative
plantings, invasive species control, protection through conservation servitudes, and monitoring
to ensure achievement of the restoration goals are recognized techniques for habitat
restoration (Atchafalaya Basin Advisory Committee 1998; ABP 2012). The entire Atchafalaya
watershed is designated as a Gulf Ecological Management Site (GEMS)3. Although the BFMB
is within a portion of the Atchafalaya HUC that is not in the Louisiana Coastal Zone Boundary
or the Louisiana Coastal Wetland Conservation Plan Area, the Louisiana Department of
Natural Resources (LDNR) Office of Coastal Management (OCM) included the entire
Atchafalaya HUC in the Intergovernmental Coordination (IGC) zone as it is subject to a
moderate level of coastal processes and influence. In addition to the IGC designation, the
OCM designated the entire HUC as a Watershed Planning Area (WPA) given its importance to
water quality, ecosystem protection and flood control as it affects the coastal zone (LDNR
OCM 2010). The Coastal Wetland Forest Science Working Group (2005) identified the
forested wetlands within the entire Atchafalaya HUC as coastal wetland forests within the
South Delta Coastal Area Region.
III. Site Selection
The BFMB1 is ecological suitable for providing the desired resource functions described in
Section II per the requirements of 33 CFR § 332.3 (c). Soils, hydrologic conditions and
elevations are suitable to provide for the restoration of bottomland hardwood and swamp
wetland habitat as described in Section II.A. This project will provide additional wetland and
ecological functions not currently realized under the existing conditions and land use (e.g. flood
storage, reduced run-off, Nearctic-Neotropical bird habitat, threatened and endangered
species habitat and habitat for other aquatic fauna). Localized and downstream water quality
will improve by retiring the land from intensive agricultural use (i.e., conventional tillage crop
production) and increasing surface-water retention time. The surrounding land use and cover
within one mile of the BFMB1 perimeter is cultivated cropland/pasture (60%), wooded wetlands
(27%), BFMB conservation servitude (12.4%), scrub-shrub (<1%), open water (<1%) and
development (<1%). These land uses are compatible with the intended habitat to be restored
at the BFMB1.
Wildlife habitat will improve for resident biota and Nearctic-Neotropical migrating bird species
(e.g., staging, resting, feeding, escape cover, etc.) through afforestation with native wetland
3
Gulf Ecological Management Sites are geographical areas that have special ecological significance to
the production of fish, wildlife, and other natural resources or represent unique habitats. In south
Louisiana, GEMS are beaches, salt domes, wildlife management areas, swamps, cheniers, lakes, bays,
and other natural habitat areas.
Page 5 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
tree and shrub species4. The afforestation of this site will provide habitat deemed important to
the recovery of the Louisiana black bear (Ursus americanus luteolus), a federally-designated
threatened species, by developing a larger forested corridor between two existing forested
tracts currently designated as critical habitat for the species5 . Corridor development is a
stated goal of species recovery (US Fish and Wildlife Service [USFWS] 2009).
IV. Site Protection Instrument
A conservation servitude will be utilized as the site protection instrument as
described in Section X of this MBI.
V. Baseline Information
This section contains both the historical and current ecological and physical
information about the Bank Site.
A. Land Use
1. Historical Land Use
The BFMB1 is located within the approximately 25 million-acre Lower Mississippi
Alluvial Valley (LMAV). Prior to European settlement and colonization, the LMAV
consisted of mostly contiguous bottomland hardwoods and swamps with some
alterations due to activities of Native Americans (Gardiner and Oliver 2005). Significant
deforestation began after colonization due to the need to convert these lands to
agricultural uses and satisfy a growing demand for timber. The rate of deforestation
increased in the 20th Century due to major flood control projects particularly with major
levee construction following the passage of the 1928 Flood Control Act. Soybean
(Glycine max) demand following World War II increased the need for agricultural
property within the LMAV (Oswalt 2013). Advancements in land clearing technology
and inflation in the price of agricultural commodities during the 1960s and 1970s
resulted in an acceleration of the deforestation (Lower Mississippi River Joint Venture
[LMRJV] 2007). By the mid-1980s, only 6.6 million acres of the LMAV remained
forested (Oswalt 2013). Approximately 20% of the original forested acreage remains
with much of it in fragmented blocks averaging a total 158 acres in size (Twedt et al.
1999). A review of historical aerial photography reveals the site and the surrounding
area was 100% forested as late as 1953. Clearing had begun in the area for
agricultural purposes between 1953 and 1966 with the entire BFMB cleared and in
agricultural production between 1972 and 1983 (Figures 3 through 10).
4
Afforestation defined by SAF (2012) as the establishment of a forest or stand in an area where the
preceding vegetation or land use was not forest.
5
Federal Register Vol. 74, No. 45 titled Endangered and Threatened Wildlife and Plants; Designation of
Critical Habitat of the Louisiana Black Bear (Ursus americanus luteolus) promulgated as a Final Rule by
the US Fish and Wildlife Service on March 10, 2009
Page 6 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
2. Current Land Use
The BFMB1 is currently in crop production with rice (Oryza sativa) and soybeans
being the predominate crop produced over the last several years. In addition to crop
production, the site is also utilized for crawfish production.
B. Soils
The soils mapped within the project area are Sharkey clay (Sf) per the Soil Survey
Geographic (SSURGO) database (NRCS 20132). The Sf map unit is listed as a
predominately hydric soil series by the NRCS with approximately 90% of the map unit
being hydric (20132) (Figure 11).
C. Hydrology
1. Historical Hydrology and Drainage Patterns
The primary sources of surface water on the BFMB1 were historically overbank
flooding from the Atchafalaya and Mississippi River systems, precipitation and high
water tables. The historical drainage pattern was for surface water to flow into an
unnamed tributary of Bayou Fisher and then into Bayou Fisher. The water would
eventually flow into the Atchafalaya River (Figure 12).
2. Existing Hydrology and Drainage Patterns
Current project hydrology is naturally influenced primarily by localized rainfall and
high water tables. Anthropogenic influences involve the pumping of ground water for
agricultural purposes (i.e., irrigation for rice/crawfish production). Most upstream, offsite
drainage which may flow onto the BFMB1 is intercepted by the unnamed tributary to
Bayou Thornton which traverses the BFMB1. This tributary is a natural feature and
most non-riverine flows (i.e. precipital sheet flow) would have originated on the natural
ridge south of this tributary and flowed south. There is the potential that some overbank
flooding may enter the BFMB1 from upstream flash flood events which may top the
tributaries banks. (Figure 13).
Natural on-site surface hydrology flow is altered by agricultural improvements
designed for the equalized retention of water for rice and crawfish production (i.e.,
levees) and to drain/discharge surface waters from the site (i.e., ditching traversing the
site and discharge pipes in the perimeter road). One groundwater irrigation well is
located within the BFMB1. The overall drainage flow is from the north to the south.
Artificial drains convey water from the portion of the property south of the unnamed
tributary into a slough located within the forested area south of the Owner's property.
These conveyances ultimately flow into the Bays canal and into the Morganza Floodway
via Bayou Johnson. From here water flows into the lower Atchafalaya Basin Floodway
Page 7 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
which is designated as being in the Louisiana Coastal Zone boundary and into the Gulf
of Mexico south of Morgan City, Louisiana.
D. Vegetation
1. Historical Plant Community
A review of historical aerial photography reveals the site and the surrounding area
was 100% forested as late as 1953. The species composition was likely typical to that of
the adjacent forested area. This area is comprised of BLH at elevations generally
above 35 feet NAVD and Swamp in areas below 35 feet NAVD.
2. Existing Plant Community
The BFMB1 is currently in crop production with rice and soybeans being the
predominate crop produced over the last several years. In addition to crop production,
the site is also utilized for crawfish production (Figure 14).
VI. Description of Work
This Bank will provide 243.7 acres of BLH and 120.1 acres of Swamp to
compensate for unavoidable wetland impacts for the Atchafalaya River Basin area
(Figure 15, Table 1). In order to accomplish this task, the Sponsor shall complete the
following soils/hydrologic and habitat work.
A. Soils/Hydrologic Work Plan
To restore wetland hydrology on the BFMB1, 29,769 linear feet of interior roads and
levees and approximately 4,549 linear feet of perimeter road will be degraded to natural
grade (Figures 16-24). The Owner will cease the use of the one groundwater irrigation
well located within BFMB1. The perimeter access road and the access along the
unnamed tributary will be maintained with an herbaceous cover and will not be
improved. The road will be maintained by mowing and ruts may occasionally be
smoothed out with the use of a box blade or similar implement to maintain a flat surface.
In total, approximately 105,317 cubic yards of earthen material will be removed from
interior levees/roads and exterior roads and deposited in adjacent borrow ditches.
Approximately 5,104 cubic yards of this material will be discharged into 1,761 linear feet
of drain currently determined to be "other waters of the US". No areas currently
determined to be wetlands will be impacted.
The BFMB1 will depend primarily on precipitation which may be supplemented by
potential high flow events from the north forested tract and within the unnamed tributary.
As such, long-term hydrology maintenance will not depend on the utilization of water
captured from irrigation wells; therefore, sufficient water rights are ensured for such
purposes.
Page 8 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
B. Vegetation
The BFMB1 will re-establish 211.8 acres of Type 2 and 3 BLH forest; 31.9 acres of
Type 1 and 2 BLH forest; and 120.1 acres of Swamp by planting selected tree species
as described by the Louisiana Natural Heritage (LNH 2009), Lester et al. (2005), and
Barrow et al. (2005) (Figure 15 and Table 2). Areas above 36 feet NAVD will be
restored to a combination of a sugarberry-American elm-green ash (Type 2) and a
sweetgum-water oak (Type 3) BLH. Areas between 35 and 36 feet NAVD will be
restored as a mosaic of an overcup-water hickory (Type 1) BLH and Type 2 BLH.
Areas below 35 feet NAVD will be restored to Swamp. Site preparation for planting will
be accomplished by applying herbicide as needed, cultivating the soil surface, and subsoiling (ripping) at equidistant intervals to a depth of approximately 18 inches (Allen et
al. 2001). Site preparation will include the removal and control of any invasive species
through herbicide treatments, mechanized clearing, cutting, shredding, or a combination
thereof.
Afforestation activities will include the planting of native BLH and Swamp species
during the first planting season (December 15, 2014 through March 15, 2015) following
site preparation. BLH species will be planted on approximate 9-foot centers for a rate of
538 stems per acre (spa) while Swamp species will be planted at a spacing of no more
than 12 feet for a minimum rate of 302 spa (Table 2). The species selected will be siteappropriate in terms of habitat design, soil-moisture regime, and species richness. Ten
or more species may be represented in the planting assemblage to insure adequate
species richness (Twedt and Best 2004). The distribution of stems will create a mosaic
of hard and soft mast species that will provide seasonally available forages for a wide
range of indigenous wildlife including the Louisiana black bear (Barrow et al. 2005).
The availability of soft mast species is important during the summer and hard mast is
critical in the fall and early winter for the build-up of fat reserves in black bears preparing
for denning (Black Bear Conservation Committee [BBCC] 2005).
Hard mast species should account for at least 50 to 70% of all BLH plantings with
the remaining percentage accounted for by soft mast tree species. The exact species
and quantities for planting will be determined by the availability of such species from
commercial nurseries providing localized ecotype seedlings. Seedlings will be mixed
upon planting so that areas are not comprised of a single species (Twedt and Best
2004).
VII. Maintenance Plan
The Sponsor will use all prudent efforts, physical, chemical, or mechanical, to
eliminate existing undesirable/exotic vegetation present such as Chinese tallow
(Triadica sebifera) on the site during site preparation activities. The Sponsor will
continue to monitor the site through annual inspections to document
Page 9 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
1.
the effectiveness of control efforts and
2.
record the extent and degree of invasive species present
3.
record the extent and degree of any herbivory damage
4.
record the condition and functionality of any hydrological structures
Following such monitoring, invasive species, weed and herbivore control will be
implemented as necessary and hydrological structures will be replaced if determined
necessary. The Sponsor will maintain boundary lines and maintain access trails by
mowing.
VIII. Performance Standards
In order for the Bank to be considered acceptable for mitigating wetland impacts
associated with DA permits, the Property will be restored in accordance with the
Mitigation Work Plan (MWP) such that it meets wetland criteria as described in the 1987
Corps of Engineers Wetland Delineation Manual (the 1987 Manual) as well as the
November 2010 Regional Supplement for the Corps of Engineers Wetland Delineation
Manual: Atlantic and Gulf Coastal Plain Region Version 2.0 (USACE 1987, 2010).
Performance standards (success criteria) used to measure the success of the Bank are
provided below.
A. Initial Success Criteria
1. Hydrology: Ground surface elevations must be conducive to establishment and
support of hydrophytic vegetation, and re-establishment and maintenance of hydric soil
characteristics. To that end, all alterations of the natural topography (ditching, spoil
banks, land leveling, bedding, fire breaks, etc) that have affected the duration and
extent of surface water have been removed or otherwise rendered ineffective in
accordance with this MWP.
2. Vegetation: A minimum of 250 planted seedling spa must survive through the end of
the second spring following the planting (i.e., Year 1). Those surviving seedlings must
be representative both in species composition and percentage identified in this MWP.
This criterion will apply to initial plantings, as well as, any subsequent replanting that
may be needed to meet this requirement.
B. Interim Success Criteria
1. Hydrology: By Year 3 (two years following attainment of the one-year survivorship
criteria) site hydrology will be restored such that the Property meets the wetland
criterion as described in the 1987 Manual as well as the November 2010 Regional
Supplement to the Corps of Engineers wetland Delineation Manual: Atlantic and Gulf
Page 10 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
Coastal Plain Region Version 2.0 (USACE 1987, 2010). Data demonstrating that
wetland hydrology has been re-established is to be collected by the Sponsor and
submitted to CEMVN in the monitoring report for the interim success criteria
2. Vegetation and Vegetative Plantings: a. For a given planting, a minimum of 250
seedlings/sapling spa must be present (with a 70: 30 or 50: 50 hard mast to soft mast
ratio in BLH) at the end of the fourth year (i.e. Year 5) following successful attainment of
the one-year survivorship criteria. Trees established through natural recruitment may
be included in this tally; however, no less that 125 hard mast-producing spa must be
present in BLH areas while no less than 125 baldcypress spa must be present in
Swamp areas. Surviving hard mast seedlings must be representative of the species
composition and percentage identified in this MWP. Exotic/invasive species may not be
included in this tally.
b. By Year 5 (four years following successful attainment of the one-year survivorship
criteria) the Bank and the perimeter will be virtually free (approximately 5% or less on an
acre-by-acre basis) of exotic/invasive vegetative species.
c. Developing plant community must exhibit characteristics and diversity indicative of a
viable native forested wetland community commensurate with stand age and site
conditions by Year 5. Achievement of wetland vegetation dominance is defined as a
vegetation community where more than 50% of all dominant species are facultative
(FAC) or wetter using "routine delineation methods" as described in the 1987 Manual as
well as the November 2010 Regional Supplement to the Corps of Engineers wetland
Delineation Manual: Atlantic and Gulf Coastal Plain Region Version 2.0 (USACE 1987,
2010).
C. Long-Term Success Criteria
1. Forest canopy coverage exceeds 80% of forested land mass as measured by an
approved method. Forest canopy species abundance and composition is consistent
with the restoration goals identified in the restoration plan and credit assessment
methodologies. The long term species composition should fall within the range of 50:50
to 30:70 soft mast to hard mast ratio.
2. When forest canopy coverage exceeds 80%, the Bank will be essentially void of
exotic/invasive vegetation (all seed-producing trees removed from Bank and perimeter
and less than 3% of the understory on an acre per acre basis). An active treatment
program will continue as part of the long-term maintenance program.
3. If thinning to maintain or enhance the ecological value of the Bank is determined
necessary by the IRT at this time, the Sponsor/Steward will develop a thinning plan in
coordination with the IRT. Thinning operations shall be performed by the
Sponsor/Steward per the requirements of the thinning plan.
Page 11 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
4. The Sponsor will provide documentation that the "Long-Term Maintenance and
Protection" escrow account is fully funded.
IX. Monitoring Requirements
The Sponsor agrees to perform all work necessary to monitor the Bank to
demonstrate compliance with the success criteria established in this MWP. The
Sponsor will monitor the Bank in the spring of each monitoring year using the guidelines
in Section VIII of this MWP.
Surveys of permanent monitoring stations will occur in the following time frame:
1. Immediately following planting of the Bank to establish baseline information.
2. In Year 1, 3, 5 and after achieving interim success criteria, monitoring will occur
every 3 years until an average canopy coverage of 80% is established.
3. If thinning is required after successfully achieving the long-term success criteria,
the site will be surveyed prior to and following the first thinning operation
following plantings.
If monitoring for any given year determines that the Bank is not progressing as
expected, monitoring will continue on an annual basis until the Bank successfully meets
or exceeds established milestones. After achieving the interim success criteria,
monitoring will occur every 3 years until average canopy coverage of 80% is obtained.
If thinning is required after successfully achieving the long-term success criteria, the site
will be surveyed prior to and following the first thinning operation following plantings.
The survey of the permanent monitoring stations will collect data to evaluate the
survival rate of planted vegetation; number, species and growth rates (average heights
and diameter). In addition to planted seedlings, surveys will include the number by
species of volunteering trees, shrubs and woody vines. Surveys will also collect
information regarding colonizing plant species, the wetland plant status (scaled from
obligate (OBL) to upland (UPL) of each and the number by species of exotic/noxious
specimens.
A. Permanent circular monitoring stations
Immediately following initial planting of the Bank, the Sponsor will randomly establish
a permanent circular monitoring station for every 20 acres on the Bank. Each station
will have a minimum area of 1/20th acre (radius=26 feet). Stations will be identified with
a permanent marker (e.g., an 8-foot PVC pipe anchored with a metal T post at plot
center) and Global Positioning System (GPS)-derived coordinates will be recorded for
each station. A map will be provided to CEMVN (See Reporting Protocols below) that
depicts the location of the monitoring stations as well as a coordinating list containing
Page 12 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
the coordinates for each station. All individual planted seedlings/saplings falling within
each monitoring station will be marked with a numbered tag that uniquely identifies each
seedling. A document providing seedling information shall be presented (to CEMVN)
for each monitoring station and this document shall not only list the specific tag number
for each seedling within the monitoring station, but also the species (by scientific and
common name), height, diameter, wetland rating, hard mast or soft mast categorization,
and general condition of each stem.
To establish baseline information this data will be obtained immediately following the
initial planting of the Bank site or phase of the Bank.
B. Transects
The Sponsor shall establish transects along planted rows to be used to determine
overall survivorship of planted seedlings. Transects shall make up approximately 3% of
the total number of rows and arranged so that a representative sample of the entire
track is obtained. The beginning and ending points of each transect shall be marked
with a permanent marker (e.g., an 8-foot PVC pipe anchored with a metal T post) and
GPS coordinates shall be recorded for these points.
To establish baseline information transects will be surveyed to determine the
number by species of planted seedlings within 60 days of planting. Transects will be
surveyed until successful attainment of the interim success criteria. Initial and interim
transect surveys shall record the species present, the number of living seedlings for
each species, the wetland indicator status of each species, the mast type of each
species and describe the general condition of the seedlings. Any failed areas of
plantings should be noted along with an explanation for the failure.
C. Soil Profile
The Sponsor will collect data on the hydrologic conditions of the Bank as necessary.
Sufficient data shall be provided to accurately demonstrate variations in soil conditions.
Information to demonstrate hydric properties within the soil shall be provided as a
description of the upper 12 inches of the soil profile. Such data will be presented as
points with GPS coordinates for each point, a hydric indication for each point, and an
explanation to support the information for each point. This information shall also be
provided on a referenced map included as an attachment.
The Sponsor will be required to submit a Corps issued JD (at year 3) to show that
the Property meets the wetland criterion as described in the 1987 Manual as well as the
Regional Supplement of the Corps of Engineers Wetland Delineation Manual: Atlantic
and Gulf Coastal Plain Region Version 2.0 (USACE 1987, 2010).
Page 13 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
D. Floristic Survey
To document the attainment of the long-term success criteria the Sponsor will
complete a comprehensive floristic survey for the Bank as part of the monitoring
requirements.
A floristic survey should be comprehensive over the entire site, and should be
conducted using systematic field techniques. This survey should provide a list of plants
and communities existing on the site. If adverse conditions such as disease, drought,
predation, or herbivory, etc. exist and have impacted the plantings then this information
and these conditions need to be discussed in the report.
E. Photographs
Digital images shall be taken from ground level at each monitoring station and from
elevated positions throughout the Bank to document overall conditions. These ground
level images should provide a North, South, East and West image for each station.
F. Qualitative Analysis
The Sponsor shall evaluate the entire extent of the Bank (or phase of the Bank that
this report represents) and provided observations concerning overall seeding
survivorship, colonization of the Bank by volunteer plant species, wildlife utilization and
any other information that is pertinent to achievement of initial success criteria.
G. Hydrologic Conditions
A description of the condition of any applicable hydrology altering features (culverts,
ditches, plugs, etc.) and a general discussion of hydrologic conditions at monitoring
stations shall be provided.
H. Ledgers
The Sponsor will utilize the Regulatory In-Lieu Fee and Bank Information Tracking
System (RIBITS) as a ledger to show all transactions. The Sponsor will input the
following information: transaction date, permittee name, credits/acres sold and DA
permit number. No other reporting measures are required.
X. Monitoring Reports
Independent of the As-built report the Sponsor will submit monitoring reports
documenting monitoring efforts at the Bank to the CEMVN by July 31st of the year
monitoring occurs. Besides monitoring results for that monitoring year, reports will
include a financial assurance report documenting withdrawals and deposits. The
monitoring reports will follow the guidelines listed below:
Page 14 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
The monitoring report will include data sufficient for comparison to the performance
standards found in Section VIII of this Work Plan. The Sponsor shall also include, in
these reports, a discussion of all activities which took place at the Bank.
A. As-Built Report
An as-built report will be submitted to CEMVN within 60 days following completion of
all work required to restore or enhance special aquatic sites. The as-built report will
describe in detail the work performed and provide a list of species planted, the number
of each species, the hard or soft mast categorization, and the wetland rating. No
deviation from the MWP may occur without prior approval from the IRT. The as-built
report will include a discussion of the coordination with IRT members, a description of
and reasons for any approved deviation. The as-built report shall provide:
a. A survey showing finished grades and plantings with written documentation,
plan view and cross sectional drawings of all construction and establishment
work implemented on the bank.
b. Survey data collected from the permanent monitoring stations and the transects.
This survey data should include the number and species of the seedlings planted,
timing of all work events, and maps showing the location (including latitude/longitude) of
all monitoring stations as described in this MWP.
c. Detailed descriptions of site preparation, planting procedures, etc.
B. Initial Success Criteria Report
The Sponsor shall monitor the Bank in the spring (March 15-May 31) of its second
growing season following initial planting of the Bank. The Sponsor will provide an Initial
Success Criteria Report by July 31st of that year.
The Sponsor shall provide details in accordance with this MWP, on any maintenance
and/or management work conducted on the Bank after submission of the As-Built
Report. The Sponsor shall provide a brief description of any anticipated maintenance
and/or management work to be conducted prior to attainment of interim success criteria.
1. Vegetation
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings falling
within each permanent circular monitoring plot as described and as established in
accordance with Section IX of this MWP. A description of the general condition of the
seedlings, including the number and species of surviving seedlings in each monitoring
Page 15 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
station, the tag number and a discussion of likely causes of mortality for the nonsurvivors shall be provided. A number (by species) of exotic/invasive species,
including, a description of the generalized degree of distribution and whether they are
seed bearing trees or seedlings will also be provided.
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in Section IX.B of this MWP. A description of the general
condition of the seedlings and the discussion of likely causes of mortality, if appropriate
shall also be provided. Exotic/invasive species should be noted along with information
on the generalized amount of each and whether they are seed bearing trees or
seedlings.
2. Hydrologic Data
The Sponsor shall provide a description of the condition of any applicable hydrology
altering features (culverts, ditches, plugs, etc.) and a general discussion of hydrologic
conditions at monitoring stations.
3. Photographs
The Sponsor must submit digital photographs in accordance with Section IX.E of this
MWP.
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in Section
IX.F of this MWP.
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial account
statements for both the financial assurance accounts and the Long-term Maintenance
and Protection Fund. If any escrowed funds were used, the Sponsor will include a
narrative describing that use, the justification for that use and supporting documentation
(e.g. receipts). The Sponsor shall also provide any justification for any requested
release from financial assurance accounts.
.
C. Interim Success Criteria Report
The Sponsor shall monitor the Bank in the spring (March 15-May 31) of its third
growing season following attainment of the one-year survivorship criteria for the Bank.
The Sponsor will provide an Interim Success Criteria Report by July 31st of that year.
Page 16 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
1. Vegetation
For a given planting, a minimum of 250 seedlings/sapling spa must be present at the
end of the fourth year (i.e. Year 5) following successful attainment of the one-year
survivorship criteria. Trees established through natural recruitment may be included in
this tally; however, no less than 125 hard mast-producing spa must be present in BLH
areas while no less than 125 baldcypress spa must be present in Swamp areas.
Surviving hard mast seedlings must be representative of the species composition and
percentage identified in this MWP. Exotic/invasive species may not be included in this
tally.
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings falling
within each permanent circular monitoring plot as described and as established in
accordance with Section IX of this MWP. A description of the general condition of the
seedlings, including the number and species of surviving seedlings in each monitoring
station, the tag number and a discussion of likely causes of mortality for the nonsurvivors shall be provided. A number (by species) of exotic/invasive species,
including, a description of the generalized degree of distribution and whether they are
seed bearing trees or seedlings will also be provided.
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in Section IX.B of this MWP. A description of the general
condition of the seedlings and the discussion of likely causes of mortality, if appropriate
shall also be provided. Exotic/invasive species should be noted along with information
on the generalized amount of each and whether they are seed bearing trees or
seedlings.
2. Hydrologic Data
By Year 3, two years following attainment of the one-year survivorship criteria, the
Sponsor must provide a corps issued wetland determination to prove that site hydrology
has been restored such that the Property meets the wetland criterion as described in
the 1987 Manual as well as the November 2010 Regional Supplement to the Corps of
Engineers wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region Version
2 (USACE 1987, 2010). The Sponsor shall submit a wetland delineation report and a
request for a jurisdictional determination to CEMVN.
3. Photographs
The Sponsor must submit digital photographs in accordance with Section IX.E. of
this MWP.
Page 17 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in Section
IX.F of this MWP. The Sponsor shall provide details on any maintenance and/or
management work conduction on the Bank after submission of the Initial Success
Criteria Report. The Sponsor shall provide a brief description of any anticipated
maintenance/management work to be conducted prior to attainment of long-term
success criteria. Note: By year 5, four years following successful attainment of the oneyear survivorship criteria, the developing community must exhibit characteristics and
diversity indicative of a viable native forested wetland community commensurate with
stand age and site conditions; the Bank and the perimeter will be virtually free
(approximately 5% or less on an acre-by-acre basis) of exotic/invasive vegetation.
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial account
statements for both the financial assurance accounts and the Long-term Maintenance
and Protection Fund. If any escrowed funds were used, the Sponsor will include a
narrative describing that use, the justification for that use and supporting documentation
(e.g. receipts). The Sponsor shall also provide any justification for any requested
release from financial assurance accounts.
D. Long Term Success Criteria Report
1. Vegetation
For a given planting, a minimum of 250 spa must be present at the end of the fourth
year (i.e. Year 5) following successful attainment of the one-year survivorship criteria.
Trees established through natural recruitment may be included in this tally; however, no
less than 125 hard mast-producing spa must be present in BLH areas while no less
than 125 baldcypress spa must be present in Swamp areas. Surviving hard mast
seedlings must be representative of the species composition and percentage identified
in this MWP. Exotic/invasive species may not be included in this tally.
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings falling
within each permanent circular monitoring plot as described and as established in
accordance with Section IX of this MWP. A description of the general condition of the
seedlings, including the number and species of surviving seedlings in each monitoring
station, the tag number and a discussion of likely causes of mortality for the nonsurvivors shall be provided. A number (by species) of exotic/invasive species which
includes a description of the generalized degree of distribution and their seed-bearing
status will be provided.
Page 18 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in Section IX.B of this MWP. A description of the general
condition of the seedlings and the discussion of likely causes of mortality, if appropriate
shall also be provided. Exotic/invasive species should be noted along with information
on the generalized amount of each and their seed-bearing status.
2. Hydrologic Data
By Year 3, two years following attainment of the one-year survivorship criteria, the
Sponsor must provide a corps issued wetland determination to prove that site hydrology
has been restored such that the Property meets the wetland criterion as described in
the 1987 Manual as well as the November 2010 Regional Supplement to the Corps of
Engineers wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region Version
2 (USACE 1987, 2010). The Sponsor shall submit a wetland delineation report and a
request for a jurisdictional determination to CEMVN.
3. Photographs
The Sponsor must submit digital photographs in accordance with Section IX.E. of
this MWP.
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in Section
IX.F of this MWP. The Sponsor shall provide details on any maintenance/management
work conduction on the Bank after submission of the Initial Success Criteria Report.
The Sponsor shall provide a brief description of any anticipated maintenance and/or
management work to be conducted prior to attainment of long-term success criteria. By
year 5, four years following successful attainment of the one-year survivorship criteria,
the developing community must exhibit characteristics and diversity indicative of a
viable native forested wetland community commensurate with stand age and site
conditions; the Bank and the perimeter will be virtually free (approximately 3% or less
on an acre-by-acre basis) of exotic/invasive vegetation.
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial account
statements for both the financial assurance accounts and the Long-term Maintenance
and Protection Fund. If any escrowed funds were used, the Sponsor will include a
narrative describing that use, the justification for that use and supporting documentation
(e.g. receipts). The Sponsor shall also provide any justification for any requested
release from financial assurance accounts.
Page 19 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
XI. Bank Credits
A. Credit Determination
Credits in the Bank were determined using the Modified Charleston Method. Results
are included as Attachment MWP-B. In addition CEMVN may also use best
professional judgment in the determination of such credits.
B. Schedule of Credit Availability
Upon submittal of all appropriate documentation by the Sponsor, and subsequent
approval by CEMVN in consultation with the IRT, CEMVN will release credits for use by
the Sponsor according to the following schedule:
1. Thirty percent (30%) of total anticipated project credits will be available for debiting
upon confirmation that all items in Section XI. F (1-7) of the MBI has been completed.
2. An additional twenty percent (20%) of total anticipated credits will be available for
debiting upon providing documentation that the vegetative plantings have been
conducted and completion of the work necessary to restore site topography and wetland
hydrology of the Bank as outlined in Section VI of this MWP.
3. An additional twenty percent (20%) of the total anticipated credits would be released
upon successfully completing the initial success criteria (Section VIII. A).
4. An additional twenty percent (20%) of the total anticipated credits would be released
upon successfully completing the interim success criteria (Section VIII B).
5. The remaining ten percent (10%) of the total anticipated credits would be released
once the long-term success criteria (Section VIII. C) are met.
XII. Adaptive management plan
An adaptive management strategy, contingency, and remedial responsibilities shall
be in place, and will be implemented in the event monitoring reveals that certain
success criteria have not been met. In the event of a deficiency, the Sponsor shall
provide a notice to the CEMVN. This notice shall include an explanation for the
deficiency, and will outline specific practices and measures that will guide decisions for
revising compensatory mitigation plans if needed.
A.
Seedling Survivorship
1.
If performance standards are not met as specified in Section VIII of this MWP the
Sponsor shall take appropriate actions, as recommended by the CEMVN, to address
the causes of mortality and shall replace seedlings of the appropriate species during the
Page 20 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
following planting season. Replanting, monitoring and reporting, as previously
described, shall occur as needed to achieve and document the required survival rate.
2.
If the performance standard is not met after three unsuccessful attempts, the
CEMVN will convene a meeting with the Sponsor to decide if replanting should
continue. Should the CEMVN determine that achieving the required survival rate would
not be likely; the Sponsor shall be required to provide replacement mitigation for the
increment of value that did not accrue within the unsuccessful areas within one year of
this decision.
B.
Contingencies for Hydrology
If wetland hydrology is not documented by Year 5, the Sponsor shall document in
the monitoring report those areas where attention is needed. The CEMVN may require
the Sponsor to conduct adaptive management measures in order to obtain adequate
hydrology. With approval of the CEMVN, the Sponsor would establish a means of
increasing the amount of available water to the site.
XIII. Long Term Protection and Maintenance
To ensure long-term sustainability of the resource, the Sponsor shall burden the
property with a perpetual conservation servitude as described in Section X.A of this
MBI.
XIV. Funding
Section IX. A of this MBI provides specific details about the funding for the
Construction and Establishment (C & E) Activities for the Bank.
A. Construction and Establishment (C&E) Funds
1. Estimate of C&E Funds Required
The amount required for a third-party to construct and manage the Bank as specified
in this MWP through the first 15 years is estimated at $475,340.04. The construction
cost (Year 0) is estimated at $347,153.64 and the establishment costs over the first 15
years (Years 1-15) are estimated at $128,186.40. Attachment MWP-B is an estimate of
work and costs requirements for constructing and establishment of the Bank.
2. C&E Funding Mechanism
To fund this account the Sponsor proposes to establish the Bayou Fisher Mitigation
Bank Construction and Establishment Fund by means of an escrow account.
Page 21 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
3. C&E Release Schedule
The Financial assurances shall be reduced as success criteria are achieved and
the probability decreases that those funds would be needed according to the following
schedule:
1. Upon verification that all hydrologic modifications, construction, and planting as
described in Section VI have been completed to the satisfaction of CEMVN, in
consultation with the IRT, CEMVN shall advise the Sponsor and the financial institution
that the C & E financial assurance may be reduced to $128,186.40 ($475,340.04$347,153.64).
2. Upon verification by CEMVN, in consultation with the IRT, that the initial success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall advise the Sponsor and the financial institution that the C & E
financial that assurance may be reduced to $70,869.14 ($128,186.40-$57,317.25).
3. Upon verification by CEMVN, in consultation with the IRT, that the interim success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall advise the Sponsor and the financial institution that the C&E
financial assurance may be reduced to $22,526.89 ($70,869.14-$48,342.25).
4. Upon verification by CEMVN, in consultation with the IRT, that the long-term success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall notify the Sponsor and the financial institution that the remaining
C&E financial assurance may be released to the Sponsor.
B. Long Term Maintenance/Management Funds
1. Long-term Management Needs
Long-term management activities will include, but is not limited to, boundary
maintenance approximately every 10 years, annual property tax payment, annual
monitoring/inspections.
2. Annual Cost Estimates for Long-Term Needs
The annual cost of long-term management is estimated at $ 2,265.33 from year 16 to
year 50. This amounts to an average of $ 3,636.75 when adjusted annually for inflation.
Attachment B contains a description of the necessary work and an itemization of costs to
perform the work for long term management and protection of the Bank.
Page 22 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
3. Long-Term Maintenance and Protection Funding Mechanism
To ensure that sufficient funds are available to provide for the perpetual maintenance
and protection of the Bank, the Sponsor is establishing the "Long-Term Maintenance and
Protection" escrow account. This account will be administered by a federally-insured
depository that is "well capitalized" or "adequately capitalized" as defined in Section 38 of
the Federal Deposit Insurance Act. The account will be incrementally funded by deposit
a minimum of $ 360.21 into the account per credit /acre sold at the time of credit sale.
The deposit value per credit/acre must reflect, at a minimum, the total fund value divided
by no more than 70% of anticipated credits. Once the account is fully funded
($91,730.00), no incremental fund per credit sale is required. The account shall be fully
funded by the time 70% of the total number of credits are sold or upon successful
achievement of the Long-term Success Criteria, whichever occurs first. If the Long-term
Success Criteria are met prior to fully funding the escrow account then the Sponsor must
deposit into the escrow account the difference between the amount determined to be full
funding and the account balance difference between the amount determined to be full
funding and the account balance. Documentation that the account is fully funded is a prerequisite for release of the remaining credits following attainment of the Lon-term Success
Criteria as identified in this MWP. Accrued interest in excess of the value of the fully
funded account may only be used for the administration, operation, maintenance and/or
other purposed that directly benefit the Bank. The principal shall not be used and shall
remain as part of the Bank's assets to ensure that sufficient funds are available should
perpetual maintenance responsibilities be assumed by a third party. The Sponsor or
Long-term Steward may withdraw the accumulated interest only with written approval
from CEMVN and only to be used to maintain the Bank. The Sponsor shall provide
copies of depository account statements to CEMVN upon request and in their monitoring
reports.
XV. Citations
Allen, J.A., B.D. Keeland, J.A. Stanturf, A.F. Clewell, and H.E. Kennedy (2001 [rev.
2004]). A guide to bottomland hardwood restoration: US Geological Survey,
Biological Resources Division Information and Technology Report
USGS/BRD/ITR-2000-0011. USDA Forest Service, Southern Forest Research
Station, General Technical Report SRS-40, 132 pp.
Atchafalaya Basin Advisory Committee (1998) Atchafalaya Basin Floodway System,
Louisiana Project, State Master Plan. A report to the People of Louisiana,
Governor M.J. "Mike" Foster, Jr. and the Louisiana State Legislature, April 1998
(revised June 1998).
Atchafalaya Basin Program (2012) Atchafalaya Basin Program Fiscal Year 2014 Annual
Plan (Draft). Louisiana Department of Natural Resources Atchafalaya Basin
Program, October 2012.
Page 23 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
Atchafalaya National Heritage Area (2012) The Atchafalaya National Heritage Area
(Website). Available URL: http://www.atchafalaya.org. Accessed July 20, 2012.
Barrow, W.C. Jr., L.A. Johnson Randall, M.S. Woodrey, J. Cox, E. Ruelas, I.C.M. Riley,
R.B. Hamilton, and C. Eberly (2005) Coastal Forests of the Gulf of Mexico: A
Description and Some Thoughts on Their Conservation. USDA Forest Service
General Technical Report PSW-GTR-191.
Black Bear Conservation Committee (2005) Black Bear Management Handbook for
Louisiana, Mississippi, Southern Arkansas, and East Texas. March 2005.
Coastal Wetland Forest Science Working Group (2005) Conservation, Protection and
Utilization of Louisiana's Coastal Wetland Forests. A final report to the Governor
of Louisiana from the Coastal Wetland Forest Science Working Group. April 30,
2005. 102 pp.
Environmental Protection Agency (2003) Level III ecoregions of the continental United
States (revision of Omernik 1987): Corvallis, Oregon, U.S. Environmental
Protection Agency - National Health and Environmental Effects Research
Laboratory, Map M-1, various scales.
Gardiner, E.S. and J.M. Oliver (2005) Restoration of bottomland hardwood forest in the
Lower Mississippi Alluvial Valley In: Restoration of boreal and temperate forests
in the Lower Mississippi Alluvial Valley, Stanturf, J.A.; Madsen, P., eds. Boca
Raton, FL.
Lester G., S. Sorenson, P. Faulkner, C. Reid, and I. Maxit (2005) Louisiana
Comprehensive Wildlife Strategy (Wildlife Action Plan). Louisiana Department of
Wildlife and Fisheries.
Louisiana Department of Natural Resources Office of Coastal Management (2010)
Defining Louisiana's Coastal Zone: A Science Based Evaluation of the Louisiana
Coastal Zone Inland Boundary. August 2010.
Louisiana Natural Heritage Program (2009) The Natural Communities of Louisiana.
Louisiana Department of Wildlife and Fisheries.
Lower Mississippi Valley Joint Venture (2007) Restoration, Management and Monitoring
of Forest Resources in the Mississippi Alluvial Valley: Recommendations for
Enhancing Wildlife Habitat, Version 5.2 (FINAL REPORT). Wilson, R., K.
Ribbeck, S. King, and D. Twedt. Lower Mississippi Valley Joint Venture Forest
Resource Conservation Working Group.
Multi-Resolution Land Characteristics Consortium (2011) National Land Cover
Database [website]. Accessed June 1, 2012. Available URL http://www.mrlc.gov .
Page 24 of 25
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
BAYOU FISHER MITIGATION BANK, AMENDMENT ONE
Natural Resources Conservation Service (2006) Land Resource Regions and Major
Land Resource Areas of the United States, the Caribbean, and the Pacific Basin.
United States Department of Agriculture Handbook 296.
Natural Resources Conservation Service (2013)1 The PLANTS Database [website]. U.S.
Department of Agriculture, Natural Resources Conservation Service, National
Plant Data Center. Accessed September 13, 2013. Available URL:
http://plants.usda.gov
Natural Resources Conservation Service (2013)2 Web Soil Survey [website]. U.S.
Department of Agriculture, Natural Resources Conservation Service, Soil Survey
Staff. Accessed September 13, 2013. Available URL:
http://websoilsurvey.nrcs.usda.gov/app/
Omernik, J.M. (1987) Ecoregions of the Conterminous United States (map supplement):
Annals of the Association of American Geographers, v. 77, no. 1, p. 118-125,
scale 1:7,500,000.
Oswalt, S.N. (2013) Forest Resources of the Lower Mississippi Alluvial Valley. General
Technical Report SRS-GTR-177. Asheville, NC: USDA-Forest Service, Southern
Research Station. 29 p.
Society of American Foresters (2012) The Dictionary of Forestry [website]. Copyright
1988 by the Society of American Foresters. Accessed November 30, 2012.
Available URL: http://dictionaryofforestry.org
Twedt, D., D. Pashley, C. Hunter, A. Mueller, C. Brown and B. Ford (1999) Partners in
Flight Bird Conservation Plan for the Mississippi Alluvial Valley, Version 1.0.
Twedt, D.J. and C. Best (2004) Restoration of floodplain forests for conservation of
migratory land birds. Ecological Restoration 22 (3): 194-203.
U.S. Army Corps of Engineers (1987) Corps of Engineers Wetland Delineation Manual.
USACE Waterways Experiment Station Technical Report Y-87-1.
U.S. Army Corps of Engineers (2010) Regional Supplement to the Corps of Engineers
Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (ver 2.0).
ERDC/EL TR-10-20. U.S. Army Corps of Engineers, Environmental Laboratory,
Vicksburg, MS, November 2010.
U.S. Fish and Wildlife Service (2009) Louisiana Black Bear Recovery Action Plan. U.S.
Fish and Wildlife Service Southeast Region- Lafayette, Louisiana Ecological
Services Field Office, August 14, 2009.
Page 25 of 25
ATTACHMENT MWP A
TABLES AND FIGURES
Table 1. Baseline Conditions and Proposed Mitigation Habitat Types at the Proposed Bayou Fisher
Mitigation Bank, Amendment One Site, in Pointe Coupee Parish, Louisiana.
Baseline Condition
Nonwetland/Prior-Converted
Cropland
Nonwetland/Prior-Converted
Cropland
Nonwetlands/PriorConverted Cropland
Nonwetlands/PriorConverted Cropland
Proposed Mitigation Habitat and Type
Acres
Baldcypress Swamp Re-establishment (<35 feet NAVD)
120.1
Type 1 and 2 Bottomland Hardwood Re-establishment (35-36 feet
NAVD)
Type 2 and 3 Bottomland Hardwood Re-establishment (>36 feet
NAVD)
Total Mitigation Credit Acreage
31.9
211.8
363.8
Access Roads/Irrigation Well Sites/Unnamed Tributary
4.7
Total Non-mitigation Acreage
4.7
Total Conservation Servitude Acreage
368.5
Table 2. Potential Planting Composition of Restoration Acres at the Proposed Bayou Fisher Mitigation Bank,
Amendment One Site, in Pointe Coupee Parish, Louisiana1.
Baldcypress Swamp Species
Common Name
baldcypress
swamp tupelo
Drummond red maple
Mayhaw
Carolina ash
pumpkin ash
buttonbush
overcup oak
Nuttall oak
water hickory
Scientific Name
Taxodium distichum
Nyssa biflora
Acer rubrum var. drummondii
Crataegus opaca
Fraxinus caroliniana
Fraxinus profunda
Cephalanthus occidentalis
Quercus lyrata
Quercus texana
Carya aquatica
Indicator Status2
OBL
OBL
OBL
OBL
OBL
OBL
OBL
OBL
FACW
OBL
Target
Composition1
60-80%
<20%
<10%
<10%
<10%
<10%
<10%
<10%
<10%
<10%
Type 1 and 2 Bottomland Hardwood Species (approximately 50 to 70% Hard Mast)
Common Name
Scientific Name
overcup oak
Nuttall oak
willow oak
water hickory
baldcypress
Drummond red maple
mayhaw
green ash
Quercus lyrata
Quercus texana
Quercus phellos
Carya aquatica
Taxodium distichum
Acer rubrum var. drummondii
Crataegus opaca
Fraxinus pennsylvanica
Indicator Status
OBL
FACW
FACW
OBL
OBL
OBL3
OBL
FACW
Target
Composition
<20%
<20%
<20%
<20%
<15%
<15%
<15%
<15%
Type 2 and 3 Bottomland Hardwood Species (approximately 50-70% Hard Mast)
Common Name
cow oak
cherrybark oak
willow oak
Nuttall oak
Delta post oak
water oak
sweet pecan
sugarberry
common persimmon
green ash
sweetgum
red mulberry
American sycamore
eastern cottonwood
American elm
1
Scientific Name
Quercus michauxii
Quercus pagoda
Quercus phellos
Quercus texana
Quercus similis
Quercus nigra
Carya illinoinensis
Celtis laevigata
Diospyros virginiana
Fraxinus pennsylvanica
Liquidambar styraciflua
Morus rubra
Platanus occidentalis
Populus deltoides
Ulmus americana
Indicator Status
FACW
FACW
FACW
FACW
FACW
FAC
FACU4
FACW
FAC
FACW
FAC
FACU4
FACW
FAC
FAC
Target
Composition
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<15%
<15%
<15%
<15%
<15%
<15%
<15%
<15%
Exact species and quantities to be determined by seedling availability from commercial sources providing seedlings grown from localized ecotypes.
Indicator status from 2013 National Wetland Plant List (Lichvar and Kortesz 2009)
Indicator status from 1988 National Wetland Plant List, Region 2
4
These species are designated as UPL on the 2013 National Wetland Plant List but were FAC species on the 1988 National Wetland Plant List for Region 2. These
species were previously listed as FAC on the 1988 National Wetland Plants List for Region 2. Although potentially upland species, these are native to the site and
will provide increased habitat value given the goals of the project. The occurrence of the species at the specified composition will not affect the targeted plant
community from being classified as a hydrophytic plant community in accordance with the methodology prescribed in the Atlantic and Gulf Coastal Plain Regional
Supplement (USACE 2010).
2
3
Red River Wildlife
Management Area
Lake Ophelia
National Wildlife
Refuge
Grassy Lake Wildlife
Management Area
Spring Bayou Wildlife
Management Area
Three Rivers Wildlife
Management Area
Pomme de Terre Wildlife
Management Area
Angola State
Penitentiary
Tunica Hills Wildlife
Management Area
«
¬
LA 1
Cat Island
National Wildlife
Refuge
£
¤
US 71
Thistlethwaite Wildlife
Management Area
Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, increment P Corp.,
GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance
Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, and the GIS User
Community
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank (507.8 Acres)
I
National Wildlife Refuges
State Lands
5
2.5
0
Miles
5
Bayou Fisher Mitigation Bank
Amendment One
VICINITY MAP
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F01_Vicinity_5mi.mxd
FIGURE 1
08040306
08040301
08060100
Project Area
08080203
08070205
08070201
08080102
08070203
08070202
08070100
08080201
08070300
08080101
08070204
08090301
08080202
08080103
08090302
I
20
10
0
20
Miles
Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan,
METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2013
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank (507.8 Acres)
Proposed Service Area
Bayou Fisher Mitigation Bank
Amendment One
Watershed Map
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F02_Watershed Map.mxd
FIGURE 2
I
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank
Amendment One
1941 AERIAL PHOTOGRAPH
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F03_1941 Aerial Map.mxd
FIGURE 3
I
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank
Amendment One
1953 AERIAL PHOTOGRAPH
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F04_1953 Aerial Map.mxd
FIGURE 4
I
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank
Amendment One
1966 AERIAL PHOTOGRAPH
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F04_1966 Aerial Map.mxd
FIGURE 5
I
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank
Amendment One
1972 AERIAL PHOTOGRAPH
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F06_1972 Aerial Map.mxd
FIGURE 6
I
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank
Amendment One
1983 AERIAL PHOTOGRAPH
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F07_1983 Aerial Map.mxd
FIGURE 7
I
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank
Amendment One
1998 AERIAL PHOTOGRAPH
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F08_1998 Aerial Map.mxd
FIGURE 8
I
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank
Amendment One
2004 AERIAL PHOTOGRAPH
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F09_2004 Aerial Map.mxd
FIGURE 9
I
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Bayou Fisher Mitigation Bank
Amendment One
2010 AERIAL PHOTOGRAPH
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F10_2010 Aerial Map.mxd
FIGURE 10
I
1,000
500
0
1,000
Feet
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,
Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Sf: Sharkey clay
Note: Soils taken from NRCS SSURGO database for Pointe Coupee Parish.
Bayou Fisher Mitigation Bank
Amendment One
NRCS Soils Map
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F11_NRCS Soils Map.mxd
FIGURE 11
F is
her
B ay
ou T
h or n
to n
Atc hafalaya Rive
r
B
u
ayo
g
ti n
is
x
E
79
e
cr
-a
bo
nd
la
tt
om
w
rd
ha
oo
d
fo
re
st
in
Ma r
you
e Ba
I
Existing 1,375-acre bottomland hardwood/swamp forest
1
0.5
0
1
Miles
Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, increment P Corp.,
GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance
Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, and the GIS User
Community
Legend
Bayou Fisher Mitigation Bank (507.8 Acres)
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Flow Direction
Bayou Fisher Mitigation Bank
Amendment One
Historical Drainage Patterns
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F12_Historical Drainage.mxd
FIGURE 12
/
"
I
500 250
0
500
Feet
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,
Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
/
"
Irrigation Well
Flow Direction
Bayou Fisher Mitigation Bank
Amendment One
Existing Drainage Patterns
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F13_Existing Hydrology.mxd
FIGURE 13
I
500 250
0
500
Feet
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,
Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Legend
Bayou Fisher Mitigation Bank
Amendment One
Existing Plant Community
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Agricultural Field
Canal
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F14_Existing Vegetation.mxd
FIGURE 14
Exterior Access Road To Remain
(Degraded to Surrounding Elevation)
.
!
I
500 250
0
500
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, Feet
USGS, AEX, Getmapping,
Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Type 1 and 2 Bottomland Hardwood Re-establishment (31.9 Acres)
Type 2 and 3 Bottomland Hardwood Re-establishment (211.8 Acres)
Baldcypress Swamp Re-establishment (120.1 Acres)
Interior Levee/Road to be Removed (13.9 Acres)
Perimeter Road to be Degraded and Remain (4.7 Acres)
Canal/Ditch to be Filled (0.8 Acres)
.
!
Water Well to be Removed
Bayou Fisher Mitigation Bank
Amendment One
Mitigation Features
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 07/07/2014
Map : F15_Mitigation Features.mxd
FIGURE 15
E
E'
F
F'
C
D
D'
B
A
A'
C'
I
B'
1,000
500
0
1,000
Feet
Legend
Bayou Fisher Mitigation Bank Amendment One (368.5 Acres)
Interior Levee/Road to be Removed (13.9 Acres)
Perimeter Road to be Degraded and Remain (4.7 Acres)
Canal/Ditch to be Filled (0.8 Acres)
Agriculture Drain / Canal
BAYOU FISHER MITIGATION BANK
AMENDMENT ONE
HYDROLOGIC PLAN VIEW
Pointe Coupee Parish, Louisiana
Created : TSC/ArcView10
Approved : LJW
Date : 7/07/2014
Map : F16_Plan View.mxd
FIGURE 16
Legend
Bayou Fisher Mitigation Bank Amendment One (368.4 Acres)
FIGURE 23
ATTACHMENT MWP B
COST ANALYSIS REPORT
Cost Reference for Bayou Fisher Mitigation Bank, Amendment One
ver 1.1
Item
Boundary Maintenance
Invasive Species Control
Units
Miles
Acre
Unit Values
3.8
368.5
Price Per Unit
$
150.00
$
90.00
$
$
Invasive Species Control Mobilization
Inspections (rate and per diem)
Taxes on Project Acreage
Planted Acreage
Planting Rate
Seedling Cost (BRS)
Seedling Installation Rate
Planting Cost (BRS and Installation)
Earth Moving
Site Prep and Preemergent Spray
Credit Acreage
Conservation Servitude Acreage
Access Road Maintenance
Fixed
Day
Acre
Acre
Trees/Acre
Seedling
Seedling
Seedling
Cubic Yards
Acres
Acres
Acres
Acres
Fixed
1.0
368.5
363.8
538.0
538.0
538.0
538.0
105,317
363.8
363.8
368.5
4.7
Fixed
$
$
NA
NA
$
$
$
$
$
NA
NA
$
$
$
$
NA
NA
$
$
$
$
$
NA
NA
$
BRS= bare-root seedlings
790.00
3.00
0.22
0.17
0.39
2.00
120.00
10.00
Total Cost
570.00
33,165.00
100.00
790.00
1,105.50
118.36
91.46
209.82
210,634.00
43,656.00
47.00
Estimated Construction Costs for
Bayou Fisher Mitigation Bank, Amendment One
Year 0
Item
Units
Unit Values Price Per Unit
Hydrology Restoration
Cubic Yards
105,317 $
2.00
Site Prep and Preemergent Spray
Acres
363.8 $
120.00
Planting Costs
Acres
363.8 $
209.82
Subtotal
Construction Cost with 5% Contingency
Cost Per Credit Acre
$
$
$
$
$
$
Cost
210,634.00
43,656.00
76,332.52
330,622.52
347,153.64
954.24
Estimated Establishment Costs for
Bayou Fisher Mitigation Bank, Amendment One
Year 1 to 15
Year
1
1
1
1
1
1
1
2
2
2
2
2
2
2
3
3
3
3
3
3
4
4
4
4
4
4
5
5
5
5
5
5
6
6
6
7
7
7
8
8
8
9
9
9
10
10
10
10
10
10
10
11
11
11
12
12
12
13
13
13
14
14
14
15
15
15
15
15
15
15
Event
Monitoring/ Inspection
Replant (30%)
Invasive Species Control (100%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Replant (10%)
Invasive Species Control (25%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Invasive Species Control (20%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Invasive Species Control (10%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Invasive Species Control (5%)
Invasive Species Mobilization
Wildlife Opening and Access Road Maintenance
Property Taxes
Subtotal
Access Road Maintenance
Property Taxes
Subtotal
Access Road Maintenance
Property Taxes
Subtotal
Access Road Maintenance
Property Taxes
Subtotal
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Invasive Species Control (2%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Boundary Maintenance
Subtotal with Year 10 Adjusted Inflation (2.49%)
Access Road Maintenance
Property Taxes
Subtotal with Year 11 Adjusted Inflation (2.49%)
Access Road Maintenance
Property Taxes
Subtotal with Year 12 Adjusted Inflation (2.49%)
Access Road Maintenance
Property Taxes
Subtotal with Year 13 Adjusted Inflation (2.49%)
Access Road Maintenance
Property Taxes
Subtotal with Year 14 Adjusted Inflation (2.49%)
Monitoring/ Inspection
Invasive Species Control (2%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Boundary Maintenance
Subtotal with Year 15 Adjusted Inflation (2.49%)
Event Cost Percent
$
790.00
100%
$ 76,332.52
30%
$ 33,165.00 100%
$
100.00
100%
$
47.00
100%
$
1,105.50 100%
$
$
$
$
$
$
790.00
76,332.52
33,165.00
100.00
47.00
1,105.50
100%
10%
25%
100%
100%
100%
$
$
$
$
$
790.00
33,165.00
100.00
47.00
1,105.50
100%
20%
100%
100%
100%
$
$
$
$
$
790.00
33,165.00
100.00
47.00
1,105.50
100%
10%
100%
100%
100%
$
$
$
$
$
790.00
33,165.00
100.00
47.00
1,105.50
100%
5%
100%
100%
100%
$
$
47.00
1,105.50
100%
100%
$
$
47.00
1,105.50
100%
100%
$
$
47.00
1,105.50
100%
100%
$
$
47.00
1,105.50
100%
100%
$
$
$
$
$
$
790.00
33,165.00
100.00
47.00
1,105.50
570.00
100%
2%
100%
100%
100%
100%
$
$
47.00
1,105.50
100%
100%
$
$
47.00
1,105.50
100%
100%
$
$
47.00
1,105.50
100%
100%
$
$
47.00
1,105.50
100%
100%
$
$
$
$
$
$
790.00
33,165.00
100.00
47.00
1,105.50
570.00
100%
2%
100%
100%
100%
100%
Occurences Inflation
Per Year
Factor
0
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
5
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
5
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
5
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
5
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
1
1.0000 $
1
1.0000 $
$
1
1.0000 $
1
1.0000 $
$
1
1.0000 $
1
1.0000 $
$
1
1.0000 $
1
1.0000 $
$
5
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
$
1
1.0249 $
1
1.0249 $
$
1
1.0249 $
1
1.0249 $
$
1
1.0249 $
1
1.0249 $
$
1
1.0249 $
1
1.0249 $
$
5
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
$
Total
Total Per Credit Acre
Years 10-15 adjusted using an inflation rate of 2.49%. This is the average Consumer Price Index (CPI) from 1983-2012.
Cost
22,899.75
33,165.00
100.00
47.00
1,105.50
57,317.25
3,950.00
7,633.25
8,291.25
100.00
47.00
1,105.50
21,127.00
3,950.00
6,633.00
100.00
47.00
1,105.50
11,835.50
3,950.00
3,316.50
100.00
47.00
1,105.50
8,519.00
3,950.00
1,658.25
100.00
47.00
1,105.50
6,860.75
47.00
1,105.50
1,152.50
47.00
1,105.50
1,152.50
47.00
1,105.50
1,152.50
47.00
1,105.50
1,152.50
4,048.36
679.82
102.49
48.17
1,133.03
584.19
6,596.05
48.17
1,133.03
1,181.20
48.17
1,133.03
1,181.20
48.17
1,133.03
1,181.20
48.17
1,133.03
1,181.20
4,048.36
679.82
102.49
48.17
1,133.03
584.19
6,596.05
$ 128,186.40
$
352.35
Percent of
Cost
44.7%
Release Milestone
$128,186.40
Initial Success
$57,317.25
$70,869.14
16.5%
9.2%
6.6%
5.4%
Interim Success
$48,342.25
$22,526.89
0.9%
0.9%
0.9%
0.9%
5.1%
0.9%
0.9%
0.9%
0.9%
5.1%
100.0%
Long-Term Success
$22,526.89
$0.00
Estimated Long-Term Annualized Cost Summary
Bayou Fisher Mitigation Bank, Amendment One
Item
Units
Unit
Values
Price Per
Unit
Boundary Maintenance (10-year event)
Miles
3.8 $
0.5% Invasive Species Control (annual event)
Acre
368.5 $
Fixed
Fixed Fixed
Acre
Day
Acre
4.7 $
5.0 $
368.5 $
Invasive Species Control Mobilization (annual
event)
Access Road Maintenance
Inspection (annual event)
Taxes (annual event)
Average Annual Cost (Starting at Year 16)
Unit
Percent
Cost
Years
Annualized
Cost
150.00 100.0%
$
570.00
10
$
57.00
90.00 0.5%
$
165.83
1
$
165.83
$
100.00
1
$
100.00
$
47.00
$ 790.00
$ 1,105.50
1
1
1
$
47.00
$ 790.00
$ 1,105.50
NA
10.00 100.0%
790.00 20.0%
3.00 100.0%
$ 2,265.33
Year
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Inflation
Interest
Per Credit
Acre
70%
1.
Item
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Total
Average
Estimated Long-Term Costs and Projected Account Activity for
Bayou Fisher Mitigation Bank, Amendment One
Year 16 to 50
Inflationary Adjustment1
Beginning Balance2
Total Cost
$
$
$
91,730.00
$
2,265.33 $
2,321.73 $
95,059.80
$
2,265.33 $
2,379.54 $
96,104.46
$
2,265.33 $
2,438.79 $
97,127.13
$
2,265.33 $
2,499.52 $
98,125.52
$
2,265.33 $
2,561.76 $
99,097.23
$
2,265.33 $
2,625.55 $
100,039.71
$
2,265.33 $
2,690.92 $
100,950.30
$
2,265.33 $
2,757.93 $
101,826.19
$
2,265.33 $
2,826.60 $
102,664.45
$
2,265.33 $
2,896.98 $
103,461.96
$
2,265.33 $
2,969.11 $
104,215.49
$
2,265.33 $
3,043.05 $
104,921.62
$
2,265.33 $
3,118.82 $
105,576.77
$
2,265.33 $
3,196.48 $
106,177.17
$
2,265.33 $
3,276.07 $
106,718.90
$
2,265.33 $
3,357.64 $
107,197.80
$
2,265.33 $
3,441.25 $
107,609.56
$
2,265.33 $
3,526.93 $
107,949.62
$
2,265.33 $
3,614.76 $
108,213.23
$
2,265.33 $
3,704.76 $
108,395.40
$
2,265.33 $
3,797.01 $
108,490.91
$
2,265.33 $
3,891.56 $
108,494.29
$
2,265.33 $
3,988.46 $
108,399.81
$
2,265.33 $
4,087.77 $
108,201.48
$
2,265.33 $
4,189.55 $
107,893.04
$
2,265.33 $
4,293.87 $
107,467.92
$
2,265.33 $
4,400.79 $
106,919.27
$
2,265.33 $
4,510.37 $
106,239.90
$
2,265.33 $
4,622.68 $
105,422.31
$
2,265.33 $
4,737.78 $
104,458.65
$
2,265.33 $
4,855.76 $
103,340.74
$
2,265.33 $
4,976.66 $
102,059.99
$
2,265.33 $
5,100.58 $
100,607.45
$
2,265.33 $
5,227.59 $
98,973.76
$
2,265.33 $
5,357.75 $
97,149.16
$
79,286.38 $
127,286.37
$
2,265.33 $
3,636.75
Ending Balance3
$
91,730.00
$
92,738.07
$
93,724.92
$
94,688.34
$
95,626.01
$
96,535.47
$
97,414.16
$
98,259.38
$
99,068.27
$
99,837.85
$
100,564.98
$
101,246.38
$
101,878.58
$
102,457.95
$
102,980.70
$
103,442.83
$
103,840.16
$
104,168.31
$
104,422.69
$
104,598.48
$
104,690.64
$
104,693.90
$
104,602.73
$
104,411.35
$
104,113.71
$
103,703.49
$
103,174.05
$
102,518.48
$
101,729.52
$
100,799.63
$
99,720.87
$
98,484.98
$
97,083.32
$
95,506.86
$
93,746.18
$
91,791.41
0.0249
0.0363
$
$
252.14
360.21
Adjusted using an inflation rate of 2.49%. This is the average Consumer Price Index (CPI) from 1983-2012.
2.
Adjusted using an interest rate of 3.63% applied to the previous years' ending balance. The rate of return is based on a 30-year Treasury Bond rate as of August 13, 2013
3.
The ending balance is the begining balance less the estimated, inflated cost.
ATTACHMENT MWP C
MCM
Negative Influences on the
mitigation site
Net Improvement
Mitigation Type
Maintenance/ Management
Requirement
Control
Temporal Lag
Credit Schedule
Kind
Location
Commercial/Residential
Development
Oil & gas activities
Size
Corridors
Factors
No Impact
No Impact
Category 1
No Impact
No Impact
No Impact
Category 1
No Impact
No Impact
No Impact
Category 1
No Impact
Area 3
(Select an Option)
Self-Sustaining
(Select an Option)
Conservation Servitude
(Select an Option)
Over 20
(Select an Option)
Schedule 1
(Select an Option)
(Select an Option) (Select an Option)
(Select an Option) (Select an Option)
Area 2
Re-establishment I
Self-Sustaining
Conservation Servitude
Over 20
Schedule 1
(Select an Option)
(Select an Option)
Area 1
Re-establishment I
Bayou Fisher Mitigation Bank Amendment One MVN-2013-02343
Mitigation Project Size (Acres) Include Wetlands,
Non-wetlands and Buffer Areas:
363.8
Mitigation Project HUC: 08080101
Mitigation Project Basin: Atchafalaya
Impacted HUC: 08080101
Mitigation Project in the same basin as the impact: Yes
Proximity Factor:
1.0
Mitigation Project Name:
Table 2B: Proposed Restoration/Enhancement Mitigation Worksheet
Version_2012_MVN_MCM_11_1
No Impact
No Impact
Category 1
No Impact
(Select an Option)
(Select an Option)
(Select an Option)
(Select an Option)
(Select an Option)
(Select an Option)
Area 4
(Select an Option)
No Impact
No Impact
Category 1
No Impact
7/8/2014
(Select an Option)
(Select an Option)
(Select an Option)
(Select an Option)
(Select an Option)
(Select an Option)
Area 5
(Select an Option)
Credits per acre (M)
Size in Acres (A)
M×A=
Credits added to bank =
Buffers
0.0
0.2
Mitigation Type * Maintenance/
Management Requirement
Non-hydric inclusions
0.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.5
120.1
540.5
0.0
0.0
0.0
0.0
0.0
0.0
4.5
243.7
1096.7
0.0
Area 3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Area 4
Hydric Inclusions
0.6
0.0
0.0
0.0
Total Restoration/Enhancement Credits = (M × A) =
Total Available including buffers
Average Credit Per Acre =
4.0
0.4
-0.3
0.4
0.0
0.0
4.5
Area 2
4.0
0.4
-0.3
0.4
0.0
0.0
4.5
Bayou Fisher Mitigation Bank Amendment One MVN-2013-02343
Factors
Area 1
Control
Temporal Lag
Credit Schedule
Kind
Location
Subtotal
Commercial/Residential
Development
Negative Influences on the
Oil & gas activities
Size
mitigation site
Utility Corridors
Sum of negative impacts
Sum of m Factors
Size of Area (Acres)
M × A=
Acreage required for Permittee-responsible Mitigation project
using required credits calculated in Adverse impact Worksheet.
Net Improvement
Mitigation Project Name:
Table 2B: Proposed Restoration/Enhancement Mitigation Worksheet
Version_2012_MVN_MCM_11_1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1637.1
1637.1
4.5
Area 5
7/8/2014
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Version_2012_MVN_MCM_11_1
MVN Permit Number: 0
Table 1: Adverse Impacts Worksheet
General Comments
Factor
Comment
Priority Category
Existing Habitat Condition
Existing Hydrologic Condition
Duration
Dominant Impact
Cumulative Impact
Mitgation Project Name: Bayou Fisher Mitigation Bank Amendment One MVN-2013-02343
Table 2B: Proposed Restoration/Enhancement Mitigation Worksheet
General Comments
Area 1: BLH Re-establishment; Area 2: SWAMP Re-establishment
Net
Improvement
Factor
Comment
Mitigation Type
Maintenance/ Management
Requirement
Control
Temporal Lag
Credit Schedule
Kind
Negative Influences on
the mitigation site
Location
Commercial/Residential
Development
Oil & gas activities
Size
Corridors
All restored from PC croplands; peremiter/interior roads reduced to grade
No active structures or management required
Perpetual conservation servitude
All forested so >20 years
Bank so advanced credit
Undeterminded
Undeterminded
<1% development (99% forest, agriculture, conservation servitude)
No active or historic wells
Adjacent to 500-acre existing Bayou Fisher Mitigation Bank conservation servitude
No pipelines or other utility rights-of-way; no public roads
ATTACHMENT D
ACCEPTANCE LETTER
US Army Corps of Engineers
Regulatory Branch
PO Box 60267
New Orleans, LA 70160
ATTN: {CORPS PROJECT MANAGER}
Gentlemen:
{MITIGATION BANK NAME} has made arrangements with {PERMITTEE'S NAME} to
purchase {NUMBER OF ACRES OR CREDITS} {ACRES OR CREDITS} of {HABITAT TYPE} for
unavoidable impacts associated with work authorized by the Department of the Army permit
number {MVN-XXXX-XXXXX-XX}. The {MITIGATION BANK NAME} assumes the responsibility
for the permittee's compensatory mitigation requirements (i.e., to implement, assure performance,
and provide long-term management of the compensatory mitigation project) in accordance with
provisions of the Mitigation Banking Instrument governing this bank.
{CLOSING}
{NAME}
{TITLE}