MODIFICATION TO MIXED USE DEVELOPMENT, THE VILLAGE AT RIVERWOOD,
IN EAST BATON ROUGE PARISH
NAME OF APPLICANT: Charles Lambert d.b.a. Louisiana Riverboat Casinos, Inc., c/o Natural Resource Professionals, LLC, Attn: Gregg Fell, 4664 Jamestown Avenue, Suite 420, Baton Rouge, Louisiana 70808.
LOCATION OF WORK: In Sections 58 and 63, Township 8 South, Range 1 West, near Baton Rouge, Louisiana, in EAST BATON ROUGE PARISH, 30.35333 N and -91.1994 W, as shown on the enclosed drawings. This project is located in USGS Hydrologic Unit Code (HUC) 08070202- Amite River HUC.
CHARACTER OF WORK: Modification to previously authorized work involves the proposed relocation of a previously authorized access road within the development and the package sewer plant for the development. This modification request also includes the proposed construction of a subsurface drainage system for the entire Riverwood development. This drainage system would include 3 primary drainage outlet pipes that will collect surface runoff and direct flow north into Elbow Bayou. These pipes will be constructed within 20-foot permanent drainage servitude. Wetland vegetation will be hand cleared and placed in a non-wetland location. Pipes will be installed via trench and backfill methodology. Approximately 0.13 acre of jurisdictional forested wetlands would be permanently converted to herbaceous wetlands within the 20-foot drainage servitude. Approximately 0.08 acre of jurisdictional forested wetlands would be permanently impacted as a result of roadway relocation. Approximately 1,500 cubic yards of clay material, 500 cubic yards of clean native fill material, and 120 cubic yards of concrete would be placed in jurisdictional areas for this proposed modification. The original Department of the Army permit for the Riverwood development was issued on February 12, 2014. The original permit authorized 14.9 acres of direct impacts to forested wetlands and 8.5 acres of avoided forested wetlands were to be impounded as a result of the development. The compensatory mitigation for the original development entailed 91.5 acres of swamp enhancement credits for the direct impacts and 48.7 acres of swamp preservation credits for the avoided wetland secondary impacts. The applicant has stated that due to the fact that all wetlands have been mitigated for in the original permit and the relatively small amount of additional permanent wetland impact proposed in the current modification that no additional compensatory mitigation be required for this modification proposal.
JOINT PUBLIC NOTICE
August 18, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1217
Project Manager
Kenny Blanke
Permit Application Number
MVN 2006-0737-CQ
(225) 219-3225
Project Manager
Ms. Elizabeth Johnson
WQC Application Number
WQC 140724-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS30:2074 A(3), and provisions of Section 401 of the Clean
Water Act (P.L.95-17).
MODIFICATION TO MIXED USE DEVELOPMENT, THE VILLAGE AT RIVERWOOD,
IN EAST BATON ROUGE PARISH
NAME OF APPLICANT: Charles Lambert d.b.a. Louisiana Riverboat Casinos, Inc., c/o Natural
Resource Professionals, LLC, Attn: Gregg Fell, 4664 Jamestown Avenue, Suite 420, Baton
Rouge, Louisiana 70808.
LOCATION OF WORK: In Sections 58 and 63, Township 8 South, Range 1 West, near Baton
Rouge, Louisiana, in EAST BATON ROUGE PARISH, 30.35333 N and -91.1994 W, as shown
on the enclosed drawings. This project is located in USGS Hydrologic Unit Code (HUC)
08070202- Amite River HUC.
CHARACTER OF WORK: Modification to previously authorized work involves the proposed
relocation of a previously authorized access road within the development and the package
sewer plant for the development. This modification request also includes the proposed
construction of a subsurface drainage system for the entire Riverwood development. This
drainage system would include 3 primary drainage outlet pipes that will collect surface runoff
and direct flow north into Elbow Bayou. These pipes will be constructed within 20-foot
permanent drainage servitude. Wetland vegetation will be hand cleared and placed in a nonwetland location. Pipes will be installed via trench and backfill methodology. Approximately
0.13 acre of jurisdictional forested wetlands would be permanently converted to herbaceous
wetlands within the 20-foot drainage servitude. Approximately 0.08 acre of jurisdictional
forested wetlands would be permanently impacted as a result of roadway relocation.
Approximately 1,500 cubic yards of clay material, 500 cubic yards of clean native fill material,
and 120 cubic yards of concrete would be placed in jurisdictional areas for this proposed
modification. The original Department of the Army permit for the Riverwood development was
issued on February 12, 2014. The original permit authorized 14.9 acres of direct impacts to
forested wetlands and 8.5 acres of avoided forested wetlands were to be impounded as a result
of the development. The compensatory mitigation for the original development entailed 91.5
acres of swamp enhancement credits for the direct impacts and 48.7 acres of swamp
preservation credits for the avoided wetland secondary impacts. The applicant has stated that
due to the fact that all wetlands have been mitigated for in the original permit and the relatively
small amount of additional permanent wetland impact proposed in the current modification that
no additional compensatory mitigation be required for this modification proposal.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this
permit and/or this WQC request and must be mailed so as to be received before or by the last
day of the comment period. Letters concerning the Corps of Engineers permit application must
reference the applicant's name and the Permit Application Number, and be mailed to the Corps
of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or
parties may request an extension of time in which to comment on the proposed work by writing
to the project manager or clicking on the project manager's name on the public notice grid on
the web page. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The Section
Chief will review the request and the requestor will be promptly notified of the decision to grant
or deny the request. If granted, the time extension will be continuous to the initial comment
period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.
Letters concerning the Water Quality Certification must reference the applicant's name and the
WQC Application number and be mailed to the Louisiana Department of Environmental Quality
at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of NA acres of EFH utilized by various life stages of
red drum and penaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services, before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch