City, and Borough of Juneau's stated purpose is to restore and enhance the downtown Juneau waterfront by providing public access to bicycles and pedestrians, create a gateway park that incorporates a whale statue, and to provide educational interpretation for coastal environments. The applicant requests authorization for the following work in waters and navigable waters of the United States (U.S.):

1. Discharge 410 cubic yards of riprap, soil material, cobble, and gravel below the High Tide Line (+20.8 feet above the 0.0 foot contour line) (HTL) impacting 0.1 acres of marine intertidal substrate to vegetate the existing riprap side slopes.

2. Discharge 11,500 cubic yards of shot rock, and riprap below the HTL impacting 0.58 acres of marine intertidal substrate to construct a park.

3. Discharge 30,000 cubic yards of shot rock and riprap below the HTL impacting 2.69 acres of marine intertidal and subtidal substrate including 0.12 acres of vegetated shallows to construct a recreational island.

4. Discharge 360 cubic yards of shot rock below the HTL impacting 0.07 acres of marine intertidal substrate to access the proposed island.

5. Discharge 127 cubic yards of rock below the HTL impacting 0.05 acres of marine intertidal substrate to construct two pedestrian paths for access to the proposed recreational island and intertidal waters.

6. Install 65, 14-inch to 16-inch diameter steel piles below the Mean High Water Mark (+15.4 feet above the 0.0-foot contour line) to construct two viewing platforms and one pedestrian and bicycle path.

Please contact Matthew Brody at (907) 790-4493, or by email at Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.

City, and Borough of Juneau'sstated purpose is to restore and enhance the downtown Juneau waterfront by providing public access to bicycles and pedestrians, create a gateway park that incorporates a whale statue, and to provide educational interpretation for coastal environments. The applicant requests authorization for the following work in waters and navigable waters of the United States (U.S.): 1. Discharge 410 cubic yards of riprap, soil material, cobble, and gravel below the High Tide Line (+20.8 feet above the 0.0 foot contour line) (HTL) impacting 0.1 acres of marine intertidal substrate to vegetate the existing riprap side slopes. 2. Discharge 11,500 cubic yards of shot rock, and riprap below the HTL impacting 0.58 acres of marine intertidal substrate to construct a park. 3. Discharge 30,000 cubic yards of shot rock and riprap below the HTL impacting 2.69 acres of marine intertidal and subtidal substrate including 0.12 acres of vegetated shallows to construct a recreational island.

4. Discharge 360 cubic yards of shot rock below the HTL impacting 0.07 acres of marine intertidal substrate to access the proposed island. 5. Discharge 127 cubic yards of rock below the HTL impacting 0.05 acres of marine intertidal substrate to construct two pedestrian paths for access to the proposed recreational island and intertidal waters.

6. Install 65, 14-inch to 16-inch diameter steel piles below the Mean High Water Mark (+15.4 feet above the 0.0-foot contour line) to construct two viewing platforms and one pedestrian and bicycle path. Please contact Matthew Brody at (907) 790-4493, or by email at Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.

POA-2014-251, Gastineau Channel_PN POA-2014-251, Gastineau Channel_PN Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.