DECK AND BOATHOUSE IN PONTCHITOLAWA CREEK
NAME OF APPLICANT: Hal Neitzschman Ill, 180 Belle Terre Boulevard, Covington, Louisiana
70433.
LOCATION OF WORK: In Pontchitolawa Creek at 30° 25' 24.42" and -90° 5' 55.82" in Covington,
Louisiana.
CHARACTER OF WORK: Install and maintain a boathouse 12 feet by 24 feet and add a 6 feet by 12
feet deck and a 6 feet by 20 feet deck all connected to an existing deck.
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
P. 0. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
REPLY TO
ATTENTION OF
Operations Division
Eastern Evaluation Section
Project Manager
Ed Wrubluski
(504) 862-2822
Edward.F.Wrubluski@usace.army.mil
AUG Z5 Z014
SUBJECT: MVN-2014-1614-EII
PUBLIC NOTICE
Interested parties are hereby notified that an application has been received by the District
engineer for a Department of the Army permit to authorize the following pursuant to (X) Section 10 of
the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or() Section 404 of
the Clean Water Act (86 Stat. 816; 33 USC 1344).
DECK AND BOATHOUSE IN PONTCHITOLAWA CREEK
NAME OF APPLICANT: Hal Neitzschman Ill, 180 Belle Terre Boulevard, Covington, Louisiana
70433.
LOCATION OF WORK: In Pontchitolawa Creek at 30° 25' 24.42" and -90° 5' 55.82" in Covington,
Louisiana.
CHARACTER OF WORK: Install and maintain a boathouse 12 feet by 24 feet and add a 6 feet by 12
feet deck and a 6 feet by 20 feet deck all connected to an existing deck.
The comment period will close 15 days from the date of this public notice advertisement. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons therefore, are being solicited from anyone having interest in this permit request. Letters
must reference the applicant's name and the subject number, be addressed and mailed to the above
address, ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension
of time in which to comment on the proposed work by writing to the project manager or clicking on
the project manager's name on the public notice grid on the web page. Any request must be
specific and substantively supportive of the requested extension, and received by this office prior to
the end of the initial comment period. The Section Chief will review the request and the requestor
will be promptly notified of the decision to grant or deny the request. If granted, the time extension
will be continuous to the initial comment period and, inclusive of the initial comment period, will not
exceed a total of 30 calendar days.
-2-
The decision whether to issue a permit will be based on an evaluation of the probable impact
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. all factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies
and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts
of this proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above. Comments
are used in the preparation of an Environmental Assessment and/or Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, rehistorical, historical sites, or data. Issuance of
this public notice solicits input from State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as endangered
by the U.S. Department of Interior nor affect any habitat designated as critical to the survival and
recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Mag nusStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of Q acre(s) of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency and certification that the proposed activity will
not violate applicable water quality standards will be required from the Louisiana Department of
Environmental Quality, Office of Environmental Services, before a permit is issued.
-3-
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
Michael V. Farabee
Chief, Eastern Evaluation Section
Regulatory Branch
Attachments
..
;91;..jU;~
f)
..,
r
"
1\
~
13
:L
,,,
}l
®
,j;
®
iS
~
"'
~
c"
0
"
~
...
,~-
~J'd ,,5.-Ul~!<)H
~
~'
~·?
i
~
-
(/'<
(\
~
r--
-'1';""'\.
!t..Ji
'J
2:_
\::)
N
T
VI~
n'
:J:j(' o__
(t,l
1
(1\
--4
() ~
r- V\
"-\-..
(\
() :t
.......,.
-
~
--..:.)
-S:
-~
<
('\
N
()
{/\
~v"
V'\
rh
(~
~
'!\
~
<'"
"-------'
Plats
Hal Neitzschman P20140817
Notes to be added to permit plats
1. As-built drawings and/or plats shall have written on them the date of
completion of said activities and shall be submitted to the Louisiana
Department of Natural Resources, Office of Coastal Management, P.O.
Box 44487, Baton Rouge, LA 70804-4487 within 30 days following project
completion.
2. All structures, facilities, well and pipelines/flowlines occurring in open
water areas or in oilfield canals or slips shall be removed within 120 days
of abandonment or the facilities for the herein permitted use unless prior
written approval to leave such structures in place is received from the
Coastal Management Division. This condition does not preclude the
necessity for revising the current permit or obtaining a separate Coastal
Use Permit, should one be required.
3. Structures must also be marked/lighted in accordance with U. S. Coast
Guard regulations.
4. In order to ensure the safety of all parties, the permittee shall contact the
Louisiana One Call System (1-800-272-3020) a minimum of 48 hours prior
to the commencement of any excavation (digging, dredging, jetting, etc.)
or demolition activity.