DRAINAGE IMPROVEMENTS AT A RESIDENTIA-COMERCIAL DEVELOPMENT IN TAMMANY PARISH, LOUISIANA
NAME AND ADDRESS OF APPLICANT: Bedico Creek Preserve, LLC c/o J.V. Burkes & Associates, Attention: Barbara Zelenka, 1805 Shortcut Highway, Slidell, Louisiana 70458.
LOCATION OF WORK: South of Interstate 12 (I-12), west of Highway 1085 within Sections 5, 6, 7, & 8, Township 7 South, Range 10 East and Section 31, Township 6 South, Range 10 East, St. Tammany Parish, Louisiana.
EXISTING CONDITIONS: The ongoing construction of this residential-commercial development was authorized by CEMVN via permit # MVN-1997-01715-ETT. The property and development rights were purchased from the original permittee and the permit was previously transferred to the applicant referenced above. The required compensatory mitigation for the ongoing work has been satisfied via purchase of wetland acre credits from Mossy Hill Mitigation Bank and by an onsite conservation servitude which is being preserved and maintained in perpetuity, in accordance with the Corps Regulatory Guidelines. The original drainage design inherited by the current owner/developer has proven to be inadequate and the applicant is proposing to make drainage improvements to alleviate reoccurring street and property flooding.
CHARACTER OF WORK: Clear, excavate, fill and grade to construct two drainage ditches.
Both drainage ditches would be approximately 7 feet deep by 42 feet wide; one would be 1,610 feet long and drain to an existing 10 acre stormwater treatment pond. The second ditch would be 435 feet long and drain to an existing drainage ditch. The proposal would result in direct impacts to + 0.34 acres of herbaceous wetlands located within an existing drainage easement and + 0.88 acres of pine forested wetlands abutting the easement. Other minimal direct wetland impacts would occur within the authorized development footprint. Those impacts were mitigated for under the previous authorization. The applicant proposes to provide the required compensatory mitigation at a CEMVN approved mitigation bank.
JOINT PUBLIC NOTICE
September 8, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
(504) 862-2041 FAX (504) 862-2117
robert.m.tewis2@usace.army.mil
Project Manager
Robert Tewis
Permit Application Number
MVN-1997-01715-ETT
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certification
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(225) 219-3225;
Fax (225) 219-3156
Project Manager
Elizabeth Johnson
WQC Application Number
WQC-140829-02
Interested parties are hereby notified that a permit application has been received by the U.S. Army
Corps of Engineers, New Orleans District (CEMVN) of the pursuant to: [] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water
Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3),
and provisions of Section 401 of the Clean Water Act (P.L.95-17).
DRAINAGE IMPROVEMENTS AT A RESIDENTIA-COMERCIAL DEVELOPMENT IN
TAMMANY PARISH, LOUISIANA
NAME AND ADDRESS OF APPLICANT: Bedico Creek Preserve, LLC c/o J.V. Burkes &
Associates, Attention: Barbara Zelenka, 1805 Shortcut Highway, Slidell, Louisiana 70458.
LOCATION OF WORK: South of Interstate 12 (I-12), west of Highway 1085 within Sections 5, 6, 7,
& 8, Township 7 South, Range 10 East and Section 31, Township 6 South, Range 10 East, St. Tammany
Parish, Louisiana.
EXISTING CONDITIONS: The ongoing construction of this residential-commercial development was
authorized by CEMVN via permit # MVN-1997-01715-ETT. The property and development rights were
purchased from the original permittee and the permit was previously transferred to the applicant
referenced above. The required compensatory mitigation for the ongoing work has been satisfied via
purchase of wetland acre credits from Mossy Hill Mitigation Bank and by an onsite conservation
servitude which is being preserved and maintained in perpetuity, in accordance with the Corps Regulatory
Guidelines. The original drainage design inherited by the current owner/developer has proven to be
inadequate and the applicant is proposing to make drainage improvements to alleviate reoccurring street
and property flooding.
CHARACTER OF WORK: Clear, excavate, fill and grade to construct two drainage ditches.
Both drainage ditches would be approximately 7 feet deep by 42 feet wide; one would be 1,610 feet long
2
and drain to an existing 10 acre stormwater treatment pond. The second ditch would be 435 feet long and
drain to an existing drainage ditch. The proposal would result in direct impacts to + 0.34 acres of
herbaceous wetlands located within an existing drainage easement and + 0.88 acres of pine forested
wetlands abutting the easement. Other minimal direct wetland impacts would occur within the authorized
development footprint. Those impacts were mitigated for under the previous authorization. The applicant
proposes to provide the required compensatory mitigation at a CEMVN approved mitigation bank.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating reasons
thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must
be mailed so as to be received before or by the last day of the comment period. Letters concerning the
Corps of Engineers permit application must reference the applicant's name and the Permit Application
Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY
BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's
name and the WQC Application number and be mailed to the Louisiana Department of Environmental
Quality at the address above. Individuals or parties may request an extension of time in which to comment
on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any
request must be specific and substantively supportive of the requested extension, and received by this
office prior to the end of the initial comment period. The Section Chief will review the request and the
requestor will be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial comment period,
will not exceed a total of 30 calendar days.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which reasonably
may be expected to accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and,
in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of
Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant
to the National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
3
The New Orleans District is unaware of any properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or destroy
presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public
notice solicits input from the State Archeologist and State Historic Preservation Officer regarding
potential impacts to cultural resources.
The Corps is unaware of any Endangered Species Act (ESA) listed species or designated critical
habitat that may be adversely affected by the proposed activity. Our initial finding is that the proposed
work would neither affect any ESA listed species nor affect any habitat designated as critical to the
survival and recovery of a listed species.
This notice initiates the EFH consultation requirements of the Magnuson-Stevens Fishery
Conservation and Management Act. The proposal would result in temporary adverse impacts to N/A
acres of EFH utilized by various life stages of red drum, blue crab and penaeid shrimp. Our initial
determination is that the proposed action may have temporary adverse impacts on EFH or federally
managed fisheries of the Gulf of Mexico. Our final determination relative to project impacts and the need
for mitigation measures is subject to review by and coordination with the NMFS.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of Environmental
Quality before a permit is issued.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The
Department of the Army permit will not be issued unless the applicant receives approval or a waiver of
the Coastal Use Permit by the Department of Natural Resources.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Regulatory Branch