Home

Tulsa District

Run scraper

The basic purpose of this project is to construct a mixed use development site

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The basic purpose of this project is to construct a mixed use development site, which includes a multi-unit independent senior residential and assisted living complex and a commercial/office/retail center.

The overall project purpose is to fulfill the need for new multi-family residential areas in a growing sector and for complimentary mixed use office-commercial space.

The application is for an after-the-fact (ATF) permit for the placement of fill material into 226 linear feet of ephemeral stream and 0.29 acre of forested wetland, both are considered waters of the United States. The purpose of the work is to construct a multi-family residential development and an associated mixed use office-commercial development. The proposed project location is in an unnamed tributary to Iron Ore Creek and an adjacent forested wetland, in Denison, Grayson County, Texas. The proposed project area comprises approximately 23 acres of the larger tract controlled by the applicant, located north and east of the intersection of Farm-to-Market Road (FM-691) (Grayson Drive) and Pool Road. The project site can be found on the Sherman, Texas 7.5 Minute USGS Quadrangle map at North Latitude 33.7069 and West Longitude 96.5795 The applicant proposes to construct three to four commercial buildings, which would result in the placement of fill material within the unnamed tributary of Iron Ore Creek by installing a box culvert for 226 linear feet until the culvert ties into rock rip-rap in the stream’s natural downstream path (Enclosure 7). The grading and construction of the multi-unit senior residential development site consisting of three large and one small building units, and a community center has already resulted in fill being placed within 0.29 acre of forested wetlands (Enclosure 3). The total volume of fill being placed within jurisdictional waters of the United States is 64 cubic yards of concrete culvert and rock rip-rap, and 468 cubic yards of earthen fill material.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas