DECOMMISSION SIXTEEN-INCH PIPELINE IN GULF OF MEXICO OFF OF PLAQUEMINES PARISH
NAME OF APPLICANT: Texas Eastern Transmission, LP c/o SWCA Environmental Consultants at 5745 Essen Lane, Suite 105, Baton Rouge, Louisiana 70810.
LOCATION OF WORK: Main Pass Area Blocks 93, 94, 95, and 102, Gulf of Mexico, off of Plaquemines Parish, Louisiana, as shown on the attached drawings.
CHARACTER OF WORK: To decommission approximately seven miles of the 16-inch natural gas pipeline 40-B-3, originating at Main Pass Block 95, crossing the Mississippi River-Gulf Outlet Channel to Mobile Ship Channel Safety Fairway, and ending at the Main Pass Block 102 subsea tie-in assembly. The natural gas pipeline will be flushed with seawater, depressurized, and forty feet cut from the ends, which will be filled with epoxy, laid on the seafloor, and covered with mix bags. A 3’x 40’ end connector/valve/launcher will be installed at each end to enable future pigging of the remaining 4.1 miles of line to be kept in service. All excavated pipe will backfilled to a minimum depth of 3 feet below the mud line. No excavation will take place within the Safety Fairway. All of the remaining abandoned line will be buried 10 to 12 feet below the mud line within the Safety Fairway and 9 to 11 feet if outside of it. This is a modification to a permit originally issued on February 14, 1968. No special aquatic sites will be affected by this project; no mitigation is anticipated.
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
P.O. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
REPLY TO
ATTENTION OF
September 15, 2014
Operations Division
Eastern Evaluation Section
Project Manager
Jennifer Burkett
(504) 862-2045
jennifer.e.burkett@usace.army.mil
SUBJECT: MVN 2014-2117 EBB
(Gulf of Mexico) 1427
PUBLIC NOTICE
Interested parties are hereby notified that a permit application has been received
by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X]
Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [ ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
DECOMMISSION SIXTEEN-INCH PIPELINE IN GULF OF MEXICO OFF OF
PLAQUEMINES PARISH
NAME OF APPLICANT: Texas Eastern Transmission, LP c/o SWCA Environmental
Consultants at 5745 Essen Lane, Suite 105, Baton Rouge, Louisiana 70810.
LOCATION OF WORK: Main Pass Area Blocks 93, 94, 95, and 102, Gulf of Mexico,
off of Plaquemines Parish, Louisiana, as shown on the attached drawings.
CHARACTER OF WORK: To decommission approximately seven miles of the 16-inch
natural gas pipeline 40-B-3, originating at Main Pass Block 95, crossing the Mississippi
River-Gulf Outlet Channel to Mobile Ship Channel Safety Fairway, and ending at the
Main Pass Block 102 subsea tie-in assembly. The natural gas pipeline will be flushed
with seawater, depressurized, and forty feet cut from the ends, which will be filled with
epoxy, laid on the seafloor, and covered with mix bags. A 3'x 40' end
connector/valve/launcher will be installed at each end to enable future pigging of the
remaining 4.1 miles of line to be kept in service. All excavated pipe will backfilled to a
minimum depth of 3 feet below the mud line. No excavation will take place within the
Safety Fairway. All of the remaining abandoned line will be buried 10 to 12 feet below
the mud line within the Safety Fairway and 9 to 11 feet if outside of it. This is a
modification to a permit originally issued on February 14, 1968. No special aquatic sites
will be affected by this project; no mitigation is anticipated.
The comment period for the Department of the Army Permit will close 15 days
from the date of this public notice. Written comments, including suggestions for
modifications or objections to the proposed work, stating reasons thereof, are being
-2-
solicited from anyone having interest in this permit must be mailed so as to be received
before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing or
e-mailing the Corps of Engineers Project Manager listed above. Any request
must be specific and substantively supportive of the requested extension, and
received by this office prior to the end of the initial comment period. The Section
Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be
continuous to the initial comment period and, inclusive of the initial comment
period, will not exceed a total of 30 calendar days.
The decision as to whether a permit will be issued will be based on an evaluation
of the impact of the proposed work on navigation and national security.
The U.S. Army Corps of Engineers is soliciting comments from the public,
federal, state, and local agencies and officials, Indian Tribes, and other interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the U.S. Army Corps of Engineers to
determine whether to make, modify, condition, or deny a permit for this proposal. To
make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest
factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National
Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register
of Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would neither affect any species
listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any
habitat designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of N/A acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
-3-
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosures
M i s s i s s i p p i
A l a b a m a
Pensacola
Mobile
L o u i s i a n a
Chandeleur
Area
Chandeleur
Area
_
^
Main
Pass
Area
Breton
Sound Area
Bay
Marchand
Area
West
Delta
Area
Grand
Isle
Area
South
Pelto
Area
Ship
Shoal
Area
South Pass Area,
South and East
Addition
South Timbalier
and Bay
Marchand Areas
Ship Shoal
Area, South
Addition
South
Timbalier Area,
South Addition
5745 Essen Lane, Suite 105
Baton Rouge, Louisiana, 70810
(225) 663-3830 phone
(225) 663-3831 fax
www.swca.com
South
Pass Area
West Delta
Area, South
Addition
Viosca
Knoll
Chandeleur
Area, East
Addition
Project Location
Lat: 29° 37' 22.224"
Long: -88° 42' 29.761"
Destin
Dome
Main Pass Area,
South and East
Addition
Viosca
Knoll
South Pass Area,
South and East
Addition
South Pass Area,
South and
East Addition
De Soto
Canyon
Mississippi
Canyon
Ewing
Bank
Grand Isle
Area, South
Addition
SPECTRA ENERGY
Legend
VICINITY MAP
_
^
LINE 40-B-3 ABANDONMENT
16" OFFSHORE NATURAL GAS PIPELINE
BLOCKS 93, 94, 95, & 102
MAIN PASS AREA
Project Location
Fairway
0
Base Imagery Provided By:
¨
Drawn By:
Approved By:
JR
CF
Submittal Date:
Revision # - Date:
5/29/2014
-
SWCA Project No:
Page:
1
OF
5
Coord. System: NAD 1983 StatePlane Louisiana
Offshore FIPS 1703 Feet
60,000
120,000
240,000
Feet
File Path: N:\Project Files\Spectra Energy\Line 40-B-3 Abandonment\Spectra Line 40-B-3 Vicinity Map.mxd
Notes
1) 800.0 CY of material to be temporarily displaced by jetting activities.
2) 60 CY of 3:1 Mix and sand will be used to backfill location. The remainder
will be backfilled with previously jetted native material.
3) 0.207 acres of waterbottom will be temporarily disturbed for this project.
ay
1
pth
De p
th
50 ft Depth
ir w
Fa
40 ft D
e
30
ft
93
ir w
Fa
94
Exist. Pipeline (Outside
Fairway) - 1,013.9 ft
A.
Exist. Pipeline (Outside
Fairway) - 15,246.5 ft
Exist. Pipeline
to Remain
Fa
88 irw
06 ay
15
End Abandonment in Place
Lat: 29° 36' 32.967"
Long: -88° 49' 23.485"
Proposed End Valve
Launcher 3' x 40' - 0.0 ft
End Fairway Crossing
Lat: 29° 36' 53.769"
Long: -88° 46' 32.604"
Fa
88 irw
06 ay
15
Workspace Detail B
Begin Abandonment in Place
See Workspace Detail A
Lat: 29° 37' 22.224"
Long: -88° 42' 29.761"
Begin Fairway Crossing
Lat: 29° 37' 21.899"
Long: -88° 42' 40.262"
A
.
1
95
Exist. Pipeline (Within
Fairway) - 20,723.8 ft
End Abandonment in Place
See Workspace Detail B
Lat: 29° 36' 32.967"
Long: -88° 49' 23.485"
ay
Workspace Detail A
Begin Abandonment
in Place
Existing PL to
be Abandoned
102
Existing PL to Remain
.
.
Prop. Workspace
15' x 200' - 0.0 ft
SPECTRA ENERGY
PLAN VIEW
5745 Essen Lane, Suite 105
Baton Rouge, Louisiana, 70810
(225) 663-3830 phone
(225) 663-3831 fax
www.swca.com
Proposed End Valve
Launcher 3' x 40'
Exist. Pipeline to
be Abandoned
LINE 40-B-3 ABANDONMENT
16" OFFSHORE NATURAL GAS PIPELINE
BLOCKS 93, 94, 95, & 102
MAIN PASS AREA
Legend
.
A
Lease Blocks
Lease Blocks Not Crossed by Project Area
Fairway Crossing Begin/End
Lease Blocks Crossed by Project
Exist. Pipeline (Within Project Scope) CRM Water Depth Contours
Index
Prop. Workspace 15' x 200'
Intermediate
Fairway
Supplementary
Project Begin/End
Base Imagery Provided By:
¨
0
Prop. Workspace
45' x 215'
Drawn By:
JR
Submittal Date:
5/22/2014
Approved By:
Revision # - Date:
SWCA Project No:
Page:
CF
Rev 1 - 9/5/2014
-
2
OF
5
Coord. System: NAD 1983 StatePlane Louisiana
Offshore FIPS 1703 Feet
2,500
5,000
10,000
Feet
File Path: N:\Project Files\Spectra Energy\Line 40-B-3 Abandonment\Spectra Line 40-B-3 Plan View.mxd
Natural Waterbottom, Water Depth Varies 32' - 52'
"
"
Varies
9 - 11 ft
Existing 16" Pipeline
Typical Cross Section A
Exist. Conditions for Pipeline Locations Outside Fairway
N.T.S.
Natural Waterbottom, Water Depth Varies 32' - 52'
"
"
Varies
10 - 12 ft
Existing 16" Pipeline
Typical Cross Section B
Exist. Conditions for Pipeline Locations Inside Fairway
N.T.S.
SPECTRA ENERGY
CROSS SECTIONS
5745 Essen Lane, Suite 105
Baton Rouge, Louisiana, 70810
(225) 663-3830 phone
(225) 663-3831 fax
www.swca.com
LINE 40-B-3 ABANDONMENT
16" OFFSHORE NATURAL GAS PIPELINE
BLOCKS 93, 94, 95, & 102
MAIN PASS AREA
Drawn By:
JR
Submittal Date:
7/10/2014
Approved By:
Revision # - Date:
SWCA Project No:
Page:
CF
Rev 1 - 9/5/2014
-
3
OF
5
File Path: N:\Project Files\Spectra Energy\Line 40-B-3 Abandonment\Spectra Line 40-B-3 X-Sections.mxd
215.0 ft
"
"
E
1
"
Temp. Spoil
Trench
3.0 ft
"
"
Existing Pipeline
to Remain
45.0 ft
Proposed End Valve
Launcher Assembly
Existing Pipeline to
be Abandoned
40.0 ft
"
"
Pipeline to be Cut,
End Valve Launcher
to Be Installed
"
Temp. Spoil
E
1
200.0 ft
Typical Plan View
"
"
Proposed Work
N.T.S.
SPECTRA ENERGY
PROPOSED WORK DETAILS
5745 Essen Lane, Suite 105
Baton Rouge, Louisiana, 70810
(225) 663-3830 phone
(225) 663-3831 fax
www.swca.com
LINE 40-B-3 ABANDONMENT
16" OFFSHORE NATURAL GAS PIPELINE
BLOCKS 93, 94, 95, & 102
MAIN PASS AREA
Drawn By:
JR
Submittal Date:
7/22/2014
Approved By:
Revision # - Date:
SWCA Project No:
Page:
CF
Rev 1 - 9/5/2014
-
4
OF
5
File Path: N:\Project Files\Spectra Energy\Line 40-B-3 Abandonment\Spectra Line 40-B-3 Prop Work Typ Plan View.mxd
Workspace
Workspace
Water Depth Varies 32' - 52'
45.0 ft
"
"
6.0 ft
"
3.0 ft
6.0 ft
"
"
"
"
"
3.0 ft
Temp.
Spoil
"
Temp.
Spoil
"
"
3.0 ft
"
"
6.0 ft
"
"
"
3.0 ft
"
"
"
"
"
6.0 ft
15.0 ft
"
"
"
15.0 ft
"
"
15.0 ft
"
"
"
12.0 ft
Natural Waterbottom
Excavation
"
Existing 16" Pipeline
3.0 ft
"
"
Typical Cross Section 1-1
Proposed Work
N.T.S.
SPECTRA ENERGY
PROPOSED WORK DETAILS
5745 Essen Lane, Suite 105
Baton Rouge, Louisiana, 70810
(225) 663-3830 phone
(225) 663-3831 fax
www.swca.com
LINE 40-B-3 ABANDONMENT
16" OFFSHORE NATURAL GAS PIPELINE
BLOCKS 93, 94, 95, & 102
MAIN PASS AREA
Drawn By:
JR
Submittal Date:
7/22/2014
Approved By:
Revision # - Date:
SWCA Project No:
Page:
CF
Rev 1 - 9/5/2014
-
5
OF
5
File Path: N:\Project Files\Spectra Energy\Line 40-B-3 Abandonment\Spectra Line 40-B-3 Prop Work Typ X Sect.mxd