Richard Chong is the Regulatory point-of-contact for this permit application from Stephen Montecucco for work impacting the Willamette River in Canby, Oregon.

PUBLIC NOTICE for Permit Application

Issue Date: September 15, 2014 Expiration Date: September 30, 2014 US Army Corps of Engineers No: NWP-2014-74 15-Day Notice Oregon Department of State Lands No: Unknown

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan. Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Richard Chong PO Box 2946 Portland, OR 97208-2946

Applicant: Stephen Montecucco Montecucco Farms, LLC 4015 N. Locust Street Canby, OR 97013 Location: The construction of the dock is to take place within the Willamette River, Section 21, Township 3 South, Range 1 East, City of Canby, Clackamas County, Oregon (45.2990, -122.6887). The proposed compensatory mitigation will take place within the Molalla River, Section 29, Township 3 South, Range 1 East, City of Canby, Clackamas County, Oregon (45.28557, -122.715905). Waterway: Willamette River and Molalla River Project Description: The proposed project involves the installation of a 16-foot by 20-foot floating dock, secured with two piles driven into the riverbed. Two irrigation pumps already employed at the location will be placed on the dock for ease of use. The existing pumps will include self-cleaning fish and debris screens at each pump intake. Dock access for pump operation and maintenance will be via a 5-foot by 70-foot gangway, which includes two ten inch pump discharge pipelines and electrical power supply cables. The piling and dock will be constructed of steel and steel framed floats and composite or expanded metal decking throughout. Mitigation: As compensatory mitigation, the applicant is proposing to improve fishery habitat diversity within the Molalla River at Mile 1.2. This compensatory mitigation involves the installation of large woody debris (LWD). Specifically, the applicant is proposing to install three logs with root wads pointing into the river, secured in place with loose rock riprap ballast stone. In addition, logs with root wads will be tied together with 1” inch manila rope and the log ends will be buried in the bank for additional stability. Other logs and woody debris are expected to collect on the upstream side of this structure. Construction of this LWD will cover approximately 320 square feet of the Molalla River. Purpose: To improve an existing irrigation pump station, located adjacent to the Willamette River, within the City of Canby, Oregon. Drawing(s): Drawings 1-6 of 6 are attached and labeled Corps No. NWP-2014-74. Additional Information: Additional information may be obtained from Richard Chong, Project Manager, U.S. Army Corps of Engineers at (503) 808-4384 or email Richard.Chong@usace.army.mil. Authority: This permit will be issued or denied under the following: Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States. Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States. Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification. Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act. Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing. Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) has been completed for this project. Essential Fish Habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The project area is within the known range of protected species. Construction of this project will result in the discharge of fill material within the Molalla River and the installation of pilings within the Willamette River. We have followed the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Consultation with the National Marine Fisheries Service has been completed for the proposed work. Cultural Resources: An initial evaluation of the proposed project area indicates that there are no known sites within the project area. There are known sites in the vicinity that should not be affected by this undertaking. There are no cultural resources surveys covering the project area. There are surveys to the north of the project area that documented the sites noted above. The GLO map for this section does not show any specific cultural features within the project area, but the map does show significant meandering of waterways in this location. Based on the information provided above and given that this project will only be placing large woody debris within the waterway with little or no excavation, this action should have no effect on historic properties. This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects. Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification Corps of Engineers No: NWP-2014-74 Oregon Department of State Lands No: N/A

Notice Issued: September 15, 2014 Written Comments Due: October 15, 2014

WHO IS THE APPLICANT: Stephen Montecucco Montecucco Farms, LLC 4015 N. Locust Street Canby, OR 97013

LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.

PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Corps No. NWP-2014-74

Page 1 of 2

Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.

Corps No. NWP-2014-74

Page 2 of 2

NWP-2014-74

Page 1 of 6

Enclosure 1

SECTION 21 T.3S. R.l E. W.M.

5 IE 21

CLACKAMAS COUNTY ,~$400 1

il

~~

31 "'

~ SEE

MAP

a

IE

21

16

2~

Ill

., LOT

6

i

41.51

Ill

2

"'

!!!

.li

.."' lti!IOO !.':!

~

"'w "'

"'.

":,;

!!I

"'"' "'

32.96

1!2000 3 IE

2GA

3

t£

~a

27

SEE

MAP

1£

268

;,(£

SfE

3 IE 21 0()'}1{

NWP-2014-74

Page 2 of 6

Enclosure 1

6'

Wlltamette River Flow

----- ---, I I I I I

~AIM

____

DOCK AND GANGWAY PlAN VIEW Scale,... 20'

..,

8'

__ _j

t--

3'

3'

-f

GANGEWAY BANK FO~NDATION PlAN VIEW Scale 1·=4'

msl

msl

-OHWaw.n:

I I I

__)

OLWI!Iov.114'-

/"'---

T_illlllllllll

/

3'

r'

~ ·~ '~

.

f"' r

...

.,.,._lollll..

l!al!l111'-ll>

,_1_ ---

GANGWAY BANK FOUNDATION ON GANGWAY G_ ble1"=4'

MON'i'ECUCCO 1ltWfE'm Pm!P STATION PROJECT Dock end Ganpay 0+20

11+40

0+60

0+00

0+100

PROFILE ON GANGWAY CENTERLINE Scale 1" "'20'

NWP-2014-74

~

sa

County. 0..,.

~w: ~2014

Page 3 of 6

Enclosure 1

MONTECUCCO FARMS, LLC

COMPENSATORY MITIGATION PLAN

TO MITIGATE PRECEIVED NEGATIVE IMPACTS CAUSED BY INSTALLING 16' X 20' DOC AND GANGWAY ON WILLAMETTE RIVER Re: NWS-2014-74 September 2, 2014 Summary: Fishery habitat diversity in the Molalla River (RM 1.2) will be improved by installing a proposed large woody debris (LWD) structure adjacent to the east bank. Since 2010 the soil exposed, near vertical 15' high river bank has been eroded horizontally over 30'. Bank erosion has claimed a dense stand of over 60' high cottonwood trees and other woody vegetation over 500' long. In addition to providing a fishery velocity refuge when river water velocities are high, some protection will be provide to the upstream end of the eroded bank. Background: The proposed LWD structure site is Molalla River Mile 1.2. At the proposed location the braided river channel is over 300' wide. River thalwag position changes from year to year. The site location is about 500' downstream from the Pudding River / Molalla River confluence. The site was chosen by having river bank access without disturbing riparian vegetation. River substratum consists of loose to consolidated sand to cobble size rock. Sandy loam overlays the rock on each bank. Accelerated Molalla River east bank erosion began in 2010. During the 2012 ­ 2013 runoff season the Pudding River outlet moved downstream on the Molalla River. This accelerated east bank erosion upstream a few hundred feet, at the site and for over 500' downstream, claiming dense 60' high cottonwood trees and other woody vegetation. River water velocities at the site can be very high (>12 ­ 15 fps) or very low (< 2 fps). When high volume storm water runoff in the Molalla River watershed, including Pudding watershed, is combined with low volume watershed runoff in the Willamette River watershed, water velocities at the site can be very high, primarily due to a steep hydraulic gradient. The opposite is true when high volume storm water runoff takes place in the Willamette River watershed and medium to low volume runoff is present in the Molalla watershed. Molalla River water velocities can be low (<2 ­ 5 fps) due inundation caused by a high Willamette River water surface elevation and resulting back water. Compensatory Mitigation: Montecucco Farms proposed compensatory mitigation action is installing three logs with root wads pointing into the river, secured in place with loose rock riprap ballast stone. In addition, logs with root wads will be tied together with 1" manila rope and have log ends buried in the bank for additional stability. Other logs and woody debris are expected to collect on the upstream side.

Leland Hardy, PE H & R Engineering, LLC

NWP-2014-74

Page 4 of 6

Enclosure 1

NWP-2014-74

Page 5 of 6

Enclosure 1

NWP-2014-74

Page 6 of 6

Enclosure 1

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas