You can copy from here when filling out the rest of the page.
Benny Dean is the Regulatory point-of-contact for this permit application from Lane County School District No. 4J for work impacting Amazon Creek and adjacent wetlands in Eugene, Oregon.
PUBLIC NOTICE for Permit Application
Issue Date: September 18, 2014
Expiration Date: October 17, 2014
US Army Corps of Engineers No: NWP-2009-170/1
30-Day Notice Oregon Department of State Lands No: APP0056781
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Benny A. Dean Jr. (Benny.A.Dean@usace.army.mil)
Eugene Field Office
211 E. 7th Avenue, Suite 105
Eugene, Oregon 97401-2722
Applicant: Lane County School District No. 4J
ATTN: Jon Lauch
715 West 4th Avenue
Eugene, Oregon 97402
Location: The project is located at Roosevelt Middle School, 680 East 24th Avenue, Eugene, Lane County, Oregon. The site is in Section 5 of Township 18 South, Range 3 West. Latitude: 44.0325269554324° N/Longitude 123.084649812939° W.
Waterway: Amazon Creek and abutting wetlands are within the project area.
Project Description: The applicant is proposing to construct a new middle school on the Roosevelt Middle School property in south Eugene. Up to 3,100 cubic yards of vegetation, topsoil, and asphalt will be excavated from the site and permanently impact 1.03 acres of onsite palustrine emergent wetlands. Fill material will be discharged over the site to raise it to grade to facilitate the construction of a new middle school. Up to 3,000 cubic yards of gravel, rock, clay, silty clay loam, asphalt, concrete, and underground utilities will be discharged and installed. The project will be completed in two phases. The first phase involves construction of the new school and associated infrastructure including sidewalks, stormwater facilities, and landscaping. Removal and fill activities would permanently impact the existing palustrine emergent wetlands. The ash forest (palustrine forested) wetland and the palustrine emergent wetland along the Amazon Creek channel will be avoided. The second phase involves demolishing the old school and parking areas on the east half of the school property and converting the site to playing fields.
Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for impacts to 1.03 acres of wet prairie wetlands by purchasing credits from an approved wetland mitigation bank within the relevant service area of the project. Banks being considered are within the Upper Willamette watershed, and carry credits for wetlands in the PEM Cowardin class and the Slope/Flat HGM class include: West Eugene Wetland Mitigation Bank, Long Tom Mitigation Bank, and Coyote Prairie North Mitigation Bank. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The project purpose is to replace institutional buildings.
Drawing(s): Twelve (12) drawings are attached and labeled Corps No. NWP-2009-170/1.
Additional Information: Additional information may be obtained from Mr. Benny A. Dean Jr., Project Manager, U.S. Army Corps of Engineers at (541) 465-6769 or email Benny.A.Dean@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources: An initial evaluation of the proposed project area indicates the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. An investigation for the presence of potentially eligible historic properties has been completed and will be coordinated with the State Historic Preservation Office (SHPO) prior to the Corps’ making a final permit decision.
This notice has been provided to the SHPO, interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
Joint Permit Application for Lane County School District #4J:
Roosevelt Middle School Project, Eugene, Lane County, OR
July 2014
D AY
E UGE NE
IS L
AN
D
ce
M ILL R AC E
FRAN
K
DR
LIN B
A ma z on
Lane County
Fairgrounds
University of
Oregon
"F
Cr
ee
LVD
P at
RD
t er s
W
Mill
Ra
University
Post
Office
AL
on
NU
ce
k
Pioneer
Memorial
Cemetery
HILLYARD ST
N
U
M
BL
VD
800
G
ITA
70 0
R
L D
60 0
Laurelwood
Municipal
Golf Course
CAP
k
r ee
n C
Southside
Post Office
Eugene AF
and AM Lodge Number
11 Masonic Cemetery
HILYARD ST
azo
F R IE N D LY S T
O
SITE
Amazon
Pool
Am
PK W Y
Y
AN
E
HW
N
90 0
60 0
A M A ZO N
0
50
RI
IR
SP
E 24th AVE
C ollege H ill
T
0
50
FA
University
of Oregon
Housing
BL
VD
50 0
"F
EME
70
0
ST
K IM
ST
R ALD
E
ID
IS
DR
ST
RR
CA
ON
BER
OOD
DR
R
LY D
90 0
PI
NE
CA
NY
ON
DR
0
90
00
ON R
.25
.5
1 MILE
SCALE: 2.6" = 1 MILE
5
Hilyard Street
Amazon Pkwy
SITE
GW
ST
OE
HA
K IN
DR
0
E 24th Ave
O
VE
H A
AZ
D E L LW O O D
AM
W 38T H
T
S
AV
0
60
W
800
"F
HIG H
Mount Calvary
Catholic
Cemetery
0T
E 3
D
LO R
E 32N D A V E
E 3 2 R D A LY
FIGURE 1: Site Location Map
E. 30th Dr.
NWP-2009-170/1
Source: Eugene East USGS Quad
Scale: 2.6" = 1 mile
Inset map not scaled
Page 1 of 12
Enclosure
T
Joint Permit Application for Lane County School District #4J:
Roosevelt Middle School Project, Eugene, Lane County, OR
July 2014
N.W.1/4 S.W.1/4 SEC.5 T.18S. R.3W. W.M.
Lane County
FOR ASSESSMENT AND
TAXATION ONLY
REVISIONS:
12/8/2009 - LCAT167 - CONVERT MAP TO GIS
18030532
EUGENE
1" =
= 100'
250'
SEE MAP
18030614
160'
56'
84.3'
*
84'
1
160'
*
56'
*
160'
*
*
2
55'
*
*
14'
3
55'
55'
39
56'
160'
160'
56'
56'
160'
4
5
5
7
56'
160'
6
54'
EAST
2
2
1
43
*
8
53'
7
6
(VACATED)
1
2
2
1500' M/L
493'
1
42
778'
97.2'
97.2'
230'
004-00
173.2'
194'
91.38'
S89°50'W
402
*
*
7'
8 .1 4"E
10 2 '0
1 °1
N5
S4
400
107.8'
LC=21.78'
S18°14'52"W
R=32.5'
LC=12.84'
S12°43'31"E
2°
20
85.31'
N0°81'46"E
88.2'
0.11 AC
493'
25TH
PLACE
*
87'
N89°57'45"W
60'
168'
255'
HILYARD
778'
59
3+
.9
*
62
*
PC
SEE MAP
18030531
78'
30'
'E
SITE
NW COR
JM LAKIN
DLC 50
107.59'
401
0.13 AC
CENTER LINE OF AMAZON CHANNEL
NO ESMT WIDTH INDICATED
FOR THIS PORTION ON CITY MAP
OF AMAZON DRAINAGE PROJECT
R
66'
173'
493'
S89°57'45"E
NE COR
WM BREEDING
DLC 49
*
300
*
200
73.55 AC
53'
*
1
9
STREET
8
N0°11'E
160'
56'
9
*
AVENUE
44
CANCELLED:
66'
55'
55'
55'
4
160'
56'
8.96
DRIVERTON ADDITION
6
1
53'
620.23'
2
12
56'
7
25TH
2
3
56'
54'
56'
56'
*
*
55'
55'
55'
160'
56'
56'
56'
MILL
8
97.95'
97.95'
97.98'
56'
56'
160'
*
*
55'
56'
56'
56'
97.98'
14'
160'
56'
56'
55'
55'
56'
STREET VACATED
56'
*
56'
55'
444.96'
55'
56'
S0°13'19"W
56'
44.3'
53'
53'
*
**
38
*
45
9
11
*
4
54'
2
3
LOT
10
1
*
R
53'
1
160'
4
6
*
SE COR
D CHRISTIAN
DLC 47
*
VACATED PORTION OF
37
5
112.0'
*
5
1
2
66'
*
112.1'
12
160'
*
4
11
GIS DATA
12/10/2009 10:22:21 AM : lcatllr
EAST
160'
10
*
111.8'
*
66'
*
3
AVENUE
160'
*
111.5'
36
54'
*
2
111.2'
12
*
*
1
110.9'
53'
11
*
100
14.91 AC
53'
10
*
APPROX.
1/4 COR.
66'
*
110.6'
SEE MAP
18030524
160'
24TH
L3 579+21.4 PC
**
AVENUE
EAST
609.92'
26TH
SOUTH
(
(VACATED)
*
*
SEE MAP
18030523
SEE MAP
18030534
18030532
EUGENE
0
100
250
SCALE: 1" = 250'
FIGURE 2: Site Location on Tax Map
Tax map 18030532
Source: Lane County Tax Map
Scale: 1" = 250'
NWP-2009-170/1
Page 2 of 12
Enclosure
EUGENE
18030532
NWP-2009-170/1
EW24th
24th AVE
AVE
SITE
0
ON
AZ
M
A
Page 3 of 12
HILLYARD ST
200
SCALE: 1" = 200'
50 100
July 2014
FIGURE 3: Site on 2012 Aerial Photo
Scale: 1" = 200'±
HILYARD ST
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
EE
CR
K
Enclosure
Page 4 of 12
4
42
2
42
42
100
WETLAND
EXTENDS
OFFSITE
427
SP 5-3
1
PEM
Riverine
Flow-Through
Depressional
(excavated)
Slope/Flat
PEM
PFO
Slope/Flat
HGM Class
PEM
Cowardin
427
428
427
SP 5-3
428
428
429
429
429
426
428
SP-D
428
SP-A
428
8
428
42
428
428
427
9
42
SP-A1
428
428
428
428
429
ROOSEVELT
MIDDLE
SCHOOL
427
429
428
July 2014
FIGURE 4: Wetland Delineation on Survey Map, West Section
Source: Branch Engineering, Inc. Springfield, OR
Scale: 1" = 100'
Study area
Sample plots from previous study
2014 additional sample plots
Wetlands
428
T5-P1
2014 BOUNDARY
CHANGE: 0.028 ac
Table 1. 2014 Summary of Wetlands
and Other Waters of the State and US.
WETLAND EXTENDS OFFSITE TO SOUTH
427
SP 5-5
T5-P2
SP 7-2
SP 7-1
T5-P1
SP 5-4
WETLAND A
1.17 ac
Wetland Number/
Size
Wetland A: 1.17 ac
Continues offsite
Wetland B: 0.08 ac
Continues offsite
Wetland C: 0.13 ac
Continues offsite
Wetland D: 0.01 ac
Continues offsite
(Amazon Creek)
T4-P1
428
TENNIS COURTS
427
T1-P1
T1-P2
SP 1-3
E 24th AVENUE
427
429
SCALE: 1" = 100'
50
3
25
42
0
T4-P2
T3-P2
8
42
7
WETLAND D
427
T2-P2
426
42
(AMAZON CREEK)
426
T2-P1
426
426
WETLAND B
0.08 ac
428
SP 2-3
6
42
T6-P1
T6-P2
WETLAND
EXTENDS
OFFSITE
T3-P1
427
WETLAND EXTENDS
OFFSITE TO WEST
WETLAND EXTENDS
OFFSITE TO WEST
WETLAND C
0.13 ac
426
428
426
429
426
426
MATCH LINE
SEE FIGURE 2
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
427
NWP-2009-170/1
428
Enclosure
428
NWP-2009-170/1
Page 5 of 12
429
50
100
428
429
429
SEE FIGURE 1
MATCH LINE
Depressional
(excavated)
Slope/Flat
Riverine
Flow-Through
PEM
PEM
428
428
429
428
429
428
428
Study area
Sample plots from previous study
2014 additional sample plots
Wetlands
SP-A1
428
427
428
429
H
429
July 2014
FIGURE 5: Wetland Delineation on
Survey Map, East Section
Source: Branch Engineering, Inc. Springfield, OR
Scale: 1" = 100'
428
ROOSEVELT MIDDLE SCHOOL
9
42
428
ET
SP 5-3
T5-P1
428
428
428
429
9
42
428
E 24th AVENUE
429
TRE
PFO
Slope/Flat
HGM Class
PEM
Cowardin
SP-A
428
8
428
Table 1. 2014 Summary of Wetlands
and Other Waters of the State and US.
428
SCALE: 1" = 100'
25
428
428
42
427
9
Wetland Number/
Size
Wetland A: 1.17 ac
Continues offsite
Wetland B: 0.08 ac
Continues offsite
Wetland C: 0.13 ac
Continues offsite
Wetland D: 0.01 ac
Continues offsite
(Amazon Creek)
0
429
428
SP-D
427
42
428
427
426
428
429
428
427
429
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
DS
AR
Y
L
I
Enclosure
Enclosure
29TH
25TH
26TH
26TH
28TH
*The protection measures for parcels within
Eugene city limits wemt into effect on January
1, 2006. The protection measures outside
Eugene city limits and inside the urban
growth boundary went into effect on
January 12, 2007.
30TH
E37 B-1
Non-Goal 5 streams
Not designated for protection
31ST
Designated for protection, no setback (Category C)
Designated for protection, 25' setback (Category B)
Designated for protection, 50' setback (Category A)
Wetland Sites
Not designated for protection
Designated for protection, no setback (Category E)
Designated for protection, 20' setback (Category D)
Designated for protection, 40' setback (Category C)
Designated for protection, 60' setback (Category B)
Tax Lots
Designated for protection, 100' setback (Category A)
West Eugene Wetlands Boundary
Riparian and Upland Wildlife Habitat Sites
27TH
24TH
24TH PL
25TH
24TH
24TH
Eugene City Limits
Eugene Urban Growth Boundary
Legend
26TH
25TH
OLIVE
H
LINCOL
CHARNELTO
SCALE: 1" = 600'
600
OLIVE
MCMILLAN
MCMILLAN
PO RTLAND
OLIVE
MCMILLAN
OL
OL
MCM
MCMILL
WILLAM
PO RTLAND
PORTLAND
AM AZON
OAK
0 150 300
PEARL
LINCOLN
LINCOLN
LN
AMA-7B
AMA-10
AMA-16
AMA-9
29TH
HIGH
OAK
OAK
HIGH
HIGH
HIGH
25TH
22ND
26TH
E30 E
25TH
28TH
AMA-7D
B
2
29
26TH
FIGURE 6: Site on Eugene Local Wetland Inventory/Goal 5 Map
Scale: 1" = 600'±
AMA-12B
29TH
AMA-12A
27TH
AMA-11B
AMA-7C
30TH
23RD
22ND
AMA-11A
SITE
22ND
July 2014
PO TTER
MIAMI
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
MILL
ALDER
ALDER
Page 6 of 12
FERRY
KINCAID
KINCAID
NWP-2009-170/1
HARRIS
HARRIS
PO TTER
ON
PO TTER
UNIVERSITY
UNIVERSITY
Z
AM A
OLIVE
NWP-2009-170/1
0
FUTURE
EXPANSION
R
FI
E
Page 7 of 12
BASKETBALL
COURT
WETLAND IMPACTS
FIGURE 7: Site Plan
Scale: 1" = 160'
NATURAL TURF FIELD
NATURAL TURF FIELD
Staging areas will be in previously disturbed areas at
least 150 feet from protected wetlands and waterways
FIRE LANE
NATURAL TURF FIELD
PARKING LOT
1.03 ac Removal in wetlands (PEM Cowardin class, Slope/Flat HGM Class)
0.95 ac Fill in wetlands (PEM Cowardin class, Slope/Flat HGM Class)
0.36 ac Avoided wetlands
LANDSCAPING
PATIO
SERVICE
AREA
MIDDLE
SCHOOL
BUILDING
BIKE
PARKING
AREA
E 24th AVENUE
July 2014
EET
Property boundary
Existing wetlands
SCALE: 1" = 160'
160
E
80
EXISTING
BIKE PATH
G
N
AP
I
N
LA
40
SC
D
N
LA
COURTYARD
BUS ONLY AREA
CONSTRUCTION ACCESS
FIRE LANE
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
YAR
HIL
TR
DS
Enclosure
PFO
NWP-2009-170/1
Page 8 of 12
1.03 ac Removal in wetlands
0.95 ac Fill in wetlands
0.36 ac Avoided wetlands
Removal
Fill
WETLAND IMPACTS
Impacts by HGM Class
1.03 ac Slope/Flat
Impacts by Cowardin Class
1.03 ac PEM
0
80
160
SCALE: 1" = 160'
40
FIGURE 8: Site Plan Showing Removal and Fill
Scale: 1" = 160'
E 24th AVENUE
July 2014
EET
Wetlands
PEM
PEM
PEM
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
YAR
HIL
TR
DS
Enclosure
427
42
8
6
42 24 21
4 4 20
4
Page 9 of 12
427
8
9
42
C
427
B
431
427
42
8428
430
428
428
428
429
429
42
9
429
Ac. Removal
1.03
12.56
13.59
See Figures 10 & 11
Property line
Existing contours
Proposed contours
Existing wetlands
A Cross sections
CY Fill
3000
48000
51000
A
432
429
427
428
429
427
Ac. Fill
0.95
12.56
13.51
428
427
9
42
CY Removal
3100
34000
37100
SCALE: 1" = 160'
160
42
6
42
7
42
C428
427
428
428
431
430
429
430
429
428
428
428
428
429
428
42
9
429
428
9
42 42
80
43
42
9
428
430
429
427
428
9
42
0
43
428
E 24th AVENUE
428
429
430
430
428
429
430
430
429
428
429
430
July 2014
FIGURE 9: Existing and Proposed Contours
Scale: 1" = 160'
Staging areas will be in previously disturbed areas at
least 150 feet from protected wetlands and waterways
428
428
428
42
8
428
427
428
427
428
429
428
80
427
A
427
B
427
427
427
9
42
40
428
A
427
8
42
42 4 42
2 23 5
7
42
427
FUTURE
EXPANSION
429
426
9
42
Land Type
Wetland
Upland
Total
0
427
426
428
426
429
CONSTRUCTION ACCESS
426
428
426
428
428
430
426
426
428
426
426
430
42
9
NWP-2009-170/1
9
42
42
8
YAR
HIL
430
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
EET
TR
DS
Enclosure
Page 10 of 12
427
426
425
424
423
422
421
420
430
429
428
427
426
425
424
423
422
421
420
430
429
428
0
0
NORTH
UPLAND
NORTH
UPLAND
po
Pro
UPLAND
sed
de
Gra
SECTION B-B
25'
WETLAND
UPLAND
ting
50'
Exis
e
SOUTH
Grad
SOUTH
e
g Grad
Existin
50'
e
Grad
SECTION A-A
25'
WETLAND
P
sed
ropo
75'
75'
10'
20'
Fill Area in Wetlands
40'
Removal Area in Wetlands
Fill Area
Removal Area
July 2014
FIGURE 10: Cross Sections A-A and B-B
See Figure 9
Vertical Scale 1"= 5'
0'
Horizontal Scale 1"= 20'
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
Property Line
Elevation
Property Line
Elevation
NWP-2009-170/1
Enclosure
NWP-2009-170/1
Page 11 of 12
Enclosure
435
434
433
432
431
430
429
428
427
426
425
424
423
422
421
NORTH
UPLAND
Fill Area in Wetlands
Fill Area
1+00
Existing Grade
Proposed Grade
2+00
SECTION C-C
3+00
WETLAND
4+00
SOUTH
25'
50'
5+00
100'
July 2014
FIGURE 11: Cross Section C-C
See Figure 9
Vertical Scale 1"= 5'
0'
Horizontal Scale 1"= 50'
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
Property Line
Elevation
NWP-2009-170/1
Page 12 of 12
Enclosure
FUTURE
EXPANSION
80
160
SCALE: 1" = 160'
40
Property boundary
Existing school
Proposed school
Existing wetlands
Impacts to wetlands
0
WETLANDS
FIELD
EASEMENT
Impacts 1.03 ac low quality wetlands
Avoids 0.36 ac high quality wetlands
FIRE LANE
NEW SCHOOL
PARKING
EASEMENT
EASEMENT
Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR
FIELD
FIGURE 15: Alternative Designs
- Alternative E: Preferred
Scale: 1" = 160'
FIELD
July 2014
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2009-170/1
Notice Issued: September 18, 2014
Oregon Department of State Lands No: APP0056781 Written Comments Due: October 17, 2014
WHO IS THE APPLICANT: Lane County School District No. 4J
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires
applicants for Federal permits or licenses to provide the Federal agency a water quality
certification from the State of Oregon if the proposed activity may result in a discharge to
waters of the state.
DESCRIPTION OF DISCHARGES:
notice on the proposed project.
See attached U.S. Army Corps of Engineers public
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues
as a result of the proposal are available for examination and copying at Oregon Department
of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are
available by contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are
readily accessible during your visit. To schedule an appointment please call DEQ Water
Quality at Northwest Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401
Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People
with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.
Corps No. NWP-2009-170/1
Page 1 of 2
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the
Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper
right section on page one of this notice. Written comments may be emailed, mailed or faxed
as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through
version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to
conversion difficulties, DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon
Telecommunications Relay Service at 1-800-735-2900.
Corps No. NWP-2009-170/1
Page 2 of 2