Benny Dean is the Regulatory point-of-contact for this permit application from Lane County School District No. 4J for work impacting Amazon Creek and adjacent wetlands in Eugene, Oregon.

PUBLIC NOTICE for Permit Application

Issue Date: September 18, 2014 Expiration Date: October 17, 2014 US Army Corps of Engineers No: NWP-2009-170/1 30-Day Notice Oregon Department of State Lands No: APP0056781

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan. Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Benny A. Dean Jr. (Benny.A.Dean@usace.army.mil) Eugene Field Office 211 E. 7th Avenue, Suite 105 Eugene, Oregon 97401-2722

Applicant: Lane County School District No. 4J ATTN: Jon Lauch 715 West 4th Avenue Eugene, Oregon 97402

Location: The project is located at Roosevelt Middle School, 680 East 24th Avenue, Eugene, Lane County, Oregon. The site is in Section 5 of Township 18 South, Range 3 West. Latitude: 44.0325269554324° N/Longitude 123.084649812939° W. Waterway: Amazon Creek and abutting wetlands are within the project area. Project Description: The applicant is proposing to construct a new middle school on the Roosevelt Middle School property in south Eugene. Up to 3,100 cubic yards of vegetation, topsoil, and asphalt will be excavated from the site and permanently impact 1.03 acres of onsite palustrine emergent wetlands. Fill material will be discharged over the site to raise it to grade to facilitate the construction of a new middle school. Up to 3,000 cubic yards of gravel, rock, clay, silty clay loam, asphalt, concrete, and underground utilities will be discharged and installed. The project will be completed in two phases. The first phase involves construction of the new school and associated infrastructure including sidewalks, stormwater facilities, and landscaping. Removal and fill activities would permanently impact the existing palustrine emergent wetlands. The ash forest (palustrine forested) wetland and the palustrine emergent wetland along the Amazon Creek channel will be avoided. The second phase involves demolishing the old school and parking areas on the east half of the school property and converting the site to playing fields. Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for impacts to 1.03 acres of wet prairie wetlands by purchasing credits from an approved wetland mitigation bank within the relevant service area of the project. Banks being considered are within the Upper Willamette watershed, and carry credits for wetlands in the PEM Cowardin class and the Slope/Flat HGM class include: West Eugene Wetland Mitigation Bank, Long Tom Mitigation Bank, and Coyote Prairie North Mitigation Bank. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project. Purpose: The project purpose is to replace institutional buildings. Drawing(s): Twelve (12) drawings are attached and labeled Corps No. NWP-2009-170/1. Additional Information: Additional information may be obtained from Mr. Benny A. Dean Jr., Project Manager, U.S. Army Corps of Engineers at (541) 465-6769 or email Benny.A.Dean@usace.army.mil. Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States. Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification. Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act. Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing. Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed. Cultural Resources: An initial evaluation of the proposed project area indicates the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. An investigation for the presence of potentially eligible historic properties has been completed and will be coordinated with the State Historic Preservation Office (SHPO) prior to the Corps’ making a final permit decision. This notice has been provided to the SHPO, interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects. Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

July 2014 D AY

E UGE NE

IS L

AN

D

ce M ILL R AC E

FRAN K

DR

LIN B

A ma z on

Lane County Fairgrounds

University of Oregon

"F

Cr

ee

LVD

P at

RD

t er s W

Mill

Ra

University Post Office

AL

on

NU

ce

k Pioneer Memorial Cemetery

HILLYARD ST

N U M

BL VD

800

G

ITA

70 0

R L D

60 0

Laurelwood Municipal Golf Course

CAP

k r ee n C

Southside Post Office

Eugene AF and AM Lodge Number 11 Masonic Cemetery

HILYARD ST

azo

F R IE N D LY S T

O

SITE

Amazon Pool

Am

PK W Y

Y

AN

E

HW

N

90 0

60 0

A M A ZO N

0 50

RI

IR

SP

E 24th AVE

C ollege H ill

T

0 50

FA

University of Oregon Housing

BL VD

50 0

"F

EME

70 0

ST

K IM

ST

R ALD

E

ID

IS

DR

ST

RR

CA ON

BER

OOD

DR

R LY D

90 0

PI

NE

CA

NY

ON

DR

0 90

00

ON R

.25

.5

1 MILE

SCALE: 2.6" = 1 MILE

5 Hilyard Street

Amazon Pkwy

SITE

GW

ST

OE

HA

K IN

DR

0 E 24th Ave

O

VE H A

AZ

D E L LW O O D

AM

W 38T H

T

S

AV

0 60

W

800

"F HIG H

Mount Calvary Catholic Cemetery

0T E 3

D

LO R

E 32N D A V E E 3 2 R D A LY

FIGURE 1: Site Location Map E. 30th Dr.

NWP-2009-170/1

Source: Eugene East USGS Quad Scale: 2.6" = 1 mile Inset map not scaled

Page 1 of 12

Enclosure

T

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

July 2014

N.W.1/4 S.W.1/4 SEC.5 T.18S. R.3W. W.M. Lane County

FOR ASSESSMENT AND TAXATION ONLY

REVISIONS: 12/8/2009 - LCAT167 - CONVERT MAP TO GIS

18030532 EUGENE

1" = = 100' 250'

SEE MAP 18030614

160'

56'

84.3'

*

84'

1

160'

*

56'

*

160'

*

*

2

55'

*

* 14'

3

55'

55'

39 56'

160'

160'

56'

56'

160'

4

5

5 7

56' 160'

6

54'

EAST

2

2

1

43 *

8

53'

7

6

(VACATED) 1

2

2 1500' M/L

493'

1

42

778'

97.2'

97.2'

230'

004-00

173.2' 194'

91.38' S89°50'W

402

* *

7' 8 .1 4"E 10 2 '0 1 °1 N5

S4

400

107.8'

LC=21.78' S18°14'52"W R=32.5' LC=12.84' S12°43'31"E

2° 20

85.31' N0°81'46"E

88.2'

0.11 AC

493'

25TH PLACE

*

87' N89°57'45"W

60'

168' 255'

HILYARD

778'

59

3+

.9

*

62

*

PC

SEE MAP 18030531

78'

30'

'E

SITE

NW COR JM LAKIN DLC 50

107.59'

401

0.13 AC CENTER LINE OF AMAZON CHANNEL NO ESMT WIDTH INDICATED FOR THIS PORTION ON CITY MAP OF AMAZON DRAINAGE PROJECT

R 66'

173'

493' S89°57'45"E

NE COR WM BREEDING DLC 49

*

300

*

200 73.55 AC

53'

*

1

9

STREET

8

N0°11'E

160'

56'

9

*

AVENUE 44

CANCELLED: 66'

55'

55' 55'

4

160' 56'

8.96

DRIVERTON ADDITION

6

1

53'

620.23'

2

12

56'

7

25TH 2

3

56'

54'

56'

56'

*

*

55'

55'

55'

160'

56' 56'

56'

MILL

8

97.95'

97.95'

97.98'

56'

56'

160'

* *

55'

56'

56'

56'

97.98' 14' 160'

56' 56' 55' 55' 56'

STREET VACATED

56'

* 56' 55'

444.96'

55' 56'

S0°13'19"W

56' 44.3'

53'

53'

*

**

38

*

45

9

11

*

4

54'

2

3

LOT

10

1

*

R

53'

1

160'

4

6

*

SE COR D CHRISTIAN DLC 47

*

VACATED PORTION OF

37

5

112.0'

*

5

1

2

66'

*

112.1'

12

160'

*

4

11

GIS DATA 12/10/2009 10:22:21 AM : lcatllr

EAST

160'

10

*

111.8'

*

66'

*

3

AVENUE

160'

*

111.5'

36

54'

*

2

111.2'

12

* *

1

110.9'

53'

11

*

100 14.91 AC

53'

10

*

APPROX. 1/4 COR.

66'

*

110.6'

SEE MAP 18030524

160'

24TH

L3 579+21.4 PC

**

AVENUE

EAST

609.92'

26TH

SOUTH

(

(VACATED)

*

*

SEE MAP 18030523

SEE MAP 18030534

18030532 EUGENE

0

100

250

SCALE: 1" = 250'

FIGURE 2: Site Location on Tax Map Tax map 18030532 Source: Lane County Tax Map Scale: 1" = 250'

NWP-2009-170/1

Page 2 of 12

Enclosure

EUGENE 18030532

NWP-2009-170/1 EW24th 24th AVE AVE

SITE

0

ON AZ M A

Page 3 of 12

HILLYARD ST

200

SCALE: 1" = 200'

50 100

July 2014

FIGURE 3: Site on 2012 Aerial Photo Scale: 1" = 200'±

HILYARD ST

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

EE

CR K

Enclosure

Page 4 of 12

4 42 2 42

42

100

WETLAND EXTENDS OFFSITE

427

SP 5-3

1

PEM

Riverine Flow-Through

Depressional (excavated) Slope/Flat

PEM PFO

Slope/Flat

HGM Class

PEM

Cowardin

427

428

427

SP 5-3

428

428

429

429

429

426

428

SP-D

428

SP-A

428

8

428

42

428

428

427

9 42

SP-A1

428

428

428

428

429

ROOSEVELT MIDDLE SCHOOL

427

429

428

July 2014

FIGURE 4: Wetland Delineation on Survey Map, West Section Source: Branch Engineering, Inc. Springfield, OR Scale: 1" = 100'

Study area Sample plots from previous study 2014 additional sample plots Wetlands

428

T5-P1

2014 BOUNDARY CHANGE: 0.028 ac

Table 1. 2014 Summary of Wetlands and Other Waters of the State and US.

WETLAND EXTENDS OFFSITE TO SOUTH

427

SP 5-5

T5-P2

SP 7-2 SP 7-1

T5-P1 SP 5-4

WETLAND A 1.17 ac

Wetland Number/ Size Wetland A: 1.17 ac Continues offsite Wetland B: 0.08 ac Continues offsite Wetland C: 0.13 ac Continues offsite Wetland D: 0.01 ac Continues offsite (Amazon Creek)

T4-P1

428

TENNIS COURTS

427

T1-P1 T1-P2

SP 1-3

E 24th AVENUE

427

429

SCALE: 1" = 100'

50

3

25

42

0

T4-P2

T3-P2

8 42

7

WETLAND D

427

T2-P2

426

42

(AMAZON CREEK)

426

T2-P1

426

426

WETLAND B 0.08 ac

428

SP 2-3

6 42

T6-P1

T6-P2

WETLAND EXTENDS OFFSITE

T3-P1

427

WETLAND EXTENDS OFFSITE TO WEST

WETLAND EXTENDS OFFSITE TO WEST

WETLAND C 0.13 ac

426

428

426

429

426

426

MATCH LINE SEE FIGURE 2

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

427

NWP-2009-170/1 428

Enclosure

428

NWP-2009-170/1

Page 5 of 12

429

50

100

428

429

429

SEE FIGURE 1 MATCH LINE Depressional (excavated) Slope/Flat

Riverine Flow-Through

PEM

PEM

428

428

429

428

429

428

428

Study area Sample plots from previous study 2014 additional sample plots Wetlands

SP-A1

428

427

428

429

H

429

July 2014

FIGURE 5: Wetland Delineation on Survey Map, East Section Source: Branch Engineering, Inc. Springfield, OR Scale: 1" = 100'

428

ROOSEVELT MIDDLE SCHOOL

9 42

428

ET

SP 5-3

T5-P1

428 428

428

429

9 42

428

E 24th AVENUE

429

TRE

PFO

Slope/Flat

HGM Class

PEM

Cowardin

SP-A

428

8

428

Table 1. 2014 Summary of Wetlands and Other Waters of the State and US.

428

SCALE: 1" = 100'

25

428

428

42

427

9

Wetland Number/ Size Wetland A: 1.17 ac Continues offsite Wetland B: 0.08 ac Continues offsite Wetland C: 0.13 ac Continues offsite Wetland D: 0.01 ac Continues offsite (Amazon Creek)

0

429

428

SP-D

427

42

428

427

426

428

429

428

427

429

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

DS AR Y L I

Enclosure

Enclosure

29TH

25TH

26TH

26TH

28TH

*The protection measures for parcels within Eugene city limits wemt into effect on January 1, 2006. The protection measures outside Eugene city limits and inside the urban growth boundary went into effect on January 12, 2007.

30TH

E37 B-1

Non-Goal 5 streams

Not designated for protection

31ST

Designated for protection, no setback (Category C)

Designated for protection, 25' setback (Category B)

Designated for protection, 50' setback (Category A)

Wetland Sites

Not designated for protection

Designated for protection, no setback (Category E)

Designated for protection, 20' setback (Category D)

Designated for protection, 40' setback (Category C)

Designated for protection, 60' setback (Category B)

Tax Lots

Designated for protection, 100' setback (Category A)

West Eugene Wetlands Boundary

Riparian and Upland Wildlife Habitat Sites

27TH

24TH 24TH PL

25TH

24TH

24TH

Eugene City Limits

Eugene Urban Growth Boundary

Legend

26TH

25TH

OLIVE

H

LINCOL CHARNELTO

SCALE: 1" = 600'

600

OLIVE MCMILLAN MCMILLAN PO RTLAND

OLIVE MCMILLAN

OL OL MCM MCMILL WILLAM

PO RTLAND

PORTLAND

AM AZON

OAK

0 150 300

PEARL

LINCOLN

LINCOLN

LN

AMA-7B

AMA-10

AMA-16

AMA-9

29TH

HIGH

OAK OAK HIGH HIGH

HIGH

25TH

22ND

26TH

E30 E

25TH

28TH

AMA-7D

B

2

29

26TH

FIGURE 6: Site on Eugene Local Wetland Inventory/Goal 5 Map Scale: 1" = 600'±

AMA-12B

29TH

AMA-12A

27TH

AMA-11B

AMA-7C 30TH

23RD

22ND

AMA-11A

SITE

22ND

July 2014

PO TTER MIAMI

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

MILL

ALDER

ALDER

Page 6 of 12

FERRY

KINCAID KINCAID

NWP-2009-170/1

HARRIS HARRIS PO TTER

ON

PO TTER UNIVERSITY UNIVERSITY

Z AM A

OLIVE

NWP-2009-170/1

0

FUTURE EXPANSION

R FI

E

Page 7 of 12 BASKETBALL COURT

WETLAND IMPACTS

FIGURE 7: Site Plan Scale: 1" = 160'

NATURAL TURF FIELD

NATURAL TURF FIELD

Staging areas will be in previously disturbed areas at least 150 feet from protected wetlands and waterways

FIRE LANE

NATURAL TURF FIELD

PARKING LOT

1.03 ac Removal in wetlands (PEM Cowardin class, Slope/Flat HGM Class) 0.95 ac Fill in wetlands (PEM Cowardin class, Slope/Flat HGM Class) 0.36 ac Avoided wetlands

LANDSCAPING

PATIO

SERVICE AREA

MIDDLE SCHOOL BUILDING

BIKE PARKING AREA

E 24th AVENUE

July 2014

EET

Property boundary Existing wetlands

SCALE: 1" = 160'

160

E

80

EXISTING BIKE PATH

G

N

AP I

N

LA

40

SC

D

N

LA

COURTYARD

BUS ONLY AREA

CONSTRUCTION ACCESS

FIRE LANE

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

YAR HIL TR DS

Enclosure

PFO

NWP-2009-170/1

Page 8 of 12 1.03 ac Removal in wetlands 0.95 ac Fill in wetlands 0.36 ac Avoided wetlands

Removal

Fill

WETLAND IMPACTS

Impacts by HGM Class 1.03 ac Slope/Flat

Impacts by Cowardin Class 1.03 ac PEM

0

80

160 SCALE: 1" = 160'

40

FIGURE 8: Site Plan Showing Removal and Fill Scale: 1" = 160'

E 24th AVENUE

July 2014

EET

Wetlands

PEM

PEM

PEM

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

YAR HIL TR DS

Enclosure

427

42 8

6 42 24 21 4 4 20 4

Page 9 of 12

427

8

9

42

C

427

B

431

427

42 8428

430

428

428 428 429

429

42 9

429

Ac. Removal 1.03 12.56 13.59

See Figures 10 & 11

Property line Existing contours Proposed contours Existing wetlands A Cross sections

CY Fill 3000 48000 51000

A

432

429

427

428

429

427

Ac. Fill 0.95 12.56 13.51

428

427

9 42

CY Removal 3100 34000 37100

SCALE: 1" = 160'

160

42 6

42 7

42

C428

427

428

428

431

430

429

430

429

428 428

428

428

429 428

42 9 429

428

9 42 42 80 43 42 9

428

430

429

427

428

9 42

0 43

428

E 24th AVENUE

428

429

430

430

428

429

430

430

429

428

429

430

July 2014

FIGURE 9: Existing and Proposed Contours Scale: 1" = 160'

Staging areas will be in previously disturbed areas at least 150 feet from protected wetlands and waterways

428

428

428 42 8

428 427

428 427

428 429

428

80

427

A

427

B

427 427

427

9 42

40

428

A

427

8 42

42 4 42 2 23 5

7 42 427

FUTURE EXPANSION

429

426

9 42

Land Type Wetland Upland Total

0

427

426

428

426

429

CONSTRUCTION ACCESS 426

428

426

428

428

430

426 426

428

426 426

430

42 9

NWP-2009-170/1 9 42

42 8

YAR HIL 430

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

EET

TR DS

Enclosure

Page 10 of 12

427 426 425 424 423 422 421 420

430 429 428

427 426 425 424 423 422 421 420

430 429 428

0

0

NORTH

UPLAND

NORTH

UPLAND

po Pro

UPLAND

sed

de Gra

SECTION B-B

25'

WETLAND

UPLAND

ting

50'

Exis

e

SOUTH

Grad

SOUTH

e g Grad Existin

50'

e

Grad

SECTION A-A

25'

WETLAND

P

sed ropo

75'

75'

10'

20'

Fill Area in Wetlands

40'

Removal Area in Wetlands

Fill Area

Removal Area

July 2014

FIGURE 10: Cross Sections A-A and B-B See Figure 9

Vertical Scale 1"= 5' 0' Horizontal Scale 1"= 20'

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

Property Line

Elevation

Property Line

Elevation

NWP-2009-170/1

Enclosure

NWP-2009-170/1

Page 11 of 12

Enclosure

435 434 433 432 431 430 429 428 427 426 425 424 423 422 421

NORTH

UPLAND

Fill Area in Wetlands

Fill Area

1+00

Existing Grade

Proposed Grade

2+00

SECTION C-C

3+00

WETLAND

4+00

SOUTH

25'

50'

5+00

100'

July 2014

FIGURE 11: Cross Section C-C See Figure 9

Vertical Scale 1"= 5' 0' Horizontal Scale 1"= 50'

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

Property Line

Elevation

NWP-2009-170/1

Page 12 of 12

Enclosure

FUTURE EXPANSION

80

160

SCALE: 1" = 160'

40

Property boundary Existing school Proposed school Existing wetlands Impacts to wetlands

0

WETLANDS

FIELD

EASEMENT

Impacts 1.03 ac low quality wetlands Avoids 0.36 ac high quality wetlands

FIRE LANE

NEW SCHOOL

PARKING

EASEMENT

EASEMENT

Joint Permit Application for Lane County School District #4J: Roosevelt Middle School Project, Eugene, Lane County, OR

FIELD

FIGURE 15: Alternative Designs - Alternative E: Preferred Scale: 1" = 160'

FIELD

July 2014

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification

Corps of Engineers No: NWP-2009-170/1 Notice Issued: September 18, 2014 Oregon Department of State Lands No: APP0056781 Written Comments Due: October 17, 2014

WHO IS THE APPLICANT: Lane County School District No. 4J LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: notice on the proposed project.

See attached U.S. Army Corps of Engineers public

WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.

Corps No. NWP-2009-170/1

Page 1 of 2

PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.

Corps No. NWP-2009-170/1

Page 2 of 2

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas