Home

Galveston District

Run scraper

Phillips 66 Company

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant's revised plan proposes to discharge fill material into 7.1 acres of non-tidal wetlands.

Full Public NoticeCommentsRevised Project PlansMitigation PlanFunctional Assessment The applicant’s revised plan proposes to discharge fill material into 7.1 acres of non-tidal wetlands (reduced from 14.8 acres) for the construction of infrastructure required, including a temporary bridge, to refrigerate, store, and load Liquid Petroleum Gas. Additionally, the applicant proposes to expand and relocate existing dock structures and install new loading arms, breasting dolphins, and pipe piles within open water of the Old Brazos River. Such activities include installing a total of 121 pilings into 3 dock areas, temporarily impacting approximately 1.14 acre and permanently impacting 0.02 acre of the Old Brazos River. See Table 22-1 for details on impacts from the 13 May 2014 public notice and current proposed impacts. See Attachment 2; Revised Project Plans.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas