The applicant's revised plan proposes to discharge fill material into 7.1 acres of non-tidal wetlands.
Full Public NoticeCommentsRevised Project PlansMitigation PlanFunctional Assessment
The applicant’s revised plan proposes to discharge fill material into 7.1 acres of non-tidal wetlands (reduced from 14.8 acres) for the construction of infrastructure required, including a temporary bridge, to refrigerate, store, and load Liquid Petroleum Gas. Additionally, the applicant proposes to expand and relocate existing dock structures and install new loading arms, breasting dolphins, and pipe piles within open water of the Old Brazos River. Such activities include installing a total of 121 pilings into 3 dock areas, temporarily impacting approximately 1.14 acre and permanently impacting 0.02 acre of the Old Brazos River. See Table 22-1 for details on impacts from the 13 May 2014 public notice and current proposed impacts. See Attachment 2; Revised Project Plans.