Danielle Erb is the Regulatory point-of-contact for this permit application from Cooper Creek, LLC, for work impacting Cooper Creek, three intermittent tributaries and four unnamed wetlands in Monmouth, Oregon.

PUBLIC NOTICE for Permit Application

Issue Date: October 6, 2014 Expiration Date: November 5, 2014 US Army Corps of Engineers No: NWP-2008-614-1 30-Day Notice Oregon Department of State Lands No: 56240-RP

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Danielle Erb, Danielle.H.Erb@usace.army.mil PO Box 2946 Portland, OR 97208-2946

Applicant: Cooper Creek, LLC 5 Financial Plaza, Ste 116 Napa, CA 94558

Location: The project is located 7855 Zumwalt Road, Monmouth, OR, Section 04, Township 9 South, Range 5 West (44.8203 N, -123.3142 W).

Waterway: Cooper Creek, three intermittent tributaries, and four unnamed wetlands.

Project Description: The proposed project involves the construction of a dam and reservoir to provide irrigation water for a vineyard and other related crops. The construction of the project would require the removal of 580 cubic yards (cy) of soil and rock for a key trench for the dam from below the Ordinary High Water Mark (OHWM). Removed soils will be placed back into the key trench in compacted form. Additional material for the earthen dam will come from the reservoir area.

The construction will impact a total of 0.37 acres of wetlands and approximately 1,690 linear feet of intermittent stream. Two wetlands will be inundated with water from the filling of the reservoir and a third wetland will have approximately 13,800 cy of silt and clay placed within 0.32 acre for the dam embankment. Portions of four streams will be inundated with water from the reservoir, totaling 1,328-linear feet of stream inundation. Three of the four streams will also have permanent fill of silt and clay for the dam embankment, totaling 356-linear feet of stream impact below the OHWM. Although the streams do not typically flow most of the summer, any flowing water would be diverted around the construction site.

All exposed soil would be seeded and mulched after the construction is completed. According to a hydrology and water quality report, the first year that the reservoir is filled, approximately 8.4% of the average annual runoff will be diverted from the 380 acre study basin; on an average year, they estimated that 4.2% of the annual runoff would be diverted.

Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for approximately 1450-feet of intermittent stream impacts. The proposed mitigation plan includes 1500-feet of onsite streambank enhancement. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To provide irrigation water for a vineyard and other related crops.

Drawing(s): Sixteen (16) drawings are attached and labeled Corps No. NWP-2008-614-1.

Additional Information: Additional information may be obtained from Ms. Danielle Erb, Project Manager, U.S. Army Corps of Engineers at (503) 808-4368 or email Danielle.H.Erb@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Essential Fish Habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH).

The project area is within the known range of protected species. We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect the species listed above, we will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning essential fish habitat will be considered in our final assessment of the described work.

Cultural Resources: An historic properties investigation has been conducted within the permit area. No sites determined eligible for or listed on the National Register of Historic Places were found to exist within the permit area. This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

STUDY AREA IS LOCATED WITHIN THE NW OF S4, T9S, R5W, WM POLK COUNT~ OREGON

FIGURE 1 -

i

SITE LOCATION MAP

COOPER CREEK VINEYARDS, LLC

99W

36

312

N

ZUMWALT RD

w+· s

211

HELMICK RD

116

SCALE: 1"

=

~ MILE

THE ROADS WITH A SOUD FILL DENOIE THE DIRECTIONS TO THE SITE FROM MONMOUTH.

THIS MAP WAS PREPARED FOR THE PURPOSE OF IDENTIFYING THE LOCATION OF THE SIIE AND STUDY BOUNDARY ONLY AND IS NOT INTENDED TO PROVIDE LEGAL DIMENSIONS OR LOCATION OF PROPERTY OWNERSHIP LINES.

NWP-2008-614-1

Project: 307-2-151 Drawing: 3072151M WElLAND.dwg By. CVB/WPK Checked by. EAU Dote: 08-05-08 Rev.: 01-16-09

Enclosure 1

FIGURE 1a -

SITE PLAN

Tax Lots 101 & 103, Section 4, T9S, R5W, WM Polk County, Oregon Land Owner: Cooper Creek Vineyards, LLC \_/

\

200

NWP-2008-614-1

0

~--1 inch

=

100

I

200 ft.

. 200

I

Project: 307-2-151 Drawing: 3072151 K RES.dwg By.

CVB/WPK

Checked by. EAU Date: 08-19-08

Enclosure 1

FIGURE 1b PROPOSED DAM CROSS SECTION Tax Lots 101 & 103, Section 4, T9S, R5W, WM Polk County, Oregon Land Owner: Cooper Creek Vineyards, LLC

Di--

ADD CU' DEP111 aiOIII 10 'ltP OF !!MI. SI.CI'E aiOIII

......

~

Ill

1!111111.21111.

-IIIDE.

-1111111

........"""'

~L."'·-

..... """' """' ......

CUT-OFF._ _ _ E$11111A'!BI. FINAL llllilmCHI liiU. liE AS llR!:Ial BY 1IIE -

30

SCALE: 1"

NWP-2008-614-1

30

0

= 30'

Project: 307-2-151 Drawing: 3072151K RES.dwg By: CVB/WPK Checked by: EAU Date: 08-19-08

Enclosure 1

FiGL4/C£ IMPORTANT This Map for Assessment

ff'c>~N

Jc

Cf.S.6f]

SEC.4 T9S R5W WtJJ POLK COUNTY

and Taxation Purp,.,pses

ONLY

-:Ji=

I

Scale 1" == 400'

.

See Map 8.5.33

100 56.60 AC.

-------- -i·l·L------------------------------------------------------------=---------------------:~~~··~~~-1?~··(~---------------------------------------------------:~::~:---------------======--~----------------------------·.....

·--------

·: ~:.;

.. j'''L-~

yS-ruoY~

:·

/./1

.. :::

I

.·~~

/

:::

./

/'I

---------·

'·

S.E. CORNER

H.W. EVANS

/

Pit

104

102

35.65 AC.

24.05 AC

f/) ~ fl)

"·

~

01

"C

tO

en C1l t; !fc:?'3: '~; "

NWP-2008-614-1

200 379.07 AC.

n ~~~·

:::: :::: ::::

.·.·

~~

Enclosure 1

NWP-2008-614-1

Enclosure 1

FIGURE 2a -WETLAND MITIGATION MAP (SOUTH) Cooper Creek Vineyards, LLC

=1~~~~~~~~~~~~~~~~~~~~~=T9S, R5~

WM

Sec. 4, Taxlot 101 & part of Taxlot 103 Polk County, Oregon

Stuntz.er.. Engineering & Forestry}L WETLAND BOUNDARIES SURVEYED WI"IH TOPCON S6 TOTAL STA110N

± 0.1' ACCURACY. "!HIS MAP WAS PREPARED FDR "!HE PURPOSE OF IOEN11FYING "!HE LOCATION OF WETLAND ONLY AND IS NOT INTENDED TO PROVIDE LEGAL DIMENSIONS DR LOCATION OF PROPERTY OWNERSHIP LINES.

NWP-2008-614-1

·+ s

~

Wetland Area

~

Removal Area (Cut-off Trench)

Base Mops:

Tax Assessor Mops 8S 5 33; 9S 5 4 & 2008 301 Aerial Photo

'

Project: 307-2-151 Drawing: 307215111! WElt.AND.dwg By: WPI< Checked by. EAU

Dale: OB-05--08 Rev.: 01-30-09

Enclosure 1

FIGURE 3 TYPICAL INTERMITTENT STREAM CROSS SECTION (A-A') Tax Lots 101 & 103, Section 4, T9S, R5W, WM Polk County, Oregon Land Owner: Cooper Creek Vineyards, LLC Project: Intermittent Steam Mitigation for Reservoir

30 foot wide riparian enhancement area

'j:.'

370.00

it

366.00

w

a 362.oo F

~ 354.oot: 3ss.oor::::::::~:::::::::::::::·:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;1t:::::::::::::::::::::::::::::::::::::::::::::::::: w

Intermittent

Riparian Tree Plantings

Scrub/Shrub Plantings

-

-

-

-

Existing Ground

NWP-2008-614-1

Project: 307-2-151 Drawing: WETLAND.dwg CVB/WPK By: Checked by: EAU Date: 08-05-08

3072151 L

Enclosure 1

FIGURE 4 TYPICAL WETLAND CREATION CROSS SECTION (B-8') Tax Lots 101 & 103, Section 4, T9S, R5W, WM Polk County, Oregon Land Owner: Cooper Creek Vineyards, LLC Project: Wetland Creation Mitigation for Reservoir

I-UPLAND-+ BUFFER 20 FT

WETLAND PLANTING TREES & SHRUBS 20FT

-J-

EMERGENT WETLAND CREATION AREA 50 FT

-1- EXISTING WETLAND

RIPARIAN FOREST 40 FT

-1

AREA 20'

~

g z

0

F

~

~

Wetland Tree Plantings Scrub/Shrub Plantings Emergent Area Plantings - - - - - - Existing Ground

NWP-2008-614-1

Project: 307-2-151 Drawing: 3072151 L WETLAND.dwg By: CVB/WPK Checked by: EAU Dote: 08-05-08

Enclosure 1

FIGURE 5 CONTROL STRUCTURE DETAIL Tax Lots 101 & 103, Section 4, T9S, R5W, WM Polk County, Oregon Land Owner: Cooper Creek Vineyards, LLC

~~ ~----- ~

~

PROFILE-LOOKING UPSTREAM

EXISTING FARM ROAD

PROFILE-SIDE 10

--

0

~- ..

1 inch = 10

5

10

I

I ft.

PLAN VIEW 20

0

~--·

1 inch = 20

NWP-2008-614-1

10

20

I I ft.

Project: 307-2-151 Drawing: 3072151L WETLAND.dwg By: CVB/WPK Checked by: EAU Dote: 08-19-08

Enclosure 1

.S

NWP-2008-614-1

Enclosure 1

f-1

t::r

u !

(.)

-J -J

SIT£ LOCATION MAP 1 "= ~ MIL£

.......

2640

0

tri

a a:: )5

a:l

~~ 0>:2 ~~ r<'JO>

1320 2640

,

"'S:

e ::.::

1 inch ""' 2640 fL

~

UJ

tE ll. ~ (.)

~~

!Il

·

a: Q: ~

f5

@5

8

z

a::

g

<:(

a:: ....

UJ Q~

WA TERSH£0 LOCATION MAP 1 "= ~ MIL£ 1320

~~~

!

0

-

~~~

--

1 inch

660

~Ct:~

a:::;ci ~

1320

·--·'

::.:: ~0

Vi

510;::, 100

~

LW~iE 0:: UJN

I

1320 ft.

I

a::~~

UJ

Q 0 0

(.)

HYDROLOGIC WA ITRSHED AREA

WEIGH TED RCN Tc

STORM DISTRIBUTION TYPE lA

0

::E

BJ

tJ0:: I ..... _.,

DATA SUMMARY

222 ACRES

-J

Q

... ., ..,.., J.t!.

88

~~

;;-;;-

24 MINUTES

"'" ~~

~e

100

~

6.3

103.5

3.1

106.6

347.9

ELEVATIONS ARE BASED ON LOCAL DATUM

100

0

~~~~~~ M M

!

1

in~h

50 I

~

100 I

~

I

~~

100 !L

CONTDUR INTERVALS:

..

~.

EXISTING GROUND: 2 FT

~ :;!:l

PROPOSCIJ DAIA: 2 F7 POD IS 1980 F7 SOUTH, AND 400 F7 £AST OF NW CORNER OF SECTION 4.

!':t;

.... ~~ ~o

44~49'11"N

12:5'18's··w @ TEST PIT LOCA TJON

& SOIL £lORING LOCATION

~

WfTLAND IAITIGATIDN AREAS [3}: MITIGATION PLAN SUW:tmD TO OREGON VSL AND ARIAY CORPS OF £NG1Nf

S'IIJNJINER ENGINEERING & FORES"IRY, LLC IIAKES NO REPRESEJITAliON AS TO TilE EX!Slt!IC£ OR NON-O:ISltNCE OF UliUllES. IT IS 1HE RESP

NWP-2008-614-1

JOB N/4N£, Pi>V COOPER CRt£!<

Enclosure 1

I

(.) ._j ._j

v)

a

0:::

2-45' ELBOWS SEPARATED BY 6"

~ .,:g ~

.. l.u

25 ::z:

... > ~~ ~Ol ~X~~ a. ...., lil ·

TOE DRAIN OUTLET (SCREEN USING 1/4" OPENING MESH)

ADD 0.5' DEPTH CROWN TO TOP OF DAM. SLOPE CROWN 2% GRADE TOWARDS RESERVOIR SIDE.

THE GATE VALVE STEM AND ARE THE NOT

t!a.O:::ClQ l.u o

PLUNGE POOL

8J

L/2

GATE STEM SUPPORTS ALIGNED ADJACENT 54" C.M.P. AND DO PENETRATE THC

~

0

u

9::;

:::;;

(/)

~

i2 <

Lu

-.1 G:: ~ Cl~ 0

"' '"'-

0

f':'

DiA. C.MP. CONDUIT

17i

'

·

'. "'' '

INV. ELEV. 324.8 12

INV. ELEV. 321.9

· DIA. C.M.P. CONDUIT

E~

Lc 1

s.o·

TYI'

2+00

3+00

4+00

5+00

· rRIPRAP (SEE SP

0:::

! PIPE ENCASEMENT..! (SEE ENCASEMENT DETAIL SHEET 3)

~~~-

360.---.---~---.---,----,---.----,---,---,----,---~--,----,---.--~r-~

!

0

5

...

I

~

fL

:::!;

0

I

.... ......,,

. ~

.....

<» t.> ~

~

""" t!.tl

:i:~ IS :g C:,t:; ~3' !E~ ~~

to~~

.s ._, ____

'

~.b- ~:

;:;;:

l

f-

<(

0

"''

,o~

,.,

-II >w

SmRAO ll!J'ORE !IOI!JIOW REMOVAL

' w -<::,

Wz '"' ~o

c~

330

{//~

~d

!

STftfPPfNG

.,. rN-..

i=w

~Sili

L

J35

v -:: _--;;::-!

I

.i

~

I·..._

~

-~~·

V/1

'"'

71 / (/'

I I I

>25

I v aonw

"'

7.5

I I

'"

JO

375

45

52.5

):~~~

I

l

75

820

: I

I

! ~

~

!J)

"' ~

!;;

PROF!

STREAM

"'"' ;&:

I I

J "'

97.5

>05

"'

O:P:IR£S

DA~~ff,;LEV L---~L---~~---J-----L----~-----L-----L-----L_____ L_ _ _ __ L_ _ _ _J __ _ _ _~_ _ _ _L __ _ _ _L __ _ _ _L _ _ j

"""

~0 ~~ t!~ <6

.~~, ... 8 ~~ ~

::::

31Qr----r----r----r----r----r----r----+----+----+--~~~-~~ROIIIMATh.~·c·~~--~~~

IIJMIIIV !Wr

STAGE-STORAGE DATA

lil~

It' ~~~ .. ~

~

' i

~"' ~

H ~:;! ~"' ~,., ., .. ,.. "

!! =::

I

II I;

z.,

~old ;-s

~

I II

·~t.Jl · OORWcw

I

"' "EET)"' (ACRE

I

O

'"' ~~

I

1"-'¥·" lS

<:J NORMAL

v,_-- ~ -- ,__ -- - ~~ ''""

-

I

I

G.

e

.-J

M

1.0

I

5030'

tl.EV.

()!"OM<

1.0

J50

w

U'i

4.0

8.0

T

I

:J

so

10.0

~~

e;·

~ c ~~ ·z "':i

POOl AREA (ACRES) JSS

I

~"' ""

~;:ih ~~

I

!!Ah_P_Q.OL El:.fV_.:!":L._4S,_& ,

340

~

ct:

(»

350

' _..>

Lu

u

I

1 inch "" 10

0

0:::~~ ct:

::y.z.o'

10

--

:::>

Oll>O ll):::!;

DRAIN (SEE DETAILS SHEET 1, SHEET 3. 4"-DIA HDPE PERF. DRAIN PIPE INSTALLED, 6" PVC OUTLET PIPE.

10

7+00

6+00

~~0

ct: Q

tj ~~ 9;

OUTLET INV. ELEV

1

CUT-OFF TRENCH

1+00

0:::~0:

~1

1

0+00

I

SPECS.

(0

wU:m

CHruKW

SlUIITZNER ENGMERING at F<:JRI:S'mY, U.C "AISS!IIUTY OF THE CONTRACTOR TO COFI.V 'MTH '!HE PRO\IISIONS Of' ORS 757.541 1'0

'CMrn·-

6/30/r:rJ

C. VAN IWRtN

sr,

W. KMESS

----~:.:n-oe

757,571. '!HE CONJRACTilR WILL Bt II£SPONSII!l£ l'lllR ANY DAMMl£ RllSU!.1lNG 111011 !liSI!UPTION CJF

SER\IIC£ CAUSED BY COHSTRUC'TIOII AC1l'J111ES.

NWP-2008-614-1

Enclosure 1

u lP-1

11'-2

TP-J

w-·

11'-5

ll'-6

'W-10

2

~

'

·--6

tl

-

~ ~

I m

... ~

~

1-

"'

1-

,.

'"'

H

f-

'--

"'

,.

-·~~~--

10

-

"

CH,_

w--1 CH

,

......

a:: ~

~' "

"

\i

~

"

,__

~

~~~It

fl :..:..: ~ ~ ou & co' <>:LuO~

Q;

g

TEST P!T LOCATiONS SHOWN ON SHEET 1 UASS!FlfD BY THE UN!FlfD CLASSJF1CAT10N

:c:

ffi

--(/)

a::

1--

~

IML

a::

-

'

..

Q. "'(

(.)

_

~ " --

u

0 0

CH

__

a::

Q

...

,-

a::!

.. Lu 0>~

! 20-----1H 1-H-1 H ;~

TEST PIT GEOLOGICAL LOGS DENOTES WATER SEEPAGE INTO TEST PIT ON C2/07/08,

r-

14---1--1-

""

"

1-H-/--

"

1--

®

CH

CH

------·-L..·-·

1.1) Q

1-

' -- r-

u-,·

"'

CH

6---

_L-J_ CH

-' -J

...

2---

·--- "'

RK

,_,

·-·

·-·

.,

1--

;-s·

"''

'--

!;

TP-12

"'

B

~

W-11

-

Q

a::~Q:;"'

~~0

(/)

lj~~

-J

N ::::>

u~o

a::~~

4\IAilASLE.'"). A COMPLE1'E COPY OF THE

Lu Q

GEOlOOSTS REPORT AND LAB TEST DATA !S AVAILABLE. BY Rt:QU£~1 Tl-!ROVCH STUNTZN\;.R ENGINEERING & F"ORESTRY, lLC

Lu

Lu ~ (/) @" Lu Ol

0::

SYSTEM {USCS} ASTM 0-2487" CLASS!flCA.TJONS AR£ GEOlOOSTS FIELD CLASSlF"!CA TICN (OR fROM LABORAfOOY TEST 0 AT A. \'MERE

-'

~

0 0

u

0

:::0

~

<..:>

0

-J

"'<:

u

G

0 -J 0 Lu

(!)

-

.._.,.,., "'"' J.~

.

"--

~~

;;-~

,.. ___

"'"'

~~

s~

SOIL BORING GEOLOGICAL LOGS &, J55r----.---.---~----.--~~~~~~~--

35o:

SOiL BORiNG LOCATIONS SHOWN ON SHEET 1

DENOTES SATURATED

~

!N SOIL BORING ON

I>

~~

""T'"

;:,o

i:i.

345

"~ "'"' ~'"'

!------+---/----""...!

..

~~ ~

,.-o 340~---L---L----L-----L----L---L---~

-1+00

-0+50

PROFILE ON

0+00

0+50

1+00

1+50

OF EMERGENCY SPILLWAY

SCAL[

CONCRETE IS AT 347.7'

CROSS SECTION OF EMERGENCY SPILLWAY STUNllNER ~ & FORESmY, UC WAKES NO REPRES£NTAT1011 AS TO litE EXISltNCE OR

NOII-EX!STENC£ OF IITIUTlES. IT IS '!HE RESPONSIBIUTY OF ntE CONTRACTOR TO COioll'l.Y 11'!11 '!HE PR0\4SIONS OF OilS 757,541 TO 757.571. 'THE OOH1RACTOR llU BE RESf'llNS!I!LE FOR NfY DAMAGE RESIJL liNG FROM DISRUPTION OF stR\IICE CAUSED BY OOHS1RIJC110N AC11VI11ES.

NWP-2008-614-1

Enclosure 1

(.) -J -J

V) 12 GAGE BAFFLES (WELD TO 78' C.M.P.)

a

n:

1"e x 3' SLOT

~

WELD

(TYP

@

ALL

INTERSECTIONS)

;.,

#4@ 6" SPACED~ £ACH WAY

VERIFY BOLT LOCATIONS FROM MFR'S SHOF DRAWINGS

1"x1"x2' LONG 3/16" ANGLE IRON BOLT TO BAFFLES ONLY: NOT TO RISER. (TYP.)

1")0>

~~ g><:~ f!Jt:l oi

i I i

It~

0..~

~

RISER CREST ELEV. 346.0

BEND ENDS DOWN TO CLEAR OUTSIDE

CX)

25~ 01:2 I.L$ ~"'"

§

78' C.M.P.

NOTE: RISER & GATE TRASH RACK TO BE PAINTED AFTER FABRICATION.

1"x1·x2" LONG J/16· ANGLE IRON SOLT TO BAFFLES ONLY; NOT TO RISER. (TYP.)

HANDWHEEL BRACKET DETAIL

~

NO SCALE

n: ~ w (/) LLJ ~" ()) n:o-... . ~

RISER TRASH RACK DETAIL

~:<::~

(/)

w~

~

LLJ :::> :r

(.) :25 ~ Lu Q: Nl"'

f5Q ~~ a ~

0

8 12" PIPE ENCASEMENT DETAIL

WATERMAN MODEL C-20\ 12" DIA. CA TE, BRONZE SEATS \ (SEE SPECIFICATIONS)

...

_., .,"" ~

NO SCALE

J.r!.

~~

"" i'$15

ee

NOTE: SKEW GATE ON INLET STRUCTURE SO GATE STEM CLEARS RISER

42" PIPE ENCASEMENT DETAIL NO SCALE

SYNTHETIC INDUSTRIES #801 NON- WOVEN OR [QUAL LAP AT TOP AS SHOWN. USE 15'

RO'.L WIDTH

42" DIA 16 GAGE C.M.P. (SEE SPEC'S)

1/2"-3/4" CRUSHffi ROCK. NO FINES

0

-..,.I 4" DIA. HEAVY DUTY P/E PERFORATED DRAINAGE

LEGEND

TUBING (SEE SPECS)

= DIAMETER CLR = CLEAR C-C CENTER TO CENTER ¢

HP!":tS

~MI' lm

3'-0"

GATE -

TRASH RACK DETAIL

CONDUIT & RISER - PLAN VIEW WITH DETAILS SChE

NWP-2008-614-1

S1UNT211£R ENGINEERING A FORESTRY, U.C MAKES IIC R£1'R£$ENTA'I10N AS TO 'THE EXISIDICE OR NON-EXISlENCE Of U11U11ES. IT IS 1HE I!ESf>ONSIBIUTY Of 1HE CON111ACTCIR TO COMPI.Y 'M'TH 1HE I'RO'IISION!l Of OR$ 757.!141 TO 757.571. 1HE CONTRACTOR 'M1J.. BE R£SPONSliii.E FOR #IV DAMAGE RESUL1lNC moN OISR!lP'I!ON Of SER\1CE CAUSED BY CONSTRUCTION ACTI'vl'!IES.

6/3ll/C$

C. VAN £1UR£N

C#fCit£D fl(:

W, rtNESS ~.t-:.n-oa

TOE DRAIN DETAIL NO J(JfJ ;;.,,,

307~2~151

'

jSHtrr4Cf4

Enclosure 1

EROSION AND SEDIMENT CONTROL PLANS PROPERTY OWNER

THE PERMITTEE IS REQUIRED TO MEET ALL THE CONDITIONS OF THE 1200C PERMIT. li!S ESCP AND GENERAL CONOmONS HAVIE BEEN DEVELOPED TO FACIUTATE COMPUANCE WITH li!E 1200C PERMIT REQUIREMENTS. IN CASES Of DISCREPANCIES OR OMISSIONS, li!E 1200C PERMIT REQUIREMENTS SUPERCEDE REQUIREMENTS Of li!IS PLAN.

COOPER CREEK VINEYARDS LLC. ATTN: MATT McKAMEY P.O. BOX 3989 NAPA, CALIFORNIA 94558

N

W*E

ENC1EEF!!NG I SURVEYING COMPANY STUNTZNER ENGINEERING AND FORESTRY ATTN: BILL KNESS, PE ATTN: ERIC A. URSTADT. PE/PLS 2137 19TH AVENUE FOREST GROVE, OREGON 97116

s

\_)

THE SfiE IS PART Of A N£WLY ESTABLISHED VINEYARD, THE SITE HAD B£EN PREVIOUSLY LISED FOR GROWING CHRISTMAS TREES. MOST Of li!E GROUND HAS BEEN ClEARED OF VEGETATION AND REPLANTED WITH VINES AND GRASSES. li!E AREA OF PROPOSf!l DISTURBANCE HAS NOT YET BEEN DISTURBED AND HAS VARYING TOPOGRAPHY.

5.

DEVELOPED CONDITIONS

7.

NATURE Of CONSTRUCTION ACTIVI1Y AND ESTIMATED TIME TABLE · CLEARlNG (JUNE 1ST JUNE lOTH) · GRADING (JUNE 10TH - AUGUST 31ST) · FlNAL STABIUZATION (SEPTEMBER 1ST - SEPTEMBER 30TH)

TOTAL SITE AREA

SITE PLAN SCALE :

= 296.9 ACRES

4.

6.

6. 9.

10. 11. 12.

TOTAL DISTURBED AREA = 22.5 ACRES

1·~600'

SITE SOIL CLASSifiCATION: ACCORDING TO li!E USDA SOIL SURVEY FOR POLK COUNTY, THE SOIL ON THE SfiE CONSISTS OF 8EI.LPINE SILTY ClAY LOAM ~~ DISTRIBUTION AREA (HYDROLOGIC SOIL GRCUP C & 0), JORY SILTY ClAY LOAM ~30% DISTRIBUTION AREA (HYDROLOGIC SOil GROUP 0 & E), AND li!E SUVER SILTY ClAY LOAM N10% DISTRIBUTION AREA (HYDROLOGIC SOIL GRCUP C).

13.

14.

15.

RECEIVING WATER BODIES: miBUTARY TO COOPER CREEK

16.

PERMITTEE'S SITE INSPECTOR - BILL KNESS, PE COMPANY/AGENCY: STIJNTZNER ENGINEERING ANll FORESTRY

PHONE: ~3) 357-5717 FAX: (QW) 357-5698 E-MAIL: bjllknjJssOs!un!zner.m DESCRIPTION Of EXPERIENCE: 19 YEARS Of ENVIRQNMENlAL ENGINEERING EXPERIENCE. 'll!l!!KINQ ON A VARIETY Of PROJECTS SOME IN\IOLVlNG ERQS!QN AN!! SEDIMENT CONTROL

SIT£ LOCATION lS IN THE

.·

SW 1/4 OF NW 1/4 OF S£CT10N 4, T9S, R5W

,

s

-.. -

1.

2.

NT

VICINITY MAP

PfiOI'EfiiY LOCAl!QN: SOUTH OF MONMOUlH OREGON, OFF Of ELKINS RCAO, 2.7 MILES WEST Of li!E INTERSIECTION WI1H HWY 99 TURN DUE WEST ON GRAVEL ROAD. FOILLOW GRAVEL ROAC WIEST AND NORTH TO SIT£. CALL AHEAD AND YOU YllLL BE DIRECTED TO THE LOCATION Of li!E PRCPOSEO IMPRQIIEMENTS. lATITUDE = 44'49'10.82" N LONGITUDE = 123'18'5+.13' W

NWP-2008-614-1

ACTIVE PERIOD PRIOR TO THE SITE BECOMING INACTIVE OR IN ANTICIPATION Of SITE INACCESSABIUTY

INSPECTION MINIMUM FREQUENCY DAILY WHEN STORMWATER RUNOFF, INCLUDING IF RUNOFF FROM SNOWMELT IS OCCURING ONCE TO ENSURE THAT EROSION AND SEDIMENl CONTROL MEASURES ARE IN WORKING ORDER. ANY NECESSARY MAINTAINCE AND REPAIR MUST BE MADE PRIOR TO LEAVING li!E SITE.

3.

INACTIVIE PERIODS GREATER 1HAN SEVEN (7) CONSI:CUTIVE CALLENOAR DAYS.

ONCE EVIERY TWO (2) WEEKS.

4.

PERIODS WHEN li!E SITE IS INACCESSABLE DUE TO INCLEMENT WEATHER.

IF PRACTICAL, INSPECTIONS MUST OCCUR DAILY AT A RELEVANT AND ACCESSABLE DISCHARGE POINT OR

~

m

~ ~ m~

~0)

t:: $

REFER TO DEO GJDANCE MANUAL FOR A COMPFIEHENSIVE LIST OF AVAJI...AJ3I..E BMP'S.

~ ~ ~(f 8: (.) a:::

18. 19. 20.

22. 23.

ll'f'I.Y lEIIPOIWI'I AND l'!'lWAHENT SOIL STABIUZATION lt£AStm ON ALL OIS11!RilED AREAS />S !.lRAiliiiG I'ROGRESSES. (SCH A.5J>].6.) CONSlR\JCllON AClM1IES liUST AVOID OR MINIIIIZE EXCAVATION AND CREATION OF !liRE GROUi'ID fROII OCTOBER 1 THROUGH MAY 31 tACH YEAft (SCH A.7.o.i.) !liJRING WET WfATH£R P!RIOilS IDIPOIWI'I STABIUZAT!ON OF 1111: Silt MUST OCCUR AT 1111: 00 OF OOl WORK DAY IF RIIINfAll IS fORECAST IN 1111: NEXT 24 HOURS. (SCH A.7.o.l.) ALL EROSION AND S!lliM£NT CONlf«llS NOT IN THE DIRECT PATH OF WORK MUST BE INSTAUEO PRIOR 10 Jll:f tAN!l ~ (SCH A.7.c.i!.) I'RES£R'I£ !liSllNG vtmATION AND RE-vtmA1E OI'EII AREAS WilEN PRACl1CAil!£ BEfORE AND AfTER !.lRAiliiiG OR CONSlR\JCllON (SCH A.7 .eJlU) ALL 1Eiii'O!!.!RY S!lliM£NT CONl1lOlS liUST RElfAIN IN PlACE Ull1lL PERIIANOO vtmAliON OR OTHER l'l'lWAHENT COI'ERING OF EXPOSIJJ SOIL IS ESTA!lUSIIED. (SCH A.7.e.lll.J.) S!lliM£NT CONl1lOlS MUST BE IIISTAU£1l AND IIAillrNN!D ON ALL DOWN GRADiENT SIDES OF 1111: CONSlR\JCllON Silt AT ALL TIIII:S !liJRING COIIS1IWCTION. (SCH A.7.d.i.(1)) ALL ACTII£ CATCH BASINS MUST HAVE SEDIIIOO CONl1lOlS INSTAillll AND MAIIITAIIIED AT ALL TIIII:S !liJRING CONSTRUCTION. (SCH A.7.d.i.(2)) WAWH!CHT TRUCKS liUST BE liSED 10 TIWISPORT SATURATED SOilS fROII 1111: CONSTRUCTION Silt. AN N'l'ROI'E() EQUIVAI.OO IS 10 DRAIN 1111: SOIL ON-Silt AT A OESIGNIJID lOCATION USING - T £ BMP's; SOIL liUST BE lliWNED SUFf!CIOOLY FOR IIINliiAl SPIIJ}G: (SCH A.7.d.ii.3) 1Eiii'O!!.!RY STABIUZATION OR WlrniNG OF SOIL SlllCKPIIB liUST OCCUR AT 1111: 00 OF tACH WOR!( DAY OR OTHER BMP's MUST BE IIIPlEMEil1Ell 10 PRE\'00 TURI3I!l DISCHARGES 10 SlmfACE WATERS. (5CH A.7.e.ll.2.) 0£\'EUlP AND MAIIITAIN OHS11[ AWRl1T£N SPU PRE\'£Nl101f AND ll£SI'ONSE PIIOCEDURE. (SCH A.7d.J) Jll:f USE OF TOXIC OR OTHER HAZAROOIIS II'TERWS IIUST INCUIIlE PROPER SlORAGE, API'l!CA110N, AND lliSl'O!W... (SCH A.7.o.ili.(2)) 1111: P£RNrrni liUST PROI'ERLY PRMNT AND IWIAGE HAZARDOUS WASTE. US£ll OILS. COIITAIIJIIATED SOliS, CONCllE1I: '11/>S!£, SANITARY '11/>S!£, UOUID WASTE. OR OTHER TOXIC SUBSlliNC£S DISC!l\I£REll OR GENERATED DUR!NG CONSTRUCllON. (SCH A.7.e.i.1 AND SCH

A.7.e.lii.4) SKlNiflCANT AliOtJNJS OF S!lliM£NT W!!ICII l£A\f 1111: S!IE liUST BE ClEANED UP IIIIHN 24 HOURS AND l'tACED BACK 011 THE Silt AND STABIIJZEI) OR PROI'ERLY lliSPOSED. !HE CAUSE OF !HE S!lliM£NT REI.EAS£ liUST BE FOliNO AND PRMHliJJ fROII CAIJSINC A REOCCU!lRENCf OF 1111: OISCHARG!Il 1111HN 1111: SAN£ 24 HOURS. Jll:f 111-S!RFAII ClEAN UP OF SEDIIIOO SHAll BE !'I:RfOIIMED ACCOROING TO 1111: OREGON ti'IISION OF STAlE lANDS REDU1RED TillE fRAIIE. (SCH A.7.f.l.1) S!lliM£NT liUST NOT BE 1NT£14110N.\1..Y WASH£ll INTO SIORM SEWERS, ORAitWlE WAYS. OR WJ\1EllBOOIES. llRY SWEEPING liUST BE USED TO Cl£AN UP R!l£ASEI) SEIJWOOS. (SCH A.W.2) 1111: APPLICATION RA1! Of FERTlUZERS USED TO R£ESTABI.ISH VECETA110N liUST FIJlLOW THE IWlUFACTURER's R£COitMENilAT!ONS. NU1RIOO RElfAS£S fROII FERTlUZERS TO stJRFACE WA1ERS MUST BE MINIMIZED. TillE RELEASE FERTlUZERS SHOUUl BE liSED AND CAR£ SHOIIlD BE TAKEN IN 1111: API'!JQI110N OF FERTlUZERS WITHIN N« WAltR WAY RIPJIRIAN lONE. {SCH A.7.f.!.J.) S!lliM£NT MUST BE REIIOI'Eil FROII BEHIND SEDIMENT FENCE WHEN II HAS ROOil:O A HEIGHT OF J 1111: HEJCHT OF 1111: FENCE />llfJIE 1111: GROUND, AND BEfORE FtNCE REifOVAL (SCH A.7.f.i.1.) SEDIIIOO MUST BE REIIOI'Eil fROII BEHINO 810 llloGS AND OTHER ll'RRIERS WilEN IT HAS ~ A HEIGHT OF TWO (2) INCH£5 AND BEfORE BMf' RllotOVAL (SCH A.7JU.) Cl£ANING Of TRAPI'8l CAJCH IIISINS lltJST OCCUR WilEN 1111: S!lliM£NT RETEN11011 CAPACfiY IllS BEEN R!llUCED BY Flf1Y (50) PfRCOO, ANil AT COIIPWION OF PRO.I£CT. (5CH A.7.f.1i.l) RllotOVAL OF TRAPPED SEDII!OO IN A S!lliM£NT BASIN OR S!lliM£NT TRAP MUST OCCUR WilEN 1111: SEDIIIOO RETENI!ON CAPACfiY HAS BEEN REOIIC£D BY AflY (50) PfRCOO, AND AT COIIPlE1ION OF PROJECT. (SCH A.7.!.ll.Jik4) OOl MUST APPROVE Of Jll:f TREAlloiOO S'IS1Eii ANil OI'£RA110NAL PlAN lHAT MAY BE NEC£SSARY TO TREAT COIITAIIJIIAllll COIIS1IWCTION DEWATrniNG OR SEDII!OO AND 11JRBilllY IN STORIIYIATER RUNOFF. (5CH A.7.1.lll.) SH0UUJ AU. COIISJRUC11011 AClM1IES erASE FOR THllm' (JO) llAYS OR MORE, THE ElffillE Silt MUST BE 1EIIII'O!lARILY Sfldli.IZED USING VEGETATION OR A HEAVY NUI.CH lAYER, mtflORAilY S!EliNG, OR OTH£R METHOD. {SCI! M.a.) SHOIJU) CONSlR\JCllON AC1Ml1£S erASE FOR Afl££N (15) llAYS OR MORE ON Nfl SIGNIACANT l'ORllOII OF A CONSlR\JCllON SITE, mtflORAilY STABIJZA11011 IS REOIIIRfll FOR THAT PO!ffiON OF 1llE SITE W!lH S!RAYI, COMPOST, OR OTHER TACI<1F1ED COVEllliiG lHAT IIlli. PREVENT SOIL OR WIND £llOSION UllllL WORK RESUIIES ON lHAT l'ORllOII Of THE SITE {SCH M.b.)

!l..

'< :c:

lli @s

8 a:::

~

lli(I)Cl~iO

IJ.jll::O)

0:: ~ ·

I

!'lc;~

t!J~:r:

a:::"'~'= (.) 10 :::>

lOg

**

ONLY APPU£0 TO SIOCI

lli ~~ Nfl

~

a..

GllOIINil lliS!UR!llNG ACTMJY.

a a (.)

ATTENTION EXCAVATORS OREGON lAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON unuTY NOTIFICATION CENTER THOSE RULES ARE SET fORTH IN OAR 952-001-0010 li!ROUGH OAR 952-001-0D90. YOU MAY OBTAIN COPIES OF THESE RULES FRCM THE CENTER BY CALLING 503-232-1987. If YOU HAVIE ANY QUESTlONS ABOUT THE RULES, YOU MAY CON1ACT li!E CENTER. YOU MUST NOTIFY THE CENTER AT LEAST TWO BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION. CALL 503-246-6699.

A COIIPREHENSI\'E UST OF AVAilABLE lli:ST IIANAGE.IIEIII I'RAC1tES (BMP) !li'T10NS ~ 011 IJEQ's GIJIDANC£ IIANtJAl HAS BEEN REW:YIED 10 COt.lPI.ETE THIS EROSION AND SEDIMENT CONlROL PWL SOliE OF !HE />llfJIE USTt:D BliP's WERE NOT ~ BECAIJSI: THEY WERE ll£TERIIINED 10 NOT IJF£CT1\'ELY twW:E EROSION PREI'ENI!ON AND SEOIYOO CONTROL FOR TliiS PROJECT ~ ON SPECifiC Silt COIIIllllONS. INCLUDING SOIL CONIJIT10NS l!IPOGRAPHIC COIISTRAINTS, ACCESSI!liUiY TO 1111: Silt, AND OTHER RElATED CON!llllOIIS, />S 1111: PROJECT PROGRESSES AND THERE IS A NEED TO RE'I1SE 1111: ESC PlAN, AN AC!ION PlAN IIlli. BE SU!MlTED.

e!tl

u " .,~ ~"' ·~ ........ ~ ~ ""' ~:g

·~

~= --~

lt ...

!

~~ ~~

~ §~

·I

s

~"" I~ ~ ~ ~ ;;:!

"

~

i

I

BmON AND SEDIMENT CONTROL PLANS 1 2 3

i

li)

RATIONALE STATEMENT

SHEET INDEX

~~

i~

~

'f:l

INIML

II

COVER SHEET FOR EROSION AND SEDIMENT CONTROL RESERVOIR GRADING AND EROSION CONTROL EROSION AND SEDIMENT CONTROL DETAILS

s~

~~~ il

I£ h~~ ill

I

DOWNSTREAM LOCATION. HOLD A PRE-CON MEETING OF PROJECT CONSTRUCTION PERSONNEL THAT INCLUDES 11!£ EC INSPECTOR

PfiOI'EfiiY DESCAIP110N:

POLK COUNTY ASSESSOR MAPS 8.5.33 TAX LOT 601 AND 9.5.4 TAX LOTS 100, 101, 102, 103, 104

17.

21.

SITE CONDITION

~

BMP MATAIX FOR CONSTRUCTION PHASES

STANDARD EROSION AND SEDIMENT CONTROL PLAN DRAWING NOTES 3.

li!E SITE WILL BE APPROPRIATELY GRADED TO CONSTRUCT A RESERVOIR. NATIVE SOIL WILL BE USED FOR DAM CONSTRUCTION MATERIAL AND A SPILLWAY WILL BE INCLUOED. WATER FROM li!E RESERVOIR WILL BE USED FOR \<1NEYARO IRRIGATION. BMP'S WILL BE INSTALLED TO PREVENT EROSION.

(f)

~ IJ.J co · l.L] 0 ~

2.

NAARAllVE DESCRIPTlONS

-'

loJ

1.

EXISTING SITE CONDITIONS

(.) -.I

·

ALL INSPECTIONS MUST BE MADE IN ACCORDANCE WITH OEQ 1200C PERMIT REQUIREMENTS. INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ'S 1200C PERMIT REQUIREMENTS. CHANGES TO THE APPRCVIED ESC PIAN MUST BE SUBMflTEO TO DEO IN THE FORM OF AN ACTION PLAN.

Ellf"IR£$ S/30/00 QRAIDI SY:

C. VAN BUREN

CH!cxr:D Bl':

W. KNESS

lM'I!';

1-19-09

JDfl NAfiEt PP'V COOPER CIU:EK

Enclosure 1 .me

u ::j V)

a

0::::

~ ~ ~It s; ~ ~~

STRAW SAI..E DIKE- SC-4

I<) (l)

~ ~ ~i

~ u~1:'0-i (\.; 0 0.. ...... 0.. "'(

2:

ffi

8

Dust Control Notes 1.

A. B. C. 0.

rA

E. F. G. 2.

u

DUST SHALL BE MINIMIZED TO THE EXTENT PRACTICABLE, UTILIZING ALL MEASURES NECESSARY, INCLUDING, BUT NOT UMITED TO: SPRINKLER HAUL AND ACCESS ROADS AND OTHER EXPOSED DUST PRODUCING AREAS APPLYING AGENCY-APPROVED DUST PALLIATIVES ON ACCESS AND HAUL ROADS. ESTABUSHING TEMPORARY VEGETATIVE COVER. PLACING WOOD CHIPS OR OTHER EFFECTIVE MULCHES ON VEHICLE AND PEOESTIRIAN USE AREAS. MAINTAINING THE PROPER MOISTURE CONDITION ON ALL fill SURFACES. PREWETTING CUT AND BORROW AREA SURFACES. USE Of COVERED HAUL EQUIPMENT.

CONTIRACTOR SHALL FURNISH AND INSTALL EQUIPMENT TO HAUL AND PLACE WATER. AN ADEDUA TE SUPPLY OF WATER SHALL BE MAINTAINED AT All TIMES.

~

~

ffi co (/) Q:::?

LL.Jct::Ol 0::::~

~~~

(.

~~

ii:3 ~

o.y

~ '-'

~\

"

e: --:n

~

7 (!

e

~

0 0

u

t:L'~--:

PLAN

PLASTIC SHEETING

~

·r='»~

!:!

.~.....:'!

"" ~li!

f:c:l

~~ 55:

0

':'(;

'».....:'!

~

oe P!.AC£0 A ROW WJIH fHt·

NOTES: 1. MINIMUM 12' OVERLAP OF ALL SEAMS REQUIRED. 2. BARRIER REQUIRED 0 TOE OF STOCK PILE. 3. COVERING MAINTAINED TIGHTLY IN PLACE BY USING SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10' GRID SPACING IN ALL DIRECTIONS.

!:::g t;rg

H

=~

....

00'-.;~~

~~

~;

~ ~~

-i

::!;;

~

I

~~

~

~

fiJ

DETAIL r:;'\ STRAW BALE DIKE

I

t

~

ARRIER REQUIRED 0 TOE OF SLOPE.

NtJrt:s:

:g~

0:::: " 2:

~

"""\

::::>

0

It)

!d II

DETAIL [;\PLASTIC SHEETING

jlli

\27NTS

~~ §t;

.... "!:!

§

EXPift£$ DRAWN

BY',:

CH£C1(£{)

DAm

...,.,

IW:

~e

&/30/09

C. VAN BUJm4 W. ICfoi.ESS

1-19-09

JOB NAM£t PP\1 COOPER CREEK

NWP-2008-614-1

..,. 1 Enclosure

3

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification Corps of Engineers No: NWP-2008-614-1 Oregon Department of State Lands No: 56240-RP

Notice Issued: October 6, 2014 Written Comments Due: November 5, 2014

WHO IS THE APPLICANT: Cooper Creek, LLC, 5 Financial Plaza, Ste 116, Napa, CA 94558 LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.

PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing."

Written comments: Corps No. NWP-2008-614-1

Page 1 of 2

Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Avenue Suite 400 Portland, Oregon 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.

Corps No. NWP-2008-614-1

Page 2 of 2

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas