Danielle Erb is the Regulatory point-of-contact for this permit application from Cooper Creek, LLC, for work impacting Cooper Creek, three intermittent tributaries and four unnamed wetlands in Monmouth, Oregon.
PUBLIC NOTICE for Permit Application
Issue Date: October 6, 2014
Expiration Date: November 5, 2014
US Army Corps of Engineers No: NWP-2008-614-1
30-Day Notice Oregon Department of State Lands No: 56240-RP
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Danielle Erb, Danielle.H.Erb@usace.army.mil
PO Box 2946
Portland, OR 97208-2946
Applicant: Cooper Creek, LLC
5 Financial Plaza, Ste 116
Napa, CA 94558
Location: The project is located 7855 Zumwalt Road, Monmouth, OR, Section 04, Township 9 South, Range 5 West (44.8203 N, -123.3142 W).
Waterway: Cooper Creek, three intermittent tributaries, and four unnamed wetlands.
Project Description: The proposed project involves the construction of a dam and reservoir to provide irrigation water for a vineyard and other related crops. The construction of the project would require the removal of 580 cubic yards (cy) of soil and rock for a key trench for the dam from below the Ordinary High Water Mark (OHWM). Removed soils will be placed back into the key trench in compacted form. Additional material for the earthen dam will come from the reservoir area.
The construction will impact a total of 0.37 acres of wetlands and approximately 1,690 linear feet of intermittent stream. Two wetlands will be inundated with water from the filling of the reservoir and a third wetland will have approximately 13,800 cy of silt and clay placed within 0.32 acre for the dam embankment. Portions of four streams will be inundated with water from the reservoir, totaling 1,328-linear feet of stream inundation. Three of the four streams will also have permanent fill of silt and clay for the dam embankment, totaling 356-linear feet of stream impact below the OHWM. Although the streams do not typically flow most of the summer, any flowing water would be diverted around the construction site.
All exposed soil would be seeded and mulched after the construction is completed. According to a hydrology and water quality report, the first year that the reservoir is filled, approximately 8.4% of the average annual runoff will be diverted from the 380 acre study basin; on an average year, they estimated that 4.2% of the annual runoff would be diverted.
Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for approximately 1450-feet of intermittent stream impacts. The proposed mitigation plan includes 1500-feet of onsite streambank enhancement. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: To provide irrigation water for a vineyard and other related crops.
Drawing(s): Sixteen (16) drawings are attached and labeled Corps No. NWP-2008-614-1.
Additional Information: Additional information may be obtained from Ms. Danielle Erb, Project Manager, U.S. Army Corps of Engineers at (503) 808-4368 or email Danielle.H.Erb@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Essential Fish Habitat: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH).
The project area is within the known range of protected species. We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect the species listed above, we will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning essential fish habitat will be considered in our final assessment of the described work.
Cultural Resources: An historic properties investigation has been conducted within the permit area. No sites determined eligible for or listed on the National Register of Historic Places were found to exist within the permit area. This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
STUDY AREA IS LOCATED
WITHIN THE NW
OF
S4, T9S, R5W, WM
POLK COUNT~ OREGON
FIGURE 1 -
i
SITE LOCATION MAP
COOPER CREEK VINEYARDS, LLC
99W
36
312
N
ZUMWALT RD
w+·
s
211
HELMICK RD
116
SCALE: 1"
=
~ MILE
THE ROADS WITH A SOUD FILL DENOIE THE
DIRECTIONS TO THE SITE FROM MONMOUTH.
THIS MAP WAS PREPARED FOR THE PURPOSE OF IDENTIFYING THE LOCATION OF
THE SIIE AND STUDY BOUNDARY ONLY AND IS NOT INTENDED TO PROVIDE LEGAL
DIMENSIONS OR LOCATION OF PROPERTY OWNERSHIP LINES.
NWP-2008-614-1
Project: 307-2-151
Drawing: 3072151M WElLAND.dwg
By. CVB/WPK
Checked by. EAU
Dote: 08-05-08
Rev.: 01-16-09
Enclosure 1
FIGURE 1a -
SITE PLAN
Tax Lots 101 & 103, Section 4, T9S, R5W, WM
Polk County, Oregon
Land Owner: Cooper Creek Vineyards, LLC
\_/
\
200
NWP-2008-614-1
0
~--1 inch
=
100
I
200 ft.
. 200
I
Project: 307-2-151
Drawing: 3072151 K RES.dwg
By.
CVB/WPK
Checked by. EAU
Date: 08-19-08
Enclosure 1
FIGURE 1b
PROPOSED DAM CROSS SECTION
Tax Lots 101 & 103, Section 4, T9S, R5W, WM
Polk County, Oregon
Land Owner: Cooper Creek Vineyards, LLC
Di--
ADD CU' DEP111 aiOIII 10
'ltP OF !!MI. SI.CI'E aiOIII
......
~
Ill
1!111111.21111.
-IIIDE.
-1111111
........"""'
~L."'·-
.....
"""'
"""'
......
CUT-OFF._ _ _
E$11111A'!BI. FINAL llllilmCHI liiU.
liE AS llR!:Ial BY 1IIE -
30
SCALE: 1"
NWP-2008-614-1
30
0
= 30'
Project: 307-2-151
Drawing: 3072151K RES.dwg
By: CVB/WPK
Checked by: EAU
Date: 08-19-08
Enclosure 1
FiGL4/C£
IMPORTANT
This Map for Assessment
ff'c>~N
Jc
Cf.S.6f]
SEC.4 T9S R5W WtJJ
POLK COUNTY
and Taxation Purp,.,pses
ONLY
-:Ji=
I
Scale 1" == 400'
.
See Map 8.5.33
100
56.60 AC.
-------- -i·l·L------------------------------------------------------------=---------------------:~~~··~~~-1?~··(~---------------------------------------------------:~::~:---------------======--~----------------------------·.....
·--------
·:
~:.;
.. j'''L-~
yS-ruoY~
:·
/./1
..
:::
I
.·~~
/
:::
./
/'I
---------·
'·
S.E. CORNER
H.W. EVANS
/
Pit
104
102
35.65 AC.
24.05 AC
f/)
~
fl)
"·
~
01
"C
tO
en
C1l
t;
!fc:?'3: '~; "
NWP-2008-614-1
200
379.07 AC.
n
~~~·
::::
::::
::::
.·.·
~~
Enclosure 1
NWP-2008-614-1
Enclosure 1
FIGURE 2a -WETLAND MITIGATION MAP (SOUTH)
Cooper Creek
Vineyards, LLC
=1~~~~~~~~~~~~~~~~~~~~~=T9S, R5~
WM
Sec. 4, Taxlot 101 &
part of Taxlot 103
Polk County, Oregon
Stuntz.er..
Engineering
& Forestry}L
WETLAND BOUNDARIES SURVEYED WI"IH TOPCON S6 TOTAL STA110N
± 0.1' ACCURACY.
"!HIS MAP WAS PREPARED FDR "!HE PURPOSE OF IOEN11FYING "!HE
LOCATION OF WETLAND ONLY AND IS NOT INTENDED TO PROVIDE LEGAL
DIMENSIONS DR LOCATION OF PROPERTY OWNERSHIP LINES.
NWP-2008-614-1
·+
s
~
Wetland Area
~
Removal Area (Cut-off Trench)
Base Mops:
Tax Assessor Mops 8S 5 33; 9S 5 4 &
2008 301 Aerial Photo
'
Project: 307-2-151
Drawing: 307215111!
WElt.AND.dwg
By: WPI<
Checked by. EAU
Dale: OB-05--08
Rev.: 01-30-09
Enclosure 1
FIGURE 3
TYPICAL INTERMITTENT STREAM CROSS SECTION (A-A')
Tax Lots 101 & 103, Section 4, T9S, R5W, WM
Polk County, Oregon
Land Owner: Cooper Creek Vineyards, LLC
Project: Intermittent Steam Mitigation for Reservoir
30 foot wide
riparian
enhancement area
'j:.'
370.00
it
366.00
w
a 362.oo
F
~ 354.oot:
3ss.oor::::::::~:::::::::::::::·:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;1t::::::::::::::::::::::::::::::::::::::::::::::::::
w
Intermittent
Riparian Tree
Plantings
Scrub/Shrub
Plantings
-
-
-
-
Existing Ground
NWP-2008-614-1
Project: 307-2-151
Drawing:
WETLAND.dwg
CVB/WPK
By:
Checked by: EAU
Date:
08-05-08
3072151 L
Enclosure 1
FIGURE 4
TYPICAL WETLAND CREATION CROSS SECTION (B-8')
Tax Lots 101 & 103, Section 4, T9S, R5W, WM
Polk County, Oregon
Land Owner: Cooper Creek Vineyards, LLC
Project: Wetland Creation Mitigation for Reservoir
I-UPLAND-+
BUFFER
20 FT
WETLAND
PLANTING
TREES &
SHRUBS
20FT
-J-
EMERGENT WETLAND CREATION
AREA 50 FT
-1- EXISTING
WETLAND
RIPARIAN FOREST
40 FT
-1
AREA 20'
~
g
z
0
F
~
~
Wetland Tree Plantings
Scrub/Shrub Plantings
Emergent Area Plantings
- - - - - - Existing Ground
NWP-2008-614-1
Project: 307-2-151
Drawing: 3072151 L
WETLAND.dwg
By: CVB/WPK
Checked by: EAU
Dote:
08-05-08
Enclosure 1
FIGURE 5
CONTROL STRUCTURE DETAIL
Tax Lots 101 & 103, Section 4, T9S, R5W, WM
Polk County, Oregon
Land Owner: Cooper Creek Vineyards, LLC
~~
~----- ~
~
PROFILE-LOOKING UPSTREAM
EXISTING FARM ROAD
PROFILE-SIDE
10
--
0
~- ..
1 inch = 10
5
10
I
I
ft.
PLAN VIEW
20
0
~--·
1 inch = 20
NWP-2008-614-1
10
20
I I
ft.
Project: 307-2-151
Drawing: 3072151L WETLAND.dwg
By: CVB/WPK
Checked by: EAU
Dote: 08-19-08
Enclosure 1
.S
NWP-2008-614-1
Enclosure 1
f-1
t::r
u !(.)
-J
-J
SIT£ LOCATION MAP
1 "= ~ MIL£
.......
2640
0
tri
a
a::
)5
a:l
~~ 0>:2
~~
r<'JO>
1320 2640
,
"'S:
e ::.::
1 inch ""' 2640 fL
~
UJ
tE
ll. ~
(.)
~~
!Il
·
a: Q:
~
f5
@5
8
z
a::
g
<:(
a:: ....
UJ Q~
WA TERSH£0 LOCATION MAP
1 "= ~ MIL£
1320
~~~
!
0
-
~~~
--
1 inch
660
~Ct:~
a:::;ci ~
1320
·--·'
::.:: ~0
Vi
510;::,
100
~
LW~iE 0::
UJN
I
1320 ft.
I
a::~~
UJ
Q
0
0
(.)
HYDROLOGIC
WA ITRSHED AREA
WEIGH TED RCN
Tc
STORM DISTRIBUTION TYPE lA
0
::E
BJ
tJ0::
I .....
_.,
DATA SUMMARY
222 ACRES
-J
Q
... .,
..,..,
J.t!.
88
~~
;;-;;-
24 MINUTES
"'"
~~
~e
100
~
6.3
103.5
3.1
106.6
347.9
ELEVATIONS ARE BASED
ON LOCAL DATUM
100
0
~~~~~~
M
M
!
1
in~h
50
I
~
100
I
~
I
~~
100 !L
CONTDUR INTERVALS:
..
~.
EXISTING GROUND: 2 FT
~
:;!:l
PROPOSCIJ DAIA: 2 F7
POD IS 1980 F7 SOUTH,
AND 400 F7 £AST OF NW
CORNER OF SECTION 4.
!':t;
....
~~
~o
44~49'11"N
12:5'18's··w
@ TEST PIT LOCA TJON
& SOIL £lORING LOCATION
~
WfTLAND IAITIGATIDN AREAS [3}:
MITIGATION PLAN SUW:tmD TO
OREGON VSL AND ARIAY CORPS
OF £NG1NfS'IIJNJINER ENGINEERING & FORES"IRY, LLC IIAKES
NO REPRESEJITAliON AS TO TilE EX!Slt!IC£ OR
NON-O:ISltNCE OF UliUllES. IT IS 1HE
RESPNWP-2008-614-1
JOB N/4N£, Pi>V COOPER CRt£!<
Enclosure 1
I
(.)
._j
._j
v)
a
0:::
2-45' ELBOWS
SEPARATED BY 6"
~ .,:g
~
.. l.u
25 ::z:
... > ~~
~Ol
~X~~
a. ...., lil ·
TOE DRAIN OUTLET
(SCREEN USING 1/4"
OPENING MESH)
ADD 0.5' DEPTH CROWN TO
TOP OF DAM. SLOPE CROWN
2% GRADE TOWARDS
RESERVOIR SIDE.
THE GATE VALVE STEM
AND
ARE
THE
NOT
t!a.O:::ClQ
l.u oPLUNGE POOL
8J
L/2
GATE STEM SUPPORTS
ALIGNED ADJACENT
54" C.M.P. AND DO
PENETRATE THC
~
0
u
9::;
:::;;
(/)
~
i2
<
Lu
-.1
G::
~ Cl~ 0
"'
'"'-
0
f':'
DiA. C.MP. CONDUIT
17i
'
·
'. "'' '
INV. ELEV. 324.8
12
INV. ELEV. 321.9
· DIA. C.M.P. CONDUIT
E~
Lc
1
s.o·
TYI'
2+00
3+00
4+00
5+00
· rRIPRAP (SEE SP
0:::
!
PIPE ENCASEMENT..!
(SEE ENCASEMENT
DETAIL SHEET 3)
~~~-
360.---.---~---.---,----,---.----,---,---,----,---~--,----,---.--~r-~
!
0
5
...
I
~
fL
:::!;
0
I
....
......,,
.
~
.....
<» t.>
~
~
"""
t!.tl
:i:~ IS :g
C:,t:; ~3'
!E~ ~~
to~~
.s ._,
____
'
~.b- ~:
;:;;:
l
f-
<(
0
"''
,o~
,.,
-II >w
SmRAO ll!J'ORE
!IOI!JIOW REMOVAL
' w
-<::,
Wz '"'
~o
c~
330
{//~
~d
!
STftfPPfNG
.,. rN-..
i=w
~Sili
L
J35
v -:: _--;;::-!
I
.i
~
I·..._
~
-~~·
V/1
'"'
71 /
(/'
I
I
I
>25
I
v aonw
"'
7.5
I
I
'"
JO
375
45
52.5
):~~~
I
l
75
820
:
I
I
!
~
~
!J)
"'
~
!;;
PROF!
STREAM
"'"'
;&:
I
I
J
"'
97.5
>05
"'
O:P:IR£S
DA~~ff,;LEV L---~L---~~---J-----L----~-----L-----L-----L_____ L_ _ _ __ L_ _ _ _J __ _ _ _~_ _ _ _L __ _ _ _L __ _ _ _L _ _ j
"""
~0
~~
t!~ <6
.~~, ... 8
~~ ~
::::
31Qr----r----r----r----r----r----r----+----+----+--~~~-~~ROIIIMATh.~·c·~~--~~~
IIJMIIIV !Wr
STAGE-STORAGE DATA
lil~
It' ~~~ .. ~
~
' i
~"' ~
H
~:;! ~"'
~,., ., .. ,.. "
!!
=::
I
II
I;
z.,
~old
;-s
~
I II
·~t.Jl
· OORWcw
I
"' "EET)"'
(ACRE
I
O'"' ~~
I
1"-'¥·"
lS
<:J NORMAL
v,_-- ~ -- ,__ -- - ~~
''""
-
I
I
G.
e
.-J
M
1.0
I
5030'
tl.EV.
()!"OM<
1.0
J50
w
U'i
4.0
8.0
T
I
:J
so
10.0
~~
e;·
~ c ~~
·z
"':i
POOl AREA (ACRES)
JSS
I
~"'
""
~;:ih ~~
I
!!Ah_P_Q.OL El:.fV_.:!":L._4S,_& ,
340
~
ct:
(»
350
'
_..>
Lu
u
I
1 inch "" 10
0
0:::~~ ct:
::y.z.o'
10
--
:::>
Oll>O
ll):::!;
DRAIN (SEE DETAILS SHEET 1,
SHEET 3. 4"-DIA HDPE PERF.
DRAIN PIPE INSTALLED, 6" PVC
OUTLET PIPE.
10
7+00
6+00
~~0
ct:
Q
tj ~~ 9;
OUTLET INV. ELEV
1
CUT-OFF TRENCH
1+00
0:::~0:
~1
1
0+00
I
SPECS.
(0
wU:m
CHruKW
SlUIITZNER ENGMERING at F<:JRI:S'mY, U.C "AISS!IIUTY OF THE CONTRACTOR TO COFI.V
'MTH '!HE PRO\IISIONS Of' ORS 757.541 1'0
'CMrn·-
6/30/r:rJ
C. VAN IWRtN
sr,
W. KMESS
----~:.:n-oe
757,571. '!HE CONJRACTilR WILL Bt II£SPONSII!l£
l'lllR ANY DAMMl£ RllSU!.1lNG 111011 !liSI!UPTION CJF
SER\IIC£ CAUSED BY COHSTRUC'TIOII AC1l'J111ES.
NWP-2008-614-1
Enclosure 1
u
lP-1
11'-2
TP-J
w-·
11'-5
ll'-6
'W-10
2
~
'
·--6
tl
-
~
~
I
m
...
~
~
1-
"'
1-
,.
'"'
H
f-
'--
"'
,.
-·~~~--
10
-
"
CH,_
w--1
CH
,
......
a::
~
~' "
"
\i
~
"
,__
~
~~~It
fl
:..:..:
~ ~ ou
&
co'
<>:LuO~
Q;
g
TEST P!T LOCATiONS SHOWN ON SHEET 1
UASS!FlfD BY THE UN!FlfD CLASSJF1CAT10N
:c:
ffi
--(/)
a::
1--
~
IML
a::
-
'
..
Q. "'(
(.)
_
~ " --
u
0
0
CH
__
a::
Q
...
,-
a::!
.. Lu 0>~
! 20-----1H 1-H-1
H
;~
TEST PIT GEOLOGICAL LOGS
DENOTES WATER SEEPAGE INTO
TEST PIT ON C2/07/08,
r-
14---1--1-
""
"
1-H-/--
"
1--
®
CH
CH
------·-L..·-·
1.1)
Q
1-
' -- r-
u-,·
"'
CH
6---
_L-J_
CH
-'
-J
...
2---
·--- "'
RK
,_,
·-·
·-·
.,
1--
;-s·
"''
'--
!;
TP-12
"'
B
~
W-11
-
Q
a::~Q:;"'
~~0
(/)
lj~~
-J
N ::::>
u~o
a::~~
4\IAilASLE.'"). A COMPLE1'E COPY OF THE
Lu
Q
GEOlOOSTS REPORT AND LAB TEST DATA !S
AVAILABLE. BY Rt:QU£~1 Tl-!ROVCH STUNTZN\;.R
ENGINEERING & F"ORESTRY, lLC
Lu
Lu ~
(/)
@"
Lu Ol
0::
SYSTEM {USCS} ASTM 0-2487" CLASS!flCA.TJONS
AR£ GEOlOOSTS FIELD CLASSlF"!CA TICN (OR
fROM LABORAfOOY TEST 0 AT A. \'MERE
-'
~
0
0
u
0
:::0
~
<..:>
0
-J
"'<:
u
G
0
-J
0
Lu
(!)
-
.._.,.,.,
"'"'
J.~
.
"--
~~
;;-~
,.. ___
"'"'
~~
s~
SOIL BORING GEOLOGICAL LOGS
&,
J55r----.---.---~----.--~~~~~~~--
35o:
SOiL BORiNG LOCATIONS SHOWN ON SHEET 1
DENOTES SATURATED
~
!N SOIL BORING ON
I>
~~
""T'"
;:,o
i:i.
345
"~
"'"'
~'"'
!------+---/----""...!
..
~~
~
,.-o
340~---L---L----L-----L----L---L---~
-1+00
-0+50
PROFILE ON
0+00
0+50
1+00
1+50
OF EMERGENCY SPILLWAY
SCAL[
CONCRETE IS AT 347.7'
CROSS SECTION OF EMERGENCY SPILLWAY
STUNllNER ~ & FORESmY, UC WAKES
NO REPRES£NTAT1011 AS TO litE EXISltNCE OR
NOII-EX!STENC£ OF IITIUTlES. IT IS '!HE
RESPONSIBIUTY OF ntE CONTRACTOR TO COioll'l.Y
11'!11 '!HE PR0\4SIONS OF OilS 757,541 TO
757.571. 'THE OOH1RACTOR llU BE RESf'llNS!I!LE
FOR NfY DAMAGE RESIJL liNG FROM DISRUPTION OF
stR\IICE CAUSED BY OOHS1RIJC110N AC11VI11ES.
NWP-2008-614-1
Enclosure 1
(.)
-J
-J
V)
12 GAGE BAFFLES
(WELD TO 78' C.M.P.)
a
n:
1"e x 3' SLOT
~
WELD
(TYP
@
ALL
INTERSECTIONS)
;.,
#4@ 6" SPACED~
£ACH WAY
VERIFY BOLT LOCATIONS FROM
MFR'S SHOF DRAWINGS
1"x1"x2' LONG 3/16" ANGLE
IRON BOLT TO BAFFLES ONLY:
NOT TO RISER. (TYP.)
1")0>
~~ g><:~
f!Jt:l oi
i I i
It~
0..~
~
RISER CREST
ELEV. 346.0
BEND ENDS DOWN
TO CLEAR OUTSIDE
CX)
25~ 01:2
I.L$ ~"'"
§
78' C.M.P.
NOTE: RISER & GATE TRASH RACK TO
BE PAINTED AFTER FABRICATION.
1"x1·x2" LONG J/16·
ANGLE IRON SOLT TO
BAFFLES ONLY; NOT
TO RISER. (TYP.)
HANDWHEEL BRACKET DETAIL
~
NO SCALE
n: ~
w
(/)
LLJ ~"
())
n:o-... . ~
RISER TRASH RACK DETAIL
~:<::~
(/)
w~
~
LLJ :::> :r
(.) :25 ~
Lu
Q: Nl"'
f5Q ~~ a
~
0
8
12" PIPE ENCASEMENT DETAIL
WATERMAN MODEL C-20\
12" DIA. CA TE, BRONZE SEATS \
(SEE SPECIFICATIONS)
...
_.,
.,""
~
NO SCALE
J.r!.
~~
""
i'$15
ee
NOTE:
SKEW GATE ON
INLET STRUCTURE
SO GATE STEM
CLEARS RISER
42" PIPE ENCASEMENT DETAIL
NO SCALE
SYNTHETIC INDUSTRIES
#801 NON- WOVEN
OR [QUAL LAP AT TOP
AS SHOWN. USE 15'
RO'.L WIDTH
42" DIA 16 GAGE
C.M.P. (SEE SPEC'S)
1/2"-3/4" CRUSHffi
ROCK. NO FINES
0
-..,.I
4" DIA. HEAVY DUTY P/E
PERFORATED DRAINAGE
LEGEND
TUBING (SEE SPECS)
= DIAMETER
CLR = CLEAR
C-C
CENTER TO CENTER
¢
HP!":tS
~MI' lm
3'-0"
GATE -
TRASH RACK DETAIL
CONDUIT & RISER - PLAN VIEW WITH DETAILS
SChE
NWP-2008-614-1
S1UNT211£R ENGINEERING A FORESTRY, U.C MAKES
IIC R£1'R£$ENTA'I10N AS TO 'THE EXISIDICE OR
NON-EXISlENCE Of U11U11ES. IT IS 1HE
I!ESf>ONSIBIUTY Of 1HE CON111ACTCIR TO COMPI.Y
'M'TH 1HE I'RO'IISION!l Of OR$ 757.!141 TO
757.571. 1HE CONTRACTOR 'M1J.. BE R£SPONSliii.E
FOR #IV DAMAGE RESUL1lNC moN OISR!lP'I!ON Of
SER\1CE CAUSED BY CONSTRUCTION ACTI'vl'!IES.
6/3ll/C$
C. VAN £1UR£N
C#fCit£D fl(:
W, rtNESS
~.t-:.n-oa
TOE DRAIN DETAIL
NO
J(JfJ ;;.,,,
307~2~151
'
jSHtrr4Cf4
Enclosure 1
EROSION AND SEDIMENT CONTROL PLANS
PROPERTY OWNER
THE PERMITTEE IS REQUIRED TO MEET ALL THE CONDITIONS OF THE 1200C PERMIT.
li!S ESCP AND GENERAL CONOmONS HAVIE BEEN DEVELOPED TO FACIUTATE
COMPUANCE WITH li!E 1200C PERMIT REQUIREMENTS. IN CASES Of DISCREPANCIES
OR OMISSIONS, li!E 1200C PERMIT REQUIREMENTS SUPERCEDE REQUIREMENTS Of
li!IS PLAN.
COOPER CREEK VINEYARDS LLC.
ATTN: MATT McKAMEY
P.O. BOX 3989
NAPA, CALIFORNIA 94558
N
W*E
ENC1EEF!!NG I SURVEYING COMPANY
STUNTZNER ENGINEERING AND FORESTRY
ATTN: BILL KNESS, PE
ATTN: ERIC A. URSTADT. PE/PLS
2137 19TH AVENUE
FOREST GROVE, OREGON 97116
s
\_)
THE SfiE IS PART Of A N£WLY ESTABLISHED VINEYARD, THE SITE HAD B£EN PREVIOUSLY
LISED FOR GROWING CHRISTMAS TREES. MOST Of li!E GROUND HAS BEEN ClEARED OF
VEGETATION AND REPLANTED WITH VINES AND GRASSES. li!E AREA OF PROPOSf!l
DISTURBANCE HAS NOT YET BEEN DISTURBED AND HAS VARYING TOPOGRAPHY.
5.
DEVELOPED CONDITIONS
7.
NATURE Of CONSTRUCTION ACTIVI1Y AND ESTIMATED TIME TABLE
· CLEARlNG (JUNE 1ST JUNE lOTH)
· GRADING (JUNE 10TH - AUGUST 31ST)
· FlNAL STABIUZATION (SEPTEMBER 1ST - SEPTEMBER 30TH)
TOTAL SITE AREA
SITE PLAN
SCALE :
= 296.9 ACRES
4.
6.
6.
9.
10.
11.
12.
TOTAL DISTURBED AREA = 22.5 ACRES
1·~600'
SITE SOIL CLASSifiCATION:
ACCORDING TO li!E USDA SOIL SURVEY FOR POLK COUNTY, THE SOIL ON THE SfiE CONSISTS
OF 8EI.LPINE SILTY ClAY LOAM ~~ DISTRIBUTION AREA (HYDROLOGIC SOIL GRCUP C & 0),
JORY SILTY ClAY LOAM ~30% DISTRIBUTION AREA (HYDROLOGIC SOil GROUP 0 & E), AND
li!E SUVER SILTY ClAY LOAM N10% DISTRIBUTION AREA (HYDROLOGIC SOIL GRCUP C).
13.
14.
15.
RECEIVING WATER BODIES:
miBUTARY TO COOPER CREEK
16.
PERMITTEE'S SITE INSPECTOR - BILL KNESS, PE
COMPANY/AGENCY: STIJNTZNER ENGINEERING ANll FORESTRY
PHONE:
~3) 357-5717
FAX:
(QW) 357-5698
E-MAIL:
bjllknjJssOs!un!zner.m
DESCRIPTION Of EXPERIENCE:
19 YEARS Of ENVIRQNMENlAL ENGINEERING EXPERIENCE. 'll!l!!KINQ ON A
VARIETY Of PROJECTS SOME IN\IOLVlNG ERQS!QN AN!! SEDIMENT CONTROL
SIT£ LOCATION lS IN THE
.·
SW 1/4 OF NW 1/4 OF
S£CT10N 4, T9S, R5W
,
s
-.. -
1.
2.
NT
VICINITY MAP
PfiOI'EfiiY LOCAl!QN:
SOUTH OF MONMOUlH OREGON, OFF Of ELKINS RCAO,
2.7 MILES WEST Of li!E INTERSIECTION WI1H HWY 99
TURN DUE WEST ON GRAVEL ROAD. FOILLOW GRAVEL
ROAC WIEST AND NORTH TO SIT£. CALL AHEAD AND
YOU YllLL BE DIRECTED TO THE LOCATION Of li!E
PRCPOSEO IMPRQIIEMENTS.
lATITUDE = 44'49'10.82" N
LONGITUDE = 123'18'5+.13' W
NWP-2008-614-1
ACTIVE PERIOD
PRIOR TO THE SITE BECOMING INACTIVE OR
IN ANTICIPATION Of SITE INACCESSABIUTY
INSPECTION MINIMUM FREQUENCY
DAILY WHEN STORMWATER RUNOFF, INCLUDING IF
RUNOFF FROM SNOWMELT IS OCCURING
ONCE TO ENSURE THAT EROSION AND SEDIMENl
CONTROL MEASURES ARE IN WORKING ORDER. ANY
NECESSARY MAINTAINCE AND REPAIR MUST BE MADE
PRIOR TO LEAVING li!E SITE.
3.
INACTIVIE PERIODS GREATER 1HAN SEVEN
(7) CONSI:CUTIVE CALLENOAR DAYS.
ONCE EVIERY TWO (2) WEEKS.
4.
PERIODS WHEN li!E SITE IS
INACCESSABLE DUE TO INCLEMENT WEATHER.
IF PRACTICAL, INSPECTIONS MUST OCCUR DAILY AT
A RELEVANT AND ACCESSABLE DISCHARGE POINT OR
~
m
~ ~ m~
~0)
t:: $
REFER TO DEO GJDANCE MANUAL FOR A COMPFIEHENSIVE LIST OF
AVAJI...AJ3I..E BMP'S.
~ ~ ~(f
8: (.)
a:::
18.
19.
20.
22.
23.
ll'f'I.Y lEIIPOIWI'I AND l'!'lWAHENT SOIL STABIUZATION lt£AStm ON ALL OIS11!RilED AREAS />S
!.lRAiliiiG I'ROGRESSES. (SCH A.5J>].6.)
CONSlR\JCllON AClM1IES liUST AVOID OR MINIIIIZE EXCAVATION AND CREATION OF !liRE GROUi'ID
fROII OCTOBER 1 THROUGH MAY 31 tACH YEAft (SCH A.7.o.i.)
!liJRING WET WfATH£R P!RIOilS IDIPOIWI'I STABIUZAT!ON OF 1111: Silt MUST OCCUR AT 1111:
00 OF OOl WORK DAY IF RIIINfAll IS fORECAST IN 1111: NEXT 24 HOURS. (SCH A.7.o.l.)
ALL EROSION AND S!lliM£NT CONlf«llS NOT IN THE DIRECT PATH OF WORK MUST BE INSTAUEO
PRIOR 10 Jll:f tAN!l ~ (SCH A.7.c.i!.)
I'RES£R'I£ !liSllNG vtmATION AND RE-vtmA1E OI'EII AREAS WilEN PRACl1CAil!£ BEfORE
AND AfTER !.lRAiliiiG OR CONSlR\JCllON (SCH A.7 .eJlU)
ALL 1Eiii'O!!.!RY S!lliM£NT CONl1lOlS liUST RElfAIN IN PlACE Ull1lL PERIIANOO vtmAliON OR
OTHER l'l'lWAHENT COI'ERING OF EXPOSIJJ SOIL IS ESTA!lUSIIED. (SCH A.7.e.lll.J.)
S!lliM£NT CONl1lOlS MUST BE IIISTAU£1l AND IIAillrNN!D ON ALL DOWN GRADiENT SIDES OF
1111: CONSlR\JCllON Silt AT ALL TIIII:S !liJRING COIIS1IWCTION. (SCH A.7.d.i.(1))
ALL ACTII£ CATCH BASINS MUST HAVE SEDIIIOO CONl1lOlS INSTAillll AND MAIIITAIIIED AT ALL
TIIII:S !liJRING CONSTRUCTION. (SCH A.7.d.i.(2))
WAWH!CHT TRUCKS liUST BE liSED 10 TIWISPORT SATURATED SOilS fROII 1111:
CONSTRUCTION Silt. AN N'l'ROI'E() EQUIVAI.OO IS 10 DRAIN 1111: SOIL ON-Silt AT A
OESIGNIJID lOCATION USING - T £ BMP's; SOIL liUST BE lliWNED SUFf!CIOOLY FOR
IIINliiAl SPIIJ}G: (SCH A.7.d.ii.3)
1Eiii'O!!.!RY STABIUZATION OR WlrniNG OF SOIL SlllCKPIIB liUST OCCUR AT 1111: 00 OF
tACH WOR!( DAY OR OTHER BMP's MUST BE IIIPlEMEil1Ell 10 PRE\'00 TURI3I!l DISCHARGES 10
SlmfACE WATERS. (5CH A.7.e.ll.2.)
0£\'EUlP AND MAIIITAIN OHS11[ AWRl1T£N SPU PRE\'£Nl101f AND ll£SI'ONSE PIIOCEDURE. (SCH
A.7d.J)
Jll:f USE OF TOXIC OR OTHER HAZAROOIIS II'TERWS IIUST INCUIIlE PROPER SlORAGE,
API'l!CA110N, AND lliSl'O!W... (SCH A.7.o.ili.(2))
1111: P£RNrrni liUST PROI'ERLY PRMNT AND IWIAGE HAZARDOUS WASTE. US£ll OILS.
COIITAIIJIIATED SOliS, CONCllE1I: '11/>S!£, SANITARY '11/>S!£, UOUID WASTE. OR OTHER TOXIC
SUBSlliNC£S DISC!l\I£REll OR GENERATED DUR!NG CONSTRUCllON. (SCH A.7.e.i.1 AND SCH
A.7.e.lii.4)
SKlNiflCANT AliOtJNJS OF S!lliM£NT W!!ICII l£A\f 1111: S!IE liUST BE ClEANED UP IIIIHN 24
HOURS AND l'tACED BACK 011 THE Silt AND STABIIJZEI) OR PROI'ERLY lliSPOSED. !HE CAUSE
OF !HE S!lliM£NT REI.EAS£ liUST BE FOliNO AND PRMHliJJ fROII CAIJSINC A REOCCU!lRENCf
OF 1111: OISCHARG!Il 1111HN 1111: SAN£ 24 HOURS. Jll:f 111-S!RFAII ClEAN UP OF SEDIIIOO
SHAll BE !'I:RfOIIMED ACCOROING TO 1111: OREGON ti'IISION OF STAlE lANDS REDU1RED TillE
fRAIIE. (SCH A.7.f.l.1)
S!lliM£NT liUST NOT BE 1NT£14110N.\1..Y WASH£ll INTO SIORM SEWERS, ORAitWlE WAYS. OR
WJ\1EllBOOIES. llRY SWEEPING liUST BE USED TO Cl£AN UP R!l£ASEI) SEIJWOOS. (SCH
A.W.2)
1111: APPLICATION RA1! Of FERTlUZERS USED TO R£ESTABI.ISH VECETA110N liUST FIJlLOW THE
IWlUFACTURER's R£COitMENilAT!ONS. NU1RIOO RElfAS£S fROII FERTlUZERS TO stJRFACE
WA1ERS MUST BE MINIMIZED. TillE RELEASE FERTlUZERS SHOUUl BE liSED AND CAR£ SHOIIlD
BE TAKEN IN 1111: API'!JQI110N OF FERTlUZERS WITHIN N« WAltR WAY RIPJIRIAN lONE. {SCH
A.7.f.!.J.)
S!lliM£NT MUST BE REIIOI'Eil FROII BEHIND SEDIMENT FENCE WHEN II HAS ROOil:O A HEIGHT
OF J 1111: HEJCHT OF 1111: FENCE />llfJIE 1111: GROUND, AND BEfORE FtNCE REifOVAL (SCH
A.7.f.i.1.)
SEDIIIOO MUST BE REIIOI'Eil fROII BEHINO 810 llloGS AND OTHER ll'RRIERS WilEN IT HAS
~ A HEIGHT OF TWO (2) INCH£5 AND BEfORE BMf' RllotOVAL (SCH A.7JU.)
Cl£ANING Of TRAPI'8l CAJCH IIISINS lltJST OCCUR WilEN 1111: S!lliM£NT RETEN11011 CAPACfiY
IllS BEEN R!llUCED BY Flf1Y (50) PfRCOO, ANil AT COIIPWION OF PRO.I£CT. (5CH A.7.f.1i.l)
RllotOVAL OF TRAPPED SEDII!OO IN A S!lliM£NT BASIN OR S!lliM£NT TRAP MUST OCCUR WilEN
1111: SEDIIIOO RETENI!ON CAPACfiY HAS BEEN REOIIC£D BY AflY (50) PfRCOO, AND AT
COIIPlE1ION OF PROJECT. (SCH A.7.!.ll.Jik4)
OOl MUST APPROVE Of Jll:f TREAlloiOO S'IS1Eii ANil OI'£RA110NAL PlAN lHAT MAY BE
NEC£SSARY TO TREAT COIITAIIJIIAllll COIIS1IWCTION DEWATrniNG OR SEDII!OO AND 11JRBilllY IN
STORIIYIATER RUNOFF. (5CH A.7.1.lll.)
SH0UUJ AU. COIISJRUC11011 AClM1IES erASE FOR THllm' (JO) llAYS OR MORE, THE ElffillE
Silt MUST BE 1EIIII'O!lARILY Sfldli.IZED USING VEGETATION OR A HEAVY NUI.CH lAYER,
mtflORAilY S!EliNG, OR OTH£R METHOD. {SCI! M.a.)
SHOIJU) CONSlR\JCllON AC1Ml1£S erASE FOR Afl££N (15) llAYS OR MORE ON Nfl SIGNIACANT
l'ORllOII OF A CONSlR\JCllON SITE, mtflORAilY STABIJZA11011 IS REOIIIRfll FOR THAT PO!ffiON
OF 1llE SITE W!lH S!RAYI, COMPOST, OR OTHER TACI<1F1ED COVEllliiG lHAT IIlli. PREVENT SOIL
OR WIND £llOSION UllllL WORK RESUIIES ON lHAT l'ORllOII Of THE SITE {SCH M.b.)
!l..
'<
:c:
lli
@s
8
a:::
~
lli(I)Cl~iO
IJ.jll::O)
0:: ~ ·
I
!'lc;~
t!J~:r:
a:::"'~'=
(.) 10 :::>
lOg
**
ONLY APPU£0 TO SIOCI
lli ~~
Nfl
~
a..
GllOIINil lliS!UR!llNG ACTMJY.
a
a
(.)
ATTENTION EXCAVATORS
OREGON lAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON unuTY NOTIFICATION CENTER
THOSE RULES ARE SET fORTH IN OAR 952-001-0010 li!ROUGH OAR 952-001-0D90. YOU MAY OBTAIN
COPIES OF THESE RULES FRCM THE CENTER BY CALLING 503-232-1987. If YOU HAVIE ANY QUESTlONS
ABOUT THE RULES, YOU MAY CON1ACT li!E CENTER. YOU MUST NOTIFY THE CENTER AT LEAST TWO
BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION. CALL 503-246-6699.
A COIIPREHENSI\'E UST OF AVAilABLE lli:ST IIANAGE.IIEIII I'RAC1tES (BMP) !li'T10NS ~ 011 IJEQ's
GIJIDANC£ IIANtJAl HAS BEEN REW:YIED 10 COt.lPI.ETE THIS EROSION AND SEDIMENT CONlROL PWL
SOliE OF !HE />llfJIE USTt:D BliP's WERE NOT ~ BECAIJSI: THEY WERE ll£TERIIINED 10 NOT
IJF£CT1\'ELY twW:E EROSION PREI'ENI!ON AND SEOIYOO CONTROL FOR TliiS PROJECT ~ ON
SPECifiC Silt COIIIllllONS. INCLUDING SOIL CONIJIT10NS l!IPOGRAPHIC COIISTRAINTS, ACCESSI!liUiY TO
1111: Silt, AND OTHER RElATED CON!llllOIIS, />S 1111: PROJECT PROGRESSES AND THERE IS A NEED TO
RE'I1SE 1111: ESC PlAN, AN AC!ION PlAN IIlli. BE SU!MlTED.
e!tl
u " .,~
~"'
·~ ........
~ ~ ""' ~:g
·~
~= --~
lt
...
!
~~ ~~
~ §~
·I
s
~""
I~
~ ~ ~
;;:!
"
~
i
I
BmON AND SEDIMENT CONTROL PLANS
1
2
3
i
li)
RATIONALE STATEMENT
SHEET INDEX
~~
i~
~
'f:l
INIML
II
COVER SHEET FOR EROSION AND SEDIMENT CONTROL
RESERVOIR GRADING AND EROSION CONTROL
EROSION AND SEDIMENT CONTROL DETAILS
s~
~~~ il
I£ h~~
ill
I
DOWNSTREAM LOCATION.
HOLD A PRE-CON MEETING OF PROJECT CONSTRUCTION PERSONNEL THAT INCLUDES
11!£ EC INSPECTOR
PfiOI'EfiiY DESCAIP110N:
POLK COUNTY ASSESSOR MAPS
8.5.33 TAX LOT 601 AND
9.5.4 TAX LOTS 100, 101, 102, 103, 104
17.
21.
SITE CONDITION
~
BMP MATAIX FOR CONSTRUCTION PHASES
STANDARD EROSION AND SEDIMENT CONTROL
PLAN DRAWING NOTES
3.
li!E SITE WILL BE APPROPRIATELY GRADED TO CONSTRUCT A RESERVOIR. NATIVE SOIL WILL
BE USED FOR DAM CONSTRUCTION MATERIAL AND A SPILLWAY WILL BE INCLUOED. WATER
FROM li!E RESERVOIR WILL BE USED FOR \<1NEYARO IRRIGATION. BMP'S WILL BE INSTALLED
TO PREVENT EROSION.
(f)
~ IJ.J co ·
l.L] 0 ~
2.
NAARAllVE DESCRIPTlONS
-'
loJ
1.
EXISTING SITE CONDITIONS
(.)
-.I
·
ALL INSPECTIONS MUST BE MADE IN ACCORDANCE WITH OEQ 1200C PERMIT
REQUIREMENTS.
INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ'S 1200C PERMIT
REQUIREMENTS.
CHANGES TO THE APPRCVIED ESC PIAN MUST BE SUBMflTEO TO DEO IN THE FORM OF
AN ACTION PLAN.
Ellf"IR£$ S/30/00
QRAIDI SY:
C. VAN BUREN
CH!cxr:D Bl':
W. KNESS
lM'I!';
1-19-09
JDfl NAfiEt PP'V COOPER CIU:EK
Enclosure 1
.me
u
::j
V)
a
0::::
~ ~
~It s;
~ ~~
STRAW SAI..E DIKE- SC-4
I<) (l)
~ ~ ~i
~ u~1:'0-i
(\.; 0 0..
...... 0.. "'(
2:
ffi
8
Dust Control Notes
1.
A.
B.
C.
0.
rA
E.
F.
G.
2.
u
DUST SHALL BE MINIMIZED TO THE EXTENT PRACTICABLE, UTILIZING ALL MEASURES NECESSARY,
INCLUDING, BUT NOT UMITED TO:
SPRINKLER HAUL AND ACCESS ROADS AND OTHER EXPOSED DUST PRODUCING AREAS
APPLYING AGENCY-APPROVED DUST PALLIATIVES ON ACCESS AND HAUL ROADS.
ESTABUSHING TEMPORARY VEGETATIVE COVER.
PLACING WOOD CHIPS OR OTHER EFFECTIVE MULCHES ON VEHICLE AND PEOESTIRIAN USE
AREAS.
MAINTAINING THE PROPER MOISTURE CONDITION ON ALL fill SURFACES.
PREWETTING CUT AND BORROW AREA SURFACES.
USE Of COVERED HAUL EQUIPMENT.
CONTIRACTOR SHALL FURNISH AND INSTALL EQUIPMENT TO HAUL AND PLACE WATER. AN ADEDUA TE
SUPPLY OF WATER SHALL BE MAINTAINED AT All TIMES.
~
~
ffi co
(/) Q:::?
LL.Jct::Ol
0::::~
~~~
(.
~~
ii:3 ~
o.y
~
'-'
~\
"
e: --:n
~
7
(!
e
~
0
0
u
t:L'~--:
PLAN
PLASTIC SHEETING
~
·r='»~
!:!
.~.....:'!
""
~li!
f:c:l
~~
55:
0
':'(;
'».....:'!
~
oe P!.AC£0
A ROW WJIH fHt·
NOTES:
1. MINIMUM 12' OVERLAP OF ALL SEAMS REQUIRED.
2. BARRIER REQUIRED 0 TOE OF STOCK PILE.
3. COVERING MAINTAINED TIGHTLY IN PLACE
BY USING SANDBAGS OR TIRES ON ROPES WITH A
MAXIMUM 10' GRID SPACING IN ALL DIRECTIONS.
!:::g
t;rg
H
=~
....
00'-.;~~
~~
~;
~ ~~
-i
::!;;
~
I
~~
~
~
fiJ
DETAIL
r:;'\ STRAW BALE DIKE
I
t
~
ARRIER REQUIRED 0 TOE OF SLOPE.
NtJrt:s:
:g~
0:::: " 2:
~
"""\
::::>
0
It)
!d
II
DETAIL
[;\PLASTIC SHEETING
jlli
\27NTS
~~ §t;
.... "!:!
§
EXPift£$
DRAWN
BY',:
CH£C1(£{)
DAm
...,.,
IW:
~e
&/30/09
C. VAN BUJm4
W. ICfoi.ESS
1-19-09
JOB NAM£t PP\1 COOPER CREEK
NWP-2008-614-1
..,. 1
Enclosure
3
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2008-614-1
Oregon Department of State Lands No: 56240-RP
Notice Issued: October 6, 2014
Written Comments Due: November 5, 2014
WHO IS THE APPLICANT: Cooper Creek, LLC, 5 Financial Plaza, Ste 116, Napa, CA 94558
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed
project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for
Federal permits or licenses to provide the Federal agency a water quality certification from the State of
Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on
the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a
result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W.
4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are readily
accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that " The Corps
provides public notice of and opportunity to comment on the applications, including the application for
certification, provided that the department (DEQ), in its discretion, may provide additional opportunity
for public comment, including public hearing."
Written comments:
Corps No. NWP-2008-614-1
Page 1 of 2
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on
page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through version
7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties,
DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed,
issued with conditions, or denied. You will be notified of DEQ's final decision if you submit
comments during the comment period. Otherwise, if you wish to receive notification, please call or
write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503)
229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a
hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.
Corps No. NWP-2008-614-1
Page 2 of 2