TIME EXTENSION FOR MAINTENANCE DREDGING IN THE WEST ST. MARY PORT CANAL AND THE GIWW IN ST. MARY PARISH
NAME OF APPLICANT: West St. Mary Parish Port, Harbor, and Terminal District, c/o Miller Engineers & Associates, Inc., Attn: Reid A. Miller, P.O. Box 223, Franklin, Louisiana 70538.
LOCATION OF WORK: Off of the GIWW at the mouth of the West St. Mary Parish Port Harbor & Terminal District Canal, at 29o45’53”N, 91o45’31”W, in St. Mary Parish, Louisiana, as shown on the attached drawings. (HUC 08080103- Vermilion River Watershed)
CHARACTER OF WORK: Excavate approximately 59,375 cubic yards of native material to maintain access to existing port businesses. All dredged material will be disposed of on adjacent non-wet property. There are no proposed impacts to jurisdictional wetlands, therefore compensatory mitigation has not been proposed.
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
P.O. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
REPLY TO
ATTENTION OF:
October 13, 2014
Operations Division
Western Evaluation Section
Project Manager
Angelle Greer
(504) 862-1879
angelle.v.greer@usace.army.mil
SUBJECT: MVN-1998-00173-WMM
PUBLIC NOTICE
Interested parties are hereby notified that an application has been received by the
District Engineer for a Department of the Army permit to authorize the following
pursuant to (X) Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat.
1151; 33 USC 403); and/or ( ) Section 404 of the Clean Water Act (86 Stat. 816; 33
USC 1344).
TIME EXTENSION FOR MAINTENANCE DREDGING IN THE WEST ST. MARY
PORT CANAL AND THE GIWW IN ST. MARY PARISH
NAME OF APPLICANT: West St. Mary Parish Port, Harbor, and Terminal District, c/o
Miller Engineers & Associates, Inc., Attn: Reid A. Miller, P.O. Box 223, Franklin,
Louisiana 70538.
LOCATION OF WORK: Off of the GIWW at the mouth of the West St. Mary Parish Port
Harbor & Terminal District Canal, at 29o45'53"N, 91o45'31"W, in St. Mary Parish,
Louisiana, as shown on the attached drawings. (HUC 08080103- Vermilion River
Watershed)
CHARACTER OF WORK: Excavate approximately 59,375 cubic yards of native
material to maintain access to existing port businesses. All dredged material will be
disposed of on adjacent non-wet property. There are no proposed impacts to
jurisdictional wetlands, therefore compensatory mitigation has not been proposed.
The comment period will close 15 days from the date of this public notice
advertisement. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit request. Letters must reference the applicant's name and the
notice number, be addressed and mailed to the above address, to ATTENTION:
REGULATORY BRANCH.
The decision whether to issue a permit will be based on an evaluation of the
probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; federal, state, and
local agencies and officials; Indian Tribes; and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received
will be considered by the Corps of Engineers to determine whether to issue, modify,
condition or deny a permit for this proposal. To make this decision, comments are used
to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used
to determine the need for a public hearing and to determine the overall public interest of
the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Copies of this notice are being sent to the State Archeologist
and the State Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Department of Interior nor affect any habitat designated as
critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of 7.8 acre(s) of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency and
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, Office of Environmental
Services before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued
unless the applicant received approval or a waiver of the Coastal Use Permit by the
Department of Natural Resources.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section