Interested parties are hereby notified that this District has received an application for a Department of the ‎Army permit for certain work in waters of the United States

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Interested parties are hereby notified that this District has received an application for a Department of the ‎Army permit for certain work in waters of the United States, including wetlands, as described below and ‎shown on the attached drawings, entitled Shadow Butte Industrial Site.‎ Project proposes to fill the Pulley Drain to develop the proposed 120 acre Shadow Butte Industrial Park. This permit is a re-issuance of a previously authorized permit, that had expired prior to the completion of work. Comments on this proposal may be submitted on or before November 4, 2014.

Interested parties are hereby notified that this District has received an application for a Department of the ‎Army permit for certain work in waters of the United States, including wetlands, as described below and ‎shown on the attached drawings, entitled Shadow Butte Industrial Site.‎

APPLICANT: Gem County, 415 E. Main Street, Emmett, Idaho 83617, Telephone 208-365-5833, Mr. ‎Lan Smith. ‎

AGENT: Mr. Denny Mengel, CH2MHILL, 322 E. Front Street, Suite 200, Boise, Idaho 83702, Telephone ‎‎208-383-6202 ‎

USACE PM CONTACT: Mr. Greg Martinez, Corps of Engineers, Boise Regulatory Office, Boise, Idaho ‎‎83704. Telephone 208-345-2154 or email: greg.j.martinez@usace.army.mil.

PURPOSE: Relocate the Pulley Drain, backfill the existing drain section and fill wetlands adjacent the ‎drain to accommodate development of a proposed Industrial Park.‎

WATERWAY: Pulley Drain and adjacent wetlands

LOCATION: The proposed is located within portions of Sections 14 and 15 of Township 6 North., Range ‎‎2 West., near latitude 43º 51’ 49” N and longitude -116° 33’ 18” W, Boise Meridian, Southwest Emmett ‎USGS Quadrangle, approximately 2.3 miles SW of Emmett, in Gem County, Idaho. ‎

DRIVING DIRECTIONS: From Emmett, Idaho drive west on State Highway 52 for 2.3 miles. The ‎project site is located on the north side of the highway. ‎

AUTHORITY: This permit will be issued or denied under the authority of Section 404 of the Clean Water ‎Act (33 U.S.C. 1344). A Department of the Army permit is required for the discharge of dredged or fill ‎material into waters of the United States, including wetlands. ‎

WORK:Discharge 10,352 cubic yards of gravel/cobble/sand into approximately 2150 linear feet of the ‎Pulley Drain (1.07 acre open water and 0.24 acre emergent wetlands) to accomodate the development of ‎Phase 1 and 2 of the Shadow Butte Industrial Park. ‎

ADDITIONAL INFORMATION: In December 2005 Gem County submitted an application fill the ‎Pulley Drain to develop the proposed 120 acre Shadow Butte Industrial Park. An Individual permit was ‎issued on March 5, 2007 authorizing the filling of 2707 linear feet of the Pulley Drain. Approximately 557 ‎linear feet of the drain was filled, however due to an economic down turn the remainder of the drain was ‎not filled prior to the permit expiring on May 1, 2009. Gem County now proposes to fill the remainder of ‎the drain. The Enterprise Canal and Wetland 11A2 will not be impacted by the proposed work (Figure 2).‎

CONSTRUCTION PERIOD: Applicant proposes to start construction as soon as the permit is issued. ‎The permit would authorize construction for a period of three years.‎

PROPOSED MITIGATION: Under the original permit the applicant proposed to back fill the existing ‎drain and relocate it along the north property line. This mitigation work was completed under the original ‎permit to include establishing a new drain approximately 3274 feet long, averaging 12 feet wide with an ‎adjacent wetland fringe (0.54 acre emergent wetland). The new drain and adjacent wetland fringe was last ‎inspected in June 2013 and determined to be fully functional. No additional mitigation to compensate for ‎project impacts is required for this proposed project. The applicant proposes to re-establish monitoring of ‎the new drain and adjacent wetlands with a vegetative survey conducted in spring 2015 with a monitoring ‎report submitted by December 31 of each year for the next three years. ‎

Avoidance: Applicant has not conducted any fill work on the site since expiration of the previous ‎permit in 2009. In addition, the applicant has designed the proposal to avoid impacting the previously ‎constructed mitigation site.‎

Minimization: Due to the location of the existing Pulley Drain, minimizing impacts to the drain and still ‎being able to fully develop the site is not possible. ‎

Compensatory Mitigation: Compensatory mitigation for the wetlands and open water the applicant is ‎proposing to fill was completed under the original in 2007 (Figure 3 & 4) and is fully functional. No ‎additional mitigation is required for the back filling of the Pulley Drain (1.07 acre) and adjacent ‎wetlands (0.24 acre).‎

OTHER ENVIRONMENTAL DOCUMENTS and DA PERMITS ISSUED TO APPLICANT: ‎Nationwide Permit 12 & 14 issued 2005 for access into site (S. Victory Court) and an Individual Permit ‎issued on March 5, 2007, authorizing the same project. ‎

WATER QUALITY CERTIFICATION: This notice will also serve as public notice that the Idaho ‎Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge ‎and/or fill material proposed for this project will not violate existing water quality standards. A Department ‎of the Army permit will not be issued until water quality certification has been issued or waived by the ‎IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, ‎waived or denied within sixty (60) days of this public notice date, and an extension of this period is not ‎requested by and granted to the IDEQ, certification will be considered waived. Additionally, within thirty ‎‎(30) days of this Public Notice, any person may provide written comments to IDEQ and request in writing ‎that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning ‎Water Quality Certification for this project should be mailed to: Idaho Department of Environmental ‎Quality, Boise Regional Office, 1445 North Orchard Street, Boise, Idaho 83706.‎

AQUATIC RESOURCE DESCRIPTION: The project area is currently a retired pastureland. This 120 ‎acre parcel is bisected by the Pulley Drain which was originally constructed to capture irrigation surface ‎water from agricultural lands to the north. The drain varies from 15 to 20 feet wide by 10 feet deep with a ‎wetland fringe dominated by reed canary grass and scattered sedges and rushes. A few large willow trees ‎are scattered along the drain. The drain is non fish bearing but does provide low quality habitat along the ‎edges for various rodents, other small mammals and song birds particularly red-wing black birds. The ‎drain does provide resting habitat for migratory water fowl. ‎

Several businesses have become established on the site since 2007, with one development filling roughly ‎‎377 linear feet of the Pulley Drain under the previously issued permit. Other development includes an ‎access road from State Highway 52 into the site (S. Victory Court) and an east –west paved roadway that ‎extends from S. Victory Court to the east end of the parcel ending in a cul-de-sac. ‎

ANTICIPATED IMPACTS ON AQUATIC ENVIRONMENT: The proposed action would fill 2150 ‎linear feet of the Pulley Drain(1.07 acre open water; 0.24 acre wetlands) from the beginning terminus (east ‎end) to the point where the new drain discharges into the original drain (See Figure 3). ‎

OTHER AUTHORIZATIONS: Currently, we are coordinating with the Tribal Historic Preservation ‎Offices for the Shoshone Bannock Tribes and Shoshone Paiute Tribes to determine if there are any tribal ‎historic or cultural interests within the project area. Other authorizations obtained or requested include a ‎‎401 water quality certification from the Idaho Department of Environmental Quality. ‎

CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State ‎Historic Preservation Officer to determine if this activity will affect a site that is listed on the National ‎Register of Historic Places, or a site that may be eligible for listing on the Register. We are also ‎coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Shoshone ‎Bannock and Shoshone Paiute Tribes, to determine if there are any tribal historic or cultural interests within ‎the project area. ‎

TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust ‎responsibility arising from treaties, statues, executive orders and the historical relations between the United ‎States and American Indian Tribes. The federal government has a unique trust relationship with federally ‎recognized American Indian Tribes, including the Shoshone Bannock and Shoshone Paiute Tribes. The ‎Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses ‎and interests. The Corps further recognizes there may be a need for additional and on-going consultation. ‎

ENDANGERED SPECIES: ‎No listed threatened or endangered species or designated critical habitats are known to exist in the project ‎area. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) and the ‎National Marine Fisheries Service (NMFS/NOAA Fisheries Service) to determine if the activity will have ‎any effect on species designated as endangered or threatened under the Endangered Species Act, or their ‎critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844; 16 U.S.C. 1531 et.seq.). ‎

ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as ‎amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the ‎National Marine Fisheries Service on all actions or proposed actions, permitted, funded or undertaken by ‎the agency that may adversely affect Essential Fish Habitat (EFH

ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will ‎not require preparation of an Environmental Impact Statement. Comments provided will be considered in ‎preparation of an Environmental Assessment. ‎

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable ‎impact, including cumulative impacts, of the proposed activity on the public interest. This decision will ‎reflect the national concern for both protection and utilization of important resources. The benefit which ‎reasonably may be expected to accrue from the proposal must be balanced against its reasonably ‎foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the ‎cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental ‎concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, ‎navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, ‎energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and ‎in general, the needs and welfare of the people. In addition, our evaluation will include application of the ‎EPA Guidelines (40 CFR 230) as required by Section 404(b) (1) of the Clean Water Act. ‎

CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the ‎general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in ‎order to consider and evaluate the impacts of this proposed activity. Any comments received will be ‎considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit ‎for this proposal. To make this decision, comments are used to assess impacts on endangered species, ‎historic properties, water quality, general environmental effects and the other public interest factors listed ‎above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental ‎Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to ‎determine the need for a public hearing and to determine the overall public interest of the proposed ‎activity.‎

PUBLIC HEARING: Any person may request in writing, within the comment period specified in this ‎notice, that a public hearing be held to consider this proposed activity. Requests for a public hearing shall ‎state specific reasons for holding a public hearing.‎

COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed ‎activity, which will become a part of the record and will be considered in the final decision. ‎

Please mail all comments to:‎ U.S. Army Corps of Engineers Walla Walla District ‎Mr. Greg Martinez ‎10095 W. Emerald Street‎ ‎Boise, Idaho 83704‎

greg.j.martinez@usace.army.mil ‎

Comments should be received no later than the comment due date of November 3, 2014, as indicated on ‎this notice, to receive consideration. ‎

Greg Martinez Sr. Project Manager ‎ Walla Walla District

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas