You can copy from here when filling out the rest of the page.
AFTER-THE-FACT CONSTRUCTION OF TWO BUTTERFLY NETS AND TWO PILE-SUPPORTED 12’ X 14’ PLATFORMS IN TERREBONNE PARISH, LOUISISANA
NAME OF APPLICANT: Percy Dardar, 1016 Highway 665, Montegut, Louisiana 70377
LOCATION OF WORK: Cut Off Canal near its intersection with Bayou Pointe au Chien at Latitude: 29.415828, Longitude -90.446794 in Terrebonne Parish, Louisiana. HUC: 08090302, West Central Louisiana Coastal.
The work described below was completed prior to obtaining a Department of the Army permit and was in violation of Section 10 of the Rivers and Harbors Act. All legal issues concerning the unauthorized work have been deferred.
CHARACTER OF WORK: This project includes after-the-fact construction of two butterfly nets and two pile-supported 12’ x 14’ platforms for private recreational use. Impacts to Waters of the U.S. include 0.008 acres to non-vegetated, navigable water bottoms. This project does not impact any special aquatic sites, including wetlands.
The applicant may be required to fully or partially restore the project site to pre-project conditions, if issuance of the permit is determined to be contrary to the overall public interest.
PUBLIC NOTICE
October 20, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
PHONE: (504) 862-1627
FAX: (504) 862-2574
kyle.b.gordon@usace.army.mil
Project Manager: Kyle Gordon
Permit Application Number: MVN-2014-02408-SA
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers (Corps) pursuant to: [X] Section 10 of the Rivers
and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403).
AFTER-THE-FACT CONSTRUCTION OF TWO BUTTERFLY NETS AND TWO PILE-SUPPORTED
12' X 14' PLATFORMS IN TERREBONNE PARISH, LOUISISANA
NAME OF APPLICANT: Percy Dardar, 1016 Highway 665, Montegut, Louisiana 70377
LOCATION OF WORK: Cut Off Canal near its intersection with Bayou Pointe au Chien at Latitude:
29.415828, Longitude -90.446794 in Terrebonne Parish, Louisiana. HUC: 08090302, West Central
Louisiana Coastal.
The work described below was completed prior to obtaining a Department of the Army permit and was in
violation of Section 10 of the Rivers and Harbors Act. All legal issues concerning the unauthorized work
have been deferred.
CHARACTER OF WORK: This project includes after-the-fact construction of two butterfly nets and two
pile-supported 12' x 14' platforms for private recreational use. Impacts to Waters of the U.S. include
0.008 acres to non-vegetated, navigable water bottoms. This project does not impact any special
aquatic sites, including wetlands.
The applicant may be required to fully or partially restore the project site to pre-project conditions,
if issuance of the permit is determined to be contrary to the overall public interest.
The comment period for the Department of the Army Permit will close 15 days from the date of
this joint public notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and
must be mailed so as to be received before or by the last day of the comment period. Letters concerning
the Corps of Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION:
2
REGULATORY BRANCH. Individuals or parties may request an extension of time in which to comment
on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any
request must be specific and substantively supportive of the requested extension, and received by this
office prior to the end of the initial comment period. The Section Chief will review the request and the
requestor will be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial comment period, will
not exceed a total of 30 calendar days.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which reasonably
may be expected to accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of
Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a
public hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or destroy
presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public
notice solicits input from the State Archeologist and State Historic Preservation Officer regarding
potential impacts to cultural resources.
The Corps is unaware of any Endangered Species Act (ESA) listed species that may be
adversely affected by the proposed activity. Our initial finding is that the proposed work would neither
affect any ESA listed species nor affect any habitat designated as critical to the survival and recovery of
any ESA listed species.
This notice initiates the EFH consultation requirements of the Magnuson-Stevens Fishery
Conservation and Management Act. The proposal would result in temporary adverse impacts to 0.008
acres of EFH utilized by various life stages of red drum, blue crab and penaeid shrimp. Our initial
determination is that the proposed action may have adverse impacts on EFH or federally managed
fisheries of the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
3
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will
not violate applicable water quality standards will be required from the Department of Environmental
Quality, Office of Environmental Services, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a waiver
of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Darrell Barbara
Chief, Western Evaluation Section
Regulatory Branch
Attachments