SPECIAL PUBLIC NOTICE: PROPOSED IN-LIEU PROGRAM IN PLAQUEMINES PARISH
CEMVN is soliciting public comment on the proposed in-lieu fee program. Comments must be received by close of business on November 18, 2014.
SPONSORSHIP: Plaquemines Parish Government, 8056 LA Hwy 23, Suite 307, Belle Chasse, Louisiana 70037. ATTN: P.J. Hahn, Director of Coastal Zone Management.
LOCATION OF WORK: The area encompassing Plaquemines Parish.
PROGRAM DESCRIPTION: The Sponsor proposes to establish an in-lieu fee compensatory mitigation program to compensate for impacts authorized by regulatory actions for Plaquemines Parish infrastructure projects. Funds would be collected to construct mitigation projects of various marsh habitat types. Attached for review is the in-lieu fee program prospectus.
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
P. O. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
October 20, 2014
REPLY TO
ATTENTION OF:
Operations Division
Regulatory Branch
Project Manager
Brian W. Breaux
(504) 862-1938
brian.w.breaux@usace.army.mil
SUBJECT: MVN-2014-02167-MB
PUBLIC NOTICE
CEMVN is soliciting public comment on the proposed in-lieu fee program. Comments
must be received by close of business on November 18, 2014.
PROPOSED IN-LIEU PROGRAM
IN PLAQUEMINES PARISH
SPONSORSHIP: Plaquemines Parish Government, 8056 LA Hwy 23, Suite 307, Belle
Chasse, Louisiana 70037. ATTN: P.J. Hahn, Director of Coastal Zone Management.
LOCATION OF WORK: The area encompassing Plaquemines Parish.
PROGRAM DESCRIPTION: The Sponsor proposes to establish an in-lieu fee compensatory
mitigation program to compensate for impacts authorized by regulatory actions for
Plaquemines Parish infrastructure projects. Funds would be collected to construct mitigation
projects of various marsh habitat types. Attached for review is the in-lieu fee program
prospectus.
Martin S. Mayer
Chief, Regulatory Branch
Prospectus for the Proposed
Plaquemines Parish In-Lieu Fund
Mitigation Program
Prepared for
PLAQUEMINES PARISH GOVERNMENT
By
43177 East Pleasant Ridge Road
Hammond, LA 70403985-662-5501 (Office) · 985-662-5504 (Fax)
September 30, 2014
F:\KLE\PPG In Lieu Fee\ILF Prospectus 0930.docx
Table of Contents
1.0
1.1
2.0
3.0
3.1
3.2
3.3
3.4
4.0
4.1
4.2
4.3
5.0
6.0
6.1
6.2
6.3
6.4
6.5
7.0
INTRODUCTION .................................................................................................. 1
Site Location ....................................................................................................... 2
PROJECT GOALS AND OBJECTIVES ............................................................... 2
ECOLOGICAL SUITABILITY OF THE SITE ..................................................... 3
Historical Ecological Characteristics of the Site ................................................ 3
Current Ecological Characteristics of the Site .................................................... 3
General Need for the Project in this Area ........................................................... 3
Technical Feasibility ........................................................................................... 4
ESTABLISHMENT OF THE MITIGATION BANK ........................................... 4
Site Restoration Plan ........................................................................................... 5
Current Site Risks ............................................................................................... 6
Long-Term Sustainability of the Site .................................................................. 6
PROPOSED SERVICE AREA............................................................................... 7
OPERATION OF THE MITIGATION BANK ...................................................... 7
Project Representatives ....................................................................................... 8
Qualifications of the Sponsor.............................................................................. 8
Proposed Long-Term Ownership and Management Representatives ................. 8
Site Protection ..................................................................................................... 9
Long-Term Strategy ............................................................................................ 9
TABLES AND FIGURES ........................................................................................... 10
List of Tables
Table 1 Acreage Breakdown ............................................................................................... 10
List of General Figures
Figure 1
Figure 2
Figure 3
Figure 4
Vicinity Map .......................................................................................................... 11
Plaquemines Parish Environmental Units .......................................................... 12
Plaquemines Parish Land Loss, 1932-2009 ....................................................... 13
Southeast Louisiana Katrina Storm Surge.......................................................... 14
The Plaquemines Parish In-Lieu Fee Mitigation Program
1.0 INTRODUCTION
Plaquemines Parish is proposing the Plaquemines Parish In-Lieu Fee Mitigation Program, a
single-user mitigation program to compensate for the wetland impacts from parish flood
protection projects and any other parish-initiated government infrastructure programs.
Existing Federal and State regulations require that compensatory mitigation be provided for
the unavoidable impacts to wetlands that will occur during construction of parish-wide
infrastructure project such as ridges, levees, or other protective elements. Plaquemines Parish
is proposing to address this issue by the creation of a parish-managed In-Lieu Fee (ILF)
Mitigation Program. Such programs are provided for in the federal regulatory system and
allow for mitigation programs to be developed and approved and credits to be issued in
advance of impacts caused by construction. The adoption of a Plaquemines Parish ILF would
provide for coordinated mitigation and would insure that the Parish's projects would not be
delayed by the need to find other acceptable mitigation projects. Instead, the ILF would be
used to mitigate for projected flood protection and infrastructure programs. The program is
anticipated to initially consist of a set of projects involving the construction of 150 acres of
fresh to intermediate marsh and 350 acres of brackish to saline marsh. An initial credit
allocation of approximately 50 acres in the aggregate represents approximately 10% of the
initial project outlay credit potential. The initial mitigation project credit potential should
provide enough credits to support the Parish's current near-term flood protection and
infrastructure programs construction projections. Future mitigation projects will be proposed
as the need for infrastructure impacts accumulates. At this point in time only marsh credits
are envisioned.
Plaquemines Parish is one of the richest parishes in Louisiana in both coastal wetland
resources and the tools and resources that are needed to make restoration and maintenance of
those wetlands feasible over the long term. With the Mississippi River bisecting the parish on
its final reach to the Gulf of Mexico, and wide expanses of marsh flanking the river to the
east and west, Plaquemines Parish is well-positioned to lead the state in both local coastal
policies and coastal project development to assist in protecting and restoring Louisiana's
coastal resources.
Because of its exposed location and geography, Plaquemines Parish also experiences one of
the highest rates of coastal land loss, and the population and industry located there
experience a higher surge risk than most of the state. During Hurricane Katrina the parish
was devastated by the hurricane's associated storm surge. This devastation made the parish's
exposure obvious, and it established a demonstrated need for a protection infrastructure. This
In Lieu Fee program is intended to provide flexibility in the relationship between impacts
created by the clear need for parish protection infrastructure and the compensatory mitigation
required by state and federal regulatory agencies to offset those impacts.
This program will also provide a framework for marsh creation site selection over the long
term to stay well ahead of the pace of permitted impacts caused by the implementation of the
parish protection plan. Projects and locations identified through the site selection process will
be planned, designed, and constructed within the time frames provided by the federal and
1
The Plaquemines Parish In-Lieu Fee Mitigation Program
state regulatory structures in order to allow needed protection and infrastructure to move into
construction without the necessary delays resulting from individual mitigation project review
or from lapses in the availability of adequate marsh mitigation bank credits. It will also result
in the resulting wetland restoration projects being constructed within the same parish as the
permitted impacts.
Federal regulations recognize that mitigation banks and fee-in-lieu programs can be
preferable options because they involve consolidating compensatory mitigation projects and
resources to better provide ecologically benefits, provide for consistent financial planning
and scientific expertise, reduce the temporal losses of function, and reduce risk and
uncertainty (33 CFR Part 332).
The following prospectus outlines the circumstances and manner in which the Plaquemines
Parish In-Lieu Fee Mitigation Program can serve to satisfy compensatory mitigation
requirements of the New Orleans District (CEMVN) of the USACE's Regulatory programs.
1.1 Site Location
Sites selected under this program will best demonstrate characteristics prioritized
according to an established selection criteria (explained below in this document).
Common features of projects anticipated to meet the goals of this program include
shallow open water areas of recent conversion, lands owned by willing landowners, areas
near enough to a suitable borrow source for marsh building sediment, areas that are
adjacent to or near the project(s) causing the impact, and areas where sustainability the
creation of stable, long-lived and healthy ecosystems is feasible.
2.0 PROJECT GOALS AND OBJECTIVES
The reason for the development of this proposed program is to provide an acceptable
compensatory mitigation for Plaquemines Parish Government efforts which will offset
unavoidable wetland impacts, with the objective of restoring lost wetland habitats in
Plaquemines Parish. The proposed ILF program will provide funding for the restoration
and/or enhancement of fresh, intermediate, brackish and saline marsh in acreages sufficient
to provide long term mitigation credits to support currently proposed Plaquemines Parish
flood protection and infrastructure work. The program will identify, plan, design and
implement projects according to settled selection criteria in order to provide for the funding
of construction projects that will have environmental and ecological benefits via creating
intermediate to brackish marsh, enhancing existing intermediate to brackish marsh, reducing
open water, improving wildlife and fisheries habitats, areas, and protecting wetlands. The
proposed ILF program anticipates a set of projects involving the construction of an estimated
150 acres of fresh to intermediate marsh and 350 acres of brackish to saline marsh, based on
current near-term flood protection and infrastructure programs construction projections. The
initial credit allocation will be about 50 acres, or about 10% of the credit potential of the
initial project suite.
2
The Plaquemines Parish In-Lieu Fee Mitigation Program
3.0 ECOLOGICAL SUITABILITY OF THE SITE
3.1 Historical Ecological Characteristics of the Site
Sites likely to be included in the ILF will be areas of shallow open water that have
succumbed to the forces of storm surge, sediment starvation, and subsidence and have
degraded from once healthy marsh habitat to unvegetated shallow water. Typical land
uses in these areas are customary recreational uses such as hunting and fishing,
commercial seafood harvesting, and commercial hydrocarbon extraction and
transportation. All sites shall be chosen in areas open to normal tidal hydrology.
3.2 Current Ecological Characteristics of the Site
Sites will be chosen based on the anticipated capacity to compensate for aquatic resources
of a similar nature to those impacted by the mitigated impacts. Salinities will be monitored
and existing data used in any selected site to ensure that vegetative species used to
populate newly created marsh platforms are compatible with the vegetative community in
the surrounding area.
Most sites are likely to demonstrate few characteristics of healthy marsh habitats. Because
of the nature of wetland loss in this area, the selected sites will be restored from tidal open
water areas characterized by soft, loosely consolidated, organic bottom sediments and
surrounded by vegetative community typical for the salinities and hydrology characteristic
of that area.
Since one of the key factors in sustaining a newly deposited marsh creation sediment deck
is the marsh consolidation in the general area and the degree to which is supports
containment and protects newly deposited sediments, sites located within excessively
open and exposed areas, and sites more than a few feet deep will not figure highly in the
site selection process. Conditions considered favorable for the construction of a
sustainable site are areas with at least some existing marsh or relic spoil banks that can be
used to help contain pumped sediments and provide a buffer from direct erosive wave and
tidal energy, and areas with a regional interspersion condition that suggest that newly
created marsh platforms have the potential to form functional and integrated units of a
larger marsh system. Isolated and remote sites will be avoided because of the challenges
they present from a sustainability and a construction feasibility standpoint.
Where anticipated necessary, plans for planting the newly created marsh platforms will be
generated by sampling the vegetative communities of nearby natural marsh and replicating
the species composition as closely as possible given availability of native plant materials.
3.3 General Need for the Project in this Area
Marsh loss in Plaquemines Parish is a significant problem that has eroded tremendously
expansive areas of coastal wetland such that over the last several decades, the parish has
3
The Plaquemines Parish In-Lieu Fee Mitigation Program
undergone a geographic transformation. What was once one of the healthiest coastal
habitats on the Gulf coast a hundred years ago has been starved for fresh water and
sediment, washed away by tropical storm events, and covered with oil, until the
ecological health and robustness coastal wetlands that remain today are but a shadow of
the ecological health and robustness that existed in the days before levees, oil field
canals, and accelerated subsidence. Projects selected under this In Lieu Fee Program are
intended to help restore a significant acreage of coastal marsh habitat in a parish that has
experienced some of the most dramatic wetland loss in the state (see Figure 3).
At the current time, options for mitigating permitted marsh impacts are severely limited,
and a lack of credit availability could halt Plaquemines Parish flood protection projects
and other infrastructure projects, even those currently in the permitting phase, until such
time as sufficient acreage could be approved as an alternative source of credit. The
Plaquemines Parish In-Lieu Fee Program is designed to prevent that from occurring,
thereby facilitating storm surge/flood protection for the parish.
3.4 Technical Feasibility
The feasibility of the projects undertaken in this program is directly correlative to the
feasibility of most marsh restoration efforts made at the federal and state level in this
area. In areas that match the selection criteria, what has become the industry standard for
marsh restoration (the basic concept of borrowing sediment from a location and then
redistributing it so that compaction and settlement results in a marsh sediment platform
compatible with the elevation of healthier marsh in the project vicinity) should result in
the creation and sustainability of hundreds of acres of integrated marsh habitat.
4.0 ESTABLISHMENT OF THE ILF PROGRAM
The proposed program sponsor is the Plaquemines Parish Government (PPG). The program
will be overseen and administered by PPG's Coastal Zone Management Department
(PPCZM). The program will be established by parish ordnance, subject to amendment as
needed to allow effective operation. Legal responsibility for providing the compensatory
mitigation lies with the PPG once a permittee secures credits from the sponsor.
PPCZM will be responsible for collecting, accounting for, and the disbursement of all monies
and habitat credits involved. PPCZM will also be responsible for initiating project selection
activities and coordinating those activities with the appropriate federal and state government
agencies. PPCZM will also be responsible for the implementation and operation of any and
all mitigation and restoration activities funded by those monies collected. The monies are not
to be comingled with monies of any other source, type or function. PPCZM will collect one
fee under this program for marsh credits regardless of type but will categorize and record
each marsh credit as being either brackish/saline or fresh/intermediate. To address habitat
impacts, marsh creation efforts will be funded through the use of the proposed ILF program,
which will include both the construction of individual, stand-alone projects or expanding the
4
The Plaquemines Parish In-Lieu Fee Mitigation Program
scope of planned or existing projects. Monies collected by the ILF will be used for the
restoration and/or enhancement of private lands (and state-owned water bottoms, as
appropriate) that are preferably adjacent to or near the individual projects causing the impact.
PPCZM will seek the pre-approval of proposed project/site plans from the federal and state
government on a case-by-case basis. The cost per acre for fresh/intermediate and
brackish/saline marshes are estimated to be $64,600 per acre, including costs for engineering,
surveying, land and/or water right acquisition, project mobilizing/demobilizing, the actual
operational costs, and for subsequent management and monitoring. The estimate is based on
project cost data from the Louisiana Coastal Protection and Restoration Authority (CPRCA).
PPCZM will perform the monitoring of these projects. Once activity begins the cost per acre
values will be updated as necessary, or at least on an annual basis.
PPCZM will undertake a mitigation project site search in areas adjacent or near to the
impacting project. PPCZM will attempt to strategically identify significant areas that would
result in the highest mitigation value, project suitability and likelihood of success. PPCZM
will be receptive to project proposals from any source, including federal and state agencies,
municipalities, NGO's, and landowners. PPCZM will also seek to find restoration projects
that will be "shovel-ready" by the time enough fees have been collected for those credits to
be issued by the ILF program.
The identification of potential marsh creation projects by the PPCZM will be an ongoing
activity, with all identified potential projects pre-qualified to the maximum extent possible.
The Corps of Engineers, New Orleans District Modified Charleston Method (MCM), a
variation of the Charleston Method developed by the Corps of Engineers Charleston District,
will be used to determine mitigation values.
The MCM quantifies impacts and assesses the amount of mitigation that is required. This
will allow for the use of an accepted, timely, predictable, and transparent tool that can be
used to evaluate the options available in order to make informed decisions regarding
proposed projects. Net gains in habitat units resulting from a compensatory mitigation action
must equal the habitat units lost.
4.1 Selection Criteria
The site restoration plan begins with establishing selection criteria for projects.
Criteria 1: Shallow water (0-2.5'). Areas suitable for inclusion as potential project sites
are open water sites with depths less than two and one half feet (2.5'). Setting this water
depth as a maximum acceptable depth provides a project site that can be restored with a
reasonable volume of sediment transfer and will allow for a better transitional grade from
the pumped elevations back to the natural sediment elevation.
Criteria 2: Appropriate salinities. The majority of permitted impacts anticipated with the
implementation of the Plaquemines Parish Coastal Plan are expected to include primarily
marsh areas with intermediate (2 -10 ppt) to brackish (10 20 ppt) salinities.
Consequently, the project selection criteria will focus on sites that demonstrate an
5
The Plaquemines Parish In-Lieu Fee Mitigation Program
average salinity of 2 20 ppt for the bulk of the project work, but lower or higher
salinities may be appropriate depending on the need generated by the impact, and the
overall goal of the project site selected for review.
Criteria 3: Nearby borrow source. One of the primary controlling conditions of any
suitable site will be the availability of sufficient volumes of sediment to complete the
project, close enough to the program site to allow the cost effective movement of material
from the borrow site to the project. Sites selected under the ILF program will include an
adequate source of suitable borrow material close enough to make the project
economically feasible.
Criteria 4: Willing landowners/established property rights. The majority of the
property involved in either the construction of the coastal plan elements or the
construction of mitigation projects under this ILF program will be privately owned. As
such, a key element to success of this program will be the ability to work with private
landowners to establish the requisite property security mechanisms (primarily long term
conservation servitudes) that can ensure protection for the expected life of the project. An
important part of selecting sites for this program will be the willingness of the
landowners to participate. Any site selected for inclusion will require landowners that
will work with the Parish to develop functional projects.
Criteria 5: Proximity to Impacts. Sites selected for construction under this program will
be evaluated for their proximity to the impacts proposed to be mitigated. An optimal
location under this criterion will be a wetland marsh platform that functions partially to
provide a natural wetland buffer protecting the permitted infrastructure project, and
facilitating the replacement of aquatic functions very near to the point of impact.
4.2 Current Site Risks
Site risks will be determined during project selection.
4.3 Long-Term Sustainability of the Site
The long term sustainability of any marsh creation project is a function of the design
elevation of pumped in sediment and the ability to achieve it, its own health, the health of
the habitats surrounding it, and the likelihood of it existing as an integral piece of a much
larger functioning habitat.
Typical threats to healthy marsh habitats are natural forces such as geologic subsidence,
tropical storm surge, and the resulting gradual increase in salinities from an encroaching
isohaline line. Additional threats are also presented in a general sense from hydrocarbon
extraction, canal dredging, flood and storm surge protection infrastructure, road
construction, etc.
To protect from the first set of threats, projects under this ILF program will be pumped to
an elevation anticipated to result in a gradual compaction over one to three years to
6
The Plaquemines Parish In-Lieu Fee Mitigation Program
elevations typical of the surrounding habitats, depending on the soil characteristics of the
borrow site and the marsh platform site.
While elevation stability is being achieved the program will focus on the creation of
stable, long-lived and healthy ecosystems by means of appropriate soil type, hydrology,
vegetation and fauna. The program will achieve and maintain the essential functions,
biodiversity and processes of the ecosystems and will retain them in full measure over the
life of the program.
The only anticipated element of projects typical of this program that might be considered
as a structural component would be containment berms constructed to retain highly liquid
sediments during and immediately after deposition. In time, depending on the
characteristics of the site and the needs of that particular project, those berms will be
degraded or gapped to allow normal hydrology to return to the project site.
5.0 PROPOSED SERVICE AREA
The geographic limits of PPG's proposed ILF program service area shall be Plaquemines
Parish, a map of which is included as Figure 1.
6.0 OPERATION OF THE MITIGATION BANK
Both the Clean Water Act and the Louisiana Coastal Zone regulations require permitting for
unavoidable impacts to vegetated wetlands that result from the placement of fill material.
Those regulations call for impacts to be mitigated by the creation or enhancement of
vegetated wetlands in an appropriate habitat value ratio. This program is intended to reestablish intermediate and brackish marsh in sufficient acreages to adequately compensate
for unavoidable impacts to wetlands due to the construction of the Plaquemines Parish
Government flood protection and infrastructure projects. Currently, the lack of adequate
marsh credits to support the foreseeable infrastructure needs is such that it could severely
limit the possibility of construction for anything but the most immediate needs.
The PPCZM will implement all ILF-funded mitigation projects within a reasonable time
frame or at a maximum of three full growing seasons after the sale (or consumption by single
user) of the first advance credit. It is anticipated that monies will be collected or dedicated
pursuant to infrastructure permitting needs, to fund each mitigation project. PPCZM does not
anticipate any conflicts with state and federal guidelines. Plaquemines Parish will be
responsible for maintaining the mitigation project for the required 20 year time frame for
marsh mitigation. Numerous factors exist that may damage or destroy a mitigation project
including hurricanes, tropical and extra-tropical storms, flooding, animal life, etc. but they
7
The Plaquemines Parish In-Lieu Fee Mitigation Program
can neither be quantified nor have risk assigned to them. Regardless, all protection and
reconstruction obligations remain with Plaquemines Parish.
6.1 Project Representatives
Sponsor:
Plaquemines Parish
Attn.: P.J. Hahn, Director of Coastal Zone Management
8056 Hwy 23, Suite 307, Belle Chasse, LA 70037
504-297-562
pjhahn@plaqueminesparish.com
6.2 Qualifications of the Sponsor
Plaquemines Parish will be the long-term manager of the ILF program. It has a history of
successful local projects and a well-established coastal zone management department. Its
strategic goals include the beneficial use of dredge material, enforcing policies and
permits, sustaining the resources of the parish, and the strategic protection of the parish
itself.
Because Plaquemines Parish has lost over 248 square miles of land due over the last fifty
years to subsidence, erosion and sea level rise and has suffered severe damage from
hurricane storm surges (see Figure 4), Plaquemines Parish is currently building multiple
lines of defense to protect the parish from further loss and damage. The existing
Plaquemines Parish Coastal Plan combines coastal restoration and protection projects
with levees to achieve 100-year flood protection for all of Plaquemines Parish. Over $700
million in coastal restoration projects have been committed in Plaquemines Parish, which
is more than at any previous time in the history of the parish. Plaquemines Parish has the
means, the motive and the opportunity to protect itself and intends to do so. This
protection effort will require mitigation, hence this ILF program and Plaquemines
Parish's role in it.
6.3 Proposed Long-Term Ownership and Management Representatives
Plaquemines Parish will be the long-term manager of the ILF program and will also be
the responsible party for all ledger entry, credit tracking and management through the
Regulatory In-lieu fee and Bank Information Tracking System (RIBITS) of the U.S.
Army Corps of Engineers. Plaquemines Parish will acquire all land rights, servitudes
and/or easements on ILF Program funded project sites. The parish will acquire land rights
for the 20 year project life of a marsh restoration project. Individual project site
management activities will be conducted by contracting services or by Plaquemines
Parish personnel. These expenses will be included in the credit cost analysis. Projects will
be tracked by Plaquemines Parish Environmental Units (see Figure 2).
8
The Plaquemines Parish In-Lieu Fee Mitigation Program
6.4 Site Protection
Property included in this program will be protected from disturbance in the long term by
the execution and monitoring of long term conservation servitudes meeting the standards
outlined in the regulations.
Plaquemines Parish will be responsible for the site protection of ILF project sites for the
duration of each ILF project.
6.5 Long-Term Strategy
Land rights for all habitat restoration projects shall be secured by servitude agreements
for a period of 20 years in order to ensure the long-term protection of the activities
conducted by Plaquemines Parish. PPCZM will select an entity for use that complies with
the standards required for holders. PPCZM will monitor the constructed each ILF-funded
projects at Year 1, Year 3, Year 5, Year 10, Year 15 and Year 20. After each monitoring
event, an analysis and evaluation of the data and information shall be conducted. If, after
a monitoring/evaluation effort is performed on an ILF project, it is determined that
additional management effort is required, PPCZM will perform or arrange for contract of
the additional effort.
Plaquemines Parish shall submit a yearly report to all relevant federal and state agencies
regarding the progress of the ILF program, which will list all funds collected, sites
selected, credits issued and program activities carried out over the previous calendar year.
This annual report will address whether the goals and objectives of the proposed program
have been met, and if any have not it will address why they were not met and what steps
will be taken to remedy the situation. PPCZM will keep a record of all habitat impacts
and benefits from mitigation work as assessed by the MCM. These numbers will be used
to determine whether the ILF program is meeting its goals of offsetting habitat impacts. If
not enough monies are being collected by the ILF program to sufficiently fund
appropriate compensatory mitigation, PPCZM will increase its cost per credit. Likewise,
if excess monies generated by the ILF program remain after funding sufficient and
appropriate compensatory mitigation projects, PPCZM will decrease its cost per credit for
the corresponding habitat type.
Plaquemines Parish will deposit all funds received for mitigation into an FDIC protected
account. Plaquemines Parish will ensure that all monies collected for this purpose will be
placed into an account that will not be comingled with any other funding sources and that
will be used for no other purposes besides the ILF.
9
The Plaquemines Parish In-Lieu Fee Mitigation Program
7.0 Tables and figures
Table 1: Best Estimate Acreage Breakdown for Initial Project Suite
Fresh to intermediate marsh
Brackish to saline marsh
150 acres
350 acres
10
The Plaquemines Parish In-Lieu Fee Mitigation Program
11
The Plaquemines Parish In-Lieu Fee Mitigation Program
Map from the Encyclopedia Louisiana
12
The Plaquemines Parish In-Lieu Fee Mitigation Program
13
The Plaquemines Parish In-Lieu Fee Mitigation Program
14