Tyler Krug is the Regulatory point-of-contact for this modification request from the U.S. Coast Guard for work at River Mile 0.2 of the Rogue River and the Pacific Ocean (Rogue River ODMDS), near Gold Beach, Ore.
PUBLIC NOTICE for Permit Modification
Issue Date: Oct. 21, 2014
Expiration Date: Nov. 5, 2014
U.S. Army Corps of Engineers No: NWP-2007-135-1
15-Day Notice Oregon Dept. of State Lands No: 56060-RF
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
This is a supplemental public notice triggered by the permittee’s request to conduct additional maintenance dredging.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Tyler Krug, Tyler.J.Krug@usace.army.mil
North Bend Field Office
2201 N. Broadway, Suite C
North Bend, OR 97459-2372
Applicant: U.S. Coast Guard – Civil Engineering Unit Oakland
Roy S. Clark
1301 Clay St., Suite 700
Oakland, CA 94612-5203
Location: The U.S. Coast Guard Rogue River Search and Rescue Detachment facility is located on the north bank of the Rogue River, at river mile 0.2. The SARDET is located off of Wedderburn Loop, near Gold Beach, Curry County, Oregon (Section 25, Township 36 South, Range 15 West; 42.426953 North, -1243424207 West). The Rogue River Ocean Dredged Material Disposal Site is located 1.75 miles west of the Rogue River mouth.
Waterway: Rogue River, RM 0.2 and the Pacific Ocean (Rogue River ODMDS).
Project description: On June 16, 2014, the Corps issued a permit to the USCG authorizing the one time dredging of sand, gravels, and cobbles from below the high tide line of the Rogue River estuary to maintain the facility to the previously approved design prism. The USCG dredged approximately 5,700 cubic yards of material from their site in July of 2014.
Shoaling in the access channel impairs and has affected the USCG's ability to conduct routine operations and to respond to emergencies during the summer months when water levels are the lowest and they have requested a permit modification to allow additional maintenance dredging. They have also requested an expansion of the dredging prism to include the access channel.
Through the proposed permit modification, the USCG would dredge the approximately 900-foot long access channel to its design depth of -12 feet MLLW using a clamshell dredge. Based upon current conditions the USCG estimates approximately 10,000 cubic yards of sand, gravels, and cobbles would be removed from facility and access channel. Dredged materials would be transported to Rogue ODMDS by a tug and dumping scow. Approximately four to ten trips to the ODMDS are necessary. The project is expected to take less than one week to accomplish.
Mitigation: The applicant has stated they believe the proposed action will not permanently impact aquatic functions and/or values. The project is a maintenance action at an existing facility and they are not proposing to modify the design prism. Therefore, no compensatory mitigation is proposed. Corps authorization NWP-2007-135/1 currently issued for this project requires no compensatory mitigation.
Purpose: The project purpose is to maintain navigability within the facility including the access channel between the USCG's SARDET and the federally maintained navigation channel.
Drawings: Six (6) drawings are attached and labeled NWP-2007-135-1 enclosure.
Additional information may be obtained from Tyler Krug, Project Manager, U.S. Army Corps of Engineers at 541-756-2097 or via email at tyler.j.krug@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Section 103, Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413), for transport of dredged material for the purpose of dumping it into ocean waters.
Water Quality Certification: A revised permit modification for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. The State of Oregon Deparmtne of Environmental Quality (DEQ) issued an individual 401 Water Quality Certification for the original project on May 6, 2014. The Corps and applicant will coordinate with DEQ to identify if a new or revised 401 WQC is required for the project. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places.
Through the initial permitting of the USCG’s currently valid Corps authorization, coordination with the State of Oregon State Historic Preservation Office occurred. The proposed action includes only the removal of recently shoaled sediments outlining there should be No Effect to historic properties. The current Corps permit special conditions requiring implementation of the Corps Inadvertent Discovery Plan in the event cultural resources are uncovered during dredging operations will remain in full force and effect.
This notice has been provided to the SHPO, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
I
~-/~---ll----------1
l ...-
/'0
_,
··~-
/
...
<
.,
.
I
,/
I
I
z
Q
0
z
1-
<
<
-
I
d ,
z
""
0
/
:
I
I
'
..~-
z
I
'
0
i
i
I
·
0
!_ L -·- r -
r-\
t,)
I
,_-1
\
\
\
'
\\\Ii
I
·;\
l
I \ ~---;---::7
I
l _-J-_ _T ' --,__
,_
·,,,, I
·,
'·,,
,
-_'··-
___:_.... ...
'··-.. ..
"'··"-- ..... ___________________ __
Figure 1. Location Map, USCG SARDET Rogue River, Curry County,
Oregon (Rogue ODMDS Zone of Siting Feasibility basemap)
USCG
SARDET
SITE
Figure 2. USGS
Topographic Map
USCG
SARDET
SITE
Figure 3. Curry
County Tax Map
NQ.lli
~ Coorduw·~m..:
Nri~D-ollW)(NADil),pn>j-tolhoSta~oPtm.C...
S,.-(SPCS), Dn-Soullt:Z... oun.x...UnaU.S. S....y fMl
Voni..c:ll - -c~
..c:ll s....,.-o.._
s-Miap . . .&ow.. ie .._. . t ~ d..ptU below UUD.l...aww t..cr. Wa.JPIJ-lOO l. ).lll.WO.O..... Ioo(IIAVDUlot . . ~.,;q..
- · - c.tM, swm.am.
Rivor.W..p ao.-., lltoRi..Milolada ol'llto H)"'nooo~r...!H,..lmtlOc
c.-. Pa.mr-...cRiwo-Buau C......Wico,~ 19611.
- - Pipalna. Overt..d
lbe ~d.pldwla.au map n pt·nab th. ruds of a mn-.y ~
em tw d· u:wlac.md. .llld em oaly bt ~-Co nprPtAC the pDaO] coddlboa.
.mtia.l .at that .....
c::J
-
f- -=- J Anahonlge ke·
¢
_L
Or1'dged Lt·tl'N I Plolc:.Mnt.N··
[[!J]eab._....._
[ZJ .............
STAPF GAGE AI COAST GUAXD DOCK:
coNDmoN I&]
N~ )01S7~
PREDREDGE
D
:e,.,..._, 3162088
St.!-alin;Nu.
BMCan. G.ner·l
- - CclntcJwl.rt·
POSIDREDGE D
ROGUE RIVE R ,
OREGON
COAST GUARD STATION
04JUNE20l3
"'
l'lDtnD.
R0_03_ROC_l0 130604
"""""'·
gu e
Access
Channel
Revised Figure 4. Site Plan with revised dredge limits in yellow.
,,
I
~
R-
~·-
--s..-v..
-.SpDol- tl· ......._
BWf, SafitWAer
I
...
*
i:t 1\~
0.,.
USCG
SARDET
SITE
Figure 5. Aerial Photograph (Google Earth, 07 June 2013)
50
51
!'0
6!
68
'1'0
71
RO GlJE R IVE R
OR E G O ~
DISPOSAL SITE
03 APRIL 2013
87
SCALE IN FEET
500
1,000
l.SOO
2.000
ROGU E
SECTION 102
PLACEMENT AREA
l.SOO
NOTES:
Hon.zonnl Coon:h.n.a_te Sy..-tun:
N01th Americm D.atum of 1983 CJAD83), pi"OjecH to the State Phnt: Coordinall!
Sy!i1Rm (SPCS), Oregon South Zont. Oist;a.nc::e units in U.S. Surny Feet
LEGEND
C.:i F@d.@ral N.w~gation Ch.ann@l
- - Fed@ral N.!V'ig.Jtion Chann@l Centeriine-
'Vertical Datum:
Soundl.np .an ~own t.n fMt .and mdtc-att deptlu b.low Mean Low.r Low V..'a tu
1983-2001. ~ILLW is 0.49 f ..cbolow !he ~onh Ameriun Veni<;o! O.rum (NAVD 88)
:at the higb:w.ay bridge:.
- -,-- C.a.tR. Overhead
- ·
Ri'\-um.ilu'"e eonfonn510 d:le Rn·er Mile Index of the Hydrolo~· and Hydnulies
Commtttee, P otct:fic Nortb't\-ec;t Rl\-eT B.a~ Co~on. J~.me 1968.
The information dep~~eted on tlus nup rept-e~ 1M re~uh~ of a !:;W'v ey conducted
on 1he d;a.tR mdic;;aad and e:m only be COil.Sidll!nd to repre2.0.t the ~ cotwhnon
exroting at that tlme.
STAFF GAGE AT COAST GUARD DOCK:
CONDITION ~
NonlunK= 301879 EastuJ~:: 3862088
PREDREDGE
D
POSTDREDGE D
P ipeline-, Submarine On L and U~
-
·
Ca~.
Subm.lrine
- - Pipeline. Ove~.:~d
c=--=~ Anchora ge Ate3
c:J Ofedg~d M.Jte rbl Pboe-mentArea
[[III) Ca ble- Area
r:::::ZJ Pipeline Area
-
Sho.31ingArea
.LL
Ill
Ill
Buoy. Lacer.>/
Buoy, Cardinal
Buoy, lsol.a:ed Danger
~ Buoy. Speci.>l p "PP··
Beacon Later.at
- - Contour LiM
S.nc:hm.ltk
Pylon Bridge Suppon
*
.;l,t
Buoy, $3f@ W a t«
_!_
A
Rod<
Obsttuaion Point
Wr.ci<-&Jbmetged
-o-
staHGage
-~C
Rec:ordl"lg Gage
Sho.Jiosc Sounding"
2010 Aori;ol PhotoJ:nphy dato ""'~: ESRI, USDA, NASA, cFigure 6. Rogue River Ocean Dredged Material Disposal Site (USACE
condition survey, 03 April 2013)
PUBLIC NOTICE
Oregon Department of Environmental Quality
Water Quality 401 Certification
Corps of Engineers No: NWP-2007-135-1
Notice Issued: Oct. 21, 2014
Oregon Department of State Lands No: 56060-RF Written Comments Due: Nov. 4, 2014
WHO IS THE APPLICANT: U.S. Coast Guard
LOCATION OF CERTIFICATION ACTIVITY: See U.S. Army Corps of Engineers public
notice.
WHAT IS PROPOSED: See U.S. Army Corps of Engineers public notice on the proposed
project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires
applicants for Federal permits or licenses to provide the Federal agency a water quality
certification from the State of Oregon if the proposed activity may result in a discharge to
waters of the state.
DESCRIPTION OF DISCHARGES: See U.S. Army Corps of Engineers public notice on the
proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues
as a result of the proposal are available for examination and copying at Oregon Department
of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are
available by contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are
readily accessible during your visit. To schedule an appointment please call DEQ Water
Quality at Northwest Region at 503-229-5552.
Any questions on the water quality certification process may be addressed to the 401
Program Coordinator at 503-229-6030 or toll free within Oregon at 800-452-4011. People
with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule 340-48-0032(2) states that "The Corps provides
public notice of and opportunity to comment on the applications, including the application for
certification, provided that the department (DEQ), in its discretion, may provide additional
opportunity for public comment, including public hearing."
Corps No. NWP-2007-135-1 56060-RF
Page 1 of 3
Written comments:
Written comments on project elements related to water quality must be received at the
Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper
right section on page one of this notice. Written comments may be emailed, mailed or faxed
as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Dept. of Environmental Quality, Northwest Region
2020 S.W. 4th Ave., Suite 400
Portland, OR 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - 503-229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through
version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to
conversion difficulties, DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
503-229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon
Telecommunications Relay Service at 1-800-735-2900.
Corps No. NWP-2007-135-1 56060-RF
Page 2 of 3
PUBLIC NOTICE
OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM
CONSISTENCY CERTIFICATION
Date: Oct. 21, 2014
U.S. Army Corps of Engineers No: Corps No. NWP-2007-135-1
Oregon Department of State Lands No: 56060-RF
NOTIFICATION:
For projects subject to coastal zone review, notice is hereby given that the project is being
reviewed by the Department of Land Conservation and Development as provided in Section
307(c) of the Coastal Zone Management Act. The applicant believes that the activities
described in the attached materials would comply with and be conducted in a manner
consistent with the Oregon Ocean and Coastal Management Program. Project information
can be made available for inspection at DLCD's Salem office.
DLCD is hereby soliciting public comments on the proposed project's consistency with the
Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635
Capital St. NE, Suite 150, Salem, OR 97301-2540. Comments may also be sent by fax to
503-378-6033 or by email to coast.permits@state.or.us. All comments must be received by
DLCD on or before the comment deadline listed in the Corps of Engineers' Public Notice for
Permit Application. For further information, you may call DLCD at 503-373-0050.
REVIEW CRITERIA:
Comments should address consistency with the applicable elements of the Oregon Coastal
management Program. These elements include the following:
Ø Acknowledged Local Comprehensive Plans & Implementing Ordinances
Ø Statewide Planning Goals
Ø Applicable State Authorities incorporated into the Oregon Coastal Management
Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as
applicable.
INCONSISTENT?
If you believe this project is inconsistent with the Oregon Coastal Management Program, your
comments to DLCD should explain why you believe the project is inconsistent and should
identify the Oregon Coastal Management Program element(s) in question. You should also
describe how the project could be modified, if possible, to make it consistent with the Oregon
Coastal Management Program.
Corps No. NWP-2007-135-1 56060-RF