The application is for the expansion of the left descending bank into the Arkansas River to accommodate the construction of two land bridges over Riverside Drive and to provide riverfront recreational opportunities for the proposed park. The proposed public recreation park is known as “A Gathering Place” for Tulsa. The support features include long-term bank stability, ADA compliant pedestrian access to the river, access to the existing River Parks trail system, lake viewing lawn, nature walk, skateboard park, and would provide safe public access across Riverside Drive.
The basic purpose of this work is to expand the left descending bank to facilitate a gentle slope from two land bridges over Riverside Drive. The overall purpose of this work is to provide a world class riverfront park for the citizens of Tulsa.
The proposed project is located in the Arkansas River in Sections 13 and 24, Township 19 North, Range 12 East, in Tulsa, Tulsa County, Oklahoma. The project site can be found on the Jenks, OK 7.5 Minute USGS Quadrangle map.
Latitude North: 36.1216 Longitude West: 95.98673 Decimal Degrees
The applicant proposes the placement of 175,000 cubic yards (cys) of fill material into jurisdictional waters along the left descending bank of the Arkansas River for the construction of two (north and south) buildouts. The proposed project would be protected by a 4-foot high (maximum height) vertical retaining wall approximately 2,500 linear feet (lf) long using rock boulders. Approximately 9.44 acres of compacted earthen fill material that consists of approximately 102,250 cys of sand, 6,500 cys of rock, 37,500 cys of shale, 27,800 cys of rock boulders, and 950 cys of excavated rock from the Public Service Company of Oklahoma (PSO) weir in the Arkansas River would be placed below the ordinary high water mark behind the retaining wall to construct the buildouts.
TABLE OF IMPACTS:
Location (Arkansas River)
Sand
Rock
Total cys
Acres
lf
Bank Stabilization Project**
2,500
Excavation of Sand*
102,250
102,250
Excavation of Rock
6,500
6,500
Excavation of Shale
37,500
37,500
10 to 47-inch rock boulders
27,800
27,800
PSO Weir Removal
950
950
Project Total
102,250
72,250
175,000
9.44
2,500
*131,000 cys of sand would be excavated. After the sand has been compacted and the water has dissipated, volume of sand would be reduced. ** 27,800 cys for rock boulders would be construction of bank stabilization project.