Carol Franson is the Regulatory point-of-contact for this permit application from the City of Reedsport for work at the Rainbow Plaza boat ramp on the Umpqua River in Reedsport, Ore.

PUBLIC NOTICE for Permit Application

Issue Date: November 4, 2014 Expiration Date: December 3, 2014 US Army Corps of Engineers No: NWP-2014-426 30-Day notice Oregon Department of State Lands No: 56971-RF Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Carol S. Franson (carol.s.franson@usace.army.mil) 211 E. 7th Ave., Ste. 105 Eugene, OR 97401-2722

Applicant: Jonathan Wright City of Reedsport 451 Winchester Ave. Reedsport, OR 97467-1521

Location: The project is located at the Rainbow Plaza boat ramp, on the Umpqua River at approximately River Mile 11.6, Reedsport, Douglas Co., Ore. The site is in Section 35 of Township 21 South, Range 12 West. (43.7048/-124.09454)

Waterway: Umpqua River – at approximate River Mile 11.6

Project Description: The applicant is proposing to remove and replace the boat ramp and docks at the Rainbow Plaza. Approximately 200 cubic yards of riprap, 380 cubic yards of rock, 196 cubic yards of concrete, and 3.4 cubic yards of steel pipe piling would be discharged into the Umpqua River. Up to 290 cubic yards of silt, 109 cubic yards of concrete, and 45 cubic yards of wooden piling would be excavated from the Umpqua River.

Fill Volumes and Dimensions:

Length (ft.)

Area (sq.ft.)

Volume (CY)

Total Fill Below Highest Measured Tide

149

9,089

776

Total Fill Below High Tide

149

9,089

776

Total Fill below Mean High Tide Elevation

108

7,056

624

Total Removal Volumes and Dimensions:

Length (ft.)

Area (sq.ft.)

Volume (CY)

Highest Measured Tide

135

7,425

444

High Tide Line

135

7,425

444

Mean High Water Tidal Elevation

101

5,384

294

The current concrete boat ramp measures 41 feet wide by 104 feet long including two docks measuring 1,500 square feet with four wooden pilings. The boat ramp would be replaced with a 53-foot wide by 127-foot long cast-in-place concrete boat ramp, one 6-foot wide by 140-foot long aluminum boarding float, one 6-foot by 160-foot long aluminum boarding float, ten 12-inch diameter steel pipe pilings and four 20-inch diameter steel pipe pilings. Riprap would be placed around the ramp. A trench drain would be installed at the top of the boat ramp to intercept stormwater runoff flowing onto the ramp and directed to a trapped catch basin fitted with oil and grit separators.

A concrete cast-in-place abutment measuring 6.5 feet wide by 7.5 feet long would be located at the top of the boat ramp on the downstream side to provide access to a boarding float. A 6.5-foot wide by 20-foot concrete abutment would be located at the top of the ramp on the upstream side to provide access to the other boarding float.

A 79-foot long debris boom would be permanently attached to four 20-inch diameter steel pipe pilings. The boom would be located above the ordinary high water mark. The boom would consist of two 40-foot float sections consisting of 24-inch high-density polyethylene plastic pipe stacked vertically and fastened to a wide flanged beam. The plastic pipe would be filled with expanded polystyrene foam flotation permanently encapsulated and contained within the HDPE pipe.

All construction debris would be disposed of in an upland location. The steel piling would be capped to exclude piscivorous bird use and driven into the riverbed using vibratory pile driver. No treated wood would be utilized.

Mitigation: The applicant has provided a proposed compensatory mitigation plan. If a permit is issued, the Corps will determine what appropriate and practicable compensatory mitigation is. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: To update the existing boat ramp to meet current design standards for safety and usability.

Drawings: Twelve (12) drawings are attached and labeled NWP-2014-426 enclosure.

Additional information may be obtained from Carol S. Franson, Project Manager, U.S. Army Corps of Engineers at 541-465-6894 or email carol.s.franson@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

PUBLIC NOTICE Oregon Department of Environmental Quality Water Quality 401 Certification Corps of Engineers No: NWP-2014-426 Notice Issued: Nov. 4, 2014 Oregon Department of State Lands No: 56971-RF Written Comments Due: Dec. 3, 2014

WHO IS THE APPLICANT: Jonathan Wright City of Reedsport 451 Winchester Ave. Reedsport, OR 97467-1521 LOCATION OF CERTIFICATION ACTIVITY: See U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at 503-229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at 503-229-6030 or toll free within Oregon at 800-452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 800735-2900. PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Corps No. NWP-2014-426

Page 1 of 3

Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 S.W. 4th Ave., Ste. 400 Portland, OR 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax ­ 503-229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at 503-229-5317 or toll free within Oregon at 800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 800-735-2900.

Corps No. NWP-2014-426

Page 2 of 3

PUBLIC NOTICE OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM CONSISTENCY CERTIFICATION Date: November 4, 2014 U.S. Army Corps of Engineers No: Corps No. NWP-2014-426 Oregon Department of State Lands No: 56971-RF

NOTIFICATION: For projects subject to coastal zone review, notice is hereby given that the project is being reviewed by the Department of Land Conservation and Development (DLCD) as provided in Section 307(c) of the Coastal Zone Management Act. The applicant believes that the activities described in the attached materials would comply with and be conducted in a manner consistent with the Oregon Ocean and Coastal Management Program. Project information can be made available for inspection at DLCD's Salem office. DLCD is hereby soliciting public comments on the proposed project's consistency with the Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635 Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by fax to (503) 378-6033 or by email to coast.permits@state.or.us. All comments must be received by DLCD on or before the comment deadline listed in the accompanying Corps of Engineers' Public Notice for Permit Application. For further information, you may call DLCD at (503) 373-0050.

REVIEW CRITERIA: Comments should address consistency with the applicable elements of the Oregon Coastal management Program. These elements include the following: Ø Acknowledged Local Comprehensive Plans & Implementing Ordinances Ø Statewide Planning Goals Ø Applicable State Authorities incorporated into the Oregon Coastal Management Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as applicable.

INCONSISTENT? If you believe this project is inconsistent with the Oregon Coastal Management Program, your comments to DLCD should explain why you believe the project is inconsistent and should identify the Oregon Coastal Management Program element(s) in question. You should also describe how the project could be modified, if possible, to make it consistent with the Oregon Coastal Management Program.

Corps No. NWP-2014-426

Page 3 of 3

NWP-2014-426

.. COUN TY DOUGLAS COU NTY

PROJECT LOCATION

c0

0

s

COUN T Y

Page 1 of 12

LOCA T!ON MAP NOT TO SCALf

VICINITY MAP S'CAJ.EIHII/LIS

Cl

DRAWING INDEX f. 2. J.

4. S. 6.

7. 8.

T/TLE.SHEIT EXISTING SITE PlAN (AU. /MPROVEIJIJITS) PROPOS£IJ SITE PIAN (AU. INPROVMNTS) EXISTING SITE PlAN (IN WATE'R /1/PROVEMENTS) PROPOSED· SIT£ PU.N {IN WA7I'R IMPROVEMENTS) fiAI,{P PIAN d: PROF/I£ RAMP CROSS s.EcnONS DEBRIS 800JI PIAN d: PROFILE

GEOGRAPHIC LOCATION TOWNSHIP 21 SOUTH. /lANGo 12 WlST, SF:cnoN !5, WIIJ.AMITT£' MERIDIAN, DOUGU.S COUNTY, OREGON U.TITUDE 43'42'17" NOR71/, LONCITUDo 124'05'41' WEST usr;s Q/JAD JIAP: f/EEDSPORT.

~

~

~ ~

~t:

;.BOATING FACILITY IMPROVEMENTS PROJECT . .

Enclosure

AT RAINBOW PLAZA ON THE UMPQUA RIVER- MILE 11.4 FOR THE CITY OF REEDSPORT

!:~!~

~~

Iii~~

~~§

(r,li~

~~0:

l=!

PERMiT REVIEW NOT FOR CONSTRUCTION

~co

w z

i:?- -

w

!< tJ z

~ 0

NWP-2014-426

Page 2 of 12

Enclosure

NWP-2014-426 City of Reedsport Umpqua River ­ RM 11.6 Section 35 of Township 21 South, Range 12 West (43.7048/-124.09454)

2112 35CA REEDSPORT

llUS f·IAP WAS PREP~~~ ASSESSMENT PURPOSE

CANCB..LEDNO'S

1200 4200 7200A1 3502 3500 15500M1 38001-11 3501fl1

PARCR 1<101

~· ~1~W£4:

!60r

762,000

SEE IW 21 12 35CD

21 12 35CA REEDSPORT

NWP-2014-426

Page 3 of 12

Enclosure

NWP-2014-426

/1

J

/ I ~-!?~ ~--.;

lf1

L

~a

LIMITS OF FILL SLOP£

~ PRECAST CONCRETE RAMP (53' X 67')

~q.~ .f?h

I I I I I

~~"~... 0p

,Jln ~~

----.....

Page 4 of 12

0

~

~

>ow

z

~~

POLYPIPE DEBRIS DEFLECTION BOOM {NON-GROUNDING)

:;:·

-"'

ffi~ ~<

3=~

··· .. TOP OF RAMP

Enclosure

:'~·:.,t-IJ~,.;~l:?~~:·~·-'· ·;. .. a

a::= a..=-

10

j"

st:AIEJNFEIT

!"

s?St:

z*fu ~tifil

~;:5~

w:SlS

20" STEEL PILE {4 PL4CES)

PERMIT REVIEW NOT FOR CONSIRUCTION

C"-j!:

w~u

2f!Ew

O..:;;:i=

~"'"' o..!:i:fl

al

w

C2J ,..IJ.J

1<(

~

z 0

C)

w

0:::

0

NWP-2014-426

·I

~ 17

a

~/~---1

-8-~ ~

>:s:' ,'"

~~~~. 13-',t:..--L' REMOVE & DISPOSE --........ ~ . ..(,. ~:,p BOAR.DING DOCKS ~ (1,500 SQ.FT.} . ~'\ ' TEMPORARY FLOATING SILT CURTAIN

Page 5 of 12

TEMPORARY SEDIMENT FENCE

0

~

~ w-.:

~~

:::;::::: Ww

~~

n:: a. a::' :::;:!!;!

O::cc UJ<

!;:~ ;5::~52

~a:

~~

~~oi UJ ....

1-

0

(i.j;::~

PERMIT REVIEW Enclosure

NOT FOR CONSTRUCTION

ta

ZD

SCAle IN FEET

JD

~!li!~ t;~a-

~~~

NWP-2014-426

J

Ir

~ BOATING FACILITY PARKING COUNT VEHICLE W/ TRAILER 38 VEHICLE W/ TRAILER ADA 2 SINGLE VEHICLE 9 SINGLE· VEHICLE ADA 1

?'~

~'l~~

I I I I I

lll'

lid ~0!

Page 6 of 12

20n STEEL PILE (4 PU.C£5)

0 0:::

......

~== :z:wW

:::;;;=

w:e

~~ CURBED PLANTER ISLAND (TYP)

a.~

:!!!l:§

_,o

~~,_ -=>a: zwo

:Si!=fu

Enclosure

SCALE lN FEU

.

En z

0

a.:;:j'!:

a.~~

NOT FOR CoNSTRUCTION

w

!<

orJ.E; ~~0

@a: a::

PERMlT REVIEW

~

."' 0

O§!lw

~

w

z

-~~~ J-i5C::

as:s~

PROPOSED SITE PLAN {ALL IMPROVEMENTS)

~ co

(!)

~

NWP-2014-426

J

~

II

-17.9~

~~17~ "'"'\. ....~... ";f>

I I I I I

BOATING FACILITY PARKING COUNT VEHICLE W/ TRAILER 28 VEHICLE W/ TRAILER ADA 1 SINGLE VEHICLE 5 SINGLE VEHICLE ADA 1

1i~~

lUi

Page 7 of 12

~

~ ~!:

~~

:Z:c! w::;;

:::;: 0:

~

.;

~~ .~ a.;!§

~a:

~~~ ::S..~fi

~~~ a.;:sc::

l!:!::s:s (i)O.~ <.!l~o

:Zmw

~~;::

EXISTING SITE PLAN {ALL IMPROVEMENTS)

Enclosure

1tl

4/}

SCALE INfECT

60

x,_:S W

PERMIT REVIEW NOT FOR CONSTRUCTION '

a:>

(l)

UJ

NWP-2014-426 Page 8 of 12

I

SCJ.U:IHI'EET

I

r

~

~

/1

/

2D

20

_.. _ -·- ......._.

18

/8

~

16 ~~

12 ID I

I II

I I I

I I·

II

I

-1 --- ~

10

i0::

$-

!i;!

!::1;2 -:3 u.a ~

2 D

-2 -4 -6

-8

-· ..... ·- . 1 1 I I I I I

~·

- -·

..... ..... . .. ... . .. ..

STOP TO PRE:VEI{T GROUNDING

· . .~

. .. . ~ ....... . . . . .

h

~_:'--STOP TO PREVENT ---r----------------_.- GROUNDING I I 1 1

1 1

ir=Pl~~~t~r·

I

I

I

I I

I

I

I

I

I

I

----1-< I I 1 -I I

I

I

-10

Ill!

I I

t~ (XTR£~

rRIYCRB£0 I-

I

I

I

I

~

I

2

~~ a.=»~

0

5~5;

~

I

-

1111

c~~wo

a_~~ o.._o

::::;:

u..

-6

-8

glS§

1f!

-ro

:r;:zx

(l)mw

ffi~~

o!

Enclosure

DEBRIS BOOM D

4

,.

PROF~£

ro

SCJ.L! IH FEU

I

-4

-2

PERMIT REVIEW NOT FOR CONSTRUCTION

1'--

NWP-2014-426

I I I I I

: . ALUMINUM -2

STEEL PILE-

-4

··~ ALUMiiiuir iJ·oci ···

DOCK ~ PRECAST CONCRETE RAMP

..

~STEEL

I I I I I

-2

PILE

-5 -8 -10

-12~ -14

il

__lL

-15 -18

-20

-20

SECTION B-B

Page 9 of 12

20

20

18

18

16

14 12

10

STEEL PILE

RIPRAP ARMOR -2 -4

1

ALUMINUM DOCK ~J I EXISTING GROUND

0

l.

nlII

lr r

q~~C--:,~:-!0.~£

I \/ALUMINUM DOCK

'

_lL

0

15

STEEL PILE

I~ \_ RIPRAP

ARMOR

14

cr: <(

12

0

10

:::;

5

§§

4

~ llJ >

II

2

JL

-2

w

oc

0

:::> 0 0.. ::;;;,._

-4

=>c::

wo

:Co. 1-CI)

SECTION A-A

ZCl

~~!li0u.. -

0

@3;~ (f)g~

a..~:I:

~;2~ 1-0

Enclosure

RAMP SECTIONS 1

5

10

15

I

PERMIT REVIEW NOT FOR CONSTRUCTION

SC\L£/IIFEE:T

I

<( U..

co UJ

z C?-UJ

~ ~ C/)

z 0

C)

w

cr:

0

NWP-2014-426 Page 10 of 12 . _2

-4 -G

I

6" CAST"-1!1-PU.CE CDNCRETr lAUNCH 1/AMP _/

o ·

I

I

12· =PI££ . JO" EMBEOA/ENT (TrP.)

6"

'

'

_/

m

-

I

0

.......

.

I

~

... . . .

f.

8" PRECAsr_JL CONC. PI.ANKS -

6" AGGREGATE SUBBASE:-'

·

-J.oo (ELT)· ·· .....

~gzffgL

'

fS%

·- ·-/"

-8

"- 10

U.[Jf}~l.LW

... r;:

. ·

_/_

~

'\~=

·

ARMOR

IV/

700 RIPRAP

I

~ ---\~\.\\:..

-14

Enclosure

RAMP PROFILE AT UPSTREAM EDGE t;

~

f.D

SCALE IH FEET

~~

-14

PERMlT REVIEW NOT FOR CONSTRUCTION

NWP-2014-426

Page 11 of 12

Enclosure

NWP-2014-426

Page 12 of 12

Enclosure

NWP-2014-426 City of Reedsport Umpqua River ­ RM 11.6 Section 35 of Township 21 South, Range 12 West (43.7048/-124.09454)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits