Richard Chong is the regulatory point-of-contact for this permit application from Oregon LNG for work in the Pacific Ocean, the Lower Columbia River Estuary and other waterways in Clatsop, Columbia, Tillamook and Cowlitz counties in Oregon and Washington.

PUBLIC NOTICE for Permit Application Issue Date: Nov. 18, 2014 Expiration Date: Jan. 17, 2015 US Army Corps of Engineers No: NWP-2005-748 60-Day Notice Oregon Department of State Lands No: 54374-RF , 54375-RF

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Richard Chong (CENWP-OD-G) P.O. Box 2946 Portland, OR 97208-2946

Applicant: Oregon LNG 8100 NE Parkway Dr., Ste. 165 Vancouver, WA 98662

Comments may also be submitted electronically to: OregonLNG@usace.army.mil

For either hard copy or electronic mail, use the subject line “NWP-2005-748 Public Comment.”

Location: Terminal: on the East Bank Skipanon Peninsula near the confluence of the Skipanon and Columbia Rivers. This peninsula is located approximately 3,200 linear feet north of Harbor Street (also known as Warrenton-Astoria Highway 105) at King Avenue, Section 15, Township 8 North, Range 10 West, City of Warrenton, Clatsop County, Oregon (46.175582, -123.9081).

Pipeline: 86.8 miles of pipeline from the proposed terminal to the Northwest Pipeline Interconnection near Woodland, Washington. The Pipeline would be routed through Clatsop, Tillamook, and Columbia counties in Oregon, and Cowlitz County in Washington.

Waterway: The Pacific Ocean, the Lower Columbia River Estuary, rivers, streams, ponds, and palustrine and estuarine wetlands.

Overview: Oregon LNG has applied to the Federal Energy Regulatory Commission (FERC) for approval to construct and operate a liquefied natural gas terminal and natural gas pipeline. The Corps, as cooperating agency pursuant to the National Environmental Policy Act, is assisting the FERC in the development of an Environmental Impact Statement. The FERC Draft EIS has not been released as of the date of this Public Notice. The FERC docket number for Oregon LNG is CP09-6-001 and CP09-7-001. Information on the FERC regulatory process including supplement Oregon LNG project information can be obtained from the following web address:

http://www.ferc.gov/docs-filing/elibrary.asp

Purpose: To construct a liquefied natural gas Terminal within the States of Oregon and Washington, to be used to facilitate the export of North American and Canadian natural gas to Pacific Rim countries.

Project description: Oregon LNG is a proposed liquefied natural gas project. Specifically, the project consists of a turning basin and berth, marine facilities, liquefied natural gas storage tanks, LNG vaporization facilities, natural gas liquefaction facilities, and associated support facilities proposed at the Terminal site in Warrenton, Oregon; 86.8 miles of underground pipeline from the Terminal to the Northwest Pipeline Interconnection near Woodland, Washington; and an electrically driven gas compressor station at milepost 80.8. The pipeline would be routed through Clatsop, Tillamook, and Columbia counties in Oregon, and Cowlitz County in Washington.

The Project will result in permanent impacts to 57.63 acres of palustrine and estuarine wetlands. The 57.63 acres of permanent wetland impacts comprise 33.88 acres of palustrine and estuarine wetlands converted to uplands for the Terminal (32.77 acres) and Terminal access road (1.11 acres), and 23.75 acres of palustrine forested and palustrine scrub-shrub wetlands converted to palustrine emergent wetlands for the Pipeline (22.70 acres) and for the Terminal water supply and wastewater disposal pipelines (1.05 acres).

The project will also result in the temporary impact to 87.52 acres of wetlands. The 87.52 acres of temporary wetland impacts comprise all impacts associated with pipeline construction (84.37) other than the PFO and PSS conversions listed above as permanent impacts, and temporary construction work areas for the terminal (1.46 acres), terminal access road (0.63 acre), and terminal water supply and wastewater disposal pipeline (1.06 acres).

Total pipeline construction-related ground disturbance will be approximately 1,195.2 acres. This 36-inch diameter pipeline will be constructed entirely underground. Pipeline components constructed above ground include the compressor station, the meter station, pig launcher and receiver station, and mainline valves. Construction of the Pipeline would include 185 total stream crossings, one of which includes an approximate 5,030 linear foot horizontal directional drill crossing underneath the Columbia River between Pipeline Route Milepost 82 and 83. Horizontal directional drilling would be used to cross 21 of the rivers and larger streams. Dry open trench methods would be used to cross the other 164 streams, including wetlands, which would require temporary removal of material that would then be used as backfill to restore the stream channels.

The proposed overwater structures would include a 2,128-foot long marine trestle consisting of a 12-foot wide access roadway and an 11-foot wide pipeway. To facilitate two-way vehicle traffic, turnouts would be provided at the third points of the trestle for vehicle passing. Platforms to support piping expansion loops will be provided at 310-foot intervals. This proposed trestle would lead to a 124-foot by 94-foot unloading platform. This unloading platform would include a 32-foot wide mezzanine platform along the outboard side to facilitate access to unloading arm controls and valving. The proposed marine facilities would also include four 34-foot by 24-foot breasting dolphins; four 18-foot by 18-foot mooring dolphins; and two 42-foot by 18-foot mooring dolphins. A 4-foot wide walkway would be installed to provide personnel access to the breasting and mooring dolphins.

The applicant proposes to dredge a 135.2 acre turning basin and a 17.1 acre berthing area at the proposed marine facilities. The existing water depth within the proposed berth area is -20 to -30 feet below mean lower low water. The existing water depth within the proposed turning basin was not specified at this time. The berthing area would be maintained at a depth of -48 to -50 feet MLLW. The turning basin would be dredged and maintained at a depth of -43 feet to -45 feet MLLW. Approximately 1.2 million cubic yards of dredged material would be deposited at or just outside the mouth of the Columbia River. The berth and turning basin would require periodic maintenance dredging throughout the life of the Oregon LNG project. The first 10 years of proposed maintenance dredging is included as a part of this permit application. The proposed maintenance dredging, at this time, would be every 3 years with an estimated volume of 300,000 cubic yards of material to be potentially excavated during each event. The applicant would be allowed to maintenance dredge for ten years from the date of issuance of the Department of the Army permit.

The applicant is proposing to transport dredged material for the purpose of disposal in the Pacific Ocean. The Corps will coordination with the Administrator of the EPA to ensure that the disposal of the dredged materials will not result in unacceptable adverse impact on municipal water supplies, shellfish beds, wildlife, fisheries, or recreational areas.

Mitigation: To mitigate for the impacts caused by the Terminal: Oregon LNG secured 120 acres at the mouth of the Youngs River on the West bank for wetland mitigation. The mitigation site is a portion of the historical tidal swamp and marsh that was lost to diking. The riverside parcel is currently used for grazing and protected from flooding by a levee. Oregon LNG intends to breach the levee to create estuarine wetland habitat and provide access for salmonids and other aquatic species.

To mitigate for the impacts caused by the Pipeline: Temporary impacts to wetlands as a result of the Pipeline construction would be mitigated through onsite wetland rehabilitation. To the extent feasible, rehabilitation of the Pipeline construction corridors to preconstruction wetland conditions will be undertaken. Permanent Cowardin class changes from shrub wetland to herbaceous wetland and forested wetland to herbaceous or shrub wetland would occur as a result of Pipeline construction and maintenance. PFO and PSS wetlands will be restored in situ to the greatest extent possible. However, compensatory mitigation will be provided to compensate for the temporal loss of wetland functions. Compensation for permanent Cowardin class changes as a result of the Pipeline would be mitigated mainly through offsite, in-kind mitigation and through an approved in-lieu fee program.

If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Drawings: Eight (8) pages are attached and labeled NWP-2005-748 enclosure.

Additional information may be obtained from Richard Chong, Project Manager, U.S. Army Corps of Engineers at 503-808-4384 or email Richard.Chong@usace.army.mil.

Authority: This permit will be issued or denied under the following:

Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Section 103, Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413), for transport of dredged material for the purpose of dumping it into ocean waters.

Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. This project will require Section 401 review from the States of Washington and Oregon. Attached is the State of Oregon’s notice advertising the request for certification. The State of Washington will issue a separate notice.

Coastal zone management: This proposed project is subject to coastal zone review. A permit for the described work will not be issued until the State of Oregon determines that the project is consistent with the Oregon Ocean and Coastal Management Program. Attached is the state’s notice advertising the request for certification.

Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: The projects compliance with Section 7 of the Endangered Species Act will be completed by the lead Federal agency (50 CFR 402.08). Pursuant to Section 313 of the Energy Policy Act of 2005, the Federal Energy Regulatory Commission is designated as the lead Federal agency for National Environmental Policy Act compliance, including the coordination of Federal authorizations, such as those required by the Endangered Species Act, Magnuson-Stevens Fishery Conservation and Management Act, and the National Historic Preservation Act.

FERC will ensure Section 7 ESA compliance as a part of their preparation of an environmental impact statement. By letter dated July 18, 2013, the U.S. Army Corps of Engineers has been invited as a Cooperating Agency in preparation of the EIS. The Corps will work with FERC to ensure compliance with Section 7 of the Endangered Species Act.

Essential fish habitat: The projects compliance with section 305(b)(2) through (4) of the Magnuson-Stevens Act will be completed by the lead Federal agency (50 CFR 600.920 (b)). As stated above, FERC is the lead Federal agency assigned to evaluate this project.

FERC will ensure Magnuson-Stevens Act compliance as a part of their preparation of an environmental impact statement. By letter dated July 18, 2013, the U.S. Army Corps of Engineers has been invited as a Cooperating Agency in preparation of the EIS. The Corps will work with FERC to ensure compliance with the Magnuson-Stevens Act.

Cultural resources: The projects compliance with Section 106 of the National Historic Preservation Act will be completed by the lead Federal agency (36 CFR 800.2(a)(2)). As stated above, FERC is the lead Federal agency assigned to evaluate this project.

FERC will ensure Section 106 National Historic Preservation Act compliance as a part of their preparation of an environmental impact statement. By letter dated July 18, 2013, the U.S. Army Corps of Engineers has been invited as a Cooperating Agency in preparation of the EIS. The Corps will work with FERC to ensure compliance with Section 106 of the National Historic Preservation Act.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

Section 408: As proposed, the project would affect Corps Civil Works projects, and is thus subject to review and approval pursuant to Section 14 of the Rivers and Harbors Act of 1899 and codified in 33 U.S.C. 408. The aspects of the project that could affect, or even modify, Corps Civil Works projects include the construction of the Terminal on a Corps disposal site; levee breaching as a part of the applicant’s mitigation plan; dredging near/in the Federal navigation channel, Pipeline placement through and/or under Corps levees and dikes; and the Pipeline placement under the Federal navigation channel. Proposed alterations must not be injurious to the public interest or affect the Corps project’s ability to meet its authorized purpose. The Section 408 review can be conducted concurrently with the Section 10/103/404 evaluation. However, the decision by the District Engineer on the Department of the Army permit application pursuant to Section 10/103/404 cannot and will not be rendered prior to the decision on the Section 408 request.

PUBLIC Lewis

£ ¤

Pacific

101

WAS H I NG TON

Wa h k ia k u m

Warrenton

# *

§ ¨ ¦ 5

Astoria

Cowlitz

£ ¤

Clatskanie

Gearhart

Clatsop

30

Rainier Prescott

OREGON

Seaside

Colum bia Cannon Beach

# *

) " Columbia City St. Helens

Vernonia

Skam ania Clark

£ ¤ 26

Nehalem Manzanita Wheeler

Scappoose

§ ¨ ¦§ ¨ ¦ £ ¤ § ¨ ¦ 5

Rockaway Beach Banks

Ti ll a m o o k Garibaldi

Wa s h in g t o n

North Plains

30

Forest Grove Cornelius Hillsboro

Bay City

205

Maywood Park

405

Portland Tillamook

Fairview Wood Village Troutdale Gresham

£ ¤

Beaverton

Milwaukie Happy Tigard Valley Damascus Lake Johnson King Oswego City City Rivergrove Gladstone Sherwood Tualatin West

£ ¤ 101

Yamhill

Wilsonville

Newberg

Carlton

Multnomah

Sandy

Linn Oregon City Estacada

Dundee Canby Barlow

Lafayette

McMinnville

84

26

Gaston

Ya m h i ll

§ ¨ ¦

Dayton

St. Paul

Donald Aurora Hubbard Molalla

Woodburn Amity

18 U V

Sheridan

§ ¨ ¦

Willamina

5

Keizer

Lincoln City

L i n c o ln

Polk

Clackamas

Gervais Mt. Angel Scotts Mills Silverton

Marion Dallas Salem

Falls City Depoe Bay

Independence Turner Aumsville Sublimity

Monmouth

Stayton

Linn

Lyons

LEGEND

# * # * ) "

Terminal Location Northwest Pipeline Interconnect Compressor Station Pipeline Route

Figure 2-2 NW Natural South Mist Pipeline Extension

Pipeline Route

´

Northwest Pipeline Freeways and Highways Rivers and Lakes Cities

0

5

10

20

Miles

County Boundary

R:\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\MISC_REQUESTS\FEDERAL_JPA_2014\GENERALPIPELINEROUTE.MXD LCLARK 9/5/2014 11:19:24 AM

NWP-2005-748

Page 1 of 8

Enclosure 1

PUBLIC River Mile 11.5

C o l u m b i a

R i v e r

Terminal Boundary

Existing Wastewater Line

East Bank Skipanon Peninsula

New Water/ Wastewater Line New Water/ Wastewater Line

Terminal Access Road

Astoria Regional Airport

Copyright:© 2013 National Geographic Society, i-cubed Area of Interest

LEGEND

Pacific

Lewis Wahkiakum

Terminal

Cowlitz

Terminal Boundary

Clatsop Columbia

Terminal Access Road

Pipeline

Cl

New Water/Wastewater Line Northwest Pipeline Interconnect

Existing Wastewater Line

Washington Tillamook

Clackam Yamhill

Figure 2-1

´

Terminal Location

0 5001,000

2,000

Feet R:\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\MISC_REQUESTS\FEDERAL_JPA_2014\FIG2-1_TERMINALOCATION.MXD LCLARK 9/5/2014 2:48:43 PM

NWP-2005-748

Page 2 of 8

Enclosure 1

PUBLIC

Figure 2-4

101

£ ¤

101

£ ¤

lla Wa

Riv cut

Proposed Dredge Material Placement Sites, Mouth of Columbia River Miles 0-15

er

Ilwaco

Pacific County Ch i no ok v er Ri

Shallow Water Site (SWS)

101

£ ¤

Baker Bay

Fort Canby State Park

Cape Disappointment

WASHINGTON

West Sand Island

LEGEND

Chinook

North Jetty

!

East Sand Island

Terminal Location Major Road

V U 401

Fort Fort Columbia Columbia State State Park Park

4

State Line Cities

5 South Jetty

Park or Recreational Area

6 7

EPA Deep Water Site

Columbia 8

Trestle Bay

Disposal Site

Federal Navigation Channel

River 101

£ ¤

Hammond

9

Fort Stevens State Park

Pacific Ocean

10

South Jetty Site (SJS)

12

11

14

13

Maritime Maritime Park Park

Astoria

OREGON Skipanon Waterway

OLNG Terminal

Columbia River Mile (RM)

Warrenton Warrenton City City Pa Park rk

Tapiola Tapiola Park Park

101

£ ¤

Warren Warren Field Field

15

30

£ ¤

Astoria Astoria Column Column

Shively Shively Park Park

Youngs Bay

Warrenton

Fort Fort Clatsop Clatsop National National Monument Monument

Clatsop County

0

´ 1.5

3

Miles

DVR \\MNUSTRICTGFS01\PROJECTS\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\RR01\DREDGE_PLACEMENT_RM_0-15.MXD LHOWELL 4/26/2013 12:09:21 PM

NWP-2005-748

Page 3 of 8

Enclosure 1

PUBLIC

Figure 4-1A

401

FEMA 100-Year Floodplains in the Project Area Columbia River

LEGEND Terminal Location 101

Pipeline Route Milepost

Astoria

30

Pipeline Route FEMA 100-Year FloodPlain

0

Highway Youngs B

30

ay

Major Road

1 2

Stream

3 Pacific Ocean

Warrenton

City Jurisdiction

101 Bea r

no Skipa

L ewis And Cl a r

k ee Cr

4 5

Sources: Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Clatsop Co., OR. Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Columbia Co., OR.

er n Riv

k River

Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Tillamook Co., OR.

6

Federal Emergency Management Agency (FEMA) 1996. Q3 Flood Data, Cowlitz Co., WA

101

7

Area of Interest

Pacific

Klaskan i n

Wahkiakum

e Rive r

202

Cowlitz

8 Clatsop

9

Columbia

Clark

10 Yo ung

Tillamook

Washington

sR

11

r ive

12 13

14

15

16

Gearhart

17 0 Pacif ic Oce an Necan icum Riv er

18

1

2

Miles

Seaside

19

20

21 22

DVR \\MNUSTRICTGFS01\PROJECTS\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\RR06\FEMA_FLOODPLAIN.MXD CVONFREEDEN 5/16/2013 10:13:45 AM

NWP-2005-748

Page 4 of 8

Enclosure 1

PUBLIC Ben ek e

ort

FEMA 100-Year Floodplains in the Project Area

N

20

19

Figure 4-1B

Cre ek

21 22

h ru

p Cr eek

Fi

shhaw k C r eek

er

23 Yo ungs Riv

47

Wa lker C

24 25

reek

LEGEND Pipeline Route Milepost

26

Fi sh wk ha

Pipeline Route

27

C reek

FEMA 100-Year FloodPlain 202

Highway

28

Major Road C ug mb East Hu

Stream

29

County Boundary

reek

30

City Jurisdiction

st H We

31 Nehale

u

mb

ug C

reek H

B uster C

m R iver

Sources: Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Clatsop Co., OR.

reek

32

um bu g

59

C reek

33

Ro c

34 35

Nor th

60

ek k C re

Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Tillamook Co., OR.

58

Federal Emergency Management Agency (FEMA) 1996. Q3 Flood Data, Cowlitz Co., WA

57 36

rk Neh a le

Fo

m

Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Columbia Co., OR.

Area of Interest

Pacific

56

37 River

26

Wahkiakum

Cowlitz

Vernonia

55

38

N ehale m Rive

Clatsop

r

54

Columbia

53

39

Clark

Tillamook

40 41

50

51 47

49

42 43

48

44 45

n

eek Cr

C roni

Washington

52

46

47

0

1

2

Miles

Wolf Cre ek

DVR \\MNUSTRICTGFS01\PROJECTS\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\RR06\FEMA_FLOODPLAIN.MXD CVONFREEDEN 5/16/2013 9:53:11 AM

NWP-2005-748

Page 5 of 8

Enclosure 1

PUBLIC

Figure 4-1C

Kalama

N

FEMA 100-Year Floodplains in the Project Area

k

Cre

Cr e e

ek

uth Fork Gob So le

Tid e

River lem eha

tle Li t

LEGEND

ts Cla

Oak R anch Creek

ka n

ie

Pipeline Route Milepost

Ri r ve

Cl

Pipeline Route

k ats

5

an ie er Riv

73

47

63 62

65

72

75

74

66 67

68

77 76

70

61

60

59

71 64

FEMA 100-Year FloodPlain

85 84 79 78

69

86

80 81

Limited Access Highway

86.8

Highway

83

503

82

Major Road Stream

Woodland

County Boundary

Columbia City

City Jurisdiction

R oc k

Sources: Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Clatsop Co., OR.

ek Cr e

30

Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Columbia Co., OR.

Vernonia

Federal Emergency Management Agency (FEMA).2009. Digital Flood Rate Insurance Maps, Tillamook Co., OR.

St. Helens

Federal Emergency Management Agency (FEMA) 1996. Q3 Flood Data, Cowlitz Co., WA

e kN

E as t Fo r

ha

lem Ri

v er

Area of Interest

Pacific

Wahkiakum

Cowlitz

Clatsop

Ridgefield

Columbia

501

Clark

Pe

Tillamook

bb le C re e k

Washington

47

0

1

2

Miles Scappoose

DVR \\MNUSTRICTGFS01\PROJECTS\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\RR06\FEMA_FLOODPLAIN.MXD CVONFREEDEN 5/16/2013 9:53:11 AM

NWP-2005-748

Page 6 of 8

Enclosure 1

VER

IA RI

MB COLU

Figure 6-1

NWP-2005-748

Page 7 of 8

Enclosure 1

PUBLIC DESCRIPTION

0

KEY

STORAGE TANKS 101 LNG LNG STORAGE TANKS

5

FACILITIES 102 REGASIFICATION REGASIFICATION FACILITIES FACILITIES 103 LIQUEFACTION LIQUEFACTION FACILITIES STORAGE REFRIGERANT STORAGE 104 REFRIGERANT

5

0 10

5

FACILITIES 105 PRETREATMENT PRETREATMENT FACILITIES TREATMENT AND FIRE WATER TREATMENT AND FIRE 106 WATER PROTECTION FACILITIES PROTECTION FACILITIES

10

UTILITIES, 107 SWITCHYARD/SUBSTATION, SWITCHYARD/SUBSTATION, UTILITIES, AND MOTOR CONTROL ROOM AND MOTOR CONTROL ROOM

5

BUILDINGS 108 ADMINISTRATION ADMINISTRATION BUILDINGS

0

TOWERS COOLING TOWERS 110 COOLING

10

10

AND METERING FACILITIES 109 PIGGING PIGGING AND METERING FACILITIES

SYSTEMS FLARE SYSTEMS 111 FLARE

5 5

COMPRESSION 112 REFRIGERANT REFRIGERANT COMPRESSION

10

10

10

5

5

5 10

10

5

5

N 5 1 0

15

0

200

400

600

Scale In Feet

10

15

10 15

5

1 5

15

2013\ 04\ 12

11: 37: 19 AM

5 15

10 ROAD

15

AD RO

10

5 15

PUBFi g1. 31_Gen_Ar r angem ent . dgn

15 15

NWP-2005-748

Figure 6-2 1.3-1 Terminal Arrangement and Plot Plan

Page 8 of 8

Enclosure 1

PUBLIC NOTICE Oregon Department of Environmental Quality Water Quality 401 Certification Corps of Engineers No: NWP-2005-748 Notice Issued: Nov. 18, 2014 Oregon Dept. of State Lands No: 54374-RF, 54375-RF Written Comments Due: Jan. 17, 2015 APPLICANT: Oregon LNG, 8100 NE Parkway Dr., Ste. 165, Vancouver, WA 98662 LOCATION OF CERTIFICATION ACTIVITY: See U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See U.S. Army Corps of Engineers public notice. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at 503-229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at 503-229-6030 or toll-free within Oregon at 800-452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900. PUBLIC PARTICIPATION: Public hearing: Oregon Administrative Rule 340-48-0032 (2) states that "The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 2020 SW 4th Ave. Ste. 400 Portland, OR 97201-4953 Attn: 401 Water Quality Certification Coordinator Corps No. NWP-2005-748

Page 1 of 3

Fax - 503-229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at 503-2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.

Corps No. NWP-2005-748

Page 2 of 3

PUBLIC NOTICE OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM CONSISTENCY CERTIFICATION Issue Date: November 18, 2014 U.S. Army Corps of Engineers No: Corps No. NWP-2005-748 Oregon Department of State Lands No: 54374-RF , 54375-RF

NOTIFICATION: For projects subject to coastal zone review, notice is hereby given that the project is being reviewed by the Department of Land Conservation and Development (DLCD) as provided in Section 307(c) of the Coastal Zone Management Act. The applicant believes that the activities described in the attached materials would comply with and be conducted in a manner consistent with the Oregon Ocean and Coastal Management Program. Project information can be made available for inspection at DLCD's Salem office. DLCD is hereby soliciting public comments on the proposed project's consistency with the Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635 Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by fax to 503-378-6033 or by email to coast.permits@state.or.us. All comments must be received by DLCD on or before the comment deadline listed in the accompanying Corps of Engineers' Public Notice for Permit Application. For further information, you may call DLCD at 503-373-0050.

REVIEW CRITERIA: Comments should address consistency with the applicable elements of the Oregon Coastal management Program. These elements include the following: Ø Acknowledged Local Comprehensive Plans & Implementing Ordinances Ø Statewide Planning Goals Ø Applicable State Authorities incorporated into the Oregon Coastal Management Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as applicable.

INCONSISTENT? If you believe this project is inconsistent with the Oregon Coastal Management Program, your comments to DLCD should explain why you believe the project is inconsistent and should identify the Oregon Coastal Management Program element(s) in question. You should also describe how the project could be modified, if possible, to make it consistent with the Oregon Coastal Management Program.

Corps No. NWP-2005-748

Page 3 of 3

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas