You can copy from here when filling out the rest of the page.
Richard Chong is the regulatory point-of-contact for this permit application from Oregon LNG for work in the Pacific Ocean, the Lower Columbia River Estuary and other waterways in Clatsop, Columbia, Tillamook and Cowlitz counties in Oregon and Washington.
PUBLIC NOTICE for Permit Application
Issue Date: Nov. 18, 2014
Expiration Date: Jan. 17, 2015
US Army Corps of Engineers No: NWP-2005-748
60-Day Notice Oregon Department of State Lands No: 54374-RF , 54375-RF
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Richard Chong (CENWP-OD-G)
P.O. Box 2946
Portland, OR 97208-2946
Applicant: Oregon LNG
8100 NE Parkway Dr., Ste. 165
Vancouver, WA 98662
Comments may also be submitted electronically to: OregonLNG@usace.army.mil
For either hard copy or electronic mail, use the subject line “NWP-2005-748 Public Comment.”
Location: Terminal: on the East Bank Skipanon Peninsula near the confluence of the Skipanon and Columbia Rivers. This peninsula is located approximately 3,200 linear feet north of Harbor Street (also known as Warrenton-Astoria Highway 105) at King Avenue, Section 15, Township 8 North, Range 10 West, City of Warrenton, Clatsop County, Oregon (46.175582, -123.9081).
Pipeline: 86.8 miles of pipeline from the proposed terminal to the Northwest Pipeline Interconnection near Woodland, Washington. The Pipeline would be routed through Clatsop, Tillamook, and Columbia counties in Oregon, and Cowlitz County in Washington.
Waterway: The Pacific Ocean, the Lower Columbia River Estuary, rivers, streams, ponds, and palustrine and estuarine wetlands.
Overview: Oregon LNG has applied to the Federal Energy Regulatory Commission (FERC) for approval to construct and operate a liquefied natural gas terminal and natural gas pipeline. The Corps, as cooperating agency pursuant to the National Environmental Policy Act, is assisting the FERC in the development of an Environmental Impact Statement. The FERC Draft EIS has not been released as of the date of this Public Notice. The FERC docket number for Oregon LNG is CP09-6-001 and CP09-7-001. Information on the FERC regulatory process including supplement Oregon LNG project information can be obtained from the following web address:
http://www.ferc.gov/docs-filing/elibrary.asp
Purpose: To construct a liquefied natural gas Terminal within the States of Oregon and Washington, to be used to facilitate the export of North American and Canadian natural gas to Pacific Rim countries.
Project description: Oregon LNG is a proposed liquefied natural gas project. Specifically, the project consists of a turning basin and berth, marine facilities, liquefied natural gas storage tanks, LNG vaporization facilities, natural gas liquefaction facilities, and associated support facilities proposed at the Terminal site in Warrenton, Oregon; 86.8 miles of underground pipeline from the Terminal to the Northwest Pipeline Interconnection near Woodland, Washington; and an electrically driven gas compressor station at milepost 80.8. The pipeline would be routed through Clatsop, Tillamook, and Columbia counties in Oregon, and Cowlitz County in Washington.
The Project will result in permanent impacts to 57.63 acres of palustrine and estuarine wetlands. The 57.63 acres of permanent wetland impacts comprise 33.88 acres of palustrine and estuarine wetlands converted to uplands for the Terminal (32.77 acres) and Terminal access road (1.11 acres), and 23.75 acres of palustrine forested and palustrine scrub-shrub wetlands converted to palustrine emergent wetlands for the Pipeline (22.70 acres) and for the Terminal water supply and wastewater disposal pipelines (1.05 acres).
The project will also result in the temporary impact to 87.52 acres of wetlands. The 87.52 acres of temporary wetland impacts comprise all impacts associated with pipeline construction (84.37) other than the PFO and PSS conversions listed above as permanent impacts, and temporary construction work areas for the terminal (1.46 acres), terminal access road (0.63 acre), and terminal water supply and wastewater disposal pipeline (1.06 acres).
Total pipeline construction-related ground disturbance will be approximately 1,195.2 acres. This 36-inch diameter pipeline will be constructed entirely underground. Pipeline components constructed above ground include the compressor station, the meter station, pig launcher and receiver station, and mainline valves. Construction of the Pipeline would include 185 total stream crossings, one of which includes an approximate 5,030 linear foot horizontal directional drill crossing underneath the Columbia River between Pipeline Route Milepost 82 and 83. Horizontal directional drilling would be used to cross 21 of the rivers and larger streams. Dry open trench methods would be used to cross the other 164 streams, including wetlands, which would require temporary removal of material that would then be used as backfill to restore the stream channels.
The proposed overwater structures would include a 2,128-foot long marine trestle consisting of a 12-foot wide access roadway and an 11-foot wide pipeway. To facilitate two-way vehicle traffic, turnouts would be provided at the third points of the trestle for vehicle passing. Platforms to support piping expansion loops will be provided at 310-foot intervals. This proposed trestle would lead to a 124-foot by 94-foot unloading platform. This unloading platform would include a 32-foot wide mezzanine platform along the outboard side to facilitate access to unloading arm controls and valving. The proposed marine facilities would also include four 34-foot by 24-foot breasting dolphins; four 18-foot by 18-foot mooring dolphins; and two 42-foot by 18-foot mooring dolphins. A 4-foot wide walkway would be installed to provide personnel access to the breasting and mooring dolphins.
The applicant proposes to dredge a 135.2 acre turning basin and a 17.1 acre berthing area at the proposed marine facilities. The existing water depth within the proposed berth area is -20 to -30 feet below mean lower low water. The existing water depth within the proposed turning basin was not specified at this time. The berthing area would be maintained at a depth of -48 to -50 feet MLLW. The turning basin would be dredged and maintained at a depth of -43 feet to -45 feet MLLW. Approximately 1.2 million cubic yards of dredged material would be deposited at or just outside the mouth of the Columbia River. The berth and turning basin would require periodic maintenance dredging throughout the life of the Oregon LNG project. The first 10 years of proposed maintenance dredging is included as a part of this permit application. The proposed maintenance dredging, at this time, would be every 3 years with an estimated volume of 300,000 cubic yards of material to be potentially excavated during each event. The applicant would be allowed to maintenance dredge for ten years from the date of issuance of the Department of the Army permit.
The applicant is proposing to transport dredged material for the purpose of disposal in the Pacific Ocean. The Corps will coordination with the Administrator of the EPA to ensure that the disposal of the dredged materials will not result in unacceptable adverse impact on municipal water supplies, shellfish beds, wildlife, fisheries, or recreational areas.
Mitigation: To mitigate for the impacts caused by the Terminal: Oregon LNG secured 120 acres at the mouth of the Youngs River on the West bank for wetland mitigation. The mitigation site is a portion of the historical tidal swamp and marsh that was lost to diking. The riverside parcel is currently used for grazing and protected from flooding by a levee. Oregon LNG intends to breach the levee to create estuarine wetland habitat and provide access for salmonids and other aquatic species.
To mitigate for the impacts caused by the Pipeline: Temporary impacts to wetlands as a result of the Pipeline construction would be mitigated through onsite wetland rehabilitation. To the extent feasible, rehabilitation of the Pipeline construction corridors to preconstruction wetland conditions will be undertaken. Permanent Cowardin class changes from shrub wetland to herbaceous wetland and forested wetland to herbaceous or shrub wetland would occur as a result of Pipeline construction and maintenance. PFO and PSS wetlands will be restored in situ to the greatest extent possible. However, compensatory mitigation will be provided to compensate for the temporal loss of wetland functions. Compensation for permanent Cowardin class changes as a result of the Pipeline would be mitigated mainly through offsite, in-kind mitigation and through an approved in-lieu fee program.
If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Drawings: Eight (8) pages are attached and labeled NWP-2005-748 enclosure.
Additional information may be obtained from Richard Chong, Project Manager, U.S. Army Corps of Engineers at 503-808-4384 or email Richard.Chong@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Section 103, Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413), for transport of dredged material for the purpose of dumping it into ocean waters.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. This project will require Section 401 review from the States of Washington and Oregon. Attached is the State of Oregon’s notice advertising the request for certification. The State of Washington will issue a separate notice.
Coastal zone management: This proposed project is subject to coastal zone review. A permit for the described work will not be issued until the State of Oregon determines that the project is consistent with the Oregon Ocean and Coastal Management Program. Attached is the state’s notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: The projects compliance with Section 7 of the Endangered Species Act will be completed by the lead Federal agency (50 CFR 402.08). Pursuant to Section 313 of the Energy Policy Act of 2005, the Federal Energy Regulatory Commission is designated as the lead Federal agency for National Environmental Policy Act compliance, including the coordination of Federal authorizations, such as those required by the Endangered Species Act, Magnuson-Stevens Fishery Conservation and Management Act, and the National Historic Preservation Act.
FERC will ensure Section 7 ESA compliance as a part of their preparation of an environmental impact statement. By letter dated July 18, 2013, the U.S. Army Corps of Engineers has been invited as a Cooperating Agency in preparation of the EIS. The Corps will work with FERC to ensure compliance with Section 7 of the Endangered Species Act.
Essential fish habitat: The projects compliance with section 305(b)(2) through (4) of the Magnuson-Stevens Act will be completed by the lead Federal agency (50 CFR 600.920 (b)). As stated above, FERC is the lead Federal agency assigned to evaluate this project.
FERC will ensure Magnuson-Stevens Act compliance as a part of their preparation of an environmental impact statement. By letter dated July 18, 2013, the U.S. Army Corps of Engineers has been invited as a Cooperating Agency in preparation of the EIS. The Corps will work with FERC to ensure compliance with the Magnuson-Stevens Act.
Cultural resources: The projects compliance with Section 106 of the National Historic Preservation Act will be completed by the lead Federal agency (36 CFR 800.2(a)(2)). As stated above, FERC is the lead Federal agency assigned to evaluate this project.
FERC will ensure Section 106 National Historic Preservation Act compliance as a part of their preparation of an environmental impact statement. By letter dated July 18, 2013, the U.S. Army Corps of Engineers has been invited as a Cooperating Agency in preparation of the EIS. The Corps will work with FERC to ensure compliance with Section 106 of the National Historic Preservation Act.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
Section 408: As proposed, the project would affect Corps Civil Works projects, and is thus subject to review and approval pursuant to Section 14 of the Rivers and Harbors Act of 1899 and codified in 33 U.S.C. 408. The aspects of the project that could affect, or even modify, Corps Civil Works projects include the construction of the Terminal on a Corps disposal site; levee breaching as a part of the applicant’s mitigation plan; dredging near/in the Federal navigation channel, Pipeline placement through and/or under Corps levees and dikes; and the Pipeline placement under the Federal navigation channel. Proposed alterations must not be injurious to the public interest or affect the Corps project’s ability to meet its authorized purpose. The Section 408 review can be conducted concurrently with the Section 10/103/404 evaluation. However, the decision by the District Engineer on the Department of the Army permit application pursuant to Section 10/103/404 cannot and will not be rendered prior to the decision on the Section 408 request.
PUBLIC
Lewis
£
¤
Pacific
101
WAS H I NG TON
Wa h k ia k u m
Warrenton
#
*
§
¨
¦
5
Astoria
Cowlitz
£
¤
Clatskanie
Gearhart
Clatsop
30
Rainier
Prescott
OREGON
Seaside
Colum bia
Cannon
Beach
#
*
)
"
Columbia
City
St.
Helens
Vernonia
Skam ania
Clark
£
¤
26
Nehalem
Manzanita
Wheeler
Scappoose
§
¨
¦§
¨
¦
£
¤
§
¨
¦
5
Rockaway
Beach
Banks
Ti ll a m o o k
Garibaldi
Wa s h in g t o n
North
Plains
30
Forest
Grove Cornelius Hillsboro
Bay City
205
Maywood
Park
405
Portland
Tillamook
Fairview
Wood
Village
Troutdale
Gresham
£
¤
Beaverton
Milwaukie Happy
Tigard
Valley Damascus
Lake
Johnson
King
Oswego
City
City Rivergrove
Gladstone
Sherwood Tualatin
West
£
¤
101
Yamhill
Wilsonville
Newberg
Carlton
Multnomah
Sandy
Linn Oregon
City
Estacada
Dundee
Canby
Barlow
Lafayette
McMinnville
84
26
Gaston
Ya m h i ll
§
¨
¦
Dayton
St. Paul
Donald Aurora
Hubbard
Molalla
Woodburn
Amity
18
U
V
Sheridan
§
¨
¦
Willamina
5
Keizer
Lincoln
City
L i n c o ln
Polk
Clackamas
Gervais
Mt.
Angel
Scotts
Mills
Silverton
Marion
Dallas
Salem
Falls
City
Depoe
Bay
Independence
Turner Aumsville
Sublimity
Monmouth
Stayton
Linn
Lyons
LEGEND
#
*
#
*
)
"
Terminal Location
Northwest Pipeline Interconnect
Compressor Station
Pipeline Route
Figure 2-2
NW Natural South Mist
Pipeline Extension
Pipeline Route
´
Northwest Pipeline
Freeways and Highways
Rivers and Lakes
Cities
0
5
10
20
Miles
County Boundary
R:\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\MISC_REQUESTS\FEDERAL_JPA_2014\GENERALPIPELINEROUTE.MXD LCLARK 9/5/2014 11:19:24 AM
NWP-2005-748
Page 1 of 8
Enclosure 1
PUBLIC
River
Mile
11.5
C o l u m b i a
R i v e r
Terminal
Boundary
Existing
Wastewater Line
East Bank
Skipanon Peninsula
New Water/
Wastewater Line
New Water/
Wastewater Line
Terminal Access
Road
Astoria Regional
Airport
Copyright:© 2013 National Geographic Society, i-cubed
Area of Interest
LEGEND
Pacific
Lewis
Wahkiakum
Terminal
Cowlitz
Terminal Boundary
Clatsop
Columbia
Terminal Access Road
Pipeline
Cl
New Water/Wastewater Line
Northwest
Pipeline
Interconnect
Existing Wastewater Line
Washington
Tillamook
Clackam
Yamhill
Figure 2-1
´
Terminal Location
0 5001,000
2,000
Feet
R:\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\MISC_REQUESTS\FEDERAL_JPA_2014\FIG2-1_TERMINALOCATION.MXD LCLARK 9/5/2014 2:48:43 PM
NWP-2005-748
Page 2 of 8
Enclosure 1
PUBLIC
Figure 2-4
101
£
¤
101
£
¤
lla
Wa
Riv
cut
Proposed Dredge
Material Placement Sites,
Mouth of Columbia River
Miles 0-15
er
Ilwaco
Pacific County
Ch i no
ok
v er
Ri
Shallow
Water Site
(SWS)
101
£
¤
Baker Bay
Fort Canby
State Park
Cape
Disappointment
WASHINGTON
West Sand
Island
LEGEND
Chinook
North Jetty
!
East Sand
Island
Terminal Location
Major Road
V
U
401
Fort
Fort
Columbia
Columbia
State
State Park
Park
4
State Line
Cities
5
South Jetty
Park or Recreational Area
6
7
EPA Deep
Water Site
Columbia
8
Trestle
Bay
Disposal Site
Federal Navigation Channel
River
101
£
¤
Hammond
9
Fort Stevens
State Park
Pacific Ocean
10
South Jetty
Site (SJS)
12
11
14
13
Maritime
Maritime Park
Park
Astoria
OREGON
Skipanon Waterway
OLNG Terminal
Columbia River Mile (RM)
Warrenton
Warrenton
City
City Pa
Park
rk
Tapiola
Tapiola
Park
Park
101
£
¤
Warren
Warren
Field
Field
15
30
£
¤
Astoria
Astoria
Column
Column
Shively
Shively
Park
Park
Youngs Bay
Warrenton
Fort
Fort Clatsop
Clatsop
National
National
Monument
Monument
Clatsop County
0
´
1.5
3
Miles
DVR \\MNUSTRICTGFS01\PROJECTS\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\RR01\DREDGE_PLACEMENT_RM_0-15.MXD LHOWELL 4/26/2013 12:09:21 PM
NWP-2005-748
Page 3 of 8
Enclosure 1
PUBLIC
Figure 4-1A
401
FEMA 100-Year Floodplains
in the Project Area
Columbia River
LEGEND
Terminal Location
101
Pipeline Route Milepost
Astoria
30
Pipeline Route
FEMA 100-Year FloodPlain
0
Highway
Youngs B
30
ay
Major Road
1
2
Stream
3
Pacific Ocean
Warrenton
City Jurisdiction
101
Bea
r
no
Skipa
L ewis And Cl a r
k
ee
Cr
4
5
Sources:
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Clatsop Co., OR.
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Columbia Co., OR.
er
n Riv
k River
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Tillamook Co., OR.
6
Federal Emergency Management Agency (FEMA) 1996.
Q3 Flood Data, Cowlitz Co., WA
101
7
Area of Interest
Pacific
Klaskan i n
Wahkiakum
e Rive r
202
Cowlitz
8
Clatsop
9
Columbia
Clark
10
Yo
ung
Tillamook
Washington
sR
11
r
ive
12
13
14
15
16
Gearhart
17
0
Pacif
ic Oce
an
Necan
icum
Riv er
18
1
2
Miles
Seaside
19
20
21
22
DVR \\MNUSTRICTGFS01\PROJECTS\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\RR06\FEMA_FLOODPLAIN.MXD CVONFREEDEN 5/16/2013 10:13:45 AM
NWP-2005-748
Page 4 of 8
Enclosure 1
PUBLIC
Ben
ek
e
ort
FEMA 100-Year Floodplains
in the Project Area
N
20
19
Figure 4-1B
Cre
ek
21
22
h ru
p Cr
eek
Fi
shhaw
k C r eek
er
23 Yo ungs Riv
47
Wa lker C
24
25
reek
LEGEND
Pipeline Route Milepost
26
Fi
sh
wk
ha
Pipeline Route
27
C reek
FEMA 100-Year FloodPlain
202
Highway
28
Major Road
C
ug
mb
East Hu
Stream
29
County Boundary
reek
30
City Jurisdiction
st H
We
31
Nehale
u
mb
ug
C
reek
H
B uster C
m R iver
Sources:
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Clatsop Co., OR.
reek
32
um
bu
g
59
C
reek
33
Ro c
34
35
Nor
th
60
ek
k C re
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Tillamook Co., OR.
58
Federal Emergency Management Agency (FEMA) 1996.
Q3 Flood Data, Cowlitz Co., WA
57
36
rk Neh a le
Fo
m
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Columbia Co., OR.
Area of Interest
Pacific
56
37
River
26
Wahkiakum
Cowlitz
Vernonia
55
38
N ehale m Rive
Clatsop
r
54
Columbia
53
39
Clark
Tillamook
40
41
50
51
47
49
42
43
48
44
45
n
eek
Cr
C roni
Washington
52
46
47
0
1
2
Miles
Wolf Cre ek
DVR \\MNUSTRICTGFS01\PROJECTS\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\RR06\FEMA_FLOODPLAIN.MXD CVONFREEDEN 5/16/2013 9:53:11 AM
NWP-2005-748
Page 5 of 8
Enclosure 1
PUBLIC
Figure 4-1C
Kalama
N
FEMA 100-Year Floodplains
in the Project Area
k
Cre
Cr e e
ek
uth Fork Gob
So
le
Tid
e
River
lem
eha
tle
Li t
LEGEND
ts
Cla
Oak R
anch Creek
ka n
ie
Pipeline Route Milepost
Ri
r
ve
Cl
Pipeline Route
k
ats
5
an
ie
er
Riv
73
47
63
62
65
72
75
74
66
67
68
77
76
70
61
60
59
71
64
FEMA 100-Year FloodPlain
85
84
79
78
69
86
80
81
Limited Access Highway
86.8
Highway
83
503
82
Major Road
Stream
Woodland
County Boundary
Columbia
City
City Jurisdiction
R
oc k
Sources:
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Clatsop Co., OR.
ek
Cr e
30
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Columbia Co., OR.
Vernonia
Federal Emergency Management Agency (FEMA).2009.
Digital Flood Rate Insurance Maps, Tillamook Co., OR.
St.
Helens
Federal Emergency Management Agency (FEMA) 1996.
Q3 Flood Data, Cowlitz Co., WA
e
kN
E as
t Fo
r
ha
lem Ri
v er
Area of Interest
Pacific
Wahkiakum
Cowlitz
Clatsop
Ridgefield
Columbia
501
Clark
Pe
Tillamook
bb le C
re e
k
Washington
47
0
1
2
Miles
Scappoose
DVR \\MNUSTRICTGFS01\PROJECTS\LNGDEVELOPMENT_355036\MAPDOCUMENTS\2013_FILING\RESOURCEREPORTS\RR06\FEMA_FLOODPLAIN.MXD CVONFREEDEN 5/16/2013 9:53:11 AM
NWP-2005-748
Page 6 of 8
Enclosure 1
VER
IA RI
MB
COLU
Figure 6-1
NWP-2005-748
Page 7 of 8
Enclosure 1
PUBLIC
DESCRIPTION
0
KEY
STORAGE
TANKS
101 LNG
LNG
STORAGE
TANKS
5
FACILITIES
102 REGASIFICATION
REGASIFICATION
FACILITIES
FACILITIES
103 LIQUEFACTION
LIQUEFACTION
FACILITIES
STORAGE
REFRIGERANT
STORAGE
104 REFRIGERANT
5
0
10
5
FACILITIES
105 PRETREATMENT
PRETREATMENT
FACILITIES
TREATMENT
AND
FIRE
WATER
TREATMENT
AND
FIRE
106 WATER
PROTECTION
FACILITIES
PROTECTION
FACILITIES
10
UTILITIES,
107 SWITCHYARD/SUBSTATION,
SWITCHYARD/SUBSTATION,
UTILITIES,
AND
MOTOR
CONTROL
ROOM
AND
MOTOR
CONTROL
ROOM
5
BUILDINGS
108 ADMINISTRATION
ADMINISTRATION
BUILDINGS
0
TOWERS
COOLING
TOWERS
110 COOLING
10
10
AND
METERING
FACILITIES
109 PIGGING
PIGGING
AND
METERING
FACILITIES
SYSTEMS
FLARE
SYSTEMS
111 FLARE
5
5
COMPRESSION
112 REFRIGERANT
REFRIGERANT
COMPRESSION
10
10
10
5
5
5
10
10
5
5
N
5
1
0
15
0
200
400
600
Scale In Feet
10
15
10
15
5
1
5
15
2013\
04\
12
11:
37:
19 AM
5
15
10
ROAD
15
AD
RO
10
5
15
PUBFi
g1.
31_Gen_Ar
r
angem ent
.
dgn
15
15
NWP-2005-748
Figure 6-2
1.3-1
Terminal Arrangement
and Plot Plan
Page 8 of 8
Enclosure 1
PUBLIC NOTICE
Oregon Department of Environmental Quality
Water Quality 401 Certification
Corps of Engineers No: NWP-2005-748
Notice Issued: Nov. 18, 2014
Oregon Dept. of State Lands No: 54374-RF, 54375-RF
Written Comments Due: Jan. 17, 2015
APPLICANT: Oregon LNG, 8100 NE Parkway Dr., Ste. 165, Vancouver, WA 98662
LOCATION OF CERTIFICATION ACTIVITY: See U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED: See U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for
Federal permits or licenses to provide the Federal agency a water quality certification from the State of
Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See U.S. Army Corps of Engineers public notice.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a
result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W.
4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are readily
accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at 503-229-5552.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at 503-229-6030 or toll-free within Oregon at 800-452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public hearing: Oregon Administrative Rule 340-48-0032 (2) states that "The Corps provides public
notice of and opportunity to comment on the applications, including the application for certification,
provided that the department (DEQ), in its discretion, may provide additional opportunity for public
comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on
page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 SW 4th Ave. Ste. 400
Portland, OR 97201-4953
Attn: 401 Water Quality Certification Coordinator
Corps No. NWP-2005-748
Page 1 of 3
Fax - 503-229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through version
7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties,
DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed, issued
with conditions, or denied. You will be notified of DEQ's final decision if you submit comments
during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at
the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at 503-2295317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a
hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1800-735-2900.
Corps No. NWP-2005-748
Page 2 of 3
PUBLIC NOTICE
OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM
CONSISTENCY CERTIFICATION
Issue Date: November 18, 2014
U.S. Army Corps of Engineers No: Corps No. NWP-2005-748
Oregon Department of State Lands No: 54374-RF , 54375-RF
NOTIFICATION:
For projects subject to coastal zone review, notice is hereby given that the project is being reviewed by
the Department of Land Conservation and Development (DLCD) as provided in Section 307(c) of the
Coastal Zone Management Act. The applicant believes that the activities described in the attached
materials would comply with and be conducted in a manner consistent with the Oregon Ocean and
Coastal Management Program. Project information can be made available for inspection at DLCD's
Salem office.
DLCD is hereby soliciting public comments on the proposed project's consistency with the Oregon
Coastal Management Program. Written comments may be submitted to DLCD, 635 Capital Street NE,
Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by fax to 503-378-6033 or by
email to coast.permits@state.or.us. All comments must be received by DLCD on or before the
comment deadline listed in the accompanying Corps of Engineers' Public Notice for Permit
Application. For further information, you may call DLCD at 503-373-0050.
REVIEW CRITERIA:
Comments should address consistency with the applicable elements of the Oregon Coastal
management Program. These elements include the following:
Ø Acknowledged Local Comprehensive Plans & Implementing Ordinances
Ø Statewide Planning Goals
Ø Applicable State Authorities incorporated into the Oregon Coastal Management
Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as
applicable.
INCONSISTENT?
If you believe this project is inconsistent with the Oregon Coastal Management Program, your
comments to DLCD should explain why you believe the project is inconsistent and should identify the
Oregon Coastal Management Program element(s) in question. You should also describe how the
project could be modified, if possible, to make it consistent with the Oregon Coastal Management
Program.
Corps No. NWP-2005-748
Page 3 of 3