You can copy from here when filling out the rest of the page.
Joseph Sheahan is the Regulatory point-of-contact for this permit application from the Geos Institute for a breach of Fielder Dam and other work impacting Evans Creek, 3.3 miles upstream from the confluence of the Rogue River
PUBLIC NOTICE for Permit Application
Issue Date: Dec. 8, 2014
Expiration Date: Jan. 7, 2015
US Army Corps of Engineers No: NWP-2014-264
30-day notice OR Department of State Lands No:
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this public notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Joseph Sheahan; joseph.e.sheahan@usace.army.mil
Eugene Field Office
211 E. 7th Ave., Ste. 105
Eugene, OR 97401-2722
Applicant: Brian Barr
Geos Institute
84 Fourth St.
Ashland OR, 97330
Location: Latitude North: 42.475572/ Longitude West: -123.182594
Waterway: Evans Creek 3.3 miles upstream from the confluence with the Rogue River.
Project description: The Geos Institute is proposing to breach Fielder Dam and reconstruct the creek channel to provide better fish passage. Fielder Dam is an approximately 259 feet long, 20 foot high concrete dam spanning Evans Creek at river mile 3.3 that is no longer used for irrigation diversion.
The Geos Institute proposes to remove up to 7,500 cubic yards of soil rock and concrete and create channel by discharging up to 3,250 cubic yards of rock, gravel and sand along a 250 foot section of Evans Creek using typical earth moving equipment. If a relic log crib dam or similar structure is encountered during the removal of the sediment, the logs and boulders that are suitable for habitat features will be incorporated into the site restoration.
Phase 1: Preparation of staging area for equipment and construction of temporary road to Evans Creek on landowner property located on west side of the creek. The dam will be removed starting from mid-river and proceeding to west bank with flow during removal of this side of dam through the fish ladder/spillway. Work area will be isolated by means of a bulk bag cofferdam. Once west side of dam is removed, the passage (bypass) channel to facilitate stream channel formation will be excavated through the removed portion of dam extending approximately 450' upstream of the existing dam.
Phase 2: A temporary culvert crossing will be placed in the excavated channel to facilitate equipment access and cofferdam materials will be rearranged such that flowing water is routed around the remaining portion of the dam and the fish ladder. Once the east portion of dam structure and fish ladder are removed, the work area isolation materials and temporary culvert will be hauled off site. Upstream grading of fish passage channel will be completed at this time as needed.
The plants for the revegetation effort will include locally sourced native trees, shrubs, and groundcover to recreate the diversity and survivability of native plants found throughout the adjoining areas within the Evans Creek watershed.
Mitigation: If a permit is issued, the Corps will determine what appropriate and practicable compensatory mitigation is. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The purpose is to remove the Fielder Dam and reservoir, and reconstruct Evans Creek.
Drawings: Four (4) drawings are attached and labeled NWP-2014-264 enclosure.
Additional information may be obtained from Joseph Sheahan, Project Manager, U.S. Army Corps of Engineers at 541-465-6765, or by e-mail: joseph.e.sheahan@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water quality certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. US Fish & Wildlife Service is the lead federal agency for the project and initiated consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844). The US Fish & Wildlife is seeking concurrence that the project is consistent with the National Marine Fisheries Service 2013, Programmatic Restoration Opinion for Joint Ecosystem Conservation by the Services by the U.S. Fish and Wildlife Service Using the Partners for Fish and Wildlife, Fisheries Biological Opinion (BiOP-NWR2013-10221). A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural resources: US Fish & Wildlife Service is the lead federal agency for the project and initiated consultation with the OR State Historic Preservation Office. SHPO (Case No. 14-1546). SHPO concluded the project will likely have no effect on any significant archaeological objects or sites.
An initial evaluation of the proposed project area indicates that the permit area is eligible for inclusion in the National Register of Historic Places. A Finding of Effect analysis is justified and if adverse effects are found mitigation would be required prior to the Corps’ final permit decision.
This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
PUBLIC NOTICE
Oregon Department of Environmental Quality
Water Quality 401 Certification
Corps of Engineers No: NWP 2014-264
Oregon Dept. of State Lands No:
Notice Issued: Dec. 8, 2014
Written Comments Due: Jan. 7, 2015
WHO IS THE APPLICANT:
Brian Barr
Geos Institute
84 4th St.
Ashland OR, 97330
LOCATION OF CERTIFICATION ACTIVITY: See U.S. Army Corps of Engineers notice.
LOCATION OF CERTIFICATION ACTIVITY: See U.S. Army Corps of Engineers notice.
WHAT IS PROPOSED: See U.S. Army Corps of Engineers notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires
applicants for Federal permits or licenses to provide the Federal agency a water quality
certification from the State of OR if the proposed activity may result in a discharge to waters
of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public
notice on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues
as a result of the proposal are available for examination and copying at OR Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020
S.W. 4th Ave., Ste. 400, Portland, OR 97201-4953. Other project materials are available by
contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are
readily accessible during your visit. To schedule an appointment please call DEQ Water
Quality at Northwest Region at 503-229-5552.
Address any questions on the water quality certification process to the 401 Program
Coordinator at 503-229-6030, or toll-free within Oregon at 800-452-4011. People with hearing
impairments can call the OR Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: OR Administrative Rule 340-48-0032 (2) states that " The Corps provides
public notice of and opportunity to comment on the applications, including the application for
certification, provided that the department (DEQ), in its discretion, may provide additional
opportunity for public comment, including public hearing."
Written comments:
Corps No. NWP-2014-264
Page 1 of 2
Written comments on project elements related to water quality must be received at the OR
Department of Environmental Quality by 5 p.m. on the date specified in the upper right
section on page one of this notice. Written comments may be emailed, mailed or faxed as
described below:
Email - 401publiccomments@deq.state.or.us
Mail Oregon Dept. of Environmental Quality, Northwest Region
2020 S.W. 4th Ave., Ste. 400
Portland, OR 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - 503-229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through
version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to
conversion difficulties, DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
503-229-5317 or toll-free within OR at 1-800-452-4011 to request an alternate format. People
with a hearing impairment can receive help by calling the OR Telecommunications Relay
Service at 1-800-735-2900.
Corps No. NWP-2014-264
Page 2 of 2
t
QJ
·a
"0..
ro
>
0
E
QJ
"-
E
ro
0
"-
QJ
"C
Qj
u:::
......
0
0..
ro
E
c
0
~
ro
u
.3
Corps No. NWP-2014-264
1
Enclosure
Corps No. NWP-2014-264
zs
(')0
~iij!l!
lJLU(_i)
~c
~'
,:'
I
~
z
Q
f1\
STREAM REACH CHARACTERISTICS
DRAINAGE AREA
=
EXISTING SITE LAY,g!;'T
\J
210 SQ. MILES
...::::t
1"-400'
OF DAM 18FT-23FT
Ii--HEIGHT
CONCRETE
± 550 CY
AC71VE CHANNEL WIDTH - - - 35'- 45'
VOLU~.E
8,180 cfs
15,200 cis
18,900cts
21,600cfs
24,30J cfs
!
CONTROL NETWORK
2
POINT#
NORTHING
EASTING
ELt:;VATION
DESCRIPTION
306590.33
4197523.06
106172
satn:lg
305441.24
4197632.44
1041 78
sat rdg
306307.80
419n64.38
1035.97
pknall
306424.90
4197564.54
10!:14.02
setcap
z
0
(')
D
en
C)
ESTIMATING THE SLOPE OF THE RIVER AFTER DAM REMOVAL
AND USING A TYPICAL CHANNEL SECTION THROUGH THE
RESERVOIR AREA AT THE ESTIMATED SLOPE. THE MOBILE
z
i=
en
><
w
SEDIMENT VOLUME IS ESTIMATED AT 16,500-20,500 CUBIC YARDS
NOTE
INFORMATION IS NOT A LAND SURVEY AND IS PRIMARILY A
TOPOGRAPHIC ANALYSIS FOR RESTORATION DESIGN PURPOSES
LlJ
z<(
0::
0
(')
<(
>
(/)
(/)
LlJ
::J
ti
LlJ
iX
(')
<(
0
t:L
0::
:r:
(/)
,<
;i
0
0
u::
w
w
0::
({)
i= z
u ~
::J w
0::
f-
(/)
z
0
u
llJ
0
COORDINATE SYSTEM OREGON STATE PLANE SOUTH
HORIZ DATUM: NADS3 (2011)
VERT DATUM: NAVDB8 (GEOID 12A)
UN.TS: U.S. SURVEY FEET
1080
0
llJ
0::
-...
ESTIMATED STORED SEDIMENT
, A PORTION OF ThE SEDIMENT W1THIN THE RESERVOIR WILL
MOBILIZE ONCE THE DAM IS REMOVED. THE EXISTING RIVER
CHANNEL WIDTH RANGES BETWEEN 25FT ANC 35FT. MOBILE
SEDIMENT VOLUME IN THE RESERVOIR WAS DETERMINED BY
IN WATER WORK PERIOD - - - JUNE 15TH -SEPT 15TH
0::
f-
(/)
~w w
COI\CRETE BUTTRESS CONSTRUCTION
- LENGTH OF CREST -259 FT
AVERAGE REACH SLOPE - - - 0.0041 FTIFT
2-YEAR FLOW
10-YEAR FLOW
25-YEARFLOW
50-YEAR FLOW
100-YEAR FLOW
0
FIELDER DAM CHARACTERISTICS
~
~ ~
i - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - R E A C H S L O P E = ± 0 0 0 4 1 FT/FT ---------------------------~-1
m
1080
ti
~!
:-1
e
"~
!!:
oc,
1060
1060
---
1040
FIELDER DAM
CREST ELEV; 1040.2'
WATER SURFACE 11112113
(-20 CFS)
~
EX!STII'\G THALWE:-
EXPOSED BE:o:
A
J
0
1040
I
1020
EXPOSED BEDROCK
GRADE CONTROl
~~
1020
6+00
8+00
10+00
12+00
14+00
16+00
18+00
20+00
22+00
24+00
Enclosure
f2\
~
26+00
28+00
30+00
32+00
34+00
EXISTING LONG PROFILE
36+00
38+00
40+00
42+00
44+00
46+00
48+00
50+00
52+00
54+00
=
HORIZ 1" = 400'
VERT 1" =40'
56+00
~
=
~
r
~ ~~
D
~~
g ·I
1000~-L~_L~~~_L~-L~,L~~~~,-LL~,L~~~LL,_LL~~~L,~LL-,L-~~~L,~LL-,LL-L~-LL,-L~_,~-L~-L~_L~~~_L~_L~_L~-r~-L~-LJ_,L~-+1000
4+00
i
::: 0
58+00
PROJECT NUMBER
ROG-13-092
DRAWING NUMBER
~ISSUED
FOR
2.0
PERMITS~!-------='~
16
QfliWing
2
Gl
Corps No. NWP-2014-264
zs
(jQ
o,:(ij!l<:
ww0
2:0
~f:
;'
z
0
C)
z
iii
C(
:z:
D.
...
~
0
3
REINFORCING STEEL
HORZ112"0@2'CTRS
VERT 112'' 0@ 4' CTRS
0
z
~
ci
u.I w
(.!)
~
(f)
(f)
~
I)_
:r:
MOBILIZE CONSTRUCTION EQUIPMENT AND FACILITIES ON SITE.
2.1
II\ STALL TEMPORARY CULVERT CROSSING AND TEMPORARY ACCESS ROAD TO
ACCESS RIVER·LEFT PORTION OF DAM AND FISH LADDER STRUCTURE.
22
REMOVE LEFT PORTION OF DAM A:-..10 FISH LADDER STRUCT'JRE. All RUBBLE TO
BE HAULED OFFSITE TO APPROVED DISPOSAL LOCATION. APPROXIMATELY ±1110
23
RE:v!OVE EXISTING BRIDGE I-BEAMS, DECKING, CONCRETE ABUTMENT, AND
DEBRIS
2.3
PERFORM STREAM RESTORATION ACTIVITIES.
2.4
REMOVE REMAINING PROJECT ISOLATION MEASURES, TEMPORARY BRIDGE AND
ASSOCIATED FOOTINGS
THE EXISTING DAM PER DRAWING 2 1
1.4
INSTALL TEMPORARY SAND BAGS/BULK BAGS L'PSTREAM OF DAM TO
TEMPORARILY DIVERT STREAM FLOW THROUGH EXISTING FISH LADDER OR SLIDE
GATE ISOLATE CONCRETE ST"15
INSTALL TEMPORARY FLOATING SILT CURTAIN DOWNSTREAM OF WORK ZONE TO
RETAIN ANY SUS?Et\DED SEDIMENT FROM DAM REMOVAL ACTIVITIES
Enclosure
1.6
PERFORM FISH SALVAGE IN ISOLATED AREA
1.7
REMOVE ISOlATED PORTION OF DAM BEGINNING AT 7HE CENTER OF THE CHANNEL
AND MOVING TOWARDS THE RIVER-RIGHT BANK CONCRETE RUBBLE TO BE HAULED
OFFSITE 70 APPROVED DISPOSAL LOCATION, APPROXIMATELY !370 CUBIC YARDS
OF CONCRETE.
18
GRADE FISH PASSAGE CHANNEL THROUGH DAM SITE PER DRAWINGS 3.5 AND 3 B (±
4,550 CY). USE EXCAVATED MATERIAL TO FIL~ DOWNSTREAM SCOUR POOL
ADDITIONAL EXCESS EXCAVATED MATERIAL TO BE PlACED ADJACENT TO FISH
PASSAGE CHANNEL OR BE HAULED FROM SITE.
1.9
ACTIVATE FISH PASSAGE CHANJ'>EL BY REMOVING PHASE 1 SAND BAGS/BU-K BAGS
1 10
REMOVE REMAINING PHASE 1 WORK AREA ISOLATION MEASURES.
CUBIC YARDS CONCRETE
CD
0
0::
UJ
:E
0
::::>
w
0::
1(f)
z
0
w
IMPROVE EXISTING TEMPORARY ROAD NETWORK TO PROVIDE SITE ACCESS TO
:::0
0::
()
i= z
0
1.3
>
0::
w
;:;: w
w
0
11
w
0::
z0
a
12
CD
0
a=
C(
ELEV: :t1029'
0::
,;,
LLI
REINFORCING STEEL
HCRZ 112" JZI@ 3' CTRS
VERT 1/2'' JZI@ 4' CTRS
w z0
(f)
(f)
:E
UPSTREAM FACE
~
0::
0
1-
~
Corps No. NWP-2014-264
4
EXISTING SEDIMENT
AT CENTERLINE~
·V
>>>l
.
.
:-- ;.- ,·
-
-.,-~,;;-=·-,; ~
DESIGN SLOPE ~1.28%-:-
1040
FIELDER DAM TO
BE REMOVED
1030
//·~1
§I
~
~~,//1!
'[, [~.~'~);; q--:1*~=-_/~~~:.;A~~~~~~~M~~~
" '~ 0 8 -<._-i1"AJ:tifi-_/'
~~~~
MAPPING
~~~0
w
f;
0
~~~
~~~
~
~
~~
g:
~
:=lw
<:N
~~
1010
~~
:rw
~
>'
\___
,.---
\/
tllo
~~
1010
~;.
~~
1005
51+00
1020
1005
52+00
53+00
Enclosure
0
54+00
55+00
56+00
57+00
58+00
FISH PASSAGE LONGITUDINAL PROFil:£
HORIZ 1"- 50'
VERT 1" = 10'
~ISSUED
FOR
PERMITS~ 1 - · ·
1