Home

St. Louis District

Run scraper

Holcim

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Holcim requests authorization to modify an existing fleet and to create an additional fleeting area along the right descending bank of the Mississippi River, at approximate river miles 138.4 and 138.0, in Ste. Genevieve County, Missouri. The Public Notice comment period opens on December 11, 2014 and closes December 31, 2014.

P2907 P2908

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas