Joseph Sheahan is the Regulatory point-of-contact for this permit application from the Geos Institute for work impacting Evans Creek 10.3 miles upstream from the confluence with the Rogue River by breaching Wimer Dam.

PUBLIC NOTICE for Permit Application

Issue Date: Dec. 9, 2014 Expiration Date: Jan. 8, 2014 US Army Corps of Engineers No: NWP 2014-469 30-Day Notice Oregon Dept. of State Lands No:

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Joseph Sheahan; joseph.e.sheahan@usace.army.mil Eugene Field Office 211 E. 7th Ave., Ste. 105 Eugene, OR 97401-2722

Applicant: Brian Barr Geos Institute 844th Street Ashland OR, 97330

Location: Latitude North: 45.545518/ Longitude West: -123.131574

Waterway: Evans Creek 10.3 miles upstream from the confluence with the Rogue River.

Project Description: The Geos Institute is proposing to breach Wimer Dam and reconstruct the creek channel to provide better fish passage. Wimer Dam is an approximately 77 feet long, 20 foot high concrete dam spanning Evans Creek at river mile 10.3 that is no longer used for irrigation diversion.

The Geos Institute proposes to remove up to 1,200 cubic yards of soil, rock, and concrete to remove the dam and create a channel. To provide fish passage and restore habitat the Geos Institute proposes to discharge up to 1,580 cubic yards of rock, gravel and sand along a 300 foot section of Evans Creek using typical earth moving equipment.

Phase 1: Preparation of staging area for equipment and construct temporary road to Evans Creek on landowner property located on north side of the creek. The dam will be removed starting from south side with water flow during removal of this side of dam directed through the existing fish ladder. Work area will be isolated by means of a bulk bag cofferdam. Once the south portion of the dam is removed, a channel extending approximately 100ft upstream of the existing dam will be constructed. The new channel will isolate the fish ladder from flowing water and the remaining portion of dam for removal.

Phase 2: Fish salvage of ladder area will occur once fish passage channel routes flow away from this portion of the structure. The remaining dam structure and fish ladder will be removed, the fish passage channel grading will be completed, and the work area isolation materials and temporary culvert will be hauled off site. Once dam removal is complete, adjustments to an existing water intake will be made to ensure adequate irrigation water supply.

Riparian areas along the north bank within and adjacent to the former reservoir area will be planted and seeded with native species to facilitate the establishment of healthy, streamside conditions. Disturbed construction areas will be planted with a native erosion seed mix.

Mitigation: If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose: The purpose is to remove the Wimer Dam and reservoir and reconstruct Evans Creek.

Drawings: Five (5) drawings are attached and labeled NWP-2014-264 enclosure.

Additional information may be obtained from Joseph Sheahan, Project Manager, U.S. Army Corps of Engineers at 541-465-6765, or E-mail joseph.e.sheahan@usace.army.mil .

Authority: This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. US Fish & Wildlife Service is the lead federal agency for the project and initiated consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844). The US Fish & Wildlife is seeking concurrence that the project is consistent with the National Marine Fisheries Service 2013, Programmatic Restoration Opinion for Joint Ecosystem Conservation by the Services by the U.S. Fish and Wildlife Service Using the Partners for Fish and Wildlife, Fisheries, Coastal, and Recovery Programs and NOAA Restoration Center, Dec. 3, 2013, West Coast Region, Portland, Oregon. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources: US Fish & Wildlife Service is the lead federal agency for the project and initiated consultation with the Oregon State Historic Preservation Office. SHPO (Case No. 14-1546) concluded the project will likely have no effect on any significant archaeological objects or sites. SHPO reviewed the described activity concurred that the property is not eligible for listing in the National Register of Historic Places and no historic properties are affected.

This notice has been provided to the State Historic Preservation Office, interested Native American Indian tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified above in this notice) to assist in a complete evaluation of potential effects.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These state requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

E

ro

0

..... (!)

E

3 ...... 0

0.

ro

E c

0 ·.p

ro

u

0

...J

Corps No. NWP-2014-469

Page 1 of 5

Enclosure

Corps No. NWP-2014-469

z

0

~ 0::

....0 [f)

w

0::

0

z -<

POINT#

NORTHING

EASTING

ui

ELEVATION

C)

Page 2 of 5

331554_39

4212049.93

331430.11

421215630

33143757

4212105.66

setrdg

-< [f)

1149.78

setrdg

[f)

115431

setrdg

NOTE INFORMAT,ON IS NOT A LAND SURVEY AND IS PRIMARILY A TOPOGRAPHIC ANALYSIS FO.~ RESTORATION DESIGN PURPOSES

-< [L :c [f)

0

COORDINATE SYSTEM· OREGONSTA:-E PLANE SOUTH HORIZ ~ATUM· NAD83 (2011) VERT DA:-UM"I\AVD66 (GEOID 12A) UNITS: U.S SURVEY FEET

u::

EXISTING SITE LAYOUT

z

;:)

ESTIMATED STORED SEDIMENT

WIMER DAM CHARACTERISTICS

DRAINAGE AREA 149 SQ. MILES AVERAGE REACH SLOPE - - - 0 . 0 1 3 5 FT/FT ACTIVE CHANNEL WIDTH - - - 25 - 35 FT 2-YEAR FLOW 6,250 cfs 10-YEARFLOW 11,600cfs 25-YEAR FLOW 14,300 cfs 50-YEAR FLOW 16,400 cfs 100-YEAR FLOW 16,400 cfs INWATERWORKPERIOO - - - J U N E 15TH -SEPT 15TH

A PORTION OF THE SEDIMENT WITHIN THE RESERVOIR WILL MOBILIZE ONCE THE DAM IS REMOVED THE EXISTING RIVER CHANNEL WIDTH RANGES BETWEEN 25FT AND 35FT. MOBILE SEDIMENT VOLUME It\ THE RESERVOIR WAS DETERMINED BY ESTIMATING THE SLOPE OF THE RIVER AFTER DAM RE~OVAL AND USING A TYPICAL CHANNEL SECTION THOUGH THE RESERVOIR AREA AT TdE ESTIMATED SLOPE. THE MOBILE SEDIMENT VOLUME IS EST:MATED AT 3,000 CUBIC YARDS

CONCRETE BUTTRESS CONSTRUCTION - LENGTH OF CREST -93 FT -HEIGHT OF DAM 18FT-23FT -CONCRETE VOLUME -400 CY

z 0

(.)

w

0

~:g---- - - - - - - - - - - - - - c - : : - = = = = = = c - _ R E S E R V O I R LENGTH:!:S86FT - - - - - - - - - - - - - - - - - - - - - - - - 1 HB

1150 -.t;:::~r-----

1140

0:: f--

[f)

f"'>--------------------------------REACHSLO?Ec±G.0068FT/FT-------------------------~'

WATER SURFACE 11113113)"

-.......__- -- - - ---~-~

HEAD OF RESERVO:R. EXPOSED BEDROCK SURFACE

CFS)

\. _

WIMER DAM< ~ CREST ELEV=±1147 9FT

SLOPE =t00C09

\1

.

'"""~- - - _./\ ' - ../ / - -

----\J~

--

----- --

\_EXISTING THALWEG

......_

1160

1150

WATER SL'RFACE 11/13/13

, - --..Ji

,__

(-1SCFSJ

\r-L--::::-::-::::-:;::-----;:::-::::-:::f==ol-__,.-c-=~-___j 1140

.......... _

I I

1130

I

;I;;;N:-RIFFLE GRADE CONTROL

I

I

~

\ /

1130

/

1120+---~----,---~----,---~-----.----L----,----L----,----L----,----L----,----L----.----~--------~--------~--------~--------~---,-----L----+ 1120

Enclosure

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

fi\1-'EX=::IS::.cT,_,I"-'N,_,G,_,L"'O"-'N,_,G,_,_P-"R~O~F~I~L;:;;:E~~

~

7oRIZ1"=100' VERT 1" = 20'

w 0::

0

ci w

:::;

s:

w

"' w

0::

(.) (/)

z 0 ;; i= w (.)

1" -100'

STREAM REACH CHARACTERISTICS

1160

z

0

(9

11+00

12+00

13+00

14+00

15+00

16+00

Corps No. NWP-2014-469

PROPOSED PROJECT PHASING

zs 00

PHASE 1 1.1

INSTALL TRAFFIC SAFETY FEATURES IN ACCORDANCE WITH DRAWING 21.

1.2

MOBILIZE CONSTRUCTION EQUIPMENT AND FACILITIES ON SITE

1.3

CONSTRUCT TEMPORARY ROAD NETWORK TO PROVIDE SITE ACCESS TO THE EXISTING

15

INSTALL TEMPORARY C"JLVERT CROSSING FOR ACCESS TO DAM STRUCTURE

16

INSTAll TEMPORARY SAND BAGS/BULK BAGS UPSTREAM AND DOWNSTREAM OF DAM

DAM PER DRAWIJ\G 2.1.

~(ij~

ww() ~0

TO TEMPORARILY DIVERT SlREAM FLOW DOWN EXISTING FISH LADDER AND :SOLATE

CONCRETE STRUCTURE FOR REMOVAL

1.7

PERFORM FISH SALVAGE IN ISOLATED AREA.

1.8

CONTRACTOR TO PROTECT AND RELOCATE WATER INTAKE PIPE IF NECESSARY

1.9

REMOVE WEIR PORTION OF DAM BEGINNING AT THE RIVER ~FT EDGE OF STRUCTURE AND MOV:NG TOWARDS THE CENTER OF THE CHANNEL CONCRETE RUBBLE TO BE HAJLED OFFSITE TO APP~OVED DISPOSAL LOCATION, APPROXIMATELY :t370 CUBIC YARDS OF CONCRETE

1.10

GRADE FISH PASSAGE CHANNEL THROUGH DAM SITE PER DRAWING 3 5 AND 3.6 (:t1000 CY). USE EXCAVATED MATERIAL TO FILL DOWNSTREAM SCOUR POOL

1.11

ACTIVATE FISH PASSAGE CHANNEL BY REMOVING PHASE 1 SAND BAGS/BULK BAGS.

~a

-1·

}I.

PROVIDE LANDOWNER W:TH CONTINUOUS ACCESS TO WATER. FINAL LOCATION POST

DAM REMOVAL TO BE PER DRAWIJ\G 3.4

1.12 REMOVE PHASE 1 WORK AREA ISOLATION MEASURES.

PHASE2

::1: M~S

ACCESS FISH LADDER AND REMAINING CONCRETE STRUCTURES BY TE.'vlPORARY CULVERT AND ACCESS ROAD USED IN PHASE 1

22

lt-;STALL TEMPORARY FLOATING SILT CURTAIN DOWNSTREAM OF THE WORK ZONE TO RETAIN ANY SUSPENDED SEDIMENT FROM REMOVAL ACTIVITIES.

OF

Page 3 of 5

23

INSTALL TEMPORARY SAND BAGS/BULK BAGS UPSTREAM OF FISH LADDER TO ISOLATE WORK AREA IF NECESSARY

24

REMOVE FISH LADDER STRUCTURE AND ANY REMANJING CONCRETE STRUCTURES. ALL RUBBLE TO BE HAULED OFFSITE TO APPROVED DISPOSAL LOCATION. APPROXIMATELY :t30 CUSIC YAROS CONCRETE. COMPLETE UPSTREAM GRADING OF FISH PASSAGE CHANNEL :F NECESSARY. PERFORM STREAW. RESTORATION ACTIVITIES.

2.7

RE~.OVE

"inz

~ 0::

0

f--

rJ)

l1J

0::

c( z0 <(

21

26

z

0

PROJECT ISOLATION MEASURES AND TEMPORARY CULVERT

a.

.... ~ 0

:E

w C) <( rJ) rJ)

<( o_

I rJ)

w::

c(

0

:::J 0:: f--

0 0

l1J 0 15 '--liA-cRESTELEV=±1147.9'

]·'

I

····;·· . APPROXIMATE ·- . STORED SEDIMENT

~

II~

. ·i .. \

-

:- k "\ · :1 .> ;···.. \

INS11113113

LOW SUMMER FLOW frTOEELEV=±1126.1'

Y-..-----

APPROXIMATE SHAPE- . L __:_ OF CONCRETE DAM !--9'~

0

WIMER DAM SECTI~

=

HORIZ 1"- 20' VERT 1" o 20'

Enclosure

f.j1 \.V

DAM REMOVAL PHASJN,g_LAYOE 1"=30'

0

ri UJ

:::;

:;:: ~

UJ UJ

ex:

()

i= w

ICII zrJ)

sz WS11113/13

UJ

ex:

w z "'z ~ 0 :;;

:E FENCE

z

0

(')

Page 4 of 5

Enclosure DATE

BY

DESCRIPTION

CHJ<

'

10131114

RB

ISSUED FOR PERMITS

SW

Corps No. NWP-2014-469

NO.

DIVERSION INTAKE RELOCATION

1--t-f-----+------+---1 DECONSTRUCTION, FISH PASSAGE, AND RESTORATION EVANS CREEK- WIMER, OREGON

...t._

RIVER

~DESIGN ·-,:-.~.-_-"

GROUP.

236 W.stonslo Avenue \l,\,itef<5h,MTS9937 4068824927

1r--1c

31 1 SW Jeffer~on Avenue C~rvliKs OR97333 541.7JS292C

Corps No. NWP-2014-469 Page 5 of 5

CD

PROPOSED FISH PASSAGE CH~NEL 1"- 50'

___ __ _---------------,/

PROPOSED STREAM FLOWLINE _ ) F:JR F:SH PASSAGE :t2.6% SLOPE

10+00

Enclosure

0

11+00

12+00

14+00

FISH PASSAGE LONGITUDINA,!:!ROFI!5 HORIZ 1" =50' VERT 1" = 25'

~ISSUED

FO

PUBLIC NOTICE Oregon Dept. of Environmental Quality Water Quality 401 Certification

Corps of Engineers No: NWP 2014-469 Oregon Dept. of State Lands No:

WHO IS THE APPLICANT:

Notice Issued: Dec. 9, 2014 Written Comments Due: Jan. 8, 2015

Brian Barr Geos Institute 84 4th Street Ashland OR, 97330

LOCATION OF CERTIFICATION ACTIVITY: See U.S. Army Corps of Engineers notice. LOCATION OF CERTIFICATION ACTIVITY: See U.S. Army Corps of Engineers notice. WHAT IS PROPOSED: See U.S. Army Corps of Engineers notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Dept. of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 2020 S.W. 4th Ave., Ste. 400, Portland, OR 97201-4953. Other project materials are available by contacting the Corps per the attached public notice. While not required, scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment, call DEQ Water Quality at Northwest Region at 503-229-5552. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at 503-229-6030 or toll-free within Oregon at 800-452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900. PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule 340-48-0032 (2) states that " The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Corps No. NWP-2014-469

Page 1 of 2

Written comments: Written comments on project elements related to water quality must be received at the Oregon Dept. of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Dept. of Environmental Quality, Northwest Region 2020 S.W. 4th Ave. Suite 400 Portland, OR 97201-4953 Attn: 401 Water Quality Certification Coordinator Fax - 503-229-6957 People wishing to send comments via e-mail should send them in Microsoft Word (through version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to conversion difficulties, DEQ recommends that comments be mailed in hard copy. WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at 503-229-5317 or toll-free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.

Corps No. NWP-2014-469

Page 2 of 2

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas