BULK LIQUIDS STORAGE AND TERMINAL FACILITY IN ST. JOHN THE BAPTIST PARISH

NAME OF APPLICANT: Pin Oak Holdings, LLC, c/o ENVIRON, 4714 Earhart Boulevard, Suite B, New Orleans, Louisiana.

LOCATION OF WORK: Within the Mississippi River Basin, in the Lake Maurepas hydrologic unit (HUC 08070204), south of Airline Highway (US Hwy 61) and east of Louisiana Highway 54, near Mt. Airy, Louisiana, in St. John the Baptist Parish.

CHARACTER OF WORK: The applicant proposes to clear, grade, and install and maintain fill to construct a bulk liquids storage and terminal facility, which will receive, store and distribute liquid commodities, including crude oil, gasoline, diesel, heavy residual oils, condensate, ethanol, etc. The terminal will include rail spurs from the CN and KCS Railroads that traverse the site, a multi-track railcar loading and unloading area, tank farm, pipeline, containment berms, access road, and other appurtenant structures. The proposed pipeline will be installed within a 50-foot permanent right-of-way, while an additional 100 feet will be cleared as temporary workspace. Direct wetland impacts include 14.9 acres permanent impacts to forested wetlands and 7.2 acres of temporary impacts to forested wetlands. As compensation for unavoidable wetland impacts the applicant proposes to purchase wetland credits from a Corps approved mitigation bank located in the watershed.

JOINT PUBLIC NOTICE December 15, 2014 United States Army Corps of Engineers New Orleans District Regulatory Branch Post Office Box 60267 New Orleans, Louisiana 70160-0267

State of Louisiana Department of Environmental Quality Water Quality Certification Section Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-2675 Project Manager Jamie Crowe Jamie.M.Crowe@usace.army.mil Permit Application Number MVN 2009-1461 CO

(225) 219-3225 Project Manager Elizabeth Johnson WQC Application Number WQC 141212-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). BULK LIQUIDS STORAGE AND TERMINAL FACILITY IN ST. JOHN THE BAPTIST PARISH NAME OF APPLICANT: Pin Oak Holdings, LLC, c/o ENVIRON, 4714 Earhart Boulevard, Suite B, New Orleans, Louisiana. LOCATION OF WORK: Within the Mississippi River Basin, in the Lake Maurepas hydrologic unit (HUC 08070204), south of Airline Highway (US Hwy 61) and east of Louisiana Highway 54, near Mt. Airy, Louisiana, in St. John the Baptist Parish. CHARACTER OF WORK: The applicant proposes to clear, grade, and install and maintain fill to construct a bulk liquids storage and terminal facility, which will receive, store and distribute liquid commodities, including crude oil, gasoline, diesel, heavy residual oils, condensate, ethanol, etc. The terminal will include rail spurs from the CN and KCS Railroads that traverse the site, a multi-track railcar loading and unloading area, tank farm, pipeline, containment berms, access road, and other appurtenant structures. The proposed pipeline will be installed within a 50-foot permanent right-of-

way, while an additional 100 feet will be cleared as temporary workspace. Direct wetland impacts include 14.9 acres permanent impacts to forested wetlands and 7.2 acres of temporary impacts to forested wetlands. As compensation for unavoidable wetland impacts the applicant proposes to purchase wetland credits from a Corps approved mitigation bank located in the watershed. The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed, so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. Letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above.

Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal,

state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. Our initial finding is that the proposed work would neither affect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of N/A acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued

unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

John M. Herman Chief, Central Evaluation Section Regulatory Branch Enclosure

12/12/2014

1 of 26

NOTES: 1.

2.

3. 4.

AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30 DAYS FOLLOWING PROJECT COMPLETION. ALL STRUCTURES, FACILITIES, WELL AND PIPELINES/FLOWLINES OCCURRING IN OPEN WATER AREAS OR IN OILFIELD CANALS OR SLIPS SHALL BE REMOVED WITHIN 120 DAYS OF ABANDONMENT OR THE FACILITIES FOR THE HEREIN PERMITTED USE UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH STRUCTURES IN PLACE IS RECEIVED FROM THE OFFICE OF COASTAL MANAGEMENT. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE PERMIT, SHOULD ONE BE REQUIRED. STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S. COAST GUARD REGULATIONS. IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING, DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.

12/12/2014

2 of 26

NOTES: 1.

2.

3. 4.

AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30 DAYS FOLLOWING PROJECT COMPLETION. ALL STRUCTURES, FACILITIES, WELL AND PIPELINES/FLOWLINES OCCURRING IN OPEN WATER AREAS OR IN OILFIELD CANALS OR SLIPS SHALL BE REMOVED WITHIN 120 DAYS OF ABANDONMENT OR THE FACILITIES FOR THE HEREIN PERMITTED USE UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH STRUCTURES IN PLACE IS RECEIVED FROM THE OFFICE OF COASTAL MANAGEMENT. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE PERMIT, SHOULD ONE BE REQUIRED. STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S. COAST GUARD REGULATIONS. IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING, DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.

12/12/2014

3 of 26

12/12/2014

4 of 26

NOTES: 1.

2.

3. 4.

AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30 DAYS FOLLOWING PROJECT COMPLETION. ALL STRUCTURES, FACILITIES, WELL AND PIPELINES/FLOWLINES OCCURRING IN OPEN WATER AREAS OR IN OILFIELD CANALS OR SLIPS SHALL BE REMOVED WITHIN 120 DAYS OF ABANDONMENT OR THE FACILITIES FOR THE HEREIN PERMITTED USE UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH STRUCTURES IN PLACE IS RECEIVED FROM THE OFFICE OF COASTAL MANAGEMENT. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE PERMIT, SHOULD ONE BE REQUIRED. STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S. COAST GUARD REGULATIONS. IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING, DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.

12/12/2014

5 of 26

NOTES: 1.

2.

3. 4.

AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30 DAYS FOLLOWING PROJECT COMPLETION. ALL STRUCTURES, FACILITIES, WELL AND PIPELINES/FLOWLINES OCCURRING IN OPEN WATER AREAS OR IN OILFIELD CANALS OR SLIPS SHALL BE REMOVED WITHIN 120 DAYS OF ABANDONMENT OR THE FACILITIES FOR THE HEREIN PERMITTED USE UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH STRUCTURES IN PLACE IS RECEIVED FROM THE OFFICE OF COASTAL MANAGEMENT. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE PERMIT, SHOULD ONE BE REQUIRED. STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S. COAST GUARD REGULATIONS. IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING, DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.

12/12/2014

6 of 26

12/12/2014

7 of 26

12/12/2014

8 of 26

12/12/2014

9 of 26

12/12/2014

10 of 26

12/12/2014

11 of 26

12/12/2014

12 of 26

12/12/2014

13 of 26

12/12/2014

14 of 26

12/12/2014

15 of 26

12/12/2014

16 of 26

12/12/2014

17 of 26

Horizontal

Vertical

12/12/2014

18 of 26

Horizontal

Vertical

12/12/2014

19 of 26

Horizontal

Vertical

12/12/2014

20 of 26

Horizontal

Vertical

12/12/2014

21 of 26

Horizontal

Vertical

12/12/2014

22 of 26

Horizontal

Vertical

12/12/2014

23 of 26

12/12/2014

24 of 26

UNLOADING PUMPS

16'-4"

60'

60'

12'

15'

60'

ELECTRICAL / MCC BUILDING

BACKUP GENERATOR

26'

232'

PIPELINE PUMP / METER SKID

60'

BARGE PUMP / METER SKID

12/12/2014

15'-6"

11'-8"

60'

11'-8"

BOILER BUILDING

40'

OPERATIONS BUILDING

25 of 26

APPROXIMATE 21 0' EXISTING RIGHT-OF-WAY LIMITS PROPOSED 16" PIPELINE CORRIDOR POINT OF ENDING LAT 30"04'29.11" N LONG 90"37'48.72" W (SEE DETAIL "A")

57.49ACRES

PROPOSED ACCESS ROAD 1497 linear feet

1

AS- BUi l l DRAWINGS ~D/OR PLATS SHAll HAllE WRITIEN ON TH Et.1 THE DATE

Ao

OF COMPlETI ON OF SAJD ACTTVtnES MJD

~~~T~~Niu~~ITI~~~~~H~E~~~~~~;

ACCESS WAY ~

DFFIC£ OF CQII.STAl MANAGEMENT, P. D. BOX 44487, B.IIJOO ROUGE, lA

RIGHT-OF WAY LIMITS ---R/W---R/W---R/W

~:;"~ici'c"J.:ii.'f~ >O DAYS FCU-"'I'ING

:t. AJ...L STRUCTURES,

FACILITIES, WELL AND f'IPELINES/FLOWLINES OCCURRING IN .:'

~~LS W~',iR SL~~fAS~~

R~~~g

.Q:

ro.m~~AS~~Es ,:;'''W:'~c'uoc ~~ FOR

P'ER~ IT OR COASTAl USE

J.

~~~0eEs

REVISIOO

RIGHT-OF-WAY LIMITS ~~

"usr

ALso

IN

ORDER

TO

~

I~TING~I~ELINE I

oc

l:J

1?:

DEMOLITION

.,;

FIPELIN~

~f--

~

I 1-------i

~ ~ ~

~ ~

RIGHT-OF-WAYLIM i T t /W ·11:/VI---rqwc

~

-

... Tl E IN POINT q;.:---

I"XISTIN

AGTMTY.

TIE IN POINT

....- TIE-IN POINT

~

N

~ ~

/W R - - - R/W---R/W

LEGEND:

~- PROPOSED PIPELINE

w' _J ~

t

;;:7,

ISTIN

ENSURE THE SAFETY [£

ALl.. PAR11ES. 1HE PERMrnEE SHAll.. CNrTAC1 Tl1E LOUISIMJA ONE CAU_ SYSTEI.t (1-800-272-3020) A MIN NUM Cf" 48 HOORS PRIOR TO 1HE co··E>JCEMWT lf · .., EXCAVATKlN (~GGH~G, OR:EOGING , JffiiNG , ETC.) OR:

----;_

~

THE CURRENT

OBTAINING A SEPAAA"TE PERMIT, SKX.Jtll ONE BE

f.IARKED/UCHTED 1;.1 ACCORDANCE WTTH U. S. COAST GUA.RO R:EGLJLA1Klt

POWE~I

STRLCTUR:ES

IN PLACE IS RECENED F~ THE OFFICE "--ECESSilY

R/W~R/W---

INE "'* D/H [J"/H ___.!.._'"ll ·- - 0/H - - - p tl:"~ 0/ - - - p - /H POWERL PIN _E 0/H - - - - j - - - 0 - - - - p ---0/H OJH

WITH IN 120 DAYS OF ' " ""OOO"E"' O R THE FACUTIES FOR "THE HEREIN PERMITTED USE UNLESS PRIOR WRmEN

APPROVAL TO LEAVE SLJCH

1-

~

SCALE

o·

,,.

'

DETAIL "A"

ooo·

>~

----

SrTE BOUNDARY PROPOSED RAI LROAD

____,I-- CORRrDDR PROPOSED PIPELINE -P-0/H- POIJER LINE - - W - IJATERLINE

~;:::::::::::::::::::::::::::::::::::::::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~::::::::::::::::~ !!'!

~ ~

/ ):

IL

/

q

ENVI RON

DRAFTED BY· 'w'ILSONCO

DATE1

Local Area Infrastructure Connection

12/12/2014

Figure

PROJECT·

26 of 26

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas