You can copy from here when filling out the rest of the page.
BULK LIQUIDS STORAGE AND TERMINAL FACILITY IN
ST. JOHN THE BAPTIST PARISH
NAME OF APPLICANT: Pin Oak Holdings, LLC, c/o ENVIRON, 4714 Earhart Boulevard, Suite B, New Orleans, Louisiana.
LOCATION OF WORK: Within the Mississippi River Basin, in the Lake Maurepas hydrologic unit (HUC 08070204), south of Airline Highway (US Hwy 61) and east of Louisiana Highway 54, near Mt. Airy, Louisiana, in St. John the Baptist Parish.
CHARACTER OF WORK: The applicant proposes to clear, grade, and install and maintain fill to construct a bulk liquids storage and terminal facility, which will receive, store and distribute liquid commodities, including crude oil, gasoline, diesel, heavy residual oils, condensate, ethanol, etc. The terminal will include rail spurs from the CN and KCS Railroads that traverse the site, a multi-track railcar loading and unloading area, tank farm, pipeline, containment berms, access road, and other appurtenant structures. The proposed pipeline will be installed within a 50-foot permanent right-of-way, while an additional 100 feet will be cleared as temporary workspace. Direct wetland impacts include 14.9 acres permanent impacts to forested wetlands and 7.2 acres of temporary impacts to forested wetlands. As compensation for unavoidable wetland impacts the applicant proposes to purchase wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
December 15, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Water Quality Certification Section
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2675
Project Manager
Jamie Crowe
Jamie.M.Crowe@usace.army.mil
Permit Application Number
MVN 2009-1461 CO
(225) 219-3225
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 141212-01
Interested parties are hereby notified that a permit application has been received by
the New Orleans District of the U.S. Army Corps of Engineers pursuant to:
[ ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in
accordance with statutory authority contained in LRS30:2047 A(3), and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
BULK LIQUIDS STORAGE AND TERMINAL FACILITY IN
ST. JOHN THE BAPTIST PARISH
NAME OF APPLICANT: Pin Oak Holdings, LLC, c/o ENVIRON, 4714 Earhart
Boulevard, Suite B, New Orleans, Louisiana.
LOCATION OF WORK: Within the Mississippi River Basin, in the Lake Maurepas
hydrologic unit (HUC 08070204), south of Airline Highway (US Hwy 61) and east of
Louisiana Highway 54, near Mt. Airy, Louisiana, in St. John the Baptist Parish.
CHARACTER OF WORK: The applicant proposes to clear, grade, and install and
maintain fill to construct a bulk liquids storage and terminal facility, which will receive,
store and distribute liquid commodities, including crude oil, gasoline, diesel, heavy
residual oils, condensate, ethanol, etc. The terminal will include rail spurs from the CN
and KCS Railroads that traverse the site, a multi-track railcar loading and unloading
area, tank farm, pipeline, containment berms, access road, and other appurtenant
structures. The proposed pipeline will be installed within a 50-foot permanent right-of-
way, while an additional 100 feet will be cleared as temporary workspace. Direct
wetland impacts include 14.9 acres permanent impacts to forested wetlands and 7.2
acres of temporary impacts to forested wetlands. As compensation for unavoidable
wetland impacts the applicant proposes to purchase wetland credits from a Corps
approved mitigation bank located in the watershed.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint
public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and/or this WQC request and must be mailed, so as to be
received before or by the last day of the comment period. Letters concerning the Corps
of Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. The application for this proposed project is on
file with the Louisiana Department of Environmental Quality and may be examined
weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of
costs of reproduction. Individuals or parties may request an extension of time in which
to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of the
initial comment period. The Section Chief will review the request and the requestor will
be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial
comment period, will not exceed a total of 30 calendar days. Letters concerning the
Water Quality Certification must reference the applicant's name and the WQC
Application number and be mailed to the Louisiana Department of Environmental
Quality at the address above.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food
and fiber production, mineral needs, considerations of property ownership and, in
general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether
to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would neither affect any species listed
as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of N/A acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, Office of Environmental
Services, before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing. You are
requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued
unless the applicant received approval or a waiver of the Coastal Use Permit by the
Department of Natural Resources.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
John M. Herman
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
12/12/2014
1 of 26
NOTES:
1.
2.
3.
4.
AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE
DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE
LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL
MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30
DAYS FOLLOWING PROJECT COMPLETION.
ALL STRUCTURES, FACILITIES, WELL AND PIPELINES/FLOWLINES OCCURRING
IN OPEN WATER AREAS OR IN OILFIELD CANALS OR SLIPS SHALL BE
REMOVED WITHIN 120 DAYS OF ABANDONMENT OR THE FACILITIES FOR THE
HEREIN PERMITTED USE UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH
STRUCTURES IN PLACE IS RECEIVED FROM THE OFFICE OF COASTAL
MANAGEMENT. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR
REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE
PERMIT, SHOULD ONE BE REQUIRED.
STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S.
COAST GUARD REGULATIONS.
IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL
CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF
48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING,
DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.
12/12/2014
2 of 26
NOTES:
1.
2.
3.
4.
AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE
DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE
LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL
MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30
DAYS FOLLOWING PROJECT COMPLETION.
ALL STRUCTURES, FACILITIES, WELL AND PIPELINES/FLOWLINES OCCURRING
IN OPEN WATER AREAS OR IN OILFIELD CANALS OR SLIPS SHALL BE
REMOVED WITHIN 120 DAYS OF ABANDONMENT OR THE FACILITIES FOR THE
HEREIN PERMITTED USE UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH
STRUCTURES IN PLACE IS RECEIVED FROM THE OFFICE OF COASTAL
MANAGEMENT. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR
REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE
PERMIT, SHOULD ONE BE REQUIRED.
STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S.
COAST GUARD REGULATIONS.
IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL
CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF
48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING,
DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.
12/12/2014
3 of 26
12/12/2014
4 of 26
NOTES:
1.
2.
3.
4.
AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE
DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE
LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL
MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30
DAYS FOLLOWING PROJECT COMPLETION.
ALL STRUCTURES, FACILITIES, WELL AND PIPELINES/FLOWLINES OCCURRING
IN OPEN WATER AREAS OR IN OILFIELD CANALS OR SLIPS SHALL BE
REMOVED WITHIN 120 DAYS OF ABANDONMENT OR THE FACILITIES FOR THE
HEREIN PERMITTED USE UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH
STRUCTURES IN PLACE IS RECEIVED FROM THE OFFICE OF COASTAL
MANAGEMENT. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR
REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE
PERMIT, SHOULD ONE BE REQUIRED.
STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S.
COAST GUARD REGULATIONS.
IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL
CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF
48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING,
DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.
12/12/2014
5 of 26
NOTES:
1.
2.
3.
4.
AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE
DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE
LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL
MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30
DAYS FOLLOWING PROJECT COMPLETION.
ALL STRUCTURES, FACILITIES, WELL AND PIPELINES/FLOWLINES OCCURRING
IN OPEN WATER AREAS OR IN OILFIELD CANALS OR SLIPS SHALL BE
REMOVED WITHIN 120 DAYS OF ABANDONMENT OR THE FACILITIES FOR THE
HEREIN PERMITTED USE UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH
STRUCTURES IN PLACE IS RECEIVED FROM THE OFFICE OF COASTAL
MANAGEMENT. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR
REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE
PERMIT, SHOULD ONE BE REQUIRED.
STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S.
COAST GUARD REGULATIONS.
IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL
CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF
48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING,
DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.
12/12/2014
6 of 26
12/12/2014
7 of 26
12/12/2014
8 of 26
12/12/2014
9 of 26
12/12/2014
10 of 26
12/12/2014
11 of 26
12/12/2014
12 of 26
12/12/2014
13 of 26
12/12/2014
14 of 26
12/12/2014
15 of 26
12/12/2014
16 of 26
12/12/2014
17 of 26
Horizontal
Vertical
12/12/2014
18 of 26
Horizontal
Vertical
12/12/2014
19 of 26
Horizontal
Vertical
12/12/2014
20 of 26
Horizontal
Vertical
12/12/2014
21 of 26
Horizontal
Vertical
12/12/2014
22 of 26
Horizontal
Vertical
12/12/2014
23 of 26
12/12/2014
24 of 26
UNLOADING
PUMPS
16'-4"
60'
60'
12'
15'
60'
ELECTRICAL /
MCC BUILDING
BACKUP
GENERATOR
26'
232'
PIPELINE PUMP
/ METER SKID
60'
BARGE PUMP
/ METER SKID
12/12/2014
15'-6"
11'-8"
60'
11'-8"
BOILER
BUILDING
40'
OPERATIONS
BUILDING
25 of 26
APPROXIMATE 21 0' EXISTING
RIGHT-OF-WAY LIMITS
PROPOSED 16"
PIPELINE CORRIDOR
POINT OF ENDING
LAT 30"04'29.11" N
LONG 90"37'48.72" W
(SEE DETAIL "A")
57.49ACRES
PROPOSED ACCESS ROAD
1497 linear feet
1
AS- BUi l l
DRAWINGS
~D/OR
PLATS
SHAll HAllE WRITIEN ON TH Et.1 THE DATE
Ao
OF COMPlETI ON OF SAJD ACTTVtnES MJD
~~~T~~Niu~~ITI~~~~~H~E~~~~~~;
ACCESS WAY ~
DFFIC£ OF CQII.STAl MANAGEMENT, P. D.
BOX
44487,
B.IIJOO
ROUGE,
lA
RIGHT-OF WAY LIMITS
---R/W---R/W---R/W
~:;"~ici'c"J.:ii.'f~ >O DAYS FCU-"'I'ING
:t. AJ...L STRUCTURES,
FACILITIES, WELL AND
f'IPELINES/FLOWLINES
OCCURRING
IN
.:'
~~LS W~',iR SL~~fAS~~
R~~~g
.Q:
ro.m~~AS~~Es ,:;'''W:'~c'uoc ~~
FOR
P'ER~ IT OR
COASTAl USE
J.
~~~0eEs
REVISIOO
RIGHT-OF-WAY LIMITS ~~
"usr
ALso
IN
ORDER
TO
~
I~TING~I~ELINE I
oc
l:J
1?:
DEMOLITION
.,;
FIPELIN~
~f--
~
I 1-------i
~ ~ ~
~ ~
RIGHT-OF-WAYLIM
i
T t
/W
·11:/VI---rqwc
~
-
...
Tl E IN POINT
q;.:---
I"XISTIN
AGTMTY.
TIE IN POINT
....- TIE-IN POINT
~
N
~ ~
/W
R - - - R/W---R/W
LEGEND:
~- PROPOSED PIPELINE
w'
_J
~
t
;;:7,
ISTIN
ENSURE THE SAFETY [£
ALl.. PAR11ES. 1HE PERMrnEE SHAll..
CNrTAC1 Tl1E LOUISIMJA ONE CAU_
SYSTEI.t (1-800-272-3020) A MIN NUM
Cf"
48
HOORS
PRIOR
TO
1HE
co··E>JCEMWT
lf
· ..,
EXCAVATKlN
(~GGH~G, OR:EOGING , JffiiNG , ETC.) OR:
----;_
~
THE CURRENT
OBTAINING
A SEPAAA"TE
PERMIT, SKX.Jtll ONE BE
f.IARKED/UCHTED 1;.1 ACCORDANCE WTTH U.
S. COAST GUA.RO R:EGLJLA1KltPOWE~I
STRLCTUR:ES
IN PLACE IS RECENED F~ THE OFFICE
"--ECESSilY
R/W~R/W---
INE
"'*
D/H
[J"/H ___.!.._'"ll ·- - 0/H - - - p tl:"~ 0/ - - - p - /H POWERL
PIN
_E
0/H - - - - j - - - 0
- - - - p ---0/H
OJH
WITH IN 120 DAYS OF ' " ""OOO"E"' O R
THE
FACUTIES
FOR
"THE
HEREIN
PERMITTED USE UNLESS PRIOR WRmEN
APPROVAL TO LEAVE SLJCH
1-
~
SCALE
o·
,,.
'
DETAIL "A"
ooo·
>~
----
SrTE BOUNDARY
PROPOSED RAI LROAD
____,I-- CORRrDDR
PROPOSED PIPELINE
-P-0/H- POIJER LINE
- - W - IJATERLINE
~;:::::::::::::::::::::::::::::::::::::::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~::::::::::::::::~
!!'!
~
~
/
):
IL
/
q
ENVI RON
DRAFTED BY· 'w'ILSONCO
DATE1
Local Area Infrastructure Connection
12/12/2014
Figure
PROJECT·