Home

Tulsa District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The basic purpose of this work is to harvest sand from the bed of the Red River and in-channel sandbars for use in the construction industry.

The application is for the excavation of accumulated sediments in the Red River. The proposed project begins in Section 34, Township 7 South, Range 1 East and ends in Section 14, Township 8 South, Range 1 East, near Thackerville, Love County, Oklahoma. The project site can be found on the Marietta, OK, TX and the Thackerville, OK, TX 7.5 Minute USGS Quadrangle Map. Project Begins: Latitude North: 33.85478 Longitude West: 97.167805 Project Ends: Latitude North: 33.90145 Longitude West: 97.186398 The basic purpose of this work is to harvest sand from the bed of the Red River and in-channel sandbars for use in the construction industry. The applicant proposes to mine approximately 400,000 cubic yards of sand per year from the bed of the Red River and in-channel sandbars. The mining would be accomplished by suction dredging on a barge in the river. The sand from the river would be pumped to the Thackerville sand processing plant and the decant water would be returned to the river via sedimentation ponds previously authorized by the Oklahoma Department of Environmental Quality. The mining limits are within the channel of the Red River. The maximum depth of dredging would be 25 feet or until bedrock is reached and a 25-foot buffer zone waterward of the wetted edge along both banks of the river would be maintained to prevent bank sloughing.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas