You can copy from here when filling out the rest of the page.
ADM requests authorization to install two 35-feet by 195-feet deflection barges immediately upstream of their existing St. Louis barge loading dock. The project site is proposed along the right descending bank of the Mississippi River, at approximate river miles 184.0, in St. Louis, St. Louis County, Missouri. The Public Notice comment period opens on December 16, 2014 and closes January 5, 2015.
P-2909