MODIFY AN EXISTING CORPS PERMT FOR THE EXPANSION OF OIL REFINERY LOCATED IN ST. CHARLES PARISH, LOUSIANA
NAME OF APPLICANT: Valero St. Charles Refinery, c/o ENVIRON International Corp., Attention: Adam Goodine, 1055 St. Charles Avenue, Ste. 501, New Orleans, Louisiana 70130.
LOCATION OF WORK: The project site is adjacent to the existing Valero St. Charles Refinery (VSCR) and abuts the south side of Highway 627 located within Section 07, Township 12 South, Range 08 East, in Norco, St. Charles Parish, Louisiana.
FILE HISTORY: The project is currently in progress. The original CEMVN permit (# MVN-2008-00030-ETT) was issued on July 11, 2008, authorizing direct impacts to +67.59 acres of wetlands. An additional + 0.43 acre of impacts located within a mowed and maintained easement were authorized via a subsequent permit modification. Compensatory mitigation has been provided for direct wetland impacts by the purchase of 218.5 wetland credits from the Sawgrass Bayou Mitigation Bank, a CEMVN approved mitigation bank. To date the project has impacted +50.39 acres of the +68.02 acres authorized by the existing permit.
CHARACTER OF WORK: Revised project plans include reduction in size of aromatics recovery unit (ARU) designed to convert refinery and third party processing stream (by products) into marketable products. The modification will also result in the elimination of the proposed continuous catalytic reformer (CCR). A Hydrogen Plant would be constructed instead of the CCR to provide additional hydrogen to the refineries hydrocraking unit (HCU). The HCU converts gas oils to useable fuels. All other required revisions and structural changes to the project such as construction of an Entergy (electric) substation, realignment of storage tanks, pipe racks, roads and parking areas will occur within the authorized footprint as well. The applicant contends that the proposed modifications will allow the VSCR to adapt to and increase its economic viability in the current refined fossil fuel products market. The proposed revisions would take place within the authorized project footprint with no additional wetland impacts; therefore, no additional mitigation is proposed.
JOINT PUBLIC NOTICE
December 15, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
(504) 862-2041 FAX (504) 862-2117
robert.m.tewis2@usace.army.mil
Project Manager
Robert Tewis
Permit Application Number
MVN-2008-00030-ETT
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certification
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(225) 219-3225;
Fax (225) 219-3156
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 141215-01
Interested parties are hereby notified that a permit application has been received by the U.S. Army
Corps of Engineers, New Orleans District (CEMVN) pursuant to: [] Section 10 of the Rivers and Harbors
Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86
Stat. 816; 33 USC 1344).
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [] Section 10 of the Rivers and Harbors
Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86
Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Office of
Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
MODIFY AN EXISTING CORPS PERMT FOR THE EXPANSION OF OIL REFINERY
LOCATED IN ST. CHARLES PARISH, LOUSIANA
NAME OF APPLICANT: Valero St. Charles Refinery, c/o ENVIRON International Corp., Attention:
Adam Goodine, 1055 St. Charles Avenue, Ste. 501, New Orleans, Louisiana 70130.
LOCATION OF WORK: The project site is adjacent to the existing Valero St. Charles Refinery
(VSCR) and abuts the south side of Highway 627 located within Section 07, Township 12 South, Range
08 East, in Norco, St. Charles Parish, Louisiana.
FILE HISTORY: The project is currently in progress. The original CEMVN permit (# MVN-200800030-ETT) was issued on July 11, 2008, authorizing direct impacts to +67.59 acres of wetlands. An
additional + 0.43 acre of impacts located within a mowed and maintained easement were authorized via a
subsequent permit modification. Compensatory mitigation has been provided for direct wetland impacts
by the purchase of 218.5 wetland credits from the Sawgrass Bayou Mitigation Bank, a CEMVN approved
mitigation bank. To date the project has impacted +50.39 acres of the +68.02 acres authorized by the
existing permit.
CHARACTER OF WORK: Revised project plans include reduction in size of aromatics recovery unit
(ARU) designed to convert refinery and third party processing stream (by products) into marketable
2
products. The modification will also result in the elimination of the proposed continuous catalytic
reformer (CCR). A Hydrogen Plant would be constructed instead of the CCR to provide additional
hydrogen to the refineries hydrocraking unit (HCU). The HCU converts gas oils to useable fuels. All
other required revisions and structural changes to the project such as construction of an Entergy (electric)
substation, realignment of storage tanks, pipe racks, roads and parking areas will occur within the
authorized footprint as well. The applicant contends that the proposed modifications will allow the VSCR
to adapt to and increase its economic viability in the current refined fossil fuel products market. The
proposed revisions would take place within the authorized project footprint with no additional wetland
impacts; therefore, no additional mitigation is proposed.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating reasons
thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must
be mailed so as to be received before or by the last day of the comment period. Letters concerning the
Corps of Engineers permit application must reference the applicant's name and the Permit Application
Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY
BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's
name and the WQC Application number and be mailed to the Louisiana Department of Environmental
Quality at the address above. Individuals or parties may request an extension of time in which to comment
on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any
request must be specific and substantively supportive of the requested extension, and received by this
office prior to the end of the initial comment period. The Section Chief will review the request and the
requestor will be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial comment period,
will not exceed a total of 30 calendar days.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which reasonably
may be expected to accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and,
in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of
Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and other public interest factors listed above. Comments are used
3
in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant
to the National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of any properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or destroy
presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public
notice solicits input from the State Archeologist and State Historic Preservation Officer regarding
potential impacts to cultural resources.
All revised work will occur within the previously authorized footprint. The Corps initial finding is
that the proposed work would not affect any Endangered Species Act (ESA) listed species; nor would it
affect any habitat designated as critical to the survival and recovery of an ESA listed species.
This notice initiates the EFH consultation requirements of the Magnuson-Stevens Fishery
Conservation and Management Act. The proposal is not expected to result in any adverse impacts to EFH
or any federally managed fisheries of the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination with the NMFS.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of Environmental
Quality before a permit is issued.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The
Department of the Army permit will not be issued unless the applicant receives approval or a waiver of
the Coastal Use Permit by the Department of Natural Resources.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Regulatory Branch
Attachments
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\18_Wetlands Boundary Comparison.dwg
U.S. Highway 61 - Airline Highway
Permitted in 2005
LDNR: P20050123 / USACE: MVN 2005-775-EE
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
Proposed Overall Project Boundary
Wetlands Impacts
Authorized Under Other Permits
Original 2008 Permit Boundary
Per P20071810
Uplands Area
Outside of Project Boundary
Wetlands Authorized for Impact in 2008
now Excluded from Project Boundary
Uplands Area
Included in Project Boundary
Additional Wetland Impacts Proposed
Under this Modification
Wetland Impacts Areas
in 2012 Modification
Note: All Design Data provided by Valero St. Charles Refinery.
Wetlands Impact Table
Wetlands
Uplands
Total
Impacts Under P20071810
P20071810 (Rev) 2011
Total Previous Impacts
67.59
0.43
68.02
1.75
0.0
1.75
69.34
0.43
69.77
Proposed Additions
Offsetting Reductions
Total Project Impacts
1.97
(1.97)
0.00
0.04
(0.62)
(0.58)
1.75
(2.58)
(0.84)
Total Post Project Impacts
68.02
1.17
69.19
APPROX. SCALE (ft.)
0
WETLANDS BOUNDARY COMPARISON
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/14/14
400
FIGURE
18
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\19 & 26_Revised Site Plan & Cross-Section Map.dwg
U.S. Highway 61 - Airline Highway
Contractor Offices
Subcontractor Offices
Valero Offices
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Guard
Shack
Tool
Trailers
Note: Permitting
to be undertaken
by others.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Existing
Entergy
Sub
X
Safety
Office
Office Parking
130 Car Capacity
X
Proposed Contractor Parking
735 Car Capacity
Proposed
Methanol Control
Room
Entergy
Expansion
Lunch Tent
X
X
X
X
X
X
X
X
SMR
Offices
X
X
SMR Parking
X
X
X
X
X
Proposed
Valero 230kV
Transformer
Yard
X
X
Parkway
Pipeline
Station
Existing Flare
200' EX
CLUS
ION ZO
NE
Guard
Shack
Existing Diamond Green Diesel
LDNR: P20050123 / USACE: MVN 2005-775-EE
Proposed
Refinery
Offgas Unit
Existing
SMR Unit
Proposed
Syngas Unit
Proposed
MeOH
Flare
Proposed Overall Project Boundary (+/- 69.19 Acres)
n ROW
smissio )
kV Tran
y Others
ed 230
pacts b
Propos
Entergy orization for Im
(Auth
X
Proposed
Construction
Laydown
Area 2
X
X
Proposed
Methanol
Tankage
X
X
Proposed Pipe Racks
Proposed
Methanol
Utilities
Proposed
Methanol
Process
Equipment
X
X
Proposed Construction
Laydown Area 1
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
Wetlands Impacts Authorized Under Other Permits
Uplands Area Included in Project Boundary
APPROX. SCALE (ft.)
Note: All Design Data provided by Valero St. Charles Refinery.
0
REVISED SITE PLAN - OVERVIEW
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/14/14
400
FIGURE
19
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\20,22-23_Revised Site Plan - West Details.dwg
U.S. Highway 61 - Airline Highway
X
X
X
X
X
X
X
X
X
X
X
X
Proposed Methanol
Control Room
X
Office Parking
130 Car Capacity
X
X
X
X
X
X
Safety
Office
X
X
Guard
Shack
X
X
Tool
Trailers
X
Proposed Contractor Parking
735 Car Capacity
Contractor Valero
Offices Offices
X
Subcontractor
Offices
Lunch
Tent
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TK-04-358
X
X
X
Existing Flare
X
X
X
X
Proposed Pipe Racks
Proposed
Methanol
Tankage
MeOH MCC BUILDING
130'X36'
X
Proposed
Methanol
Process
Equipment
Proposed
Methanol
Utilities
X
X
X
X
X
ProposedConstruction
Laydown Area 1
X
X
X
X
XCLU
E
ON
NZ
SIO
200' E
CLU
' EX
200
SION
ZONE
Guard
Shack
Parkway
Pipeline
Station
Proposed
MeOH
Flare
Existing Diamond Green Diesel
LDNR: P20050123 / USACE: MVN 2005-775-EE
Proposed
Overall Project Boundary
Wetlands
Uplands Area
Included in Project Boundary
Wetlands Impacts Authorized
Under Other Permits
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
APPROX. SCALE (ft.)
0
Note: All Design Data provided by Valero St. Charles Refinery.
REVISED SITE PLAN - WEST DETAIL
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/13/14
320
FIGURE
20
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\21,24-25_Revised Site Plan - East Details.dwg
S5225
S5231
S5234L
S5228
Proposed
Construction
Laydown Area 2
Ex
is
tin
gA
cc
es
s
Ro
ad
S5234B
SMR Parking
Entergy
Expansion
U.S. Highway 61 - Airline Highway
Proposed
Valero 230kV
Transformer
Yard
SMR
Offices
Proposed Overall Project Boundary
Wetlands
Existing
SMR Unit
Proposed
Syngas Unit
n ROW
smissio
kV Tran y Others)
ed 230
pacts b
Propos
Entergy orization for Im
(Auth
Proposed Piperack
Proposed
Refinery
Offgas Unit
Note: Permitting to be
undertaken by others.
Wetlands Impacts
Authorized Under Other Permits
Note: All Design Data provided by Valero St.
Charles Refinery.
APPROX. SCALE (ft.)
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
REVISED SITE PLAN - EAST DETAIL
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/13/14
0
250
FIGURE
21
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\20,22-23_Revised Site Plan - West Details.dwg
U.S. Highway 61 - Airline Highway
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Contractor
Offices
X
X
X
Valero
Offices
X
X
X
Subcontractor Offices
Lunch Tent
Proposed Methanol
Control Room
X
X
X
X
X
Safety
Office
X
Proposed Contractor Parking
735 Car Capacity
X
X
Office Parking
130 Car Capacity
X
X
X
Guard
Shack
X
X
Tool
Trailers
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Ro
ad
X
X
X
X
X
es
s
X
X
X
X
X
Ac
c
X
X
X
X
X
X
ist
X
X
Ex
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Proposed
Overall Project Boundary
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MeOH MCC BUILDING
130'X36'
X
TK-04-358
Proposed
Methanol
Tankage
ing
X
X
ProposedConstruction
Laydown Area 1
X
Proposed
Methanol
Process
Equipment
Proposed
Methanol
Utilities
X
X
X
X
X
X
X
Wetlands Impacts Authorized
Under Other Permits
X
X
X
X
X
X
Note: All Design Data provided by Valero
St. Charles Refinery.
Existing Diamond Green Diesel
LDNR: P20050123 / USACE: MVN 2005-775-EE
APPROX. SCALE (ft.)
0
DETAILED VIEW - METHANOL UNIT
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/13/14
150
FIGURE
22
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\20,22-23_Revised Site Plan - West Details.dwg
ProposedConstruction
Laydown Area 1
Proposed Pipe Racks
Guard
Shack
200' E
NE
ZO
Parkway
Pipeline
Station
Existing Diamond Green Diesel
LDNR: P20050123 / USACE: MVN 2005-775-EE
N
SIO
CLU
' EX
200
XCLU
S
ION Z
ONE
Existing Flare
Proposed
MeOH
Flare
Proposed
Overall Project Boundary
Wetlands
Uplands Area
Included in Project Boundary
Wetlands Impacts Authorized
Under Other Permits
Note: All Design Data provided by Valero
St. Charles Refinery.
APPROX. SCALE (ft.)
0
DETAILED VIEW - METHANOL FLARE
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/13/14
150
FIGURE
23
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\21,24-25_Revised Site Plan - East Details.dwg
U.S. Highway 61 - Airline Highway
Proposed
Overall Project Boundary
S5225
Note: All Design Data provided by Valero
St. Charles Refinery.
Existing
Entergy
Sub
S5231
S5234L
Entergy
Expansion
S5228
Note: Permitting to be
undertaken by others.
cc
es
sR
oa
d
S5234B
tin
gA
Ex
is
Proposed
Valero 230kV
Transformer
Yard
SMR Parking
SMR
Offices
n ROW
smissio
kV Tran y Others)
ed 230
pacts b
Propos
Entergy orization for Im
(Auth
Proposed
Construction
Laydown Area 2
DETAILED VIEW - ENTERGY & VALERO TRANSFORMER YARD
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/13/14
APPROX. SCALE (ft.)
0
125
FIGURE
24
2623333AE
Ex
ist
i
ng
A
cc
es
s
Ro
ad
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\21,24-25_Revised Site Plan - East Details.dwg
n ROW
smissio
kV Tran y Others)
ed 230
pacts b
Propos
Entergy orization for Im
(Auth
Proposed Piperack
Existing
SMR Unit
Proposed
Refinery
Offgas Unit
Proposed
Syngas Unit
Wetlands
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
Proposed
Overall Project Boundary
Wetlands Impacts
Authorized Under Other Permits
APPROX. SCALE (ft.)
0
Note: All Design Data provided by Valero St. Charles Refinery.
DETAILED VIEW - REFINERY OFFGAS UNIT AND SYNGAS OFFGAS UNIT
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/13/14
150
FIGURE
25
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\19 & 26_Revised Site Plan & Cross-Section Map.dwg
U.S. Highway 61 - Airline Highway
Contractor Offices
Subcontractor Offices
Valero Offices
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
G'
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A'
X
X
X
X
X
SMR
Offices
X
Proposed
Valero 230kV
Transformer
Yard
Existing
SMR Unit
X
X
X
X
X
X
X
X
X
X
X
X
X
Existing Diamond Green Diesel
LDNR: P20050123 / USACE: MVN 2005-775-EE
Proposed
Refinery
Offgas Unit
Proposed
Syngas Unit
C
C'
Proposed
MeOH
Flare
Proposed Overall Project Boundary (+/- 69.19 Acres)
X
X
X
X
X
X
X
X
X
F'
200' EX
Entergy
Expansion
X
X
X
X
X
CLUS
ION ZO
NE
X
X
X
SMR Parking
A
X
Proposed
Construction
Laydown
Area 2
F
B
Note: Permitting
to be undertaken
by others.
n ROW
smissio )
kV Tran
y Others
ed 230
pacts b
Propos
Entergy orization for Im
(Auth
X
Proposed
Methanol
Tankage
E
D
Guard
Shack
X
X
Proposed
Methanol
Utilities
E'
Proposed
Methanol
Process
Equipment
Tool
Trailers
X
X
Parkway
Pipeline
Station
Existing Flare
D'
Existing
Entergy
Sub
X
X
B'
G
Guard
Shack
Proposed Methanol Control Room
Safety
Office
Office Parking
130 Car Capacity
Proposed Construction
Laydown Area 1
Proposed Pipe Racks
X
Proposed Contractor Parking
735 Car Capacity
X
Lunch Tent
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
Wetlands Impacts Authorized Under Other Permits
Uplands Area Included in Project Boundary
APPROX. SCALE (ft.)
Note: All Design Data provided by Valero St. Charles Refinery.
0
CROSS-SECTION LOCATION MAP
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/14/14
400
FIGURE
26
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\27_Cross-Sections A-A' & B-B'.dwg
LIMITS OF WORK
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
6" FINISHING STONE (TYP.)
1' TYP.
FOUNDATION
(2.5 FT. DEPTH)
EXISTING GRADE
2
1
11'-6"
3'
APPROXIMATELY 306'
TYPICAL CROSS-SECTION A-A' - POWER SWITCHYARD
NOT TO SCALE
LIMITS OF WORK
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
9" GRAVEL PAVING (TYP.)
6" FINISHING STONE (TYP.)
3'
3'
CHRUSHED STONE
FOUNDATION
(4 FT DEPTH)
GEOGRID
APPROXIMATELY 65'
TYPICAL CROSS-SECTION B-B' - FLARE RACK
Note: All Design Data provided by Valero St. Charles Refinery.
NOT TO SCALE
CROSS-SECTIONS A-A' AND B-B'
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/14/14
FIGURE
27
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\28_Cross-Sections C-C' & D-D'.dwg
LIMITS OF WORK
ASPHALT PERIMETER ROAD (TYP.)
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
6" CONCRETE AREA PAVING (TYP.)
REFORMER FOUNDATION
(4 FT. DEPTH)
VESSEL FOUNDATION
(4 FT. DEPTH)
1' TYP.
EXISTING GRADE
2
1
6'
3'
APPROXIMATELY 360'
TYPICAL CROSS-SECTION C-C' - SYNGAS SMR
NOT TO SCALE
LIMITS OF WORK
ASPHALT PERIMETER ROAD (TYP.)
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
6" CONCRETE AREA PAVING (TYP.)
STORM WATER SUMP
(12 FT. DEPTH)
PUMP FOUNDATION
(4 FT. DEPTH)
COOLING TOWER BASIN
(3 FT. DEPTH)
2
1
7'
3'
APPROXIMATELY 370'
TYPICAL CROSS-SECTION D-D' - MeOH UITILITIES AREA
Note: All Design Data provided by Valero St. Charles Refinery.
NOT TO SCALE
CROSS-SECTIONS C-C' AND D-D'
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/14/14
FIGURE
28
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\29_Cross-Sections E-E' & F-F'.dwg
LIMITS OF WORK
ASPHALT PERIMETER ROAD (TYP.)
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
VESSEL FOUNDATION
(4 FT. DEPTH)
6" CONCRETE AREA PAVING (TYP.)
2
1
7'
3'
PIPERACK FOUNDATION
(4 FT. DEPTH)
EQUIPMENT SUPPORT STRUCTURE FOUNDATION
(4 FT. DEPTH)
APPROXIMATELY 370'
TYPICAL CROSS-SECTION E-E' - METHANOL ISBL
NOT TO SCALE
LIMITS OF WORK
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
6" FINISHING STONE (TYP.)
15" ASPHALT ROAD (TYP.)
2
1
3'
3'
FOUNDATION
(4 FT. DEPTH)
CHRUSHED STONE
APPROXIMATELY 45'
TYPICAL CROSS-SECTION F-F' - NORTH PLANT ROAD
Note: All Design Data provided by Valero St. Charles Refinery.
NOT TO SCALE
CROSS-SECTIONS E-E' AND F-F'
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/14/14
FIGURE
29
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\30_Cross-Section G-G'.dwg
LIMITS OF WORK
9" GRAVEL PAVING (TYP.)
2
1
3'
EXISTING GRADE
3'
CHRUSHED STONE
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
GEOGRID
APPROXIMATELY 570'
TYPICAL CROSS-SECTION G-G' - LAYDOWN/PARKING
NOT TO SCALE
Note: All Design Data provided by Valero St. Charles Refinery.
CROSS-SECTION G-G'
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/14/14
FIGURE
30
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\31_Wetlands Impact Map.dwg
U.S. Highway 61 - Airline Highway
Permitted in 2005
LDNR: P20050123 / USACE: MVN 2005-775-EE
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
Proposed
Overall Project Boundary
Wetlands Impacts
Authorized Under Other Permits
Uplands Area
Included in Project Boundary
Project Wetlands Impacts
(+/-68.02 acres)
APPROX. SCALE (ft.)
Note: All Design Data provided by Valero St. Charles Refinery.
0
WETLANDS IMPACTS MAP
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/13/14
400
FIGURE
31
2623333AE
C:\Users\prodriguez.ENVIRONCORP\Desktop\Projects\26\VSCR_2013 CUP Mod for BTX 2623333AE\32_Regional Development Map.dwg
Approximately 5.1 miles
NOT TO SCALE
REGIONAL DEVELOPMENT MAP - PLANNED PIPELINE ROUTE
VALERO EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR
DATE: 11/13/14
FIGURE
32
2623333AE