Home

Galveston District

Run scraper

Pete Garland

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to restore a canal on Lake Livingston to its original condition.

Full Public NoticeProject Plans The applicant proposes to fill 0.25 acre of open water to restore a canal to its original conditions. Approximately 1,469 cubic yards of fill material will be used. A previously issued permit allowed for the creation of a canal by dredging the area from uplands. Additional activities include adding a 25-linear-foot bulkhead across opening of the canal and back filling the dredged area.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas