Home

Los Angeles District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Application for Permit Arroyo Grande Creek Waterway Management Program

The Arroyo Grande Creek Channel Waterway Management Program (“proposed project”) consists of the following actions within a 3-mile reach of lower Arroyo Grande Creek and a 0.5-mile reach of lower Los Berros Creek: 1) initial vegetation and sediment management with an attendant levee raise; and, 2) long-term vegetation and sediment management.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas