Home

Sacramento District

Run scraper

SPK-1995-00412 - Correction to Appendix D

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Corps has discovered that an error was made when the DEIS was published for public comment. An outdated version of the River Islands at Lathrop Hydraulic Impacts Analysis dated May 13, 2010, was included as Appendix D in Volume 2. On December 16, 2014, this version was removed from the document and replaced with the current July 28, 2014, revision of the March 16, 2012, River Islands at Lathrop Hydraulic Impacts Analysis

Sacramento District Comments Period: October 24, 2014 – January 24, 2014 SUBJECT: The Corps has discovered that an error was made when the DEIS was published for public comment. An outdated version of the River Islands at Lathrop Hydraulic Impacts Analysis dated May 13, 2010, was included as Appendix D in Volume 2. On December 18, 2014, this version was removed from the document and replaced with the current July 28, 2014, revision of the March 16, 2012, River Islands at Lathrop Hydraulic Impacts Analysis. If due to this error you find you need additional time to review the DEIS please contact William H. Guthrie at (916)-557-5269, william.h.guthrie@usace.army.mil; 1325 J Street, Room 1350, Sacramento, California 95864 to request an time extension for the public comment period.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas