PROPOSED DRAINAGE IMPROVEMENTS FOR A RESIDENTIAL SUBDIVISION IN WEST BATON ROUGE PARISH
NAME OF APPLICANT: Parish of West Baton Rouge, c/o Patin Engineers and Surveyors, Inc., Attn: Tyler Francois, 4463 LA Hwy. 1 South, Suite F, Port Allen, Louisiana 70767.
LOCATION OF WORK: Near the Intracoastal Waterway, Section 79, T8S-R12E, approximately 2.5 miles west from Brusly, Louisiana, in West Baton Rouge Parish, within the Lower Grand Basin, in hydrologic unit (HUC 08070300), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate, and deposit native fill material, compacted base fill material, and limestone to construct an access road, enlarge, re-route, and clean out existing drainage ditches, and place two (2) 48-inch culverts for drainage improvements to accommodate a subdivision which is being built in a non-jurisdictional area of the project site. One of the drainage ditches will be re-routed through a detention pond created on site in a non-wetland area, one of the ditches will be deepened and widened and the rest will be cleaned out and reshaped. All material being removed will be placed in the non-wet area of the project site, used as fill for the subdivision, and will be transported on an access road built in wetlands approximately 420 feet in length and 15 feet wide. Approximately 160 cubic yards of compacted base fill and lime stone material will be deposited to complete the culvert installation and the access road and approximately 3,100 cubic yards of native material will be excavated and re-deposited as fill for subdivision construction. The site contains approximately 7 acres of forested wetlands. It is anticipated that the proposed action would have minimal impact on adjacent wetlands.
A Preliminary analysis has determined that the proposed project would permanently impact 0.2 acre of jurisdictional forested wetlands and 0.008 acre of “other waters of the US”. The project will temporarily impact approximately 0.5 acre of jurisdictional “other waters of the US”.
The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. As compensation for unavoidable wetland impacts, the applicant proposes to use a Corps approved mitigation bank within the watershed of impact.