New Ethane Pipeline in Calcasieu, Jefferson Davis, Acadia, Vermilion, Lafayette, and St. Martin Parishes
Name of Applicant: Enterprise Products Operating LLC, c/o Atkins North America, Inc., Attn: Mr. Michael Dyke, 101 Summit Avenue, Suite 1014, Fort Worth, Texas 76102.
Location of Work: The proposed Aegis Ethane Header, Segment 2 Pipeline Project consists of approximately 111miles of new 20‑inch-diameter ethane pipeline in Calcasieu, Jefferson Davis, Acadia, Vermilion, Lafayette, and St. Martin Parishes, Louisiana. The proposed project begins approximately 1.5miles east of Carlyss near the intersection of Louisiana Highway 1133 and East Dave Dugas Road. The alignment extends generally west-to-east, terminating approximately 3.9miles east of Parks near the intersection of Parish Road28 and Parish Road 152. The proposed project traverses portions of Calcasieu, Jefferson Davis, Acadia, Vermilion, Lafayette, and St. Martin Parishes, Hydrologic Unit Codes 08080206 – Lower Calcasieu, 08080202 – Mermentau, 08080103 – Vermilion, and 08080102 – Bayou Teche Watersheds.
Character of Work: Install the new 20‑inch-diameter ethane pipeline using a combination of construction methods, including open cutting, horizontal directional drilling (HDD), boring, and floating methods. Enterprise proposes to install the pipeline parallel to and within existing rights-of-way. In wetland areas, the construction corridor will be reduced to minimize impacts: a 90‑foot-wide construction corridor (30‑foot-wide permanent right-of-way easement and 60‑foot-wide temporary workspace) will be utilized in non-forested wetland areas, and a 75‑foot-wide construction corridor (30‑foot-wide permanent right-of-way easement and 45‑foot-wide temporary workspace (TWS) will be used in forested wetland areas. During construction activities, additional temporary workspace (ATWS) will be required beyond the width of the 75‑, 90‑, and 100‑foot construction corridor at certain designated locations to provide for safe and efficient installation of the pipeline. Construction would result in unavoidable impacts to forested wetlands resulting in the conversion of 26.04acres of bottomland hardwood wetlands, 3.69acres of cypress-tupelo wetlands, and 6.29acres of pine dominated forested wetlands to emergent and/or scrub-shrub wetlands. Included within the impacts totaled above, 1.41 acres of bottomland hardwood wetlands will be permanently filled due to the construction of the pad site for the Section 28 Meter Station. Upon completion of construction, TWS and ATWS will be returned to pre-construction contours and allowed to revert to its original land use; including 51.96 acres of palustrine emergent wetland, 28.08 acres of palustrine scrub-shrub wetlands, 0.85 acres of palustrine unconsolidated bottom ponds, 6.80 acres of estuarine intertidal emergent wetlands, 0.15 acre of estuarine intertidal scrub-shrub wetlands, and 3.73 acres of estuarine subtidal unconsolidated bottom wetlands. Enterprise will provide compensatory mitigation for unavoidable impacts to forested wetlands as described above utilizing USACE approved mitigation banks on a per-watershed basis with preference shown to mitigation banks with in-kind credits approved for sale in the primary service area.
Joint Public Notice
January 12, 2015
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certification Sec.
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager: James W. Little, Jr.
(225) 342-3099 / fax: (225) 342-9439
james.little@usace.army.mil
Permit Application Number:
MVN-2014-00115-WII
Project Manager:
Elizabeth Johnson
(225) 219-3225 / fax: (225) 219-3156
WQC Application Number:
WQC 141216-02
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
The application has also been made to the Louisiana Department of Environmental
Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A (3) and provisions of Section 401 of the
Clean Water Act (P.L. 95-17).
New Ethane Pipeline in Calcasieu, Jefferson Davis, Acadia, Vermilion, Lafayette, and St.
Martin Parishes
Name of Applicant: Enterprise Products Operating LLC, c/o Atkins North America, Inc., Attn:
Mr. Michael Dyke, 101 Summit Avenue, Suite 1014, Fort Worth, Texas 76102.
Location of Work: The proposed Aegis Ethane Header, Segment 2 Pipeline Project consists of
approximately 111 miles of new 20-inch-diameter ethane pipeline in Calcasieu, Jefferson Davis,
Acadia, Vermilion, Lafayette, and St. Martin Parishes, Louisiana. The proposed project begins
approximately 1.5 miles east of Carlyss near the intersection of Louisiana Highway 1133 and
East Dave Dugas Road. The alignment extends generally west-to-east, terminating
approximately 3.9 miles east of Parks near the intersection of Parish Road 28 and Parish Road
152. The proposed project traverses portions of Calcasieu, Jefferson Davis, Acadia, Vermilion,
Lafayette, and St. Martin Parishes, Hydrologic Unit Codes 08080206 Lower Calcasieu,
08080202 Mermentau, 08080103 Vermilion, and 08080102 Bayou Teche Watersheds.
Character of Work: Install the new 20-inch-diameter ethane pipeline using a combination of
construction methods, including open cutting, horizontal directional drilling (HDD), boring, and
floating methods. Enterprise proposes to install the pipeline parallel to and within existing
rights-of-way. In wetland areas, the construction corridor will be reduced to minimize impacts:
a 90-foot-wide construction corridor (30-foot-wide permanent right-of-way easement and
60-foot-wide temporary workspace) will be utilized in non-forested wetland areas, and a 75-footwide construction corridor (30-foot-wide permanent right-of-way easement and 45-foot-wide
temporary workspace (TWS) will be used in forested wetland areas. During construction
activities, additional temporary workspace (ATWS) will be required beyond the width of the 75-,
90-, and 100-foot construction corridor at certain designated locations to provide for safe and
efficient installation of the pipeline. Construction would result in unavoidable impacts to forested
wetlands resulting in the conversion of 26.04 acres of bottomland hardwood wetlands,
3.69 acres of cypress-tupelo wetlands, and 6.29 acres of pine dominated forested wetlands to
emergent and/or scrub-shrub wetlands. Included within the impacts totaled above, 1.41 acres
of bottomland hardwood wetlands will be permanently filled due to the construction of the pad
site for the Section 28 Meter Station. Upon completion of construction, TWS and ATWS will be
returned to pre-construction contours and allowed to revert to its original land use; including
51.96 acres of palustrine emergent wetland, 28.08 acres of palustrine scrub-shrub wetlands,
0.85 acres of palustrine unconsolidated bottom ponds, 6.80 acres of estuarine intertidal
emergent wetlands, 0.15 acre of estuarine intertidal scrub-shrub wetlands, and 3.73 acres of
estuarine subtidal unconsolidated bottom wetlands. Enterprise will provide compensatory
mitigation for unavoidable impacts to forested wetlands as described above utilizing USACE
approved mitigation banks on a per-watershed basis with preference shown to mitigation banks
with in-kind credits approved for sale in the primary service area.
The comment period for the Department of Army Permit and the Louisiana Department
of Environmental Quality WQC will close 20 days from the date of this joint public notice.
Written comments, including suggestions for modifications or objections to the proposed work,
stating reasons thereof, are being solicited from anyone having interest in this permit and/or this
WQC request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, Attention: Regulatory Branch. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing, faxing, or e-mailing the
Corps of Engineers Project Manager listed above. Any request must be specific and
substantively supportive of the requested extension, and received by this office prior to the end
of the initial comment period. The Section Chief will review the request and the requestor will
be promptly notified of the decision to grant or deny the request. If granted, the time extension
will be continuous to the initial comment period, and inclusive of the initial comment period, will
not exceed a total of 30 calendar days. Letters concerning the Water Quality Certification must
reference the applicant's name and the WQC Application number and be mailed to the
Louisiana Department of Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All Factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places are near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of N/A acres of EFH utilized by various life stages of
red drum and panaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administration of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosures