APPLICANT/IN-LIEU FEE SPONSOR: Missouri Conservation Heritage Foundation PROJECT LOCATION: The proposed mitigation plan No. SSTF1004-Dallas County is located along Hays Road at an existing crossing in Greasy Creek in the northeast quarter of Section 6

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

APPLICANT/IN-LIEU FEE SPONSOR: Missouri Conservation Heritage Foundation

PROJECT LOCATION: The proposed mitigation plan No. SSTF1004-Dallas County is located along Hays Road at an existing crossing in Greasy Creek in the northeast quarter of Section 6, Township 33 north, Range 19 west, Dallas County, Missouri.

ACTIVITY: The Missouri Conservation Heritage Foundation proposes under its Stream Stewardship Trust Fund (SSTF) In-Lieu Fee Instrument to establish mitigation plan No. SSTF1004-Dallas County entitled the Hayes Road Low Water Crossing Replacement Project.

APPLICANT/IN-LIEU FEE SPONSOR: Missouri Conservation Heritage Foundation PROJECT LOCATION: The proposed mitigation plan No. SSTF1004-Dallas County is located along Hays Road at an existing crossing inGreasy Creek in the northeast quarter of Section 6, Township 33 north, Range 19 west, Dallas County, Missouri. ACTIVITY: The Missouri Conservation Heritage Foundation proposes under its Stream Stewardship Trust Fund (SSTF) In-Lieu Fee Instrument to establish mitigation plan No. SSTF1004-Dallas County entitled the Hayes Road Low Water Crossing Replacement Project.

MISSOURI CONSERVATION HERITAGE FOUNDATION STREAM STEWARDSHIP TRUST FUND ­ GRANT PROGRAM REQUEST FOR MITIGATION PLAN APPROVAL

The Stream Stewardship Trust Fund is available to restore, enhance, and/or protect stream systems and associated riparian habitats. Proposed projects will be prioritized and funded by the Foundation based on regional stream needs, maximum return on expended monies, level of threat to the stream system, and overall anticipated benefits to stream resources. Proposed projects should be located within the ecological drainage unit (EDU) where participating stream impacts occurred. Approval will be limited to projects that restore, enhance, or preserve Missouri's diverse stream systems. This request form will be used by MCHF Board members assigned to the Stream Stewardship Trust Fund ­ Grant Program Action Team. Proposals submitted for funding consideration need to clearly explain elements of streambased projects listed below which warrant consideration during the approval process. Spaces provided in the elements below are not to be considered limiting, and the attachment of additional pages of explanation is encouraged in order to provide full details. The Goal of the MCHF's Stream Stewardship Trust Fund is to provide an innovative tool for the restoration, enhancement, and protection of Missouri's streams and aquatic resources.

1) Project Title

Hayes Road Low Water Crossing Replacement Project, Greasy Creek

Landowner Name 2) County 3)

Dallas

Dallas County Commission MDC region

Southwest

Project objectives We are proposing this project because we believe it will fulfill the following objectives. One objective of the project is to replace the existing low water crossing with a newly designed, clear-span low water crossing to facilitate fish passage and allow for improved sediment transport increasing stream stability. A second objective is to use the newly designed crossing as a demonstration project for neighboring county road services working on streams within the Niangua darter range. A third objective is for Missouri Department of Conservation (MDC) personnel to monitor and evaluate changes in Niangua darter populations and their subsequent distribution. These objectives will all address specific areas of concern discussed in the Compensation Planning framework for the Ozark/Osage EDU including aquatic resource problems, water quality problems, and aquatic resource conditions. The portions of the Niangua

River near Benton Branch (Williams Ford) will be used as a reference reach to help establish achievement of the defined objectives. 4) The project submitted for consideration is in the Niangua River watershed and is considered a priority by MDC for the following reasons (include how project achieves watershed objectives and describe the rationale for site selection). Greasy Creek, a major tributary to the Niangua River, contains 12.9 miles of Niangua darter known range. The Niangua River watershed contains a total of 62.6 miles of Niangua darter known range, of which 31 miles are federally designated critical habitat. Replacing the existing low water crossing with a clear-span structure will not only facilitate fish passage, but will also improve sediment transport thereby restoring a critical component of the natural stream process and enhancing stream habitat stability within this reach of habitat. An inventory and assessment of low water crossings, including a priority ranking report, has been completed for the entire range of the Niangua darter. The inventory data has been entered into the National Fish Passage Decision Support System and can be found with the online GeoFIN application (http://ecos.fws.gov/geofin/). There were five crossings originally identified as fish passage barriers in the Niangua River watershed (three on the Niangua River and two on Greasy Creek). Two of those, both on the Niangua River, have been replaced with passage friendly structures. A third, also on the Niangua River, is currently in the process of being replaced. This project would be consistent with four goals that are identified as Fiscal Year 2014 Department Priorities by Goal: 1) Healthy forests, fish and wildlife. Ensure healthy and sustainable forest, fish and wildlife resources throughout the state; 2) Sound business and workplace practices. Ensure sound financial accountability and transparency in all areas of operation; 3) Citizen involvement/education. Provide opportunities for active citizen involvement in services and conservation education in both rural and urban areas; and 4) Engage partners. Engage partners at all levels (individual, community, county, state, federal) to enhance natural resources and effective delivery of conservation service. Additionally, this project would be consistent with a MDC's Fisheries Division stretch goal: Fish Habitat Enhancement...enhance aquatic organism passage on selected streams by involving a variety of partners and using a mix of internal and external funding. 5) Site protection instrument (circle): Acquisition

Perpetual easement

Special management agreement

6) Describe the details of the site protection instrument (ownership, legal arrangements, how the instrument assures the long term protection of the proposed mitigation site): This project will be completed under a 30-year term cooperative agreement between Dallas County and the Missouri Department of Conservation; a standard agreement used to implement projects within the Niangua Darter Habitat Enhancement Low Water Crossing Assistance Program. 7)

Baseline information a. Describe the ecological characteristics of the proposed project site: The project site is located on Greasy Creek approximately 4.9 river miles upstream from its confluence with the Niangua River. Greasy Creek is a 4th order stream with a 46,228 acre watersehd. This site is also located about in the center of the 12.9 miles of Niangua Darter known range within Greasy Creek. b. Historic and existing plant communities, hydrology and soils of the proposed project site:

Land cover in the Greasy Creek watershed before settlement was a mosaic of prairie, savanna, and forest. The undissected uplands were dominated by patches of prairie and savanna with high grasses and large post oaks. Areas of greater relief and narrow ridgetops were dominated by oak-hickory forest with occasional patches of prairie in the bottomland. Currently much of the land within the watershed has been converted from forest, savanna and prairie to cattle pasture and hay-land. Overall, the Niangua River Watershed lies in the Salem Plateau subdivision of the Ozark Plateau physiographic region. The watershed is underlain with several hundred feet of Ordovician and Cambrian rock, largely dolomite. The edges of the watershed lie in Jefferson City-Cotter dolomite, while streams cut into progressively older Roubidoux, Gasconade, and Eminence formations. There is considerable subsurface movement of water in the watershed through solution dissolved channels in the fractured and jointed dolomite. As a result, karst features such as caves, sinkholes, losing streams, and springs are abundant. Streams which incise into the middle or lower Gasconade have well sustained base flows even during dry periods, due to ample groundwater supplies. Streams which incise into the Roubidoux formation are frequently losing streams and sinkholes are common. Soils in the watershed are classified as residual, alluvial, colluvial, and loess. Residual soils consist primarily of material weathered from cherty dolomite, dolomite, and sandstone, and occur on the surface of steep slopes. When they develop in uplands from Roubidoux formations, and Jefferson City - Cotter dolomites, an impervious fragipan usually occurs 18 to 24 inches below the surface. Colluvial soils, which are soils deposited on lower valley slopes by erosion from more elevated sites, are limited in abundance. Alluvial soils are those transported by streams and deposited on level or gently sloping areas in flood plains. They range in size from silt to gravel. Loess soils are silty, windblown material which commonly occur on ridgetops. c. Project application must include maps identifying the proposed project boundary with lat/long boundaries in decimal degrees and a GIS shape file with metadata of the delineated boundary. See attached figures for project location and details. d. Describe existing hydro-system connectivity between the stream project site and any wetlands or other waters including tributaries connecting to receiving waters: The project site is located on Greasy Creek approximately 4.9 river miles upstream from its confluence with the Niangua River. The project site is located about mid-way in the 12.9 miles of Niangua Darter known range on Greasy Creek. Greasy Creek enters the Niangua River within the 31.0 miles stretch of federally designated critical habitat; 12.5 miles upstream from the downstream boundary. In addition to federally designated critical habitat, the Niangua River contains 47.1 miles of known range. A total of approximately 9.0 miles of known range within Greasy Creek will be opened above this project site. When modeling this site with the GeoFIN web-based application, a total of 183.9 miles (295.9 km) of streams within the Greasy Creek watershed upstream from this barrier are opened. 8) Determination of credits as determined by the Missouri Mitigation Method (attach credit calculation worksheet or other detailed information to demonstrate the specific approach for credit calculation for this project):

a. Number of stream channel credits 11,500 b. Number of riparian credits N/A c. Stream type (circle): Ephemeral Intermittent

Perennial

Credit release schedule: 20%

Upon project approval by the COE and IRT

20%

Upon completion of the project and signing of long term maintenance agreement.

60% After two bank-full flow events or a maximum of two years, whichever occurs first. Our experience and observations suggest that the stability of the structure and its effects on the stream channel and related habitat could easily be observed after two high flow events and those events would be likely to occur, on average, within or prior to a two year time frame. 9) Mitigation work plan a. Specifications of the project (geographic boundaries, construction methods, timing, sequence): The current low water crossing is a typical vented ford with three concrete box culverts. Aquatic organism passage barriers exist (particularly to benthic fishes) at low flows due to the culverts being perched above the stream bed, as well as a biological barrier due to the concrete floor and walls. At moderate to high flows, the structure creates velocity, exhaustion, and jump barriers. The boundaries of the project will be confined to the foot-print of the existing low water crossing. The project will entail demolition of the existing low water crossing by chipping/breaking up of the structure, then loading and hauling the refuge off site. Once removed, the new low water bridge (clear-span design) will be constructed on the same foot-print and tie into the existing road approaches. Design plans have yet to be developed, but, will be similar to recently completed single clear-span crossings used in numerous other low water crossing replacement projects throughout Niangua Darter range as part of this recovery effort to address AOP concerns. It is anticipated that all in-stream work related to this project will be completed soon after the seasonal spawning time frame (March 15 through June 15) 2015. The demolition/construction portion of this project should take approximately 60 working days. b. Methods for establishing desired plant community (species composition and type, control of undesirable species, size of plants used, control of wildlife damage): This project does not include establishing any plant communities. Any areas disturbed during construction will be planted to pre-existing cover. c. Grading plan and elevations of constructed features (describe or attach engineering design plans):Although design plans have not been completed for this project, the elevation of the new low water bridge will not be significantly higher than the existing low water crossing. Since the existing road approaches will be used the grade of the new structure will closely match that of the existing structure. However, the new structure will be a clear-span type of structure without a floor and will utilize the natural stream bed to facilitate AOP and natural sediment transport. Actual design will take place after project approval. d. Describe or attach drawings showing existing stream channel cross sections, proposed alterations to the stream channel and/or banks, a description of in-stream structures including materials used for improvements, dimensions and elevations, and riparian plantings: No alterations to the existing stream channel and/or banks are planned for this project. A low water bridge, clear-span type of structure will be constructed in place of

the existing vented ford low water crossing. Some rip-rap will be placed around the bridge abutments to protect from scour. The new low water bridge will have a clear-span approximately 45 feet long with an elevation similar to the existing low water crossing. 10) Maintenance plan: a. Description and schedule of maintenance following initial construction: As outlined in the cooperative agreement, the county agrees to: 1) remove gravel and flood debris from the deck of the crossing as needed; 2) remove snags and obstructions from the stream channel, in the immediate vicinity of the crossing, if flow under the crossing is obstructed; 3) examine the crossing immediately following high flow events for scour or undercutting that may impact the structural integrity of the crossing; and 4) provide maintenance as needed to the crossing and roadway approaches. b. Mowing frequency and timing: Not applicable. c. Herbicide applications (chemical used, method, timing, frequency): Not applicable. d. Irrigation plan (include source of water): Not applicable. e. Passive water control and instream structure description and required maintenance (type and frequency): See item (a) for maintenance information. 11) Performance standards a. Description of the performance standards used (include metrics for determining project success): Riparian: Not applicable. Stream Channel: The three main standards that will be met by this project are: 1) the existing crossing that has been identified as a barrier to AOP and sediment transport will be removed; 2) the newly designed clear-span low water bridge will not have a floor and use the natural stream bed; and 3) the length of the clear-span low water bridge will be greater than 75% of the bank-full channel width. Reference stream(s) used (if any): These performance standards have been documented in being successful in facilitating AOP and sediment transport in the connecting Niangua River and nearby Little Niangua River consistent with this recovery effort throughout Niangua Darter range. b.

Describe how the performance standards relate to the objectives of the mitigation site (include description of the desired resource type, expected functions or services being measured, or any other applicable metrics): Replacing the existing low water crossing with a clear-span structure will not only facilitate fish passage, but will also improve sediment transport thereby restoring a critical component of the natural stream process and enhancing stream habitat stability within this reach of habitat. The portions of the Niangua River near Benton Branch (Williams Ford) will be used as a reference reach to help establish achievement of defined objectives.

12) Describe the method and frequency of project monitoring to determine when performance standards are being met (project site must be monitored for an appropriate period not less than 5 years after initial construction/planting), who will be conducting the monitoring, and the frequency monitoring reports will be submitted: Numerous low water crossings on streams

within the range of the Niangua Darter Etheostoma nianguae are barriers to the passage of aquatic organisms, materials, and degrade habitat for small, benthic fishes. Ongoing cooperative efforts between the Missouri Department of Conservation and several partners (US Fish & Wildlife Service, Missouri Conservation Heritage Foundation, Missouri Department of Transportation, Federal Emergency Management Agency, county governments) have allowed for prioritization and subsequent replacement of many poorly-designed crossings with clear-span bridges. Goals of the projects include improving fish passage and restoring habitat while at the same time reducing the need for maintenance and increasing the availability and safety of the crossing for use by road traffic. We provide monitoring to evaluate the response of Niangua Darter populations and habitat associated with low water crossing improvement projects. Study sites extend approximately 300 m upstream and downstream from each crossing. We categorized and sampled all non-deep pool habitat patches within the site boundaries including riffles, runs, glides, shallow pools, and pool edges. Pool edges are identified by a somewhat gentle slope of predominately clean gravel, often with water willow (Justicia sp.), bordering one or sometimes both sides of a deep pool. With the exception of some edges, deep pools are not sampled. At the downstream boundary of each habitat patch, we measure lateral secchi disk visibility and water temperature. Fish sampling is performed by two snorkelers moving upstream through each longitudinal half of a habitat patch in a zigzag pattern at a rate of 3 m/min. In very shallow areas (<10 cm), counts are conducted by slowly walking and visually scanning the stream bottom with the aid of polarized sunglasses. When a Niangua Darter is sighted, investigators identified it as a juvenile or adult. Juveniles, spawned during April or May, are markedly smaller at the time sampling is performed in June and unlikely to have exceed 40 mm in total length. We use multiple-pass, depletion/removal methods to estimate Niangua Darter population metrics for each habitat patch where more than one Niangua Darter is discovered. When an adult-sized Niangua Darter is sighted, the snorkelers capture it by surrounding the fish with four aquarium nets. Niangua Darters collected during this first pass through the habitat patch are placed in a floating net bag (3.2 mm mesh). Juvenile Niangua Darters are counted but not included in population estimates because of the high variability associated with their abundance, difficulties in surveying the shallow habitats where they occur, and concerns related to the potential for injury from handling. After the habitat patch had been searched, snorkelers perform additional passes according to the following guidelines: a. Stop after 1 pass if # adult Niangua Darters = 0 or 1 b. Stop after 2 passes if i. pass 2 # adult Niangua Darters = 0 ii. pass 1 + pass2 # Niangua Darters 3 iii. depletion from pass 1 to 2 > 80% c. If time is limited stop after 3 passes if no single pass # Niangua Darters > 3 The guidelines are selected to accelerate progress through habitat patches where Niangua Darters are sparse and sample size would be too low for meaningful population estimates. During each pass, snorkelers employ a comparable degree of effort by thoroughly searching the same locations within the habitat patch. Juvenile Niangua Darters are ignored after the first pass to avoid double-counting. Additional net bags are used as necessary to reduce risks associated with overcrowding and for counting fish from different passes. After sampling of a habitat patch is

completed, Niangua Darters are returned to locations with cover and distributed among original collection points at densities approximating those observed during sampling. We record the presence of all darter species observed by snorkelers as they search a habitat patch. We also measure the length of each habitat patch and at three equally-spaced points at mid-channel measure wetted width, depth, mean column water velocity, and dominant substrate type using a modified Wentworth classification of particle diameter including fines (< 2 mm), gravel (2 - 15 mm), pebble (16 - 63 mm), cobble (64 - 256 mm), boulder (> 256 mm), and bedrock. Measurements of length and width are made to the nearest 1-m with a laser rangefinder or visual estimation for distances < 10 m. Depths are measured to the nearest 1-cm and velocities to the nearest 1-cm/s using a calibrated wading staff and Marsh McBirney Flo-Mate 2000 current velocity meter. We also classify the percentage length of each habitat patch bordered on either side by wetted water willow, dense algal blooms, bank erosion (e.g., lack of attached vegetation and with eroding base), livestock use, and other significant disturbances such as gravel removal. Habitat percentage classes included 0-5%, 6-25%, 26-50%, 51-75%, 76-100%. After we complete sampling of fish and habitat patches, we performed a Wolman pebble count to ascertain patterns in the sizes of rocky substrates and also estimated the embeddedness of the rocky substrate matrix by fine sediments. Both measurements are relevant to determining habitat suitability for small, benthic fishes that forage, find shelter, and reproduce dependent on characteristics of the interstitial spaces in the stream bottom. The pebble count is performed by measuring the intermediate axis (nearest 1-mm) of the particle encountered at toe-point as we walk transects crossing the stream channel diagonally from one high-water bank to the other. Each transect crosses a 50-m length of stream and particles are selected with a frequency that result in approximately 20 measurements per transect. At each point where a particle is measured, we also estimate if larger rocky particles are surrounded or covered by fine sediment to a degree < or > 75% (highly embedded). We used the Zippin M(b) model and Program CAPTURE2 v.090210.1141 to obtain estimates for population size, precision, and capture probability for adult Niangua Darters. The model assumption of closure is satisfied because Niangua Darter movements are limited, movement among habitat patches is often discouraged by natural barriers (high flow, excessive depth, lack of cover, unsuitable substrate), and our sampling method is of short duration and minimally intrusive to avoid driving darters ahead of snorkelers. We evaluate changes in Niangua Darter populations, darter species richness, and habitat by inspecting data summaries for pre- and post-replacement time periods in the reaches upstream and downstream of each crossing. Particle diameter measurements derived from pebble counts are summarized for each transect and cumulative relative frequency plots created for pre- and post-replacement time periods. For most crossings it is only possible to collect a single prereplacement sample, therefore we compared pre-replacement values with the summarized postreplacement values and consider the degree of overlap given the amount of variation and direction of change. Post-replacement sampling occurs during each of the first three years after construction of a new bridge. A three-year hiatus from sampling follows the first postreplacement time period, then a second three-year sampling period is initiated. For example, the crossing will be sampled during years 1-3 and years 7-9 following replacement. Doug Novinger of the Missouri Department of Conservation, Resource Science Division will be leading the low water crossing Niangua Darter monitoring efforts. Craig Fuller of the Missouri Department of Conservation, Fisheries Division will be collecting standardized photo-monitoring information.

13) Long-term management plan: a. Describe how the project site will be managed after performance standards have been met: Through the 30-year term cooperative agreement the county has agreed to provide standard maintenance as outlined above. Additionally, through the cooperative agreement the county has agreed to incorporate fish passage and sediment transport considerations into subsequent design and construction whenever the crossing must be repaired or replaced. b. Annual cost estimate for management: $ Responsibility of Dallas County c. Funding mechanisms will be used to finance long term management (including responsible party: Dallas County road and bridge department will manage and perform maintenance as needed. Funding will be provided through the counties annual budget for road/bridge maintenance. d. Long term management responsibilities transferred to (include description of their long term management plan and a written stewardship commitment that includes a financing plan): Long term management responsibilities are transferred to Dallas County Commission. A long term management plan and stewardship commitment are included in the above referenced cooperative agreement. 14) Adaptive management plan (due to inability to construct project in accordance with approved plans, monitoring revealing that the project is not meeting performance standards, remedial measures resulting in project modifications, design changes, revisions to maintenance requirements, revised monitoring, etc): a. Description of strategy to address unforeseen changes in the project: If there is an inability to construct the project in accordance with approved plans, no further action will be taken and the existing structure will be left in place. If the structure fails due to an act of God, the County has agreed to replace the structure with a new structure that facilitates fish passage and sediment transport. Design changes will only occur after consultation and approval by MDC, USFWS, USACOE, and County. b. Party (ies) responsible for implementing adaptive management: If failure in the project is due to an act of God, the agencies will assist with adaptive management implementation. If project failure is due to County negligence, the County will be responsible for implementing adaptive management plans and remedial measures with oversight from agencies. 15) Financial Assurances: The MCHF has previously demonstrated its ability to fund good stream projects and is committed to the installation, monitoring, and long term management of its compensatory mitigation projects. Since an important basis for project selection is a project's fit into MDC's statewide stream management plan, a commitment of the biological, engineering, and legal resources of MDC also accompanies each project. In addition to MDC's support, the MCHF has incorporated financial assurances into its cost-per-credit and will retain financial assurances not to exceed 10% of each project's estimated completion cost to establish a continuous contingency fund balance of $250,000.00. 16) Total cost of the project is estimated at $ 197,000. SSTF Resources are requested in the amount of $ 100,000.

17) Partner funds in the amount of $ 97,000 are being contributed by: (if applicable): US Fish and Wildlife Service ($62,000); Dallas County Commission ($25,000); MDC ($10,000 in-kind services). 18) Total stream length of the project

NA

Total Riparian corridor acreage NA

19) Total cost per credit (including all costs) estimated at $ 16.66

.

20) If the project is leveraged with contributions from others, SSTF Resources are requested to fund which practices/products/costs activities? Project engineering/design; and, demolition, hauling and disposal of existing low water crossing. 21) Schedule for project completion and/or installation: Planning, engineering, environmental review and permit acquisition Winter 2014 and Spring 2015. Demolition, removal of existing crossing and construction of new crossing summer 2015. Note: Proposal must include appropriate on-site photographs, county maps locating the proposed project, related topographic, soils, or other maps, drawings and materials necessary to describe planned activities. In order to reproduce color photographs and maps, a complete electronic file is requested with project proposals.

Attachment- Map of the State, Highlighting Location of the Watershed

Attachment- Watershed Map with location of project site in relation to other project sites, Niangua Darter federally designated critical habitat and Niangua Darter known range.

Attachment- Aerial photo and topographic map of Dallas County Hayes Road/Greasy Creek project site with GPS coordinates and associated shapefile name.

Attachment- Pictures of the Project Site

Looking at upstream side of crossing

Looking at downstream side of crossing

Looking upstream from crossing

Looking downstream from crossing

Attachment- Example of the proposed clear-span (45-foot) low water bridge design to be used on Dallas County Hayes Road over Greasy Creek.

Photo of the completed 45-foot clear-span low water bridge located on Dallas County School Road over the Little Niangua River as part of the Niangua Darter (AOP) recovery efforts.

-0

"

" -6 " 1' -0 " 2' '-0 "1 -0 1'

" -6 1'

5'

" '-0 17 CL ROADWAY

2'-6 1/2"±

" 12

"

5'-0"

45°

'-1 0

#6F W13A BARS @ 11" O.C.

12 "

" '-0 17 18

1'-6"

1'-6"

FOOTING

1' 0"

-1 10"

12'-7"

10"

12'-7"

FILL FACE

STREAM FACE

PLAN VIEW OF GEOMETRY

2'-0" U11A BARS

** FILL AREA UNDER GIRDER WITH JOINT FILLER TO BE SUPPLIED BY CONTRACTOR. JOINT FILLER MUST BE IN PLACE PRIOR TO SETTING BEAMS.

FW13A BARS

V BARS #6 FW12A BARS @ 11" O.C.

T11A BARS

1'-9" LAP

FW EQ 1 . S 1A PA BA C RS ED

H11A BARS

A *** T12A BARS

D11A, D13A, D15A, D17A, D19A & D21A BARS

FW12A BARS

(6) #6 FW14A BARS (1/2 TOP & BOT.)

FW13A BARS

B

D12A, D14A, D16A, D18A, D20A & D22A BARS

H11A BARS U11A BARS

V11A BARS

SECTION B-B

ABUTMENT REINFORCEMENT

FW14A BARS EQ. SPACED

V12A BARS

135

°

5" T12A BENDING DIAGRAM

FW12A BARS

B

V13A BARS

PLAN VIEW OF REBAR *** T12A BARS SHALL BE FIELD BENT TO FIT THE WING WALL ELBOW.

° 135 5"

S1-S7_DE NTS

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

T12A BENDING DIAGRAM

01.22.2013

CL ROADWAY 17'-0"

1'-10"

10"

12'-7"

10"

12'-7"

1"

1'-10"

17'-0"

1" EL 896.00 SLOPE 2%

SLOPE 2%

EL 895.75

EL 895.75

EL 894.04

EL 893.79

1'-3"

EL 893.79

ELEVATION OF STREAM FACE GEOMETRY (WINGWALLS SHOWN STRAIGHT FOR CLARITY)

CL ROADWAY 17'-0"

12"

12'-7"

12"

1"

17'-0"

1" EL 896.00 SLOPE 2%

SLOPE 2%

EL 895.75

EL 893.79

EL 895.75

EL 894.04

EL 893.79

TOP OF FOOTING EL 887.75

BOTTOM OF FOOTING EL 885.2±

ELEVATION OF FILL FACE GEOMETRY (WINGWALLS SHOWN STRAIGHT FOR CLARITY)

S1-S7_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

SEE DETAIL A

(56) #7 V11A BARS (1/2 E.F.) (28) #4 U11A BARS

(36) #7 V12A BARS (1/2 E.F.)

5 1/2" 17 SPACES @ 11"

12"

SEE DETAIL B

CL ROADWAY

13 SPCS @ 11"

5 1/2"

(36) #7 V12A BARS (1/2 E.F.)

13 SPCS @ 11"

17 SPACES @ 11"

(1) #6 D24A BAR

(1) #6 D24A BAR

EL 894.04

(5) #6 D14A, D16A, D18A, D20A & D22A BARS

12" 4 SPCS @ 12"

(1) #6 D12A BAR

7 3/4"

12"

(1) #6 D12A BAR

(1) #4 T12A BARS (STREAM FACE)

5 SPACES @ 12"

(12) #6 H11A BARS (1/2 E.F.)

(1) #4 T12A BARS (STREAM FACE)

12"

4 SPCS @ 12"

12"

EL 893.79

7 3/4"

(5) #6 D14A, D16A, D18A, D20A & D22A BARS

EL 893.79

12"

STREAM FACE ELEVATION

(WINGWALLS SHOWN STRAIGHT FOR CLARITY)

2 1/2"

2 1/2"

(1) #6 D11A BAR

12"

7 3/4"

TOP OF FOOTING EL 887.75

7 3/4"

12"

(1) #6 D11A BAR

BOTTOM OF FOOTING EL 885.2±

65 SPACES @ 11"

1'-1 1/2"

10 1/2"

(132) #6 FW13A BARS (1/2 E.F.), (132) #6 FW12A BARS (1/2 TOP & BOTTOM), (132) #6 DOWELS (1/2 E.F.)

FILL FACE ELEVATION

(3) #7 V13A BARS 5" 11"

(3) #7 V13A BARS

(WINGWALLS SHOWN STRAIGHT FOR CLARITY)

6 1/2" 3 1/2"

6 1/2" 3 1/2"

2 1/2"

2 1/2"

EL 893.79

5" 11"

EL 893.79

S1-S7_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

DETAIL "A"

DETAIL "B"

5'-0" 2'-0" 1'-6"

1'-6"

"

17'-0"

17 '-0

12" 12"

** JOINT FILLER (TYP.)

" 12

" '-0 17

#6 FW23B BARS @ 11" O.C.

BEARING PAD 25'-0" x 6" x 1/2"

1'-6"

90

5'-0"

2'-0"

°

0"

-1

1'

1'-6"

12" 12"

45°

0" '-1 18

FILL FACE

10"

12'-7"

2'-0"

12'-7"

2'-0"

PLAN VIEW OF GEOMETRY

FILL FACE

STREAM FACE

2'-0"

** FILL AREA UNDER GIRDER WITH JOINT FILLER TO BE SUPPLIED BY CONTRACTOR. JOINT FILLER MUST BE IN PLACE PRIOR TO SETTING BEAMS.

U21B BARS

H21B BARS V BARS 1'-9" LAP

#6 FW22B BARS @ 11" O.C.

FW22B BARS (6) #6 FW24B BARS (1/2 TOP & BOT.)

SECTION B-B ABUTMENT REINFORCEMENT

PLAN VIEW OF FOOTING REBAR S1-S7_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

17'-0"

1'-10"

10"

2'-0" 1"

2'-0"

1"

A

A

ELEVATION OF STREAM FACE GEOMETRY (ONE WINGWALL SHOWN STRAIGHT FOR CLARITY)

17'-0" 15'-0"

2'-0"

B

2'-0"

ELEVATION A-A ELEVATION OF WINGWALL STREAM FACE GEOMETRY

2'-0"

12" 1"

17'-0"

1"

EL 890.75

TOP OF FOOTING EL 887.80 BOTTOM OF FOOTING EL 885.30

B

ELEVATION B-B ELEVATION OF WINGWALL FILL FACE GEOMETRY

ELEVATION OF FILL FACE GEOMETRY (ONE WINGWALL SHOWN STRAIGHT FOR CLARITY)

S1-S7_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

(5) #7 V23B BARS 2 1/2"

12 1/2"

3 1/2" 4 SPCS @ ABT. 10 1/4"

(32) #7 V24B BARS (1/2 E.F.) 11"

15 SPACES @ 11"

12"

C

3" CLR.

D 3" CLR.

10 3/4"

(7) #6 D32B BARS

(1) #6 D30B BAR

6 SPACES @ 12"

D

3 1/2"

3 1/2"

#6 FW21B BARS

#6 x 12" DOWELS, EVERY 5TH DOWEL SHALL BE 3'-5" LONG, CONTRACTOR SHALL VERIFY LOCATION WITH ENGINEER

#6 FW24B BARS

#6 FW22B BARS

#6 FW22B BARS #6 FW25B BARS

STREAM FACE ELEVATION

C

(ONE WINGWALL SHOWN STRAIGHT FOR CLARITY)

#6 FW25B BARS

#6 FW22B BARS

ELEVATION C-C ELEVATION OF WINGWALL STREAM FACE

V23B BARS

135

°

5"

SECTION D-D PLAN VIEW OF REBAR

T22B BENDING DIAGRAM S1-S7_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

SEE DETAIL C

2 1/2"

6"

T23B BARS D31B BARS

(1) #4 T24B BARS (FILL FACE)

12" 12"

V23B BARS

2 SPCS @ 12" 12"

(1) #6 D29B BAR

D26B BARS

BOTTOM OF FOOTING EL 885.30 #6 FW22B BARS #6 FW25B BARS

E

#6 FW22B BARS

5 SPACES @ 11"

#6 FW21B BARS

#6 x 12" DOWELS, EVERY 5TH DOWEL SHALL BE 3'-5" LONG, CONTRACTOR SHALL VERIFY LOCATION WITH ENGINEER

#6 FW24B BARS

(3) #6 D21B BARS (FILL FACE)

TOP OF FOOTING EL 887.80

1'-2 1/2"

(3) #6 D23B, D25B, & D27B BARS

E

1'-1 1/4"

46 SPACES @ 11"

(10) #6 DOWELS (1/2 E.F.)

(94) #6 FW23B BARS (1/2 E.F.), (94) #6 FW22B BARS (1/2 TOP & BOTTOM), (94) #6 DOWELS (1/2 E.F.)

FILL FACE ELEVATION (ONE WINGWALL SHOWN STRAIGHT FOR CLARITY)

(32) #7 V24B BARS (1/2 E.F.) 15 SPACES @ 11"

12"

3"

3" CLR. (2) #4 T23B BARS (FILL FACE)

D26B BARS

(3) #7 V23 BARS

(16) #6 D31B BARS

V23B BARS

5 SPACES @ 12"

D25B BARS

2 SPCS @ 11" 1 1/2"

3" CLR.

#6 FW22B BARS 12"

10 3/4"

4 1/2" CLR.

T23 BARS D31 BARS

#6 FW25B BARS 17 SPACES @ 11" (36) #6 FW23B BARS (1/2 E.F.), (36) #6 FW22B BARS (1/2 TOP & BOTTOM), (36) #6 DOWELS (1/2 E.F.)

ELEVATION E-E ELEVATION OF WINGWALL FILL FACE

DETAIL "C" S1-S7_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

B

A A

G

BENT 1 BENT 2

B

BENT 1 ELEVATIONS LOCATION

ELEVATION

A

889.00

B

895.75

C

893.79

D

894.04

E F G

889.00

F

BENT 2 ELEVATIONS

B F

E

LOCATION

ELEVATION

A

895.00

B

895.75

C

893.79

D

894.04

893.79

E

893.79

895.75

F

895.75

G

890.75

C

D

D

E

C

F

B B

F

A

B G

A

PLAN - END BENT AND WINGWALL ELEVATIONS

F

B E

D

F

C

B E

G

A

ELEVATION "A-A"

D

C

B

A

G

ELEVATION "B-B"

S8_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

25'-0"

DESIGN SPECIFICATIONS:

1.

AFTER BEAMS HAVE BEEN ERECTED, HOLES SHALL BE DRILLED INTO SUBSTRUCTURE AND ANCHOR BOLTS PLACED. ANCHOR HOLES SHALL BE FILLED WITH NON-SHRINK GROUT TO TOP OF BEAM AND ALLOWED TO CURE MIN. 24 HOURS PRIOR TO GROUTING THE SHEAR KEYS. ANCHOR BOLTS SHALL BE EQUIVALENT TO ASTM A 307.

THE CONTRACTOR SHALL FOLLOW THE SPECIFICATIONS AS STATED IN THE "MISSOURI STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION," 2011 AND CURRENT SUPPLEMENTAL SPECIFICATIONS REVISIONS. DESIGN LOADING:

HS20-44 SEISMIC PERFORMANCE CATEGORY 'A' EARTH --- 120 PSF EQUIVALENT FLUID PRESSURE --- 45 POUNDS/CU. FT. 35 POUND/SQUARE FOOT FUTURE WEAR SURFACE SUPERSTRUCTURE: SIMPLY SUPPORTED NON-COMPOSITE FOR DEAD AND LIVE LOADS.

CONCRETE REINFORCING STEEL STRUCTURAL CARBON STEEL

6'-0"

TYP. SEE CROSS SECTION SEE SHEET S6

f'c = 6,000 psi fy = 60,000 psi fy = 50,000 psi

6"

6"

6'-0"

6'-0"

6"

LONGITUDINAL KEYS SHALL BE GROUTED.

3.

THE 1" DIAMETER RODS IN THE TRANSVERSE TIE ASSEMBLY SHALL BE TIGHTENED TO A SNUG FIT AND THE THREADS SET. POCKETS THAT RECEIVE TRANSVERSE TIE BAR OUTSIDE SHALL BE FILLED WITH GROUT AFTER TRANSVERSE TIE ASSEMBLY IS IN PLACE. SEE SHEET S6 FOR DETAILS. TIE RODS SHALL BE ASTM A36.

4.

USE RECESSED LIFT ANCHORS ON EACH END. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION.

5.

ALL REBAR IN PRECAST DECK BEAMS SHALL BE EPOXY COATED.

6.

DO NOT LIFT BEAMS UNTIL CONCRETE STRENGTH IS EQUAL TO 3500 PSI.

7.

PROVIDE A TYNE FINISH ON TOP OF BEAMS WITH DEPTH OF TYNES 1/4".

8.

JOINT FILLER MUST BE IN PLACE PRIOR TO SETTING SLAB BEAMS.

9.

SLAB BEAMS MUST MEET A DEFLECTION CRITERIA OF L/800

10.

SUPPLIER NEEDS TO BE PRE APPROVED

11.

NOMINAL 1" JOINT AT CENTERLINE PIER SHALL BE FILLED WITH JOINT FILLER. SEAL JOINT WITH SONOLISTIC NFI BY SONNEBORN SEALANT SYSTEMS OR APPROVED EQUAL.

12.

SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL.

6"

6'-0"

6"

6'-0"

6"

CENTERLINE ROADWAY PROFILE GRADE LINE

SHEAR KEYS TYP. SEE NOTE 2

SLOPE = 2%

2.

6'-0"

12'-6"

12'-6"

NOTES: 2002 A.A.S.H.T.O. STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, 17TH EDITION AND CURRENT INTERIMS

6'-0"

SLOPE = 2%

1/4" JOINT-TYP. (8) PRECAST CONCRETE DECK BEAMS @ 3'-1 1/4" + 1/4" JOINTS = 25'-0"

TYPICAL CROSS SECTION OF ROADWAY (NEAR CL OF STRUCTURE)

8" CURB (TYP.)

TYPICAL SLAB CAMBER

CL BENT

SEE NOTE 1 (TYP.)

1"Ø X 36.5" H.A.S. THREADED ROD (TYP.) WITH NUT AND 1/4" WASHER (2 EACH BEAM) TRANSVERSE TIES (SEE NOTE 3)

CL BRIDGE

SEE NOTE 2 (TYP.) 1'-0"

12'-6"

1'-0"

SEE NOTE 4 (TYP.)

SEE NOTE 4 (TYP.)

1'-0"

3"Ø OPEN HOLE TO BE FILLED WITH APPROVED NON-SHRINK GROUT AFTER BOLT AND NUT HAVE BEEN INSTALLED.

1 1/2"Ø OPEN HOLE TO BE FILLED WITH HIGH STRENGTH NON-SHRINK EPOXY GROUT. (TYP). (2 EACH BEAM)

FIELD DRILL 1 1/8"Ø X 1'-3" HOLE. PLACE THREADED ROD WITH APPROVED ADHESIVE (HILTI HIT RE-500 OR APPROVED EQUAL).

2"

SEE NOTE 1 (TYP.)

(8) DECK BEAMS

25'-0"

12'-6"

NOT TO SCALE

FILL AREA UNDER GIRDER WITH JOINT FILLER (SEE NOTE 8) 1/2" ELASTOMERIC BEARING PAD

SECTION AT ABUTMENTS (ALONG CL BEAMS) 4'-0"

12"

12"

22'-6"

22'-6" 45'-0"

SLAB BEAM LAYOUT PLAN

S9-S11_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

NOTE:

1. USE DAYTON/RICHMOND D-4 HEX COUPLING NUT FOR CONNECTING 1"Ø THREADED RODS. ALTERNATE APPROVED TRANSVERSE TIE RODS OF INCREASED SEGMENTAL LENGTH ARE ACCEPTABLE, INCLUDING 1 CONTINUOUS TIE ROD THROUGH ALL DECK BEAMS.

8 3/8"

1'-0"

PLAN OF STIRRUP SPACING DETAIL

CL BEAM

3"

9 SPACES @ 6" CTS. (8) TRADITIONAL STIRRUPS 5 SPACES @ 9" CTS. (2) DOUBLE STIRRUPS 9" (6) DOUBLE STIRRUPS 1'-0"

1'-0"

12 SPACES @ 12" CTS. (1) TRADITIONAL STIRRUPS (12) DOUBLE STIRRUPS

B

A

B

A

12 SPACES @ 12" CTS. (1) TRADITIONAL STIRRUPS (12) DOUBLE STIRRUPS

6"

5 SPACES @ 9" CTS. 1'-0" (6) DOUBLE STIRRUPS

9 SPACES @ 6" CTS. (8) TRADITIONAL STIRRUPS (2) DOUBLE STIRRUPS 9"

4'-0"

TYPICAL END BENT

TYPICAL END BENT 45'-0"

ELEVATION OF STIRRUP SPACING DETAIL

4"ROUND x1/2" PL WASHER FOR 10° SKEW

SEE NOTE 1

CL SPAN

WASHERS ON 0° SKEW

OUTSIDE BEAM

1/4"

4 1/2"

1/2"

11 1/2"

NUT FOR 1" DIA. ROD

3" TRANSVERSE TIE ASSEMBLY SHALL BE GALVANIZED PER ASTM123

3" DIA. OPENING

1" DIA. RODS (THREAD EACH END 4") SEE NOTE 3

SECTION ALONG TRANSVERSE TIE ASSEMBLY

SEE NOTE 3

PARTIAL PLAN TRANSVERSE TIE ASSEMBLY ('D'=0°)

S9-S11_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

5"

1"

REFER TO INTERIOR BEAM SECTION FOR LONGITUDINAL BAR SIZE AND SPACING

2'-10 1/4" (OUTSIDE BAR DIMENSION)

#4 BARS

8"

8"

#4 BARS

REFER TO INTERIOR BEAM SECTION FOR LONGITUDINAL BAR SIZE AND SPACING

#4 BAR @ 9" SEE CURB BAR DETAIL

#4 BAR @ 9" SEE CURB BAR DETAIL

2"

1'-6" MIN.

23"

#4 STIRRUPS (SEE BEAM LAYOUT FOR SPACING)

1'-6" MIN.

23"

1"

3/4" RADIUS TYP.

12" 3"

3"

SEE "SINGLE LEG OF DOUBLE STIRRUP" STIRRUP DETAIL

11"

SEE "TRADITIONAL" STIRRUP DETAIL

2"

1'-6 1/2" (OUTSIDE BAR DIMENSION)

5" 3/4" RADIUS TYP.

3"

3" 3/4" CHAMFER TYP.

3'-1 1/4"

TYPICAL CROSS SECTION B-B

(EXTERIOR BEAM) NOT TO SCALE

(EXTERIOR BEAM) NOT TO SCALE 2 1/2"

2 1/2"

3"

3'-1 1/4"

TYPICAL CROSS SECTION A-A

1/2"

3 5/8"

2 1/2"

(6) #5 BARS (AS SHOWN)

1'-6 1/2"

3/4" CHAMFER TYP.

2 1/2"

(6) #5 BARS (AS SHOWN)

7 7/8"

CL ANCHOR HOLES EACH END

7 7/8"

1'-8 5/8"

4 1/2"

4" 1"

1 1/2"

2 5/8"

2"

(8) #8 BARS EA. SPACED AS SHOWN (TOP & BOT) (SIM.)

2"

3"

3"

1'-0"

1 1/2"

1"

SEE "SINGLE LEG OF DOUBLE STIRRUP" STIRRUP DETAIL

SEE "TRADITIONAL" STIRRUP DETAIL

1 1/2"

1"

23"

3/4"

3"

1 1/2"

1"

1 1/2"

1" 3/4" CHAMFER TYP.

9 5/8"

(SINGLE LEG OF DOUBLE STIRRUP)

#4 STIRRUPS (SEE BEAM LAYOUT FOR SPACING)

3/4" 23"

3"

3"

4 1/2"

3"

4"

3"

1/2"

3/4" CHAMFER TYP.

1"

2 5/8" (8) #8 BARS EA. SPACED AS SHOWN (TOP & BOT) (SIM.)

2"

2"

3" 1'-6"

3'-1 1/4" 3'-1 1/4"

TYPICAL CROSS SECTION A-A Interior Beam (INTERIOR BEAM) NOT TO SCALE

TYPICAL CROSS SECTION B-B (INTERIOR BEAM) NOT TO SCALE

S9-S11_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

S12-S13_DE NTS

01.22.2013

SHAPE 15

C

C

SHAPE 24

1

H

SHAPE 32

#2 GAGE (CORRUGATED PREFERRED) (SMOOTH ACCEPTABLE) #4 GAGE 2"-5" HEIGHT #2 GAGE OVER 5"-9" #0 GAGE OVER 9" HEIGHT

K H

C

D

D

CONTINUOUS HIGH CHAIR - (CHC)

SHAPE 33

SHAPE 26

EPOXY OR PLASTIC

D (IN.)

#3 #4 #5 #6

1 1/2" 2" 2 1/2" 4 1/2"

4" 4 1/2" 6" 8"

4" 4 1/2" 5 1/2" 7"

2 1/2" 3" 3 3/4" 4 1/2"

NOTE: UNLESS OTHERWISE NOTED DIAMETER "D" IS THE SAME FOR ALL BENDS AND HOOKS ON A BAR.

D

*

1

SYMMETICAL ABOUT CL BALL FOOT

#5 GA

ELEVATION

SECTION

HOOK A OR G d

J

90°

H

180°

D

ALL REINFORCING IN END BENTS INCLUDED WITH SUPERSTRUCTURE QUANTITIES.

BENDING DIAGRAMS NOTES: ALL STANDARD HOOKS AND BENDS OTHER THAN 180 DEG TO BE BENT WITH SAME PROCEDURE AS FOR 90 DEG. STD. HOOKS HOOKS AND BENDS SHALL BE IN ACCORDANCE WITH THE PROCEDURES AS SHOWN ON THIS SHEET E - EPOXY COATED REINFORCEMENT S - STIRRUP X - BAR IS INCLUDED IN SUBSTRUCTURE QUANTITIES V - BAR DIMENSIONS VARY IN EQUAL INCREMENTS BETWEEN DIMENSIONS

ØD

90°

SIZE OF 180° HOOKS GRADE 40 KSI D = 6d FOR #3 THRU #8 D = 8d FOR #9, #10 AND #11 D = 10d FOR #14 AND #18

135°

SLAB BOLSTER - (SB)

D (IN.)

#3 #4 #5 #6 #7 #8 #9 #10

2 1/4" 3" 3 1/4" 4 1/2" 5 1/4" 6" 9 1/2" 10 1/4"

*

BAR SUPPORTS FOR CONCRETE REINFORCEMENT

SIZE OF 90° HOOKS ALL GRADES AND 180° HOOKS GRADE 60 KSI

END HOOK DIMENSIONS BAR SIZE

BALL FOOT SECTION

DETAILING DIMENSION

ØD

4d OR 2 1/2" MIN d

KNUCKLED FOOT

*COATED WHEN USED TO SUPPORT COATED REINFORCEMENT.

d

HOOK A OR G CL BEAM

DETAILING DIMENSION

GRADES 40-50-60 KSI 90° HOOKS 135° HOOKS HOOK HOOK APPROX. A OR G A OR G H

Ø

DETAILING DIMENSION

D

BAR SIZE

ØD A OR G d

6d OR 2 1/2" MIN

Ø

END HOOK DIMENSIONS

DETAILING DIMENSION

CL BEAM

5" #4 GAGE CORRUGATED

GENERAL NOTES: ALL GAGES GIVEN ARE AMERICAN STEEL AND WIRE GAGES. ALL STEEL TO BE AMERICAN. ALL CONTACT POINTS TO BE SECURELY WELDED. USE A BALL OR KNUCKLED FOOT ON ALL BAR SUPPORTS BEARING ON FORMS. WHERE BAR SUPPORTS ARE USED ON EARTH OR AGGREGATE SUBGRADES SUITABLE PLATES OR CONTINUOUS BARS SHALL BE PROVIDED TO PREVENT DISPLACEMENT OF THE SUPPORT FOOT. ALL DIMENSIONS TO REINFORCING STEEL ARE TO C/L BAR EXCEPT WHERE CLEAR DISTANCE FROM FACE OF CONCRETE IS INDICATED. HEIGHT OF BAR SUPPORTS TO BE THAT REQUIRED TO SUPPORT BARS IN EXACT POSITIONS SHOWN ON PLANS. WHEN BARS OF DIFFERENT SIZES ARE USED IN THE SAME MEMBERS, THE SELECTION OF BAR SUPPORTS SHALL BE BASED ON THE LARGER SIZE. SUPPORTS FOR UPPER LAYERS NEED NOT BE DIRECTLY OVER THE SUPPORTS BELOW. PORTIONS TO BE

BENDING DIAGRAM

6d FOR #3 THRU #5 12d FOR #6 OR 2 1/2" MIN

1°

PART SECTION G-G

SLABS ON PRECAST PRESTRESSED PANELS

15°

KNUCKLED FOOT

ELEVATION

D

CLEAR DISTANCE AS SPECIFIED ON PLANS MAX SPACING POSSIBLE. SUPPORTS FOR UPPER LAYERS NEED NOT BE DIRECTLY OVER THE SUPPORTS BELOW.

2"*

SHAPE 31

TOP OF PRECAST PRESTRESSED PANELS

PART SECTION F-F

1 1/4"

C

2

1/8" MIN 3/8" MAX 45°

H

D

D

C

1

PREFERRED LEG CONFIGURATION-LEG WITHOUT BEND ACCEPTABLE

8 1/4" (MAX) 2"*

F

CL GIRDER

PART CROSS SECTION

K B

E

B K

D

D B

H B

C

1"±

SHAPE 29

H

B F C

SHAPE 25

K F

SHAPE 30

SHAPE 23

VERTICAL LEG C

K

E

B H

E

H

B

K

C

K

D

PRECAST PRESTRESSED PANELS

12d

H B

D

E

B

D

D

E

K

B

SHAPE 22

SHAPE 21

F

C

B

C

B K

C

SHAPE 28 A G

TOP OF SLAB

G

F

5"±

H

C

SHAPE 27

H B

D

SHAPE 19

1Ð TURNS

E

B

H

A

C

C

SPOTWELD #2 BARS

H B

K D

SHAPE 12 SHAPE 13

K H H

SHAPE 20

C

(SB)

(SB)

A OR G

SHAPE 14

SHAPE 16

E

TOP OF SLAB

(CHC)

" /32

D

SHAPE 18

D

K

G

(SB)

R5

K

C

C

SHAPE 11

G

B

3" PITCH

A

D

SHAPE 10

SHAPE 9

B

E B

C

B B

D

C

SHAPE 8

VERTICAL LEG

G

E

12" (SB) 2'-0" (MAX) MAX SPA.

/4" R3

C

E

C

B

SHAPE 7

E

D

SHAPE 6

SHAPE 17

B

B

H

K

K F

A

D

C

B

C

H

B D

B

LA A P

2

(CHC)

B

K

B

E

B

K

H

C

3" CLR

F

180° HOOKS ALL GRADES A OR G J 5" 3" 6" 4" 7" 5" 8" 6" 10" 7" 11" 8" 15" 11 1/4" 17" 12 3/4"

90° HOOKS ALL GRADES A OR G 6" 8" 10" 12" 14" 16" 19" 22"

SHOWN ON THIS LINE AND THE FOLLOWING LINE NO. EA. NUMBER OF BARS OF EACH LENGTH NOMINAL LENGTHS ARE BASED ON OUT TO OUT DIMENSIONS SHOWN IN BENDING DIAGRAMS AND ARE LISTED FOR FABRICATORS USE (NEAREST INCH ACTUAL LENGTHS ARE MEASURED ALONG CENTERLINE BAR TO THE NEAREST INCH PAYWEIGHTS ARE BASED ON ACTUAL LENGTHS. S12-S13_DE NTS

01.22.2013

NOTE: THIS DRAWING NOT TO SCALE. FOLLOW DIMENSIONS.

PUBLIC NOTICE Permit No. NWK-2014-1161 Issue Date: January 14, 2015 Expiration Date: February 13, 2015

US Army Corps of Engineers Kansas City District

30-Day Notice

______________________________________________________________________________ APPLICANT/IN-LIEU FEE SPONSOR: Missouri Conservation Heritage Foundation P.O. Box 366 Jefferson City, Missouri 65102-0366 PROJECT LOCATION (As shown in the referenced mitigation plan): The proposed mitigation plan No. SSTF1004-Dallas County is located along Hays Road at an existing crossing in Greasy Creek in the northeast ¼ of Section 6, Township 33 north, Range 19 west, Dallas County, Missouri. The project is within the Ozark/Osage Ecological Drainage Unit (EDU) [USGS QUAD Charity -- Latitude: 37.612448 -- Longitude: -93.067558]. AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344). ACTIVITY (As described in the referenced mitigation plan): The Missouri Conservation Heritage Foundation (Sponsor) proposes under its Stream Stewardship Trust Fund (SSTF) In-Lieu Fee (ILF) Instrument to establish mitigation plan No. SSTF1004-Dallas County entitled the Hayes Road Low Water Crossing Replacement Project. A draft copy of the mitigation plan has initially been reviewed by the Interagency Review Team (IRT) which is composed of representatives from the U.S. Environmental Protection Agency, the U.S. Fish and Wildlife Service, the Missouri Department of Natural Resources, and the Missouri Department of Conservation. The mitigation plan consists of initiating construction work on Hays Road in Dallas County to remove a low water crossing in Greasy Creek and replace it with a clear-span bridge. The existing crossing is a vented ford with three concrete box culverts. The crossing blocks passage of aquatic organisms during low flows because the culverts slabs are perched above the streambed. During moderate to high flows the crossing creates currents with high velocity that damage downstream banks. The existing crossing will be demolished and hauled from the site. Once removed a new low water bridge (clear-span design) will be constructed on the same footprint as the existing crossing. The mitigation plan with design drawings is posted at: http://www.nwk.usace.army.mil/Media/PublicNotices.aspx. This crossing is one of five crossings that were previously identified as fish passage barriers in the Niangua River watershed. Replacement of the crossing will increase fish passage, improve stream sediment transport, and increase stream stability within this reach. In addition, the new crossing will be used as a demonstration project for the Dallas County Road Department. The Sponsor proposes to enter into a 30-year term cooperative agreement with the county to provide standard maintenance for the project. This proposed agreement would not alleviate the Sponsor from their responsibility

for the long term protection and management of this SSTF-funded project as described in their ILF instrument. The project is partially funded by Dallas County, the U.S. Fish & Wildlife Service, and the Missouri Department of Conservation. If approved by the Corps, in consultation with the IRT, the project will have a total potential of 11,500 mitigation credits minus a partial reduction of credits that would be generated from use of federal funds for the project as required by the 2008 Mitigation Rule. APPLICANT'S STATEMENT OF AVOIDANCE, MINIMIZATION, AND COMPENSATORY MITIGATION FOR UNAVOIDABLE IMPACTS TO AQUATIC RESOURCES: The project is proposed under the Sponsor's ILF instrument as compensatory mitigation for stream impacts authorized by Department of the Army permits. The Sponsor has avoided and minimized impacts to waters of the U.S. to the maximum extent practicable through project design. ADDITIONAL INFORMATION: Additional information about this application may be obtained by contacting Mr. James A. Ptacek, U.S. Army Corps of Engineers, Missouri State Regulatory Office, 221 Bolivar Street, Suite 103, Jefferson City, Missouri 65101, telephone No. 816-389-3834, or email to james.a.ptacek@usace.army.mil. All comments to this public notice should be directed to the above address. CULTURAL RESOURCES: Kansas City District will comply with the National Historic Preservation Act of 1966 and 36 CFR 800. We have checked the National Register of Historic Places and the Federal Register and no property listed in the Register or proposed for listing is located in the permit area. This is the extent of our knowledge about historic properties in the permit area at this time. However, we will evaluate input by the State Historic Preservation Officer, Tribal Historic Preservation Officers (or Tribe designated representative) and the public in response to this public notice, and we may conduct or require a reconnaissance survey of the permit area to check for unknown historic properties, if warranted. ENDANGERED SPECIES: Greasy Creek is a major western tributary to the Niangua River. It

contains 12.9 miles within the known range of the federally threatened Niangua Darter, Etheostoma nianguae. The U.S. Fish and Wildlife Service will serve as the lead federal agency responsible for Endangered Species Act compliance via Section 7 consultation by developing an effects determination as result of the proposed project toward the species and/or any critical habitat. Once the determination is made, it will become part of the decision document. The USACE is also requesting any comments from other interested agencies and individuals. FLOODPLAINS: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this public notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: If authorized, this project will meet the conditions of a nationwide permit, which presently has certification under Section 401 of the Clean Water Act (33 USC 1341) in compliance with applicable effluent limitations and water quality standards. Certification expresses the state's opinion that the discharge will not violate applicable water quality standards.

PUBLIC INTEREST REVIEW: The decision to approve the mitigation plan and verify compliance with a nationwide permit will be based on an evaluation of the probable impact including the cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, esthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs and, in general, the needs and welfare of the people. The evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency under authority of Section 404(b) of the Clean Water Act (33 USC 1344). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this mitigation plan. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COMMENTS: This notice is provided to outline details of the above described activity so this District may consider all pertinent comments prior to determining if issuance of a permit would be in the public interest. Any interested party is invited to submit to this office written facts or objections relative to the activity on or before the public notice expiration date. Comments both favorable and unfavorable will be accepted and made a part of the record and will receive full consideration in determining whether it would be in the public interest to issue the Department of the Army permit. Copies of all comments, including names and addresses of commenters, may be provided to the applicant. Comments should be mailed to the address shown on page 2 of this public notice. PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this public notice, that a public hearing be held to consider this application. Such requests shall state, with particularity, the reasons for holding a public hearing.

Section 6, Township 33 north, Range 19 west APPLICATION NO. NWK-2014-1161 MISSOURI CONSERVATION HERITAGE FOUNDATION LOW WATER CROSSING REMOVAL/BRIDGE REPLACEMENT GREASY CREEK DALLAS COUNTY, MISSOURI SHEET 1 OF 1 DATED 14 JANUARY 2015

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas