You can copy from here when filling out the rest of the page.
BOATHOUSE ON THE BOGUE FALAYA RIVER IN ST. TAMMANY PARISH
NAME OF APPLICANT: John M. Taylor c/o Lamulle Construction, LLC at 4978 Pontchartrain Drive, Slidell, Louisiana 70458.
LOCATION OF WORK: On the Bogue Falaya River, at 18149 Three Rivers Road, Covington, in St. Tammany Parish, Louisiana, as shown on the attached drawings.
HUC: 080090201; Liberty Bayou – Tchefuncte River
CHARACTER OF WORK: To install and maintain a 24' x 30' boathouse adjacent to an existing bulkhead. The structure will extend 65’ into the river, which is approximately 175’ wide at this location. No fill is required. No special aquatic sites will be affected by this project; no mitigation is anticipated.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
P.O. BOX 60267
NEW ORLEANS LA 70160-0267
REPLY TO
ATTENTION OF
January 20, 2015
Operations Division
Eastern Evaluation Section
Project Manager
Jennifer Burkett
(504) 862-2045
jennifer.e.burkett@usace.army.mil
SUBJECT: MVN 2014-2389 EBB
PUBLIC NOTICE
Interested parties are hereby notified that a permit application has been received
by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X]
Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [ ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
BOATHOUSE ON THE BOGUE FALAYA RIVER IN ST. TAMMANY PARISH
NAME OF APPLICANT: John M. Taylor c/o Lamulle Construction, LLC at
4978 Pontchartrain Drive, Slidell, Louisiana 70458.
LOCATION OF WORK: On the Bogue Falaya River, at 18149 Three Rivers Road,
Covington, in St. Tammany Parish, Louisiana, as shown on the attached drawings.
HUC: 080090201; Liberty Bayou Tchefuncte River
CHARACTER OF WORK: To install and maintain a 24' x 30' boathouse adjacent to an
existing bulkhead. The structure will extend 65' into the river, which is approximately
175' wide at this location. No fill is required. No special aquatic sites will be affected by
this project; no mitigation is anticipated.
The comment period for the Department of the Army Permit will close 15 days
from the date of this public notice. Written comments, including suggestions for
modifications or objections to the proposed work, stating reasons thereof, are being
solicited from anyone having interest in this permit must be mailed so as to be received
before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing or
e-mailing the Corps of Engineers Project Manager listed above. Any request
must be specific and substantively supportive of the requested extension, and
-2-
received by this office prior to the end of the initial comment period. The Section
Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be
continuous to the initial comment period and, inclusive of the initial comment
period, will not exceed a total of 30 calendar days.
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public,
federal, state, and local agencies and officials, Indian Tribes, and other interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the U.S. Army Corps of Engineers to
determine whether to make, modify, condition, or deny a permit for this proposal. To
make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest
factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National
Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register
of Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would neither affect any species
listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any
habitat designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of N/A acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
-3-
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosures
1
LAMULLE CONSTRUCTION, INC.
14-3
10.20.2014
AS SHOWN
P-1
PLAN VIEW
Scale: 1/8" = 1'-0"
BOATHOUSE & DOCK FOR JAMES TAYLOR, 18149 THREE RIVERS ROAD,
BEING 1.06 ACRES IN SECTION 9, T-7-S, R-11-E, ST. TAMMANY PARISH,
LOUISIANA.
1
LAMULLE CONSTRUCTION, INC.
14-3
10.20.2014
AS SHOWN
P-2
ENLARGED PLAN VIEW
Scale: 1/8" = 1'-0"
BOATHOUSE & DOCK FOR JAMES TAYLOR, 18149 THREE RIVERS ROAD,
BEING 1.06 ACRES IN SECTION 9, T-7-S, R-11-E, ST. TAMMANY PARISH,
LOUISIANA.
1
LAMULLE CONSTRUCTION, INC.
14-3
10.20.2014
AS SHOWN
P-3
TYPICAL SECTION VIEW
Scale: 3/16"=1'-0"
BOATHOUSE & DOCK FOR JAMES TAYLOR, 18149 THREE RIVERS ROAD,
BEING 1.06 ACRES IN SECTION 9, T-7-S, R-11-E, ST. TAMMANY PARISH,
LOUISIANA.
1
LAMULLE CONSTRUCTION, INC.
14-3
10.20.2014
N.T.S
P-4
TYPICAL SECTION VIEW
Scale: N.T.S.
BOATHOUSE & DOCK FOR JAMES TAYLOR, 18149 THREE RIVERS ROAD,
BEING 1.06 ACRES IN SECTION 9, T-7-S, R-11-E, ST. TAMMANY PARISH,
LOUISIANA.