You can copy from here when filling out the rest of the page.
The applicant, Clearwater Beach Property Owner’s Association (CBPOA), has requested Department of the Army authorization to perform dredging, with ten-year maintenance, and subsequent placement of the material in an existing upland staging area. The project work site is located at 352 Kings Point Road, Town of East Hampton, Suffolk County, New York.
The applicant, Clearwater Beach Property Owner’s Association (CBPOA), has requested Department of the Army authorization to perform dredging, with ten-year maintenance, and subsequent placement of the material in an existing upland staging area. The project work site is located at 352 Kings Point Road, Town of East Hampton, Suffolk County, New York.
The work would involve clam shell bucket or other mechanical dredging of approximately 1,200 cubic yards of material from an approximate 10,000-square-foot channel to a maximum depth of six feet below the plane of mean low water (MLW). The final channel shape will be approximately 150-feet-long by 58 to 96-feet-wide. Dredging is done by mechanical means. Material would be transported from clamshell bucket to friction crane or long reach excavator to temporary storage area located upland to the east of Hog Creek Channel. Upon drying, the material will be moved approximately 240 linear feet further east to the final dredge disposal area. It is anticipated that there will be additional dredging events with a dredge volume of approximately 1,200 cubic yards per event.
The applicant has stated that they have avoided, minimized, and mitigated for impacts proposed to the maximum extent practicable, reducing their original volume from 4,000 cubic yards to 1,200. Most of the impacts associated with the 10-year maintenance dredging project are temporary and would be offset by implementing best management practices. Using Clamshell or mechanical dredge techniques reduces the amount of water mixed with material, is capable of handling large debris and,
can be combined with hydraulic transport to form a hybrid system. It also digs below the substrate and its noise and vibration provide notice to nearby species.
The stated purpose of this project is to provide a safe navigable 6 foot deep MLW channel for entry to Hog Creek from Gardiners Bay.