Home

Los Angeles District

Run scraper

SPL-2013-00601-JWM 13th Street Bridge Replacement

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Application for Permit 13th Street Bridge Replacement, Vandenberg Air Force Base

To replace the existing 13th Street Bridge crossing of the Santa Ynez River and to demolish the existing bridge. As proposed, the project would result in approximately 1.1 acres of permanent impacts to waters of the U.S., and approximately 1.80 acres of temporary impacts to waters of the U.S.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas