Lake Lery East Shoreline and Marsh Restoration Project in Saint Bernard Parish, Louisiana

NAME OF APPLICANT: Saint Bernard Parish Government ℅ Coastal Environments, Inc., Attn: Hunter Guidry, 1260 Main Street, Baton Rouge, Louisiana, 70802.

LOCATION OF WORK: Dredging adjacent to the northern shoreline of Lake Lery to restore two areas of its eastern shoreline near the western natural levee of Bayou Terre Aux Boeufs, in Delacroix, Louisiana, Saint Bernard Parish, as shown on the enclosed drawings.

Hydrologic Unit Code: 08090203 - Eastern Louisiana Coastal Borrow Area - Latitude: 29.8078, Longitude: -89.8071 Restoration Site 1 - Latitude: 29.7788, Longitude: -89.7827 Restoration Site 2 - Latitude: 29.7873, Longitude: -89.7784

CHARACTER OF WORK: The Lake Lery East Shoreline and Marsh Restoration Project includes hydraulically dredging 780,700 cubic yards of material to create 52 acres of marsh and nourish an additional 43 acres of broken/subsiding marsh. The two restoration areas would be contained by an earthen dike that would extend from the Bayou Terre Aux Boeufs natural levee into open water. Filling activities within the earthen dike would bring the marsh elevation to +1.5 feet at both locations for lift 1 and +2.75 feet (Site 1) and +3.25 feet (Site 2) for lift 2. Material would be transported via pipeline within two 75 foot wide open water pipeline corridors.

This project is included in the Louisiana Coastal Master Plan via funding from the Coastal Impact Assistance Program (CIAP) program. It has been designed to provide a net benefit to the eastern portion of Lake Lery’s shoreline throughout the project’s 20 year design life. No additional compensatory mitigation measure have been proposed at this time.

JOINT PUBLIC NOTICE February 9, 2015 United States Army Corps of Engineers New Orleans District Regulatory Branch Post Office Box 60267 New Orleans, Louisiana 70160-0267

State of Louisiana Department of Environmental Quality ATTN: Water Quality Certifications Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-2225 Brad.LaBorde@usace.army.mil Project Manager Brad LaBorde Permit Application Number MVN 2014-1120 EOO

(225) 219-3225 Project Manager Elizabeth Johnson WQC Application Number WQC 150204-02

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Water Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). Lake Lery East Shoreline and Marsh Restoration Project in Saint Bernard Parish, Louisiana NAME OF APPLICANT: Saint Bernard Parish Government Coastal Environments, Inc., Attn: Hunter Guidry, 1260 Main Street, Baton Rouge, Louisiana, 70802. LOCATION OF WORK: Dredging adjacent to the northern shoreline of Lake Lery to restore two areas of its eastern shoreline near the western natural levee of Bayou Terre Aux Boeufs, in Delacroix, Louisiana, Saint Bernard Parish, as shown on the enclosed drawings. Hydrologic Unit Code: 08090203 - Eastern Louisiana Coastal Borrow Area - Latitude: 29.8078, Longitude: -89.8071 Restoration Site 1 - Latitude: 29.7788, Longitude: -89.7827 Restoration Site 2 - Latitude: 29.7873, Longitude: -89.7784 CHARACTER OF WORK: The Lake Lery East Shoreline and Marsh Restoration Project includes hydraulically dredging 780,700 cubic yards of material to create 52 acres of marsh and nourish an additional 43 acres of broken/subsiding marsh. The two restoration areas would be contained by an earthen dike that would extend from the Bayou Terre Aux Boeufs natural levee into open water. Filling activities within the earthen dike would bring the marsh elevation to +1.5 feet at both locations for lift 1 and +2.75 feet (Site 1) and +3.25 feet (Site 2) for lift 2. Material would be transported via pipeline within two 75 foot wide open water pipeline corridors. This project is included in the Louisiana Coastal Master Plan via funding from the Coastal Impact Assistance Program (CIAP) program. It has been designed to provide a net benefit to the eastern

-2portion of Lake Lery's shoreline throughout the project's 20 year design life. No additional compensatory mitigation measure have been proposed at this time. The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources.

-3Dredging and filling activities are located in areas known to be utilized by the West Indian manatee (Trichechus manatus). The West Indian manatee is listed as endangered by the U.S. Department of Interior. Our initial finding is that the proposed work is "not likely to adversely affect" the West Indian manatee. Concurrence has been received from the U.S. Fish and Wildlife Service per the Standard Local Operating Procedure for Endangered Species in Louisiana, dated October 22, 2014. If authorized, "The Standard Manatee Conditions for In-Water Activities" will be made part of the permit's special conditions. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 95 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Water Quality Certifications, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Michael V. Farabee Chief, Eastern Evaluation Section Enclosure

ST. BERNARD PARISH GOVERNMENT

(CIAP) COASTAL IMPACT ASSISTANCE PROGRAM LAKE LERY MARSH CREATION ST. BERNARD PARISH, LOUISIANA

STATE OF LOUISIANA INSET MAP

BORROW AREA

SITE 2

SITE 1

PREPARED FOR:

Google Earth Pro Date: March 5, 2013

St. Bernard Parish Government 8201 W. Judge Perez Dr. Chalmette, LA 70043 (504) 278-1593

PREPARED BY:

3500 N. Causeway Blvd., Suite 900 Metairie, Louisiana 70002 (504) 837-6326

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE AS NOTED

DWG ID. TITLE SHEET

DWG. NO. FIG 1

REV.

INDEX OF DRAWINGS: FIG. 1 FIG. 2 FIG. 3 FIG. 4 FIG. 5 FIG. 6 FIG. 7 FIG. 8 FIG. 9 FIG. 10 FIG. 11 FIG. 12 FIG. 13

TITLE SHEET INDEX OF DRAWINGS PROJECT LOCATION AND VICINITY MAP OVERALL PROJECT LAYOUT WELL HEAD INFORMATION BORROW AREA LAYOUT ACCESS CHANNEL TYPICAL SITE 1 SECTION TYPICAL SITE 2 SECTION MARSH CREATION PLAN - SITE 1 (SHEET 1 OF 2) MARSH CREATION PLAN - SITE 1 (SHEET 2 OF 2) MARSH CREATION PLAN - SITE 2 75' WIDE TEMPORARY PIPELINE CORRIDOR

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE

DWG ID. INDEX OF DRAWINGS

DWG. NO. FIG 2

REV.

ST. BERNARD PARISH

STATE OF LOUISIANA

BORROW SITE

SITE 2

SITE 1

MARSH CREATION SITE

PROJECT LOCATION MAP SCALE: 1" = 10,000'

NEW ORLEANS

LAKE LERY

PROJECT SITE

PROJECT VICINITY MAP SCALE: 1" = 40,000'

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE AS NOTED

DWG ID. PROJECT VICINITY AND LOCATION MAP

DWG. NO. FIG. 3

REV.

NO DREDGING ZONE. 50' ON EITHER SIDE OF EXISTING PIPELINES

97 96

BORROW AREA SEE FIGURE 6 FOR DETAILS 93 94

DELACROIX HWY. (LA 300)

92 91 90 89 88

87 83 85 86

84 81

82

80

78 76

79

77

75

MARSH CREATION SITE

74

73 71 69

65 64 63 62 61

59

ACCESS CHANNEL FOR BORROW AREA SEE FIGURE 7 FOR DETAILS

60

SITE 2 57

55

75' WIDE PIPELINE CORRIDOR SITE (SEE FIGURE 15

56

SITE 1

Google Earth Pro Date: March 5, 2013

LEGEND:

WELL HEAD BORROW MATERIAL PIPELINE TEMPORARY CONSTRUCTION EASEMENT

C/E

C/E

BORROW AREA LIMITS MARSH CREATION AREA CUT/FILL NOTE: SEE FIG 5 FOR WELL HEAD DETAILS

5000' 2500'

0

5000'

10000'

1"= 5000'

SITE 1

SITE 2

DREDGE MATERIAL

466,500 CY

314,200 CY

FILL MATERIAL (MARSH CREATION)

285,640 CY

177,264 CY

FILL MATERIAL (DIKE CREATION)

103,111 CY

84,578 CY

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE AS NOTED

DWG ID. OVERALL PROJECT LAYOUT

DWG. NO. FIG. 4

REV.

NOTE: SEE FIGURE 4 FOR WELL HEAD LAYOUT.

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE N.T.S.

DWG ID. WELL HEAD INFORMATION

DWG. NO. FIG. 5

REV.

BORROW AREA BOUNDARY ELEVATION TABLE MIN EL

MAX EL

-5.500

-5.000

-5.000

-4.000

-4.000

-3.000

-3.000 -2.000

LATITUDE

LONGITUDE

1

N29.8141

W89.8217

2

N29.8079

W89.8228

3

N29.8073

W89.8186

4

N29.7934

W89.7984

5

N29.7961

W89.7958

6

N29.8008

W89.7977

7

N29.8078

W89.8071

8

N29.8084

W89.8108

9

N29.8137

W89.8184

-10 -15 -20 -25

-1.000

NO DREDGE ZONE: 50' ON EITHER SIDE OF EXIST. PIPELINE

7 9

POINT NO. COLOR

-2.000

EXISTING PIPELINE

NO DREDGE ZONE: 50' ON EITHER SIDE OF EXIST. PIPELINE

.

A

8

1

6

-3.0 -4.0

-2.0 -1.0

5

0.0

-5.0

3 2

A

4

75' WIDE TEMPORARY PIPELINE CORRIDOR

ACCESS CHANNEL TO BORROW AREA SEE FIGURE 7 FOR DETAILS

Google Earth Pro Date: March 5, 2013 5

5 MHT = 0.665' MWL = 0.289' MLT = 0.204'

EXISTING GRADE

0

0

-5

-5

-10

-10

-15

-15

-20

-20 MAXIMUM DREDGE LIMIT EL -20

-25 0+00

5+00

10+00

15+00

20+00

-25 23+14

LEGEND:

SECTION A-A NTS 2000' 1000'

0

2000'

4000'

C/E

C/E

BORROW MATERIAL PIPELINE TEMPORARY CONSTRUCTION EASEMENT BORROW EXCAVATION

1"= 2000'

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE AS NOTED

DWG ID. BORROW AREA LAYOUT

DWG. NO. FIG. 6

REV.

ELEVATION TABLE

BORROW AREA SEE FIGURE 6 FOR DETAILS

MIN EL

MAX EL

-20.000

-15.000

-15.000

-12.000

-12.000

-10.000

-10.000

-9.000

-9.000

-8.000

-8.000

-7.000

-7.000

-6.000

-6.000

-5.000

-5.000

-4.000

-4.000

-2.000

COLOR

SITE 2

84

147+

75' WIDE TEMPORARY PIPELINE CORRIDOR

0 40+0

1

SITE 1

B

80+00

A

60+

00

120+00

LAKE LERY

100+00

SL-1

74

PE

A

LI N

20+

E

0+0

0

PI

00

AT

-2

N

SL

SO

ACCESS CHANNEL TO BORROW AERA

40+0

0

B

MHT = 0.665'

5

5

MWL = 0.289'

0

0

EL = -2.3

MLT = 0.204'

-5

-5

EL = -12.0 -10

EL = -12.5

EL = -3.4

EXIST. GRADE (VARIES)

-10

-15

LEGEND:

-15 -100

-80

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

200

BORROW MATERIAL PIPELINE

SECTION A-A MHT = 0.665'

10

MWL = 0.289'

5

TEMPORARY CONSTRUCTION EASEMENT

C/E

10 5

MLT = 0.204'

0

EXIST. GRADE (VARIES)

EL = -6.3

EL = -6.4

-5

-5

-10

-10 -100

-80

-60

-40

-20

0

20

40

60

80

100

120

140

160

BORROW EXCAVATION

0

EL = -6.6

180

MARSH CREATION AREA

200

SECTION B-B

2000' 1000'

0

Google Earth Pro Date: March 5, 2013

2000'

4000'

1"= 2000'

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE

DWG ID. ACCESS CHANNEL

DWG. NO. FIG 7

REV.

DET.

1

B/L

C/L EXCAVATION

INITIAL FILL EL. = 2.5 EL 3.5 4

TARGET SURFACE EL. = 1.0 (5 YEAR SETTLEMENT) 4

1

MHT = 0.665' MWL = 0.289' MLT = 0.204'

1

EARTHEN CONTAINMENT DIKE. UNCOMPACTED FILL SHALL BE PLACED IN LIFTS NO MORE THAN 3' 1 3

1 4

EXISTING GRADE EARTHEN CONTAINMENT DIKE SUITABLE BORROW MATERIAL FOR DIKE CONSTRUCTION

-75

-50

-25

0

25

EL -8.0

50

75

100

125

150

175

200

225

250

275

300

325

350

375

400

425

450

475

500

525

550

575

600

625

650

TYPICAL SECTION- SITE 1 1"=100' HORIZONTAL

EARTHEN CONTAINMENT DIKE. SHALL BE DEGRADED TO SAME ELEVATION AS ADJUSTED CREATED MARSH AT COMPLETION OF CONSTRUCTION

C/L BASELINE B/L

C/L EXCAVATION 100' (+/-)

LIFT #2 TARGET EL. = 2.75 5'

LIFT #1 TARGET EL. = 1.5

EL 3.5

TARGET SURFACE EL. = 1.0 (20 YEAR SETTLEMENT) 4 1

1

25' MIN

EXISTING GRADE EARTHEN CONTAINMENT DIKE. UNCOMPACTED FILL SHALL BE PLACED IN LIFTS NO MORE THAN 3'

TOP 3' OF BORROW MATERIAL IS UNSUITABLE FOR DIKE CONSTRUCTION. THE MATERIAL SHALL BE PLACED IN MARSH CREATION AREA. A MINIMUM OF 25 FT AWAY FROM TOP OF SLOPE OF EXCAVATED AREA

1

1 3

SUITABLE DIKE BORROW MATERIAL FOR EARTHRN CONTAINMENT DIKE CONSTRUCTION

3' (+/-)

MHT = 0.665' MWL = 0.289' MLT = 0.204'

4

MARSH FILL

-100

EARTHEN CONTAINMENT DIKE. SHALL BE DEGRADED TO EL 2.5 PRIOR TO COMPLETION OF CONSTRUCTION

3

DIKE FILL

-12

ELEVATION (FT., NAVD 88)

C/L BASELINE

EL -8.0

50'

EARTHEN CONTAINMENT DIKE - SITE 1

DETAIL 1 LEGEND:

1"=30' HORIZONTAL EARTHEN CONTAINMENT DIKE FILL

EARTHEN CONTAINMENT DIKE BORROW AREA

LIFT #1

LIFT #2

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE

DWG ID. TYPICAL SITE 1 SECTION

DWG. NO. FIG 8

REV.

ELEVATION (FT., NAVD 88)

DET.

DET.

1

2

10 8 6 4 2 0 -2 -4 -6 -8 -10 -12 -14 -15

10 8 6 4 2 0 -2 -4 -6 -8 -10 -12 -14 -15 -100

-75

-50

-25

0

25

50

75

100

125

150

175

200

225

250

275

300

325

350

375

400

425

450

650

675

700

725

750

TYPICAL SECTION- SITE 2 1"=100' HORIZONTAL

EARTHEN CONTAINMENT DIKE. SHALL BE DEGRADED TO SAME ELEVATION AS ADJUSTED CREATED MARSH AT COMPLETION OF CONSTRUCTION

C/L BASELINE B/L

C/L EXCAVATION

100' (+/-) LIFT #2 TARGET EL. = 3.25 5'

LIFT #1 TARGET EL. = 1.5

EL 4.25

TARGET SURFACE EL. = 1.0 (20 YEAR SETTLEMENT)

1

1

EXISTING GRADE

25' MIN

1 TOP 3' OF BORROW MATERIAL IS UNSUITABLE FOR DIKE CONSTRUCTION. THE MATERIAL SHALL BE PLACED IN MARSH CREATION AREA. A MINIMUM OF 25 FT AWAY FROM TOP OF SLOPE OF EXCAVATED AREA

1 3

DIKE FILL

EARTHEN CONTAINMENT DIKE. UNCOMPACTED FILL SHALL BE PLACED IN LIFTS NO MORE THAN 3'

3' (+/-)

MHT = 0.665' MWL = 0.289' MLT = 0.204'

4

MARSH FILL

4

3

EL -8.0

SUITABLE DIKE BORROW MATERIAL FOR EARTHRN CONTAINMENT DIKE CONSTRUCTION

50'

EARTHEN CONTAINMENT DIKE - SITE 2

DETAIL 1 1"=30' HORIZONTAL

LIFT #2 TARGET EL. = 3.25

LEGEND:

TOP OF BALES EL. = 3.75 REQUIRED HAY BALES PER LADOTD STANDARD PLAN EC-01, "TEMPORARY EROSION CONTROL DETAILS" (SEE NOTE 2)

EARTHEN CONTAINMENT DIKE FILL

EARTHEN CONTAINMENT DIKE BORROW AREA EXISTING GRADE (VARIES)

LIFT #1

DETAIL 2

LIFT #2

1"=30' HORIZONTAL

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE

DWG ID. TYPICAL SITE 2 SECTION

DWG. NO. FIG 9

REV.

NOTES: 1. SEE FIGURE 4 FOR PROJECT LAYOUT. 2. SEE FIGURE 5 FOR WELL HEAD INFORMATION.

LEGEND: BORROW MATERIAL PIPELINE TEMPORARY CONSTRUCTION EASEMENT BASELINE LIMITS OF FILL MATERIAL (MARSH CREATION)

LAKE LERY SURVEY SHOT ELEVATION AND DESCRIPTION

-4.44 WATER

75' WIDE TEMPORARY PIPELINE CORRIDOR

-2.94 WATER

-2.94 WATER

-3.44 WATER -1.94 WATER

-0.94 WATER

1.38 MARSH

1.97 MARSH

3.14 MARSH

-4.44 WATER

110+00

EARTHEN DIKE

00

120+00

115+00

0.56 MARSH

-3.44 WATER -2.44 WATER

MATCHLINE B/L STA. 124+60

105+

-3.44 WATER

-2.94 WATER -1.44 WATER

-2.44 WATER -1.94 WATER

-0.94 WATER

-0.44 WATER

-1.94 WATER -1.44 WATER

DIKE BORROW -0.44 WATER

-1.44 WATER

-1.44 WATER

-0.78 MARSH 0.39 FIELD

-1.44 WATER

1.80 MARSH

-0.44 WATER 0.45 MARSH

1.78 FIELD

100+ -2.94 WATER

00

-5.44 WATER

-8.44 WATER

7.25 MARSH

2.16 FIELD

-4.94 WATER

-2.94 WATER -3.94 WATER -4.44 WATER

2.28 FIELD

APPROX. EDGE OF WATER

6.77 MARSH

2.99 FIELD

-1.94 WATER

2.55 LEVEE 3.55 MARSH

DELAC R

OIX H

BAYOU TERR

WY (L

A 300)

FS

E AUX BOEU

APPROX. EDGE MARSH CREATION EL. 1.0. SEE NOTE 3

Google Earth Pro Date: March 5, 2013

MARSH CREATION SITE 1 (STA. 100+00 TO STA. 124+60)

0

300'

600'

SCALE: 1"=300'

1"= 300'

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE AS SHOWN

DWG ID. MARSH CREATION SITE 1 (SHEET 1 OF 2)

DWG. NO. FIG. 10

REV.

NOTES: 1. SEE FIGURE 4 FOR PROJECT LAYOUT. 2. SEE FIGURE 5 FOR WELL HEAD INFORMATION.

LAKE LERY

LEGEND: BORROW MATERIAL PIPELINE TEMPORARY CONSTRUCTION EASEMENT BASELINE LIMITS OF FILL MATERIAL (MARSH CREATION) SURVEY SHOT ELEVATION AND DESCRIPTION

-3.44 WATER -3.44 WATER

75' WIDE TEMPORARY PIPELINE CORRIDOR

SITE 1

-2.44 WATER -2.44 WATER -2.94 WATER -2.94 WATER -3.44 WATER

14

-3.94 WATER

00

5+

-4.44 WATER

-2.94 WATER -2.94 WATER

-4.44 WATER

0 150+0

0+ 14

MATCHLINE B/L STA. 124+60

00

-2.44 WATER 1.54 MARSH -2.94 WATER

DIKE BORROW

-3.44 WATER

0 5+ 13

-6.44 WATER -2.44 WATER

-3.44 WATER

-4.44 WATER -3.44 WATER

-2.94 WATER

-3.44 WATER -2.94 WATER

0

155+0

-0.94 WATER

-1.44 WATER

-1.44 WATER

-1.94 WATER

-1.44 WATER

-1.44 WATER

-1.94 WATER

1.70 MARSH

0 158+0

0.52 MARSH -1.44 WATER 0.95 MARSH 2.47 LEVEE

APPROX. EDGE OF WATER

-8.44 WATER -2.44 -5.94 WATER WATER

3.30 MARSH

FS

TEMP. CELL DE-WATERING DIKE

RRE U TE

APPROX. EDGE MARSH CREATION

BOEU AUX

BAYO

CRO DELA

Y (LA IX HW

300)

Google Earth Pro Date: March 5, 2013

MARSH CREATION SITE 1 (STA. 124+60 TO STA. 158+00)

0

300'

600'

SCALE: 1"=300'

1"= 300'

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE AS SHOWN

WATER

WATER

-0.94 WATER

1.36 MARSH

1.89 MARSH

-3.94 WATER

0.72 MARSH

-1.44 WATER

-0.44 WATER

-2.94 WATER -3.44 WATER

-3.44 WATER -4.44 WATER

-3.44 WATER

0

130+00

-4.94 WATER

-3.44 WATER

-0.44 WATER

-0.44 WATER

-2.94 WATER

-0.94 WATER -3.94 WATER

-3.44 WATER

-1.44 WATER

-1.44 WATER

EARTHEN DIKE

-2.94 WATER

-4.44 WATER

-5.44 WATER -6.44 WATER

-3.44 WATER

DWG ID. MARSH CREATION SITE 1 (SHEET 2 OF 2)

DWG. NO. FIG. 11

REV.

1. SEE FIGURE 4 FOR PROJECT LAYOUT. 2. SEE FIGURE 5 FOR WELL HEAD INFORMATION.

LAKE LERY

LEGEND: BORROW MATERIAL PIPELINE TEMPORARY CONSTRUCTION EASEMENT BASELINE LIMITS OF FILL MATERIAL (MARSH CREATION) SURVEY SHOT ELEVATION AND DESCRIPTION

-3.44 WATER -3.44 WATER

SITE 1

-2.44 WATER -1.44 WATER

-2.44 WATER -2.94 WATER -2.94 WATER

-1.44 WATER

-3.44 WATER

00

-1.44 WATER

21

-3.94 WATER

5+

00 0+

-1.94 WATER

-1.94 WATER

-2.94 WATER -2.94 WATER

-3.44 WATER -1.94 WATER

0+ 00

0.74 MARSH

-2.94 WATER

22

0.77 MARSH -1.44 WATER

-4.94 WATER

-3.44 WATER

-2.94 WATER

1.25 MARSH

-3.44 WATER

-0.94 WATER

-3.44 WATER -4.44 WATER

205+00

-1.44 WATER

-3.44 WATER -3.44 WATER

-0.94 WATER

-0.94 WATER

-4.44 WATER

-3.44 WATER

-1.44 WATER

-1.44 WATER

-2.44 WATER

DIKE BORROW

-3.94 WATER

0

155+0

1.92 MARSH

-2.44 WATER

-1.94 WATER

-3.44 WATER

2.43 MARSH

SITE 2

0.88 MARSH

-3.44 WATER

-2.94 WATER -3.44 WATER

-2.44 WATER

-2.44 WATER

-3.44 WATER

-2.94 WATER

00

-6.44 WATER -2.44 WATER

5+

-1.44 WATER

-1.44 WATER

-4.44 WATER

-5.44 WATER -6.44 WATER

1.54 MARSH

EARTHEN DIKE

-4.44 WATER

0

150+0

22

-4.44 WATER

-1.44 WATER

21

ROIX

NOTES: 75' WIDE TEMPORARY PIPELINE CORRIDOR

0.26 MARSH

0.91 MARSH -4.44 WATER

0.64 MARSH

-3.94 WATER -2.94 WATER

0

158+0

-1.44 WATER

2.47 LEVEE

-8.44 -6.44 WATER -2.44 -5.94 WATER WATER WATER

0 200+0-1.94

3.30 MARSH -7.44 WATER

WATER 2.08 MARSH

-4.94 WATER -7.44 WATER

0.91 MARSH

(LA 3

0.36 FIELD

DELA

CROIX

00)

X BOE

HWY

23 0+ 0

0.73 FIELD

1.91 FIELD

BAYO U TER

RE AU

-3.94 WATER

HWY

0.44 MARSH

0.81 FIELD

APPROX. EDGE MARSH CREATION

0.58 MARSH

-0.75 WATER

0

1.33 FIELD

UFS 2.33 LEVEE

(LA 30 0)

23 APPROX. EDGE OF WATER 3+00

0.86 MARSH MARSH 1.60

Google Earth Pro Date: March 5, 2013

0

MARSH CREATION SITE 2

300'

600'

SCALE: 1"=300'

1"= 300'

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE AS SHOWN

DWG ID. MARSH CREATION SITE 2

DWG. NO. FIG. 12

REV.

BORROW AREA. SEE FIG 3 FOR DETAILS

BORROW AREAS PIPELINE CORRIDOR IMPACT BORROW AREA PIPELINE

TOTAL REQUIRED EASEMENT (AC)

ALIGNMENT 1 ALIGNMENT 1 ALIGNMENT 1

BP: 0+00.00 NORTHING: 474507.57 EASTING: 3768400.06

WETLAND IMPACTS (AC) OPEN WATER

SOLID MARSH

BROKEN MARSH

12.0

12.0

0.0

0.0

10.0

10.0

0.0

0.0

2.1

2.1

0.0

0.0 LAT: N29.7958 LONG: W89.7961

BP: 0+00.00 NORTHING: 473630.33 EASTING: 3767668.72 LAT: N29.7934 LONG: W89.7984

NOTES: 1. SEE FIGURE 4 FOR PROJECT LAYOUT. 2. SEE FIGURE 5 FOR WELL HEAD INFORMATION.

LAKE LERY

LEGEND: BORROW MATERIAL PIPELINE TEMPORARY CONSTRUCTION EASEMENT BASELINE

75' WIDE PIPELINE CORRIDOR ALIGNMENT 2

LIMITS OF FILL MATERIAL (MARSH CREATION)

PI: 38+00.00 NORTHING: 470418.09 EASTING: 3769698.88

PI: 51+24.72 NORTHING: 472021.41 EASTING: 3772881.33

LAT: N29.7845 LONG: W89.7922

BP: 0+00.00 NORTHING: 472021.41 EASTING: 3772881.33 LAT: N29.7888 LONG: W89.7821

75' WIDE PIPELINE CORRIDOR ALIGNMENT 1

75' WIDE PIPELINE CORRIDOR ALIGNMENT 2A

EP: 64+24.72 NORTHING: 471489.99 EASTING: 3774067.75

EP: 74+50.00 NORTHING: 468364.68 EASTING: 3772716.50

LAT: N29.7873 LONG: W89.7784

LAT: N29.7788 LONG: W89.7827

SITE 2

BAY O

U LE

RY

SITE 1

EP: 14+00.00 NORTHING: 470798.21 EASTING: 3773562.36

X BOEUFS

AU BAYOU TERRE

LAT: N29.7854 LONG: W89.7800

00) Y (LA 3

W ROIX H DELAC

Google Earth Pro Date: March 5, 2013

BORROW AREA PIPELINES

0

1000'

2000'

SCALE: 1"=1000'

1"= 1000'

LAKE LERY MARSH CREATION 3500 N. Causeway Blvd. Suite 900 Metairie, Louisiana 70002 (504) 837-6326 Project No. 10001871

ST. BERNARD PARISH, LOUISIANA DATE NOV., 2014

SCALE AS SHOWN

DWG ID. BORROW AREA PIPELINES

DWG. NO. FIG. 13

REV.

Coastal Environments, Incorporated January 20, 2015

Services: Applied Science & Planning Environmental Restoration & Monitoring Cultural Resources Management Geographic Information (GIS) Services

Ms. Amelia Wolfe Coastal Resources Scientist Office of Coastal Management Louisiana Department of Natural Resources P. O. Box 44487 Baton Rouge, LA 70804 RE:

Permit #P20141578 Revised Additional Information Request Letter Proposed Lake Lery Marsh Creation Project, St. Bernard Parish, LA

Litigation Services

Dear Ms. Wolfe,

Website: www.coastalenv.com Corporate Office: 1260 Main Street Baton Rouge, LA 70802 Ph (225) 383-7455 Fax (225) 383-7925

Other Locations: 127 Babcock Farm Road Appomattox, VA 24522 Ph/F (434) 352-4168 cpearson@coastalenv.com 525 South Carancahua Street Corpus Christi, TX 78401 Ph (361) 854-4885 Fax (361) 884-1844 jkelly@coastalenv.com 812 Water St. Biloxi, MS 39530 Ph (228) 385-5547 Fax (228) 385-5548 rellis@coastalenv.com 2045 Lakeshore Dr. CERM RM 443 New Orleans, LA 70122 Ph...(504) 280-4082 Fax (504) 280-4081 bkappel@coastalenv.com

This letter serves as a revised additional information request for the above referenced Coastal Use Permit for your recent email additional information requests from January 9, 14, and 20, 2015 as well as your letter dated January 9, 2015 from the SONRIS website. Enclosed is the requested information provided by the URS Corporation representative. 1. "...Pages 8 & 9 on the plats include the cross sections for the marsh creation area, but only details the area near the containment dike. Please provide a typical cross-sectional drawing(s) for the areas where the dredged material will be laid upon marsh, making sure to include the elevations." The cross sections on Plat 8 and 9 do include the land area. Note that the existing marsh is around EL 1. We are filling the entire marsh creation area to EL 2.75 and 3.5 to rebuild the land so all of the existing marsh within the dike area will be filled. The cross section showing the marshland areas to be filled was extended on Plot 9. This revised plot is included with this letter. 2. "...Please submit a statement explaining how the applicant will use best management practices to minimize the amount of runoff (particularly sediment) during and immediately after construction activities." Describe/list the BMPs that will be utilized for the project. The required BMPs for the project will be implemented by the contractor during project dredging and marsh creation to insure the water quality will be the same both pre- and post-construction. Per the construction specifications, the contractor will be required to submit an erosion control plan to keep excess sediment within the containment area and minimize runoff. The contractor will be required to limit the NTU during construction. The contractor specifications in the bid package for the proposed project detail the 1

dewatering and turbidity controls required for the BMPs during dredging and marsh creation. A copy of the section (8.6 Dewatering and Turbidity Controls) included in the bid package is attached at the end of this letter. 3. "What are the drafts for the vessels that will be utilized?" The drafts listed below are estimated. The actual drafts will depend on the contractor selected. Below is a list of anticipated drafts: 1) Barge: 6.5' maximum draft 2) Boat: 5' maximum draft 3) Tug: 6.5' maximum draft 4) Airboat: 1.5' maximum draft 5) Marsh buggy: 5' maximum draft 4. "Vessel Drafts: According to Fig. 7 Cross section B-B, your proposed 8' barge and tug will not be able to approach the borrow area without prop washing....can't you make sure they use vessels that won't draft more than 5' or 6' (near borrow area)?" The engineer has verified with multiple contractors that the dredge and marsh creation areas can be accessed with a maximum draft of 6'. Because the waterbody bottom minimum depth is 6.5', DNR and URS representatives agreed that 6.5' depth will be the maximum allowed draft for the contractor equipment impact. The 6.5' maximum draft will be added to the contractor specifications in the bid package. The contractor specifications in the work plan will state that there will be "no prop wash" impacts during the proposed project work areas. 5. "Will the marsh buggy traverse on land or will it be mounted on a barge?" Marsh Buggies will not be used outside the limits of work. No marsh will be disturbed in the borrow area, and the pipeline corridors were laid out to not disturb existing marsh (as shown on the aerial image, not filed verified). All land within the marsh creation dikes will be filled to EL 2.75 and 3.25, so the marsh buggies will traverse land here, but we are filling and restoring the marsh in this area anyway. Should you have any questions, comments and/or need additional information, please contact me at 383-7455, ext. 154 or hguidry@coastalenv.com. Thank you.

Sincerely yours,

Hunter B. Guidry Hunter B. Guidry Project Specialist II

Enclosure xc: Phillip Olivier, PE, URS

2

Attachment Contractor Bid Package Specification for BMPs from URS 8.6

Dewatering and Turbidity Control

The Contractor shall conduct his/her work in a manner that will not cause damaging siltation or pollution of any water bodies. All applicable Federal and State regulations of agencies and statutes relating to the prevention and abatement of pollution shall be complied with in the performance of the Contract. Dredging and filling operations shall be done in a manner that will minimize turbidity of the water at each dredge site and at the discharge sites from the marsh creation fill. Discharge water shall be directed towards the appropriate location determined by the Contractor and approved by the Engineer. The Contractor shall keep construction activities under continued surveillance, management, and control to minimize interference with, disturbance to, and damage of water, fish and wildlife resources. If excess turbidity occurs, the Contractor shall report such to the Engineer and change the operating procedure to reduce the degree of turbidity. Excess turbidity shall be noted when turbidity monitoring shows turbidity 30% or greater than the established turbidity levels. The Contractor shall use turbidity control measures for dewatering. The Contractor shall submit a Turbidity Control Plan along with the Work Plan including descriptions and drawings of all turbidity control measures used, acceptable turbidity limits (NTU) established, and all proposed discharge locations for approval by the Engineer. All turbidity control structures must be removed prior to demobilization as approved by the Engineer. The Contractor shall ensure to maintain the turbidity in the lake post construction to be at the same level as established pre-construction. The Contractor shall measure the existing turbidity of the water in the lake for a minimum of 1 week at multiple locations within the project limits prior to beginning of any construction and submit monitoring information to the Engineer for review and establishment of base line turbidity levels. Once the construction is completed the Contractor shall measure the turbidity limits in the lake for a minimum of 1 week at multiple locations and submit the records for Engineer's approval. Work will not be considered complete until turbidity conditions are within original levels.

3

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas