Lake Lery East Shoreline and Marsh Restoration Project in Saint Bernard Parish, Louisiana
NAME OF APPLICANT: Saint Bernard Parish Government ℅ Coastal Environments, Inc.,
Attn: Hunter Guidry, 1260 Main Street, Baton Rouge, Louisiana, 70802.
LOCATION OF WORK: Dredging adjacent to the northern shoreline of Lake Lery to restore two areas of its eastern shoreline near the western natural levee of Bayou Terre Aux Boeufs, in Delacroix, Louisiana, Saint Bernard Parish, as shown on the enclosed drawings.
Hydrologic Unit Code: 08090203 - Eastern Louisiana Coastal
Borrow Area - Latitude: 29.8078, Longitude: -89.8071
Restoration Site 1 - Latitude: 29.7788, Longitude: -89.7827
Restoration Site 2 - Latitude: 29.7873, Longitude: -89.7784
CHARACTER OF WORK: The Lake Lery East Shoreline and Marsh Restoration Project includes hydraulically dredging 780,700 cubic yards of material to create 52 acres of marsh and nourish an additional 43 acres of broken/subsiding marsh. The two restoration areas would be contained by an earthen dike that would extend from the Bayou Terre Aux Boeufs natural levee into open water. Filling activities within the earthen dike would bring the marsh elevation to +1.5 feet at both locations for lift 1 and +2.75 feet (Site 1) and +3.25 feet (Site 2) for lift 2. Material would be transported via pipeline within two 75 foot wide open water pipeline corridors.
This project is included in the Louisiana Coastal Master Plan via funding from the Coastal Impact Assistance Program (CIAP) program. It has been designed to provide a net benefit to the eastern portion of Lake Lery’s shoreline throughout the project’s 20 year design life. No additional compensatory mitigation measure have been proposed at this time.
JOINT PUBLIC NOTICE
February 9, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2225
Brad.LaBorde@usace.army.mil
Project Manager
Brad LaBorde
Permit Application Number
MVN 2014-1120 EOO
(225) 219-3225
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 150204-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
Lake Lery East Shoreline and Marsh Restoration Project in Saint Bernard Parish, Louisiana
NAME OF APPLICANT: Saint Bernard Parish Government Coastal Environments, Inc.,
Attn: Hunter Guidry, 1260 Main Street, Baton Rouge, Louisiana, 70802.
LOCATION OF WORK: Dredging adjacent to the northern shoreline of Lake Lery to restore two
areas of its eastern shoreline near the western natural levee of Bayou Terre Aux Boeufs, in Delacroix,
Louisiana, Saint Bernard Parish, as shown on the enclosed drawings.
Hydrologic Unit Code: 08090203 - Eastern Louisiana Coastal
Borrow Area - Latitude: 29.8078, Longitude: -89.8071
Restoration Site 1 - Latitude: 29.7788, Longitude: -89.7827
Restoration Site 2 - Latitude: 29.7873, Longitude: -89.7784
CHARACTER OF WORK: The Lake Lery East Shoreline and Marsh Restoration Project includes
hydraulically dredging 780,700 cubic yards of material to create 52 acres of marsh and nourish an
additional 43 acres of broken/subsiding marsh. The two restoration areas would be contained by an
earthen dike that would extend from the Bayou Terre Aux Boeufs natural levee into open water.
Filling activities within the earthen dike would bring the marsh elevation to +1.5 feet at both locations
for lift 1 and +2.75 feet (Site 1) and +3.25 feet (Site 2) for lift 2. Material would be transported via
pipeline within two 75 foot wide open water pipeline corridors.
This project is included in the Louisiana Coastal Master Plan via funding from the Coastal Impact
Assistance Program (CIAP) program. It has been designed to provide a net benefit to the eastern
-2portion of Lake Lery's shoreline throughout the project's 20 year design life. No additional
compensatory mitigation measure have been proposed at this time.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time
in which to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively supportive of
the requested extension, and received by this office prior to the end of the initial comment
period. The Section Chief will review the request and the requestor will be promptly notified of
the decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a total
of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
-3Dredging and filling activities are located in areas known to be utilized by the West Indian
manatee (Trichechus manatus). The West Indian manatee is listed as endangered by the U.S.
Department of Interior. Our initial finding is that the proposed work is "not likely to adversely affect"
the West Indian manatee. Concurrence has been received from the U.S. Fish and Wildlife Service per
the Standard Local Operating Procedure for Endangered Species in Louisiana, dated October 22,
2014. If authorized, "The Standard Manatee Conditions for In-Water Activities" will be made part of
the permit's special conditions.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 95 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
ST. BERNARD PARISH GOVERNMENT
(CIAP) COASTAL IMPACT ASSISTANCE PROGRAM
LAKE LERY MARSH CREATION
ST. BERNARD PARISH, LOUISIANA
STATE OF LOUISIANA
INSET MAP
BORROW AREA
SITE 2
SITE 1
PREPARED FOR:
Google Earth Pro Date: March 5, 2013
St. Bernard Parish Government
8201 W. Judge Perez Dr.
Chalmette, LA 70043
(504) 278-1593
PREPARED BY:
3500 N. Causeway Blvd., Suite 900
Metairie, Louisiana 70002
(504) 837-6326
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
AS NOTED
DWG ID.
TITLE SHEET
DWG. NO.
FIG 1
REV.
INDEX OF DRAWINGS:
FIG. 1
FIG. 2
FIG. 3
FIG. 4
FIG. 5
FIG. 6
FIG. 7
FIG. 8
FIG. 9
FIG. 10
FIG. 11
FIG. 12
FIG. 13
TITLE SHEET
INDEX OF DRAWINGS
PROJECT LOCATION AND VICINITY MAP
OVERALL PROJECT LAYOUT
WELL HEAD INFORMATION
BORROW AREA LAYOUT
ACCESS CHANNEL
TYPICAL SITE 1 SECTION
TYPICAL SITE 2 SECTION
MARSH CREATION PLAN - SITE 1 (SHEET 1 OF 2)
MARSH CREATION PLAN - SITE 1 (SHEET 2 OF 2)
MARSH CREATION PLAN - SITE 2
75' WIDE TEMPORARY PIPELINE CORRIDOR
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
DWG ID.
INDEX OF
DRAWINGS
DWG. NO.
FIG 2
REV.
ST. BERNARD
PARISH
STATE OF LOUISIANA
BORROW SITE
SITE 2
SITE 1
MARSH CREATION SITE
PROJECT LOCATION MAP
SCALE: 1" = 10,000'
NEW ORLEANS
LAKE LERY
PROJECT SITE
PROJECT VICINITY MAP
SCALE: 1" = 40,000'
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
AS NOTED
DWG ID.
PROJECT VICINITY AND
LOCATION MAP
DWG. NO.
FIG. 3
REV.
NO DREDGING ZONE. 50' ON EITHER
SIDE OF EXISTING PIPELINES
97
96
BORROW AREA
SEE FIGURE 6 FOR DETAILS
93
94
DELACROIX HWY. (LA 300)
92
91
90
89
88
87
83
85 86
84
81
82
80
78
76
79
77
75
MARSH CREATION SITE
74
73
71
69
65
64
63
62
61
59
ACCESS CHANNEL FOR
BORROW AREA SEE FIGURE
7 FOR DETAILS
60
SITE 2
57
55
75' WIDE PIPELINE
CORRIDOR SITE
(SEE FIGURE 15
56
SITE 1
Google Earth Pro Date: March 5, 2013
LEGEND:
WELL HEAD
BORROW MATERIAL PIPELINE
TEMPORARY CONSTRUCTION EASEMENT
C/E
C/E
BORROW AREA LIMITS
MARSH CREATION AREA
CUT/FILL
NOTE: SEE FIG 5 FOR WELL HEAD DETAILS
5000' 2500'
0
5000'
10000'
1"= 5000'
SITE 1
SITE 2
DREDGE MATERIAL
466,500 CY
314,200 CY
FILL MATERIAL (MARSH CREATION)
285,640 CY
177,264 CY
FILL MATERIAL (DIKE CREATION)
103,111 CY
84,578 CY
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
AS NOTED
DWG ID.
OVERALL PROJECT
LAYOUT
DWG. NO.
FIG. 4
REV.
NOTE: SEE FIGURE 4 FOR WELL HEAD LAYOUT.
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
N.T.S.
DWG ID.
WELL HEAD
INFORMATION
DWG. NO.
FIG. 5
REV.
BORROW AREA BOUNDARY
ELEVATION TABLE
MIN EL
MAX EL
-5.500
-5.000
-5.000
-4.000
-4.000
-3.000
-3.000
-2.000
LATITUDE
LONGITUDE
1
N29.8141
W89.8217
2
N29.8079
W89.8228
3
N29.8073
W89.8186
4
N29.7934
W89.7984
5
N29.7961
W89.7958
6
N29.8008
W89.7977
7
N29.8078
W89.8071
8
N29.8084
W89.8108
9
N29.8137
W89.8184
-10
-15
-20
-25
-1.000
NO DREDGE ZONE:
50' ON EITHER SIDE OF
EXIST. PIPELINE
7
9
POINT NO.
COLOR
-2.000
EXISTING PIPELINE
NO DREDGE ZONE:
50' ON EITHER SIDE OF
EXIST. PIPELINE
.
A
8
1
6
-3.0
-4.0
-2.0
-1.0
5
0.0
-5.0
3
2
A
4
75' WIDE TEMPORARY
PIPELINE CORRIDOR
ACCESS CHANNEL TO BORROW AREA
SEE FIGURE 7 FOR DETAILS
Google Earth Pro Date: March 5, 2013
5
5
MHT = 0.665'
MWL = 0.289'
MLT = 0.204'
EXISTING GRADE
0
0
-5
-5
-10
-10
-15
-15
-20
-20
MAXIMUM DREDGE LIMIT EL -20
-25
0+00
5+00
10+00
15+00
20+00
-25
23+14
LEGEND:
SECTION A-A
NTS
2000' 1000'
0
2000'
4000'
C/E
C/E
BORROW MATERIAL PIPELINE
TEMPORARY CONSTRUCTION EASEMENT
BORROW EXCAVATION
1"= 2000'
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
AS NOTED
DWG ID.
BORROW AREA LAYOUT
DWG. NO.
FIG. 6
REV.
ELEVATION TABLE
BORROW AREA
SEE FIGURE 6 FOR DETAILS
MIN EL
MAX EL
-20.000
-15.000
-15.000
-12.000
-12.000
-10.000
-10.000
-9.000
-9.000
-8.000
-8.000
-7.000
-7.000
-6.000
-6.000
-5.000
-5.000
-4.000
-4.000
-2.000
COLOR
SITE 2
84
147+
75' WIDE TEMPORARY
PIPELINE CORRIDOR
0
40+0
1
SITE 1
B
80+00
A
60+
00
120+00
LAKE LERY
100+00
SL-1
74
PE
A
LI
N
20+
E
0+0
0
PI
00
AT
-2
N
SL
SO
ACCESS CHANNEL TO BORROW AERA
40+0
0
B
MHT = 0.665'
5
5
MWL = 0.289'
0
0
EL = -2.3
MLT = 0.204'
-5
-5
EL = -12.0
-10
EL = -12.5
EL = -3.4
EXIST. GRADE (VARIES)
-10
-15
LEGEND:
-15
-100
-80
-60
-40
-20
0
20
40
60
80
100
120
140
160
180
200
BORROW MATERIAL
PIPELINE
SECTION A-A
MHT = 0.665'
10
MWL = 0.289'
5
TEMPORARY
CONSTRUCTION
EASEMENT
C/E
10
5
MLT = 0.204'
0
EXIST. GRADE (VARIES)
EL = -6.3
EL = -6.4
-5
-5
-10
-10
-100
-80
-60
-40
-20
0
20
40
60
80
100
120
140
160
BORROW EXCAVATION
0
EL = -6.6
180
MARSH CREATION AREA
200
SECTION B-B
2000' 1000'
0
Google Earth Pro Date: March 5, 2013
2000'
4000'
1"= 2000'
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
DWG ID.
ACCESS CHANNEL
DWG. NO.
FIG 7
REV.
DET.
1
B/L
C/L EXCAVATION
INITIAL FILL EL. = 2.5
EL 3.5
4
TARGET SURFACE EL. = 1.0 (5 YEAR SETTLEMENT)
4
1
MHT = 0.665'
MWL = 0.289'
MLT = 0.204'
1
EARTHEN CONTAINMENT DIKE.
UNCOMPACTED FILL SHALL BE
PLACED IN LIFTS NO MORE THAN 3'
1
3
1
4
EXISTING GRADE
EARTHEN CONTAINMENT DIKE
SUITABLE BORROW MATERIAL FOR
DIKE CONSTRUCTION
-75
-50
-25
0
25
EL -8.0
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
450
475
500
525
550
575
600
625
650
TYPICAL SECTION- SITE 1
1"=100' HORIZONTAL
EARTHEN CONTAINMENT DIKE. SHALL
BE DEGRADED TO SAME ELEVATION
AS ADJUSTED CREATED MARSH AT
COMPLETION OF CONSTRUCTION
C/L BASELINE
B/L
C/L EXCAVATION
100' (+/-)
LIFT #2 TARGET EL. = 2.75
5'
LIFT #1 TARGET EL. = 1.5
EL 3.5
TARGET SURFACE EL. = 1.0 (20 YEAR SETTLEMENT)
4
1
1
25' MIN
EXISTING GRADE
EARTHEN CONTAINMENT DIKE.
UNCOMPACTED FILL SHALL BE
PLACED IN LIFTS NO MORE THAN 3'
TOP 3' OF BORROW MATERIAL IS UNSUITABLE FOR
DIKE CONSTRUCTION. THE MATERIAL SHALL BE
PLACED IN MARSH CREATION AREA. A MINIMUM
OF 25 FT AWAY FROM TOP OF SLOPE OF
EXCAVATED AREA
1
1
3
SUITABLE DIKE BORROW MATERIAL FOR EARTHRN
CONTAINMENT DIKE CONSTRUCTION
3' (+/-)
MHT = 0.665'
MWL = 0.289'
MLT = 0.204'
4
MARSH
FILL
-100
EARTHEN CONTAINMENT
DIKE. SHALL BE DEGRADED
TO EL 2.5 PRIOR TO
COMPLETION OF
CONSTRUCTION
3
DIKE FILL
-12
ELEVATION (FT., NAVD 88)
C/L BASELINE
EL -8.0
50'
EARTHEN CONTAINMENT DIKE - SITE 1
DETAIL 1
LEGEND:
1"=30' HORIZONTAL
EARTHEN CONTAINMENT DIKE FILL
EARTHEN CONTAINMENT DIKE BORROW AREA
LIFT #1
LIFT #2
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
DWG ID.
TYPICAL SITE 1
SECTION
DWG. NO.
FIG 8
REV.
ELEVATION (FT., NAVD 88)
DET.
DET.
1
2
10
8
6
4
2
0
-2
-4
-6
-8
-10
-12
-14
-15
10
8
6
4
2
0
-2
-4
-6
-8
-10
-12
-14
-15
-100
-75
-50
-25
0
25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
450
650
675
700
725
750
TYPICAL SECTION- SITE 2
1"=100' HORIZONTAL
EARTHEN CONTAINMENT DIKE. SHALL
BE DEGRADED TO SAME ELEVATION
AS ADJUSTED CREATED MARSH AT
COMPLETION OF CONSTRUCTION
C/L BASELINE
B/L
C/L EXCAVATION
100' (+/-)
LIFT #2 TARGET EL. = 3.25
5'
LIFT #1 TARGET EL. = 1.5
EL 4.25
TARGET SURFACE EL. = 1.0 (20 YEAR SETTLEMENT)
1
1
EXISTING GRADE
25' MIN
1
TOP 3' OF BORROW MATERIAL IS UNSUITABLE FOR DIKE
CONSTRUCTION. THE MATERIAL SHALL BE PLACED IN
MARSH CREATION AREA. A MINIMUM OF 25 FT AWAY
FROM TOP OF SLOPE OF EXCAVATED AREA
1
3
DIKE FILL
EARTHEN CONTAINMENT DIKE.
UNCOMPACTED FILL SHALL BE
PLACED IN LIFTS NO MORE THAN 3'
3' (+/-)
MHT = 0.665'
MWL = 0.289'
MLT = 0.204'
4
MARSH
FILL
4
3
EL -8.0
SUITABLE DIKE BORROW MATERIAL FOR
EARTHRN CONTAINMENT DIKE CONSTRUCTION
50'
EARTHEN CONTAINMENT DIKE - SITE 2
DETAIL 1
1"=30' HORIZONTAL
LIFT #2 TARGET EL. = 3.25
LEGEND:
TOP OF BALES EL. = 3.75
REQUIRED HAY BALES PER LADOTD
STANDARD PLAN EC-01, "TEMPORARY
EROSION CONTROL DETAILS" (SEE NOTE 2)
EARTHEN CONTAINMENT DIKE FILL
EARTHEN CONTAINMENT DIKE BORROW AREA
EXISTING GRADE (VARIES)
LIFT #1
DETAIL 2
LIFT #2
1"=30' HORIZONTAL
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
DWG ID.
TYPICAL SITE 2
SECTION
DWG. NO.
FIG 9
REV.
NOTES:
1. SEE FIGURE 4 FOR PROJECT LAYOUT.
2. SEE FIGURE 5 FOR WELL HEAD INFORMATION.
LEGEND:
BORROW MATERIAL PIPELINE
TEMPORARY CONSTRUCTION EASEMENT
BASELINE
LIMITS OF FILL MATERIAL (MARSH
CREATION)
LAKE LERY
SURVEY SHOT ELEVATION AND
DESCRIPTION
-4.44
WATER
75' WIDE TEMPORARY
PIPELINE CORRIDOR
-2.94
WATER
-2.94
WATER
-3.44
WATER
-1.94
WATER
-0.94
WATER
1.38
MARSH
1.97
MARSH
3.14
MARSH
-4.44
WATER
110+00
EARTHEN DIKE
00
120+00
115+00
0.56
MARSH
-3.44
WATER
-2.44
WATER
MATCHLINE B/L STA. 124+60
105+
-3.44
WATER
-2.94
WATER
-1.44
WATER
-2.44
WATER
-1.94
WATER
-0.94
WATER
-0.44
WATER
-1.94
WATER
-1.44
WATER
DIKE BORROW
-0.44
WATER
-1.44
WATER
-1.44
WATER
-0.78
MARSH
0.39
FIELD
-1.44
WATER
1.80
MARSH
-0.44
WATER
0.45
MARSH
1.78
FIELD
100+
-2.94
WATER
00
-5.44
WATER
-8.44
WATER
7.25
MARSH
2.16
FIELD
-4.94
WATER
-2.94
WATER
-3.94
WATER
-4.44
WATER
2.28
FIELD
APPROX. EDGE OF WATER
6.77
MARSH
2.99
FIELD
-1.94
WATER
2.55
LEVEE
3.55
MARSH
DELAC
R
OIX H
BAYOU TERR
WY (L
A 300)
FS
E AUX BOEU
APPROX. EDGE MARSH
CREATION EL. 1.0. SEE NOTE 3
Google Earth Pro Date: March 5, 2013
MARSH CREATION SITE 1 (STA. 100+00 TO STA. 124+60)
0
300'
600'
SCALE: 1"=300'
1"= 300'
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
AS SHOWN
DWG ID.
MARSH CREATION SITE 1
(SHEET 1 OF 2)
DWG. NO.
FIG. 10
REV.
NOTES:
1. SEE FIGURE 4 FOR PROJECT LAYOUT.
2. SEE FIGURE 5 FOR WELL HEAD INFORMATION.
LAKE LERY
LEGEND:
BORROW MATERIAL PIPELINE
TEMPORARY CONSTRUCTION EASEMENT
BASELINE
LIMITS OF FILL MATERIAL (MARSH
CREATION)
SURVEY SHOT ELEVATION AND
DESCRIPTION
-3.44
WATER
-3.44
WATER
75' WIDE TEMPORARY
PIPELINE CORRIDOR
SITE 1
-2.44
WATER
-2.44
WATER
-2.94
WATER
-2.94
WATER
-3.44
WATER
14
-3.94
WATER
00
5+
-4.44
WATER
-2.94
WATER
-2.94
WATER
-4.44
WATER
0
150+0
0+
14
MATCHLINE B/L STA. 124+60
00
-2.44
WATER
1.54
MARSH
-2.94
WATER
DIKE BORROW
-3.44
WATER
0
5+
13
-6.44
WATER
-2.44
WATER
-3.44
WATER
-4.44
WATER
-3.44
WATER
-2.94
WATER
-3.44
WATER
-2.94
WATER
0
155+0
-0.94
WATER
-1.44
WATER
-1.44
WATER
-1.94
WATER
-1.44
WATER
-1.44
WATER
-1.94
WATER
1.70
MARSH
0
158+0
0.52
MARSH
-1.44
WATER
0.95
MARSH
2.47
LEVEE
APPROX. EDGE OF WATER
-8.44
WATER
-2.44
-5.94
WATER WATER
3.30
MARSH
FS
TEMP. CELL
DE-WATERING DIKE
RRE
U TE
APPROX. EDGE
MARSH CREATION
BOEU
AUX
BAYO
CRO
DELA
Y (LA
IX HW
300)
Google Earth Pro Date: March 5, 2013
MARSH CREATION SITE 1 (STA. 124+60 TO STA. 158+00)
0
300'
600'
SCALE: 1"=300'
1"= 300'
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
AS SHOWN
WATER
WATER
-0.94
WATER
1.36
MARSH
1.89
MARSH
-3.94
WATER
0.72
MARSH
-1.44
WATER
-0.44
WATER
-2.94
WATER
-3.44
WATER
-3.44
WATER
-4.44
WATER
-3.44
WATER
0
130+00
-4.94
WATER
-3.44
WATER
-0.44
WATER
-0.44
WATER
-2.94
WATER
-0.94
WATER
-3.94
WATER
-3.44
WATER
-1.44
WATER
-1.44
WATER
EARTHEN DIKE
-2.94
WATER
-4.44
WATER
-5.44
WATER
-6.44
WATER
-3.44
WATER
DWG ID.
MARSH CREATION SITE 1
(SHEET 2 OF 2)
DWG. NO.
FIG. 11
REV.
1. SEE FIGURE 4 FOR PROJECT LAYOUT.
2. SEE FIGURE 5 FOR WELL HEAD INFORMATION.
LAKE LERY
LEGEND:
BORROW MATERIAL PIPELINE
TEMPORARY CONSTRUCTION EASEMENT
BASELINE
LIMITS OF FILL MATERIAL (MARSH
CREATION)
SURVEY SHOT ELEVATION AND
DESCRIPTION
-3.44
WATER
-3.44
WATER
SITE 1
-2.44
WATER
-1.44
WATER
-2.44
WATER
-2.94
WATER
-2.94
WATER
-1.44
WATER
-3.44
WATER
00
-1.44
WATER
21
-3.94
WATER
5+
00
0+
-1.94
WATER
-1.94
WATER
-2.94
WATER
-2.94
WATER
-3.44
WATER
-1.94
WATER
0+
00
0.74
MARSH
-2.94
WATER
22
0.77
MARSH
-1.44
WATER
-4.94
WATER
-3.44
WATER
-2.94
WATER
1.25
MARSH
-3.44
WATER
-0.94
WATER
-3.44
WATER
-4.44
WATER
205+00
-1.44
WATER
-3.44
WATER
-3.44
WATER
-0.94
WATER
-0.94
WATER
-4.44
WATER
-3.44
WATER
-1.44
WATER
-1.44
WATER
-2.44
WATER
DIKE BORROW
-3.94
WATER
0
155+0
1.92
MARSH
-2.44
WATER
-1.94
WATER
-3.44
WATER
2.43
MARSH
SITE 2
0.88
MARSH
-3.44
WATER
-2.94
WATER
-3.44
WATER
-2.44
WATER
-2.44
WATER
-3.44
WATER
-2.94
WATER
00
-6.44
WATER
-2.44
WATER
5+
-1.44
WATER
-1.44
WATER
-4.44
WATER
-5.44
WATER
-6.44
WATER
1.54
MARSH
EARTHEN DIKE
-4.44
WATER
0
150+0
22
-4.44
WATER
-1.44
WATER
21
ROIX
NOTES:
75' WIDE TEMPORARY
PIPELINE CORRIDOR
0.26
MARSH
0.91
MARSH
-4.44
WATER
0.64
MARSH
-3.94
WATER
-2.94
WATER
0
158+0
-1.44
WATER
2.47
LEVEE
-8.44
-6.44
WATER
-2.44
-5.94
WATER
WATER WATER
0
200+0-1.94
3.30
MARSH
-7.44
WATER
WATER
2.08
MARSH
-4.94
WATER
-7.44
WATER
0.91
MARSH
(LA 3
0.36
FIELD
DELA
CROIX
00)
X BOE
HWY
23
0+
0
0.73
FIELD
1.91
FIELD
BAYO
U TER
RE AU
-3.94
WATER
HWY
0.44
MARSH
0.81
FIELD
APPROX. EDGE
MARSH CREATION
0.58
MARSH
-0.75
WATER
0
1.33
FIELD
UFS
2.33
LEVEE
(LA 30
0)
23
APPROX. EDGE OF WATER 3+00
0.86
MARSH
MARSH
1.60
Google Earth Pro Date: March 5, 2013
0
MARSH CREATION SITE 2
300'
600'
SCALE: 1"=300'
1"= 300'
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
AS SHOWN
DWG ID.
MARSH CREATION SITE 2
DWG. NO.
FIG. 12
REV.
BORROW AREA. SEE
FIG 3 FOR DETAILS
BORROW AREAS PIPELINE CORRIDOR IMPACT
BORROW AREA
PIPELINE
TOTAL REQUIRED
EASEMENT (AC)
ALIGNMENT 1
ALIGNMENT 1
ALIGNMENT 1
BP: 0+00.00
NORTHING: 474507.57
EASTING: 3768400.06
WETLAND IMPACTS (AC)
OPEN
WATER
SOLID
MARSH
BROKEN
MARSH
12.0
12.0
0.0
0.0
10.0
10.0
0.0
0.0
2.1
2.1
0.0
0.0
LAT: N29.7958
LONG: W89.7961
BP: 0+00.00
NORTHING: 473630.33
EASTING: 3767668.72
LAT: N29.7934
LONG: W89.7984
NOTES:
1. SEE FIGURE 4 FOR PROJECT LAYOUT.
2. SEE FIGURE 5 FOR WELL HEAD INFORMATION.
LAKE LERY
LEGEND:
BORROW MATERIAL PIPELINE
TEMPORARY CONSTRUCTION
EASEMENT
BASELINE
75' WIDE PIPELINE
CORRIDOR ALIGNMENT 2
LIMITS OF FILL MATERIAL (MARSH
CREATION)
PI: 38+00.00
NORTHING: 470418.09
EASTING: 3769698.88
PI: 51+24.72
NORTHING: 472021.41
EASTING: 3772881.33
LAT: N29.7845
LONG: W89.7922
BP: 0+00.00
NORTHING: 472021.41
EASTING: 3772881.33
LAT: N29.7888
LONG: W89.7821
75' WIDE PIPELINE
CORRIDOR ALIGNMENT 1
75' WIDE PIPELINE
CORRIDOR ALIGNMENT 2A
EP: 64+24.72
NORTHING: 471489.99
EASTING: 3774067.75
EP: 74+50.00
NORTHING: 468364.68
EASTING: 3772716.50
LAT: N29.7873
LONG: W89.7784
LAT: N29.7788
LONG: W89.7827
SITE 2
BAY
O
U LE
RY
SITE 1
EP: 14+00.00
NORTHING: 470798.21
EASTING: 3773562.36
X BOEUFS
AU
BAYOU TERRE
LAT: N29.7854
LONG: W89.7800
00)
Y (LA 3
W
ROIX H
DELAC
Google Earth Pro Date: March 5, 2013
BORROW AREA PIPELINES
0
1000'
2000'
SCALE: 1"=1000'
1"= 1000'
LAKE LERY MARSH CREATION
3500 N. Causeway Blvd. Suite 900
Metairie, Louisiana 70002
(504) 837-6326
Project No. 10001871
ST. BERNARD PARISH, LOUISIANA
DATE
NOV., 2014
SCALE
AS SHOWN
DWG ID.
BORROW AREA PIPELINES
DWG. NO.
FIG. 13
REV.
Coastal Environments, Incorporated
January 20, 2015
Services:
Applied Science
& Planning
Environmental
Restoration &
Monitoring
Cultural Resources
Management
Geographic
Information
(GIS) Services
Ms. Amelia Wolfe
Coastal Resources Scientist
Office of Coastal Management
Louisiana Department of Natural Resources
P. O. Box 44487
Baton Rouge, LA 70804
RE:
Permit #P20141578
Revised Additional Information Request Letter
Proposed Lake Lery Marsh Creation Project,
St. Bernard Parish, LA
Litigation Services
Dear Ms. Wolfe,
Website:
www.coastalenv.com
Corporate Office:
1260 Main Street
Baton Rouge, LA 70802
Ph (225) 383-7455
Fax (225) 383-7925
Other Locations:
127 Babcock Farm Road
Appomattox, VA 24522
Ph/F (434) 352-4168
cpearson@coastalenv.com
525 South Carancahua Street
Corpus Christi, TX 78401
Ph (361) 854-4885
Fax (361) 884-1844
jkelly@coastalenv.com
812 Water St.
Biloxi, MS 39530
Ph (228) 385-5547
Fax (228) 385-5548
rellis@coastalenv.com
2045 Lakeshore Dr.
CERM RM 443
New Orleans, LA 70122
Ph...(504) 280-4082
Fax (504) 280-4081
bkappel@coastalenv.com
This letter serves as a revised additional information request for the above referenced
Coastal Use Permit for your recent email additional information requests from January 9,
14, and 20, 2015 as well as your letter dated January 9, 2015 from the SONRIS website.
Enclosed is the requested information provided by the URS Corporation representative.
1. "...Pages 8 & 9 on the plats include the cross sections for the marsh creation area, but
only details the area near the containment dike. Please provide a typical cross-sectional
drawing(s) for the areas where the dredged material will be laid upon marsh, making sure to
include the elevations."
The cross sections on Plat 8 and 9 do include the land area. Note that the existing
marsh is around EL 1. We are filling the entire marsh creation area to EL 2.75 and
3.5 to rebuild the land so all of the existing marsh within the dike area will be filled.
The cross section showing the marshland areas to be filled was extended on Plot 9.
This revised plot is included with this letter.
2. "...Please submit a statement explaining how the applicant will use best management
practices to minimize the amount of runoff (particularly sediment) during and immediately
after construction activities." Describe/list the BMPs that will be utilized for the project.
The required BMPs for the project will be implemented by the contractor during
project dredging and marsh creation to insure the water quality will be the same both
pre- and post-construction.
Per the construction specifications, the contractor will be required to submit an
erosion control plan to keep excess sediment within the containment area and
minimize runoff. The contractor will be required to limit the NTU during
construction.
The contractor specifications in the bid package for the proposed project detail the
1
dewatering and turbidity controls required for the BMPs during dredging and marsh creation. A copy
of the section (8.6 Dewatering and Turbidity Controls) included in the bid package is attached at the
end of this letter.
3. "What are the drafts for the vessels that will be utilized?"
The drafts listed below are estimated. The actual drafts will depend on the contractor selected. Below is
a list of anticipated drafts:
1) Barge: 6.5' maximum draft
2) Boat: 5' maximum draft
3) Tug: 6.5' maximum draft
4) Airboat: 1.5' maximum draft
5) Marsh buggy: 5' maximum draft
4. "Vessel Drafts: According to Fig. 7 Cross section B-B, your proposed 8' barge and tug will not be able to
approach the borrow area without prop washing....can't you make sure they use vessels that won't draft more
than 5' or 6' (near borrow area)?"
The engineer has verified with multiple contractors that the dredge and marsh creation areas can be
accessed with a maximum draft of 6'. Because the waterbody bottom minimum depth is 6.5', DNR and
URS representatives agreed that 6.5' depth will be the maximum allowed draft for the contractor
equipment impact. The 6.5' maximum draft will be added to the contractor specifications in the bid
package.
The contractor specifications in the work plan will state that there will be "no prop wash" impacts
during the proposed project work areas.
5. "Will the marsh buggy traverse on land or will it be mounted on a barge?"
Marsh Buggies will not be used outside the limits of work. No marsh will be disturbed in the borrow
area, and the pipeline corridors were laid out to not disturb existing marsh (as shown on the aerial
image, not filed verified). All land within the marsh creation dikes will be filled to EL 2.75 and 3.25, so
the marsh buggies will traverse land here, but we are filling and restoring the marsh in this area
anyway.
Should you have any questions, comments and/or need additional information, please contact me at 383-7455,
ext. 154 or hguidry@coastalenv.com. Thank you.
Sincerely yours,
Hunter B. Guidry
Hunter B. Guidry
Project Specialist II
Enclosure
xc:
Phillip Olivier, PE, URS
2
Attachment
Contractor Bid Package Specification for BMPs from URS
8.6
Dewatering and Turbidity Control
The Contractor shall conduct his/her work in a manner that will not cause damaging siltation or pollution of
any water bodies. All applicable Federal and State regulations of agencies and statutes relating to the
prevention and abatement of pollution shall be complied with in the performance of the Contract. Dredging
and filling operations shall be done in a manner that will minimize turbidity of the water at each dredge site
and at the discharge sites from the marsh creation fill. Discharge water shall be directed towards the
appropriate location determined by the Contractor and approved by the Engineer.
The Contractor shall keep construction activities under continued surveillance, management, and control to
minimize interference with, disturbance to, and damage of water, fish and wildlife resources. If excess
turbidity occurs, the Contractor shall report such to the Engineer and change the operating procedure to reduce
the degree of turbidity. Excess turbidity shall be noted when turbidity monitoring shows turbidity 30% or
greater than the established turbidity levels.
The Contractor shall use turbidity control measures for dewatering. The Contractor shall submit a Turbidity
Control Plan along with the Work Plan including descriptions and drawings of all turbidity control measures
used, acceptable turbidity limits (NTU) established, and all proposed discharge locations for approval by the
Engineer. All turbidity control structures must be removed prior to demobilization as approved by the
Engineer.
The Contractor shall ensure to maintain the turbidity in the lake post construction to be at the same level as
established pre-construction. The Contractor shall measure the existing turbidity of the water in the lake for a
minimum of 1 week at multiple locations within the project limits prior to beginning of any construction and
submit monitoring information to the Engineer for review and establishment of base line turbidity levels. Once
the construction is completed the Contractor shall measure the turbidity limits in the lake for a minimum of 1
week at multiple locations and submit the records for Engineer's approval. Work will not be considered
complete until turbidity conditions are within original levels.
3