INSTALL & MAINTAIN TRANSMISSION AND DISTRIBUTION PIPING SYSTEM AND ACCESS ROAD, EXCAVATE AND FILL A DESIGNATED AREA FOR WETLANDS ASSIMILATION PROJECT IN ORLEANS AND ST. BERNARD PARISH
NAME OF APPLICANT: Sewerage and Water Board of New Orleans, 2900 Peoples Avenue, New Orleans, Louisiana 70122.
LOCATION OF WORK: Project site is located at 6501 Florida Avenue, New Orleans, Louisiana, in Orleans Parish, as shown on the attached drawings.
Latitude: 29.971722/Longitude: -89.990767 Hydrologic Unit Codes: 08090203 Eastern Louisiana Coastal-Louisiana.
CHARACTER OF WORK: The project has been proposed in three separate phases. Phase 1 includes the installation and maintenance of a 10’ wide access road and an 18” transmission and a 16” distribution piping system which will tie into the existing Eastbank Sewage Treatment Plant force main and run eastward to the designated assimilation area, A-2. An approximate 32 acre borrow area within open water shall be excavated and the material shall be placed into the adjacent 30 acre assimilation area. Once this area has reach an elevation and salinity capable of supporting vegetated plantings Phase 2 will commence. Phase 2 consist of planting cypress and tupelo gum seedlings and bullwhip. Phase 3 involves the monitoring process of the site over a 5 year period. The project seeks to restore cypress wetlands within the Central Wetlands Unit using the assimilation of treated wastewater and provide protection to the local community from future storms. The applicant maintains that the project will not create an adverse impact to the environment; therefore no compensatory mitigation has been proposed.