The applicant requests a 10-year extension of time for maintenance dredging.

Full Public NoticeProject Plans The applicant proposes a 10-year extension of time to conduct maintenance dredging of an irregularly shaped area covering an area of approximately 2.5 acres and consisting of varying lengths and widths at the terminus of the Jewell Fulton Canal. The project would restore the authorized depth of -21 feet mean low tide, and involve the removal of approximately 30,000 cubic yards of material that would be placed in Dredged Material Placement Area 13.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas