Home

Galveston District

Run scraper

Endeavour Marina

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant is seeking After-the-Fact authorization to retain existing marina structures.

Full Public NoticeProject Plans The applicant is seeking After-the-Fact authorization to retain existing marina structures that deviated from permitted plans and repair, in place, approximately 428 linear feet of bulkheading. The permitted pier alignment, as well as the as-built drawings, is shown on page 3 of 7. The piers consist of one six-foot-wide by 150-foot-long walkway leading to a 6-foot-wide by 260-foot-long T-head pier; two 12-foot-wide by 100-foot-long floating piers; an 8-foot-wide by 100-foot-long fixed pier, and a 6-foot-wide by 157-foot-long walkway leading to a 6-foot-wide by 100-foot-long T-head pier with seven finger piers to create mooring slips.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas