PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK
AMENDMENT ONE (PHASE II)IN POINTE COUPEE PARISH
NAME OF APPLICANT: Delta Land Services, LLC, , 1090 Cinclare Drive, Port Allen, Louisiana 70767 ATTN: Mr. Daniel Bollich.
LOCATION OF WORK: The proposed project area is located in Section 101, Township 5 South, Range 10 East, approximately 3 miles south-southeasterly from New Roads, Louisiana, in Pointe Coupee Parish, as shown on the attached prospectus. (Lat. 30.654693, Long. -91.408778)
CHARACTER OF WORK: The proposed bank property totals approximately 386.4 acres of improved pasture lands managed for livestock production. The applicant/sponsor proposes to restore 374.0 acres of bottomland hardwood and 12.4 acres of cypress swamp ecosystem. Aspects of the proposed restoration plan excavating areas exceeding 28-feet NAVD and utilizing the excavated material as fill for grading drainage ditches to restore surface hydrology; appropriate vegetation will then be planted. Specific details of the proposed restoration plan can be found in the attached prospectus.
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
P. O. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
February 23, 2015
REPLY TO
ATTENTION OF:
Operations Division
Regulatory Branch
Project Manager
Brian W. Breaux
(504) 862-1938
SUBJECT: MVN-2015-00393-MB
PUBLIC NOTICE
Interested parties are hereby notified that an application has been received by the District
engineer for a Department of the Army permit to authorize the following pursuant to (X) Section
10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or (X)
Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK
AMENDMENT ONE (PHASE II)
IN POINTE COUPEE PARISH
NAME OF APPLICANT: Delta Land Services, LLC, , 1090 Cinclare Drive, Port Allen,
Louisiana 70767 ATTN: Mr. Daniel Bollich.
LOCATION OF WORK: The proposed project area is located in Section 101, Township 5
South, Range 10 East, approximately 3 miles south-southeasterly from New Roads, Louisiana, in
Pointe Coupee Parish, as shown on the attached prospectus. (Lat. 30.654693, Long. -91.408778)
CHARACTER OF WORK: The proposed bank property totals approximately 386.4 acres of
improved pasture lands managed for livestock production. The applicant/sponsor proposes to
restore 374.0 acres of bottomland hardwood and 12.4 acres of cypress swamp ecosystem.
Aspects of the proposed restoration plan excavating areas exceeding 28-feet NAVD and utilizing
the excavated material as fill for grading drainage ditches to restore surface hydrology;
appropriate vegetation will then be planted. Specific details of the proposed restoration plan can
be found in the attached prospectus.
The comment period will close 30 days from the date of this public notice advertisement.
Written comments, including suggestions for modifications or objections to the proposed work,
stating reasons therefore, are being solicited from anyone having interest in this permit request.
Letters must reference the applicant's name and the subject number, be addressed and mailed to
the above address, ATTENTION: REGULATORY BRANCH.
-2The decision whether to issue a permit will be based on an evaluation of the probable impact
including cumulative impacts of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The
benefit that reasonably may be expected to accrue from the proposal must be balanced against its
reasonably foreseeable detriments. All factors which may be relevant to the proposal will be
considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation,
water supply and conservation, water quality, energy needs, safety, food and fiber production,
mineral needs, consideration of property ownership and, in general, the needs and welfare of the
people.
The Corps of Engineers is soliciting comments from the public; federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and the other public interest
factors listed above. Comments are used in the preparation of an Environmental Assessment
and/or Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the overall
public interest of the proposed activity.
No properties listed in the National Register of Historic Places are near the proposed work.
The possibility exists that the proposed work may damage or destroy presently unknown
archeological, scientific, pre-historical or historical sites or data. Copies of this notice are being
sent to the State Archeologist and the State Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Department of Interior nor affect any habitat designated as critical to the
survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnus-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the alteration of N/A acres of EFH utilized by various life stages of red drum and
penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
-3If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency and certification that the proposed
activity will not violate applicable water quality standards will be required from the Louisiana
Department of Environmental Quality, Office of Water Resources, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program. The Department of the Army permit will not be issued unless the applicant received
approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Martin S. Mayer
Chief, Regulatory Branch
BANKING INSTRUMENT AMENDMENT ONE
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK
Bottomland Hardwood and Baldcypress Swamp
Re-establishment and Rehabilitation Project
Pointe Coupee Parish, Louisiana
Sponsored By:
Delta Land Services, LLC
Prepared January 16, 2015
TABLE OF CONTENTS
I.
PURPOSE OF MBI ................................................................................................. 1
II.
LOCATION AND OWNERSHIP OF BANK PROPERTY (PROPERTY) ...... 1
A.
B.
C.
D.
PROPERTY LOCATION ....................................................................................................................... 1
PROPERTY OWNERSHIP ..................................................................................................................... 1
PROPERTY LEGAL DEFINITION .......................................................................................................... 1
RECORDED LIENS, ENCUMBRANCES, EASEMENTS, SERVITUDES OR RESTRICTIONS .......................... 3
III. RESPONSIBILITIES OF PARTIES ..................................................................... 3
A.
B.
C.
D.
E.
THE OWNER ...................................................................................................................................... 3
THE SPONSOR ................................................................................................................................... 3
THE IRT ............................................................................................................................................ 3
THE HOLDER OF CONSERVATION SERVITUDE (HOLDER) .................................................................. 3
LONG-TERM STEWARD (STEWARD) .................................................................................................. 3
IV. GOALS AND OBJECTIVES ................................................................................. 3
V.
PERFORMANCE STANDARDS .......................................................................... 3
VI. MONITORING PLAN AND REPORTING PROTOCOLS ............................... 4
A.
B.
MONITORING .................................................................................................................................... 4
REPORTING PROTOCOLS ................................................................................................................... 4
VII. CONTINGENCIES AND REMEDIAL ACTIONS.............................................. 4
A.
B.
C.
D.
E.
ADAPTIVE MANAGEMENT ................................................................................................................. 4
NOTICE OF DEFICIENCY .................................................................................................................... 4
CONDITIONS FOR SUSPENDING CREDIT SALES .................................................................................. 4
CATASTROPHIC EVENTS INCLUDING NATURAL DISASTERS AND UNLAWFUL ACTS ......................... 4
FINANCIAL RESPONSIBILITIES ........................................................................................................... 4
VIII. INSPECTION BY IRT AND HOLDER ................................................................ 4
IX. FINANCIAL PROTECTION ................................................................................. 4
X.
LONG-TERM PROTECTION AND MAINTENANCE ..................................... 5
A.
B.
CONSERVATION SERVITUDE ............................................................................................................. 5
LONG-TERM MAINTENANCE PLAN ................................................................................................... 5
XI. BANK USE ............................................................................................................... 5
A.
B.
C.
D.
E.
F.
G.
BANK SERVICE AREA........................................................................................................................ 5
PROJECTS ELIGIBLE TO USE THE BANK ............................................................................................. 5
DETERMINATION OF BANK CREDITS ................................................................................................. 5
SCHEDULE OF CREDIT AVAILABILITY ............................................................................................... 6
CREDIT TRANSACTIONS .................................................................................................................... 6
REQUIREMENTS FOR INITIAL CREDIT RELEASE ................................................................................. 6
SUBSEQUENT CREDIT RELEASES....................................................................................................... 6
XII. MODIFICATION OF THIS MBI .......................................................................... 7
A.
B.
C.
D.
MINOR MODIFICATION TO MBI ........................................................................................................ 7
ADDENDA TO BANK .......................................................................................................................... 7
EXCLUSIONS OF APPROVED MITIGATION SITE .................................................................................. 8
TERMINATION OF THIS MBI.............................................................................................................. 9
E.
TERMINATION OF PARTICIPATION ..................................................................................................... 9
XIII. TRANSFER OF PROPERTY OR SPONSORSHIP .......................................... 10
A.
B.
TRANSFERS OF BANK PROPERTY .....................................................................................................10
TRANSFER OF SPONSORSHIP.............................................................................................................10
XIV. ESTABLISHMENT OF STEWARD ................................................................... 10
XV. BANK LIFE............................................................................................................ 10
XVI. OTHER PROVISIONS ......................................................................................... 10
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
DISCLAIMER.....................................................................................................................................10
NON-REPORTING NATIONWIDE PERMIT ...........................................................................................10
DISPUTE RESOLUTION ......................................................................................................................10
OVERALL PERFORMANCE ................................................................................................................10
SPECIFIC LANGUAGE OF MBI SHALL BE CONTROLLING ..................................................................10
NOTICE ............................................................................................................................................10
ENTIRE AGREEMENT ........................................................................................................................10
INVALID PROVISIONS .......................................................................................................................10
HEADINGS AND CAPTIONS ...............................................................................................................10
COUNTERPARTS ...............................................................................................................................10
BINDING...........................................................................................................................................10
LIABILITY OF REGULATORY AGENCIES ............................................................................................10
Attachment A Maps
Figure 1. Vicinity Map
Figure 2. Service Area Map
Attachment B Title Report/Opinion
Attachment C Mitigation Work Plan
Attachment D Acceptance Letter
MITIGATION BANKING INSTRUMENT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK
The following represents the first amendment (Amendment One) to the Ponderosa Ranch
of Pointe Coupee Mitigation Bank (Bank) of which the Mitigation Banking Instrument (MBI)
was approved by the U.S. Army Corps of Engineers New Orleans District (CEMVN) on October
11, 2013. This amendment follows all provisions provided for in the MBI with the exception of
those specifically provided for in the Mitigation Work Plan (MWP). This amendment is made
and entered into by and among Delta Land Services LLC (Sponsor), the heirs of the Succession
of John E. Jumonville, Sr. and Claude Coulon Jumonville (Owner) and the Interagency Review
Team (IRT) composed of the CEMVN, Region VI of the U.S. Environmental Protection Agency
(EPA), the U.S. Fish and Wildlife Service (FWS), and the Louisiana Department of Wildlife and
Fisheries (LDWF). This MBI is a binding agreement among the parties and incorporates the
detailed Mitigation Work Plan and any other attachments to the MBI as a part hereof.
I.
Purpose of MBI
The Purpose of the MBI remains as defined in Section I of the October 11, 2013 MBI.
Location and Ownership of Bank Property (Property)
II.
A. Property Location
The Property Location is described in Section I of the Mitigation Work Plan (MWP).
B. Property Ownership
MBI.
The property owner (Owner) remains as defined in Section II.B of the October 11, 2013
C. Property Legal Definition
A tract or parcel of land located in Section 101 Township 5 South, Range 10 East in
Pointe Coupee Parish, Louisiana.
For a Point of Reference begin at a ¾" iron pipe marking the apparent corner common to
Section 101 Township 5 South, Range 10 East and section 104 and 106, Township 5
South, Range 10 East; thence South 17 degrees 17 minutes 17 seconds East a distance of
160.83 feet to a calculated point of beginning. (Northing of 785789.8444 and Easting of
3256354.0623 using State Plane, NAD83, LA South, US survey feet).
From the Point of Beginning run South 57 degrees 21 minutes 29 seconds East a distance
of 540.73 feet to a calculated point; thence South 58 degrees 44 minutes 30 seconds East
a distance of 144.70 feet to a calculated point; thence South 62 degrees 27 minutes 06
seconds East a distance of 214.90 feet to a calculated point; thence South 68 degrees 48
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
minutes 05 seconds East a distance of 494.73 feet to a calculated point; thence South 67
degrees 46 minutes 02 seconds East a distance of 321.19 feet to a calculated point; thence
South 65 degrees 45 minutes 05 seconds East a distance of 381.41 feet to a calculated
point; thence South 50 degrees 25 minutes 16 seconds East a distance of 234.73 feet to a
calculated point; thence South 80 degrees 06 minutes 13 seconds East a distance of 45.50
feet to a calculated point; thence South 71 degrees 04 minutes 42 seconds East a distance
of 74.62 feet to a calculated point; thence South 79 degrees 33 minutes 03 seconds East a
distance of 298.70 feet to a calculated point; thence South 74 degrees 44 minutes 34
seconds East a distance of 62.14 feet to a calculated point; thence South 48 degrees 49
minutes 40 seconds East a distance of 82.21 feet to a calculated point; thence South 64
degrees 30 minutes 09 seconds East a distance of 102.63 feet to a calculated point; thence
South 67 degrees 58 minutes 35 seconds East a distance of 115.55 feet to a calculated
point; thence South 71 degrees 10 minutes 45 seconds East a distance of 191.31 feet to a
calculated point; thence South 67 degrees 15 minutes 26 seconds East a distance of
201.91 feet to a calculated point; thence South 65 degrees 42 minutes 55 seconds East a
distance of 312.34 feet to a calculated point; thence South 68 degrees 50 minutes 39
seconds East a distance of 273.60 feet to a calculated point; thence South 72 degrees 10
minutes 35 seconds East a distance of 206.04 feet to a calculated point; thence South 73
degrees 18 minutes 15 seconds East a distance of 89.60 feet to a calculated point; thence
South 14 degrees 36 minutes 59 seconds West a distance of 275.17 feet to a calculated
point; thence South 13 degrees 21 minutes 34 seconds West a distance of 819.43 feet to a
calculated point; thence South 59 degrees 03 minutes 05 seconds West a distance of
4241.82 feet to a calculated point; thence North 29 degrees 41 minutes 22 seconds West a
distance of 20.27 feet to a calculated point; thence North 28 degrees 43 minutes 40
seconds West a distance of 1483.62 feet to a calculated point; thence North 49 degrees 19
minutes 10 seconds East a distance of 156.73 feet to a calculated point; thence North 26
degrees 02 minutes 40 seconds West a distance of 847.54 feet to a calculated point;
thence North 66 degrees 05 minutes 04 seconds East a distance of 75.19 feet to a
calculated point; thence North 29 degrees 56 minutes 49 seconds West a distance of
287.21 feet to a calculated point; thence North 66 degrees 53 minutes 49 seconds West a
distance of 103.44 feet to a calculated point; thence North 31 degrees 50 minutes 38
seconds West a distance of 330.57 feet to a calculated point; thence South 69 degrees 03
minutes 26 seconds West a distance of 42.42 feet to a calculated point; thence South 63
degrees 50 minutes 51 seconds West a distance of 100.99 feet to a calculated point;
thence North 28 degrees 34 minutes 06 seconds West a distance of 880.59 feet to a
calculated point; thence North 28 degrees 35 minutes 32 seconds West a distance of
786.74 feet to a calculated point; thence North 02 degrees 40 minutes 30 seconds West a
distance of 134.26 feet to a calculated point; thence North 88 degrees 20 minutes 23
seconds East a distance of 600.24 feet to a calculated point; thence North 00 degree 58
minutes 59 seconds West a distance of 626.56 feet to a calculated point; thence North 89
degrees 08 minutes 38 seconds East a distance of 324.43 feet to a calculated point; thence
South 82 degrees 57 minutes 21 seconds East a distance of 247.75 feet to a calculated
point; thence North 89 degrees 48 minutes 09 seconds East a distance of 200.77 feet to a
calculated point; thence North 83 degrees 13 minutes 49 seconds East a distance of
268.03 feet to a calculated point; thence North 62 degrees 53 minutes 28 seconds East a
distance of 296.45 feet to a calculated point; thence South 88 degrees 17 minutes 55
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
seconds East a distance of 284.59 feet to the Point of Beginning, consisting of 386.42
acres.
D. Recorded Liens, Encumbrances, Easements, Servitudes or Restrictions
Title to the Property has been documented by a title opinion (Attachment B) generated by
the Law Offices of Jewell & Jewell on January 15, 2015 and will be updated two weeks prior to
execution of the conservation servitude. Any exceptions to the real estate title not subordinated
to the conservation servitude are listed below.
The Bank is free of any mortgages, liens and encumbrances except for four mortgages
held in favor of Peoples Bank and Trust Company of Pointe Coupee. However, Peoples Bank
and Trust Company will subordinate all four of the mortgages in favor of the conservation
servitude described in Section X.A of this MBI. There are no zoning or existing ordinances in
place affecting the Bank.
A mineral title opinion was rendered by the Law Offices and Jewell & Jewell to the
Sponsor on January 22, 2013 regarding the existence of any mineral leases or mineral ownership.
The Opinion states that minerals and mineral rights are owned by the following persons in
undivided portions as follows: 1) Claude Coulon Jumonville (Owner) (1/4th), 2) Trustee of the
Alexander E. Jumonville Spendthrift Trust (1/4th), 3) ETC Land & Holdings, LLC, 4) Leah Estes
Theriot Miller (1/8th) and 5) Bryan Estes (1/8th). Claude Coulon Jumonville (Owner) owns
100% of the executive rights associated with the aforementioned minerals and mineral rights.
The Sponsor conducted a review of the Louisiana Department of Natural Resources (LDNR)
Strategic Online Natural Resources Information System (SONRIS) database for oil and gas
activity. This review revealed the location of two wells within or in close proximity to the Bank
but these wells were plugged and abandoned.
III.
RESPONSIBILITIES OF PARTIES
The responsibilities of the parties are as described in Sections III. A through E of the October 11,
2013 MBI.
IV.
GOALS AND OBJECTIVES
Goals, objectives and contributions to overall watershed/regional functions provided by the
Bank Addendum are described in Section II of the MWP (Attachment C).
V.
PERFORMANCE STANDARDS
Performance standards used to measure the success of the Bank are described in Section
VIII of the MWP (Attachment C).
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
VI.
MONITORING PLAN AND REPORTING PROTOCOLS
Monitoring and reporting remain as defined in Sections VI.A and VI.B of the October 11,
2013 MBI. Monitoring and Reporting requirements are established in Section IX and Section X of
the MWP, respectively (Attachment C).
VII.
CONTINGENCIES AND REMEDIAL ACTIONS
Contingencies and remedial actions remain as defined in Section VII.A through Section VII.E of
the October 11, 2013 MBI. The Adaptive Management Plan is defined in Section XII of the
MWP (Attachment C).
VIII. INSPECTION BY IRT AND HOLDER
Inspection provisions remain as defined in the October 11, 2013 MBI.
IX.
FINANCIAL PROTECTION
A. The Sponsor agrees to provide Financial Assurances sufficient to ensure satisfactory
completion for the work described in the Mitigation Work Plan and the Adaptive Management
Plan. The Sponsor is establishing the Construction and Establishment (C&E) financial assurance
to assure sufficient funds are available to perform work required to construct and maintain the
Bank through successful attainment of long-term success criteria. An assessment of the initial and
capital costs and ongoing management funds required to manage and monitor the Bank is included
in the Mitigation Work Plan and provides an estimate of work and cost requirements for
construction and establishment of the Bank through achievement of long-term success criteria. To
fund this account, the Sponsor proposes to establish the Ponderosa Ranch of Pointe Coupee
Mitigation Bank Construction and Establishment Fund by means of an escrow account in the
amount of $ $446,504.57. The Financial assurance shall be reduced as success criteria are
achieved and the probability decreases that those funds would be needed according to the
following schedule:
1. Upon verification by the IRT that the construction work has been completed, the
CEMVN, acting on behalf of the IRT, shall advise the Sponsor that the C&E financial assurance
may be reduced to $132,705.33.
2. Upon verification by the IRT that the initial success criteria have been attained for all
tracts, the CEMVN, acting on behalf of the IRT, shall advise the Sponsor that the C&E financial
assurance may be reduced to $72,347.79.
3. Upon verification by the IRT that the interim success criteria have been attained for all
tracts, the CEMVN, acting on behalf of the IRT, shall advise the Sponsor that the C&E financial
assurance may be reduced by $22,537.95.
4. Upon verification by the IRT that the long-term success criteria have been attained for
all tracts, the remaining C&E financial assurance shall be released to the Sponsor.
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
B. The Sponsor shall provide copies of annual status of the financial assurances to CEMVN
upon request and/or in their monitoring reports.
C. The financial assurances shall guarantee payment to a third party, as determined
appropriate by the CEMVN in consultation with the IRT, in the event that the Sponsor does not
fulfill its obligations to perform, as specified in this MBI.
D. Payment to Sponsor, or if necessary, to a third party as identified by CEMVN, of a
specified amount of the financial assurances shall be made upon written notification by CEMVN
to the financial institution.
X.
LONG-TERM PROTECTION AND MAINTENANCE
All provisions regarding the conservation servitude are defined in Section X.A of the October 11,
2013 MBI. The Long-Term Maintenance Plan is outlined in Section XIII of the MWP (Attachment
C).
The funding of long-term maintenance is described in Section XIV.B of the MWP
(Attachment C).
XI.
BANK USE
Provisions governing bank use remain as defined in the Section XI of the October 11, 2013
MBI unless otherwise specified below.
A. Bank Service Area
The Bank Service Area remains as defined in Section XI.A of the October 11, 2013 MBI.
B. Projects Eligible to Use the Bank
Provisions for project eligible to use the bank remain as defined in Section XI.B of the
October 11, 2013 MBI.
C. Determination of Bank Credits
To determine the amount of acres required to offset a particular impact to wetlands,
CEMVN will use either best professional judgment or a CEMVN approved assessment method to
determine the number of credits per acre available at the bank and the number of credits lost as a
result of an impact. The same assessment method will be used to calculate both credits available
and credits lost.
Credit Determination is tied to the ecological restoration and/or enhancement
outlined in the Mitigation Work Plan (Attachment C. Section XI).
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
D. Schedule of Credit Availability
Credit release is tied to achieving all the milestones within the success criteria at specific
monitoring times as outlined in Section XI.B of the MWP (Attachment C).
E. Credit Transactions
Provisions for credit transactions remain as defined in Section XI.E of the October 11, 2013 MBI.
F. Requirements for Initial Credit Release
No credits will be released until the Sponsor has provided a signed statement stating that
all of the following requirements have been met and has provided copies of the following
executed documents, as appropriate:
1. Permits: Obtain all necessary permits or other authorizations needed to construct and
maintain the Bank. This MBI does not fulfill or substitute for such authorization.
2. Holder Qualifications: Evidence that the entity proposed to hold the conservation
servitude is a CEMVN approved Holder.
3. Conservation Servitude: A copy of the executed perpetual conservation servitude
with a copy of this MBI as recorded in the Mortgage and Conveyances Records Office of the
parish in which the Property is located.
4. Financial Assurance: Documentation establishing the C&E financial assurances
stipulated in Section IX and the Long-Term Maintenance and Protection endowment described in
Section X of this MBI.
5. Property Ownership: A title search that identifies all known encumbrances including
mortgages, liens, rights-of-way, servitudes, easements, etc. and documentation that the
conservation servitude is not subordinate to any other easement or major lien. Sponsor shall
provide a copy of the recorded document evidencing that any mortgages encumbering the property
have been subordinated to the conservation servitude.
6. Execution of MBI: MBI signed by the Owner, Sponsor and CEMVN District
Commander or his representative and approval by all participant IRT agencies; and
7. Work Schedule: Submission of the timetable for implementing work identified in the
permit, Mitigation Work Plan or elsewhere in this MBI.
G. Subsequent Credit Releases
The Sponsor shall provide to CEMVN and the IRT a monitoring report or information
necessary to document successful attainment of required milestones before each credit release.
CEMVN, with assistance from the IRT, will determine whether the information provided is
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
accurate and, in its opinion, whether those milestones were achieved. CEMVN will advise the
Sponsor and the IRT in writing of its findings and the amount of credits that will be released.
XII.
MODIFICATION OF THIS MBI
A. Minor Modification to MBI
1. This MBI is subject to written modification as mutually agreed to by the IRT and the
Sponsor for such reasons as changes reflecting adaptive management of the Bank, credit
assessment, changes in credit releases and credit release schedules. Changes to this MBI that the
district engineer determines not to be significant will follow procedures in paragraph 332.8(g)(2)
streamlined review process.
2. Should changes in this MBI be required by the IRT that are not acceptable to the
Sponsor, the Sponsor may elect to end his participation and close the Bank. At that time, the IRT
will:
a. Revise the Bank's credit allotment based on the work completed at closure,
b. Review the credits sold by the Bank, and then
c. Determine whether the previously sold acreage is sufficient to balance mitigation
needs or whether additional acreage is needed to be left in the Bank to balance the credits mitigated
at the Bank.
3. The conservation servitude will remain in force on that portion of the Property remaining
in the Bank and a sufficient buffer, as determined by the IRT, to protect the integrity of the Bank.
B. Addenda to Bank
1. The Sponsor may include additional acreage in the Bank as modifications to this MBI,
following procedures in paragraph 332.8(g)(1) provided that (1) the additional acreage is located on
the same parcel of land or on a parcel of land contiguous to the Bank and (2) the natural
composition, structure, functions and processes performed by the restored/enhanced wetland
community are the same as those outlined in this MBI. For the modification of this MBI, the
amendment will contain the following:
a. Detailed description of existing conditions of the Property identifying existing and
prior land uses, vegetation, hydrology alterations and soils;
b. A Mitigation Work Plan that details the proposed hydrologic and vegetative
restoration/enhancement work that is necessary to produce the mitigation credits;
c. Drawings depicting the site showing its location to other mitigation sites authorized
by this MBI, different mitigation types, soils and hydrology; also drawings depicting the work
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
required; vicinity map, a plan view depicting the proposed work and typical cross-sections of that
work;
d. A Department of the Army issued wetland determination;
Property;
e. A title opinion and survey clearly identifying any existing encumbrances on the
f. A draft conservation servitude;
g. A draft of the mechanism to be used to secure the necessary Construction and
Establishment financial assurance; and
h. A draft of the mechanism to be used to establish the necessary Long-Term
Maintenance and Protection account.
2. CEMVN will determine if the work identified in the Mitigation Work Plan requires a
DA permit. A DA permit application is not a required with the prospectus, but the Sponsor may
choose to submit an application at this time as obtaining any and all permits is a prerequisite to
selling credits.
3. A public interest review will be required for each addendum. The prospectus, Mitigation
Work Plan and drawings will be advertised by public notice for a minimum of thirty days to obtain
public comments.
4. The IRT will evaluate each proposed property. The evaluation will typically require an
inspection of the property and review of the prospectus and restoration plan. If warranted, the IRT
will recommend modifications to the proposed restoration plan. By signing this MBI, the agencies
are under no obligation to accept future addenda. Each addendum will be evaluated on its own
merit.
5. A separate credit assessment will be conducted to determine habitat values of each
addendum.
6. The mutually agreed upon Mitigation Work Plan will be signed by designated authorities
for each IRT member and included as an amendment to this MBI and subject to all its requirements,
conditions and terms.
C. Exclusions of Approved Mitigation Site
1. The Sponsor may elect to exclude a portion of the Property on which no credits have
been sold from the Bank. However, notification and approval by the IRT must be obtained by the
Sponsor prior to removal from the Bank.
2. Reduction in Bank size may adversely affect future releases of mitigation credits and
financial assurances. Additionally, the IRT will re-evaluate the credit value per acre for the
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
portion of the site remaining in the Bank. Should the re-evaluation of credits determine that debits
exceed the available credits produced by the acres remaining in the Bank, the IRT may require that
a portion of the area to be excluded remain in the Bank to make up the credit difference caused by
the reduction in Bank size.
3. After IRT has approved the exclusion, the Owner may, with approval from the Sponsor,
Holder and the IRT, modify the conservation servitude to remove the servitude from that portion
of the Property excluded.
D. Termination of This MBI
Should the IRT determine that the Sponsor is in material default of any provision of this
MBI, the IRT, acting through the CEMVN may notify the Sponsor that the sale or transfer of any
Credits will be suspended until the appropriate deficiencies have been remedied. Upon notice of
such suspension, the Sponsor agrees to immediately cease all sales or transfers of Mitigation
Credits until the IRT informs the Sponsor that sales or transfers may be resumed. Should the
Sponsor remain in default, the IRT, acting through CEMVN, may terminate the MBI and any
subsequent Bank operations. Upon termination, the Sponsor agrees to perform and fulfill all
obligations under this MBI relating to Credits that were sold or transferred prior to termination.
If circumstances warrant, such as misrepresentation, misapplication, misappropriation,
improper management, non-disclosure of pertinent information or non-compliance with the
terms of this MBI by the Sponsor, CEMVN and other members may void their recognition of the
Bank as well as terminate their future participation in this MBI. Any executed and recorded
conservation servitude pertaining to wetlands restored pursuant to mitigation contracts and this
MBI will remain in full force and effect, and as waters of the United States, any subsequent
discharges would require Section 404 authorization. Upon termination of this MBI, the
conservation servitude shall remain on those lands for which credits were sold for the use as
compensatory mitigation for adverse impacts associated with DA permits. In addition, a buffer
sufficient to protect the integrity of the Bank as determined by the IRT, shall be established and
protected by the conservation servitude. The revised conservation servitude shall be recorded in
the Mortgage and Conveyance Office of the parish where the land is located with the holder
acting as the long-term manager. All funds in the escrow account, if any, will be forfeited to the
Holder or to a long-term Steward or other appropriate CEMVN designee who agrees to assume
the maintenance and monitoring of the restored habitat in accordance with this MBI.
Additionally, intentional misrepresentation, misappropriation, non-disclosure of pertinent
information, non-compliance with the terms of this MBI, or any other intentional illegal act may
be prosecuted to the fullest extent of the law.
E. Termination of Participation
Any IRT members may terminate their participation upon written notification to all
signatory parties without invalidating this MBI. Participation of the IRT member seeking
termination will end 30 days after written notification. Termination by one member of the IRT
of its involvement in this MBI shall not terminate or affect the relationship between the
remaining members of the IRT, toward each other or the Sponsor or Owner, under this MBI.
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
Remaining Credits authorized under the authority of the withdrawing agency will no longer be
available for transfer. Nothing in this Section is intended or shall be construed to limit the legal
or equitable remedies (including specific performance and injunctive relief) available to the IRT
members in the event of a threatened or actual breach of this MBI.
XIII. TRANSFER OF PROPERTY OR SPONSORSHIP
Transfer of Property or Sponsorship remains as defined in Section XIII of the October 11,
2013 MBI.
XIV. ESTABLISHMENT OF STEWARD
Establishment of Steward provisions remain as defined Section XIV of the October 11,
2013 MBI.
XV.
BANK LIFE
Provisions for Bank Life remain as defined in Section XV of the October 11, 2013 MBI.
XVI. OTHER PROVISIONS
All other provisions remain as defined in Section XVI A through L of the October 11, 2013 MBI.
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
__________________________________________
________________________
CLAUDE COULON JUMONVILLE
DATE
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
__________________________________________
________________________
GEORGE GUERIN
DATE
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK
Ponderosa Ranch of Pointe Coupee Mitigation Bank
Mitigation Banking Instrument
___________________________
MARTIN S. MAYER
CHIEF, REGULATORY BRANCH
___________
_____________________
DATE
ATTACHMENT A
Maps
Cat Island
National Wildlife
Refuge
Atchafalaya
National Wildlife
Refuge
Sherburne Wildlife Management Area
I
5
2.5
0
Miles
5
Sources: Esri, DeLorme, USGS, NPS, Esri, HERE, DeLorme, MapmyIndia, ©
OpenStreetMap contributors, and the GIS user community
Legend
Ponderosa Ranch of Pointe Coupee Mitigation Bank Amendment One (386.4 Acres)
Ponderosa Ranch of Pointe Coupee Mitigation Bank (323.8 Acres)
National Wildlife Refuges
State Lands
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
VICINITY MAP
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/06/2014
Map : F01_Vicinity_5mi.mxd
FIGURE 1
Site Location
Sources: Esri, DeLorme, USGS, NPS, Sources: Esri, USGS, NOAA
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
Legend
Primary Service Area (Lower Grand River Watershed: 08070300)
SERVICE AREA MAP
Secondary Service Area (West Central LA Coastal Watershed: 08090302)
I
14
7
0
Miles
Pointe Coupee Parish, LA
14
Created :
Approved :
Date :
Map No. :
LJW/ArcView
DEB
12/05/2014
F02_ServiceArea.mxd
FIGURE 2
ATTACHMENT B
Title Report/Opinion
ATTACHMENT C
Mitigation Work Plan
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
Contents
I. Bank Property Location ................................................................................................ 3
II. Objective ..................................................................................................................... 3
A. Aquatic Resource Type and Functions to be Restored/Enhanced/Preserved ......... 3
B. Watershed Contributions ......................................................................................... 4
III. Site Selection ............................................................................................................. 6
IV. Site Protection Instrument .......................................................................................... 7
V. Baseline Information .................................................................................................. 7
A. Land Use ................................................................................................................. 8
B. Soils ........................................................................................................................ 9
C. Hydrology ................................................................................................................ 9
D. Vegetation ............................................................................................................. 11
VI. Description of Work ................................................................................................. 12
A. Soils/Hydrologic Work Plan ................................................................................... 12
B. Vegetation ............................................................................................................. 12
VII. Maintenance Plan .................................................................................................. 13
VIII. Performance Standards ....................................................................................... 14
A. Initial Success Criteria ........................................................................................... 14
B. Interim Success Criteria ........................................................................................ 14
C. Long-Term Success Criteria ................................................................................. 15
IX. Monitoring Requirements ......................................................................................... 15
A. Permanent circular monitoring stations ................................................................. 16
B. Transects .............................................................................................................. 16
C. Soil Profile ............................................................................................................. 17
D. Floristic Survey...................................................................................................... 17
E. Photographs .......................................................................................................... 17
F. Qualitative Analysis ............................................................................................... 18
G. Hydrologic Conditions ........................................................................................... 18
H. Ledgers ................................................................................................................. 18
X. Monitoring Reports.................................................................................................... 18
A. As-Built Report ...................................................................................................... 18
B. Initial Success Criteria Report ............................................................................... 19
C. Interim Success Criteria Report ............................................................................ 20
D. Long Term Success Criteria Report ...................................................................... 22
XI. Bank Credits .......................................................................................................... 23
A. Credit Determination ............................................................................................. 23
B. Schedule of Credit Availability ............................................................................... 24
XII. Adaptive management plan .................................................................................... 24
XIII. Long Term Protection and Maintenance ................................................................ 25
XIV. Funding ................................................................................................................. 25
A. Construction and Establishment (C&E) Funds ...................................................... 25
B. Long Term Maintenance/Management Funds ....................................................... 26
XV. Other Information.................................................................................................... 27
Page 1 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
Attachment MWP-A-Tables and Figures
Attachment MWP-B-Cost Analysis Report
Page 2 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
I. Bank Property Location
The center point of the Ponderosa Ranch of Pointe Coupee Mitigation Bank
Amendment One (PRPCMB1 or Bank) is located at latitude 91.408778° North and
longitude 30.654693° in Pointe Coupee Parish, Louisiana (Figure 1). The PRPCMB1 is
located in the Lower Grand Watershed as identified by the U.S. Geological Survey
(USGS) Hydrologic Unit Code (HUC) 08080101 (Figure 2).
Driving directions to the site are as follows:
From the intersection of US Highway 190 and LA Highway 413 (Bayou Poydras
Road) in Erwinville, Louisiana, proceed north on LA Highway 413 for 4.8 miles.
Turn left onto Highway 416 and travel 0.2 miles. Turn right on Highway 413 and
proceed north for 0.5 miles. Turn left on Highway 414 and travel approximately
1.6 miles to Oilfield Road and take a right onto Oil Field Road (private road). At
this point there is a locked gate so arrangements must be made with DLS or the
Owner prior to further access. From the gate travel approximately 2.4 miles. The
PRPCMB1 is on the northeast side of the unimproved road.
II. Objective
A. Aquatic Resource Type and Functions to be Restored/Enhanced/Preserved
This Bank will re-establish1 361.9 acres of bottomland hardwood forest (BLH) and 6.6 acres
of baldcypress (Taxodium distichum) swamp (Swamp) and will rehabilitate2 12.1 acres of BLH
and 5.8 acres of Swamp.
As defined by The Natural Communities of Louisiana published in 2009 by the Louisiana
Department of Wildlife and Fisheries (LDWF) and the Louisiana Natural Heritage program
(LNHP), BLH forests are forested, alluvial wetlands occupying broad floodplain areas that flank
large river systems. BLH forests may be called fluctuating water level ecosystems
characterized and maintained by a natural hydrologic regime of alternating wet and dry
periods. These forests support distinct assemblages of plants and animals associated with
particular landforms, soils, and hydrologic regimes. They are important natural communities
for maintenance of water quality, providing a very productive habitat for a variety of fish and
wildlife, and are important in regulation of flooding and stream recharge. Baldcypress swamps
are forested, alluvial swamps growing on intermittently exposed soils. The soils are inundated
or saturated by surface water or groundwater on a nearly permanent basis throughout the
growing season except during periods of extreme drought. Bayous commonly intersect these
1 Re-establishment is defined in 33 CFR 332.2 as the manipulation of the physical, chemical, or biological characteristics of a site with the goal of
returning natural/historic functions to a former aquatic resource. Re-establishment results in rebuilding a former aquatic resource and results in a gain
in aquatic resource area and functions.
2 Rehabilitation is defined in 33 CFR 332.2 as the manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing
natural/historic functions to a degraded aquatic resource. Rehabilitation results in a gain in aquatic resource function, but does not result in a gain in
aquatic resource area.
Page 3 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
wetlands. There is a low floristic diversity. Baldcypress is the dominant overstory species 3.
Many aquatic food webs depend on the input of allochthonous material in the form of leaf litter
or other organic debris that the wetland forest provides. Net primary productivity of swamp
forests seems to be increased by periodic flooding or increased water flow and decreased by
slow water movement or stagnation.
B. Watershed Contributions
1. Watershed Need
The PRPCMB1 is located within the 29,555-square mile Mississippi Delta Cotton
and Feed Grains Region Land Resource Region (LRR O) of the 38,865-square
mile Southern Mississippi River Alluvium Major Land Resource Area (MLRA
131A), the Mississippi Alluvial Plain Level 3 Ecoregion and Southern Holocene
Meander Belts Level 4 Ecoregion (Natural Resources Conservation Service
[NRCS] 2006, Omernik 1987, Environmental Protection Agency [EPA] 2003). The
PRPCMB1 is also located in 838,000-acre Atchafalaya Trace State Heritage Area
as designated by the Louisiana Legislature (R.S. 24:1221-1225). The region was
designated as a National Heritage Area by the National Park Service (NPS) in
2006 due to its concentration of significant natural, scenic, cultural, historic and
recreational resources (Atchafalaya National Heritage Area 2012).
The PRPCMB1 is in the upper reach of the Barataria-Terrebonne estuary complex
(Figure 3). The Barataria-Terrebonne National Estuary Program (BTNEP) was
established in 1990 by the State of Louisiana and the EPA for the purpose of
preserving, protecting and restoring this estuary complex.
The PRPCMB1 is located between the present channel of the Mississippi River
and False River, an oxbow lake which was once the main course of the
Mississippi River. This area is locally known as the Island. The entirety of this
land area drains into False River and is located in the USGS eight-digit HUC
08070300 (Lower Grand Watershed). The Lower Grand watershed is the focus of
the Upper Terrebonne Basin (UTB) Water Quality Improvement Project, whose
goals are to protect water resources and improve quality of impaired waters within
the watershed for fish and wildlife, drinking water, and aesthetics. One of the
goals of this initiative is to complete the False River Ecosystem Restoration
(FRER) Study and Project authorized by Section 206 of the 1996 Water
Resources Development Act (WRDA). According to the premise for this study,
False River has undergone a decline in water quality as a result of several land
use changes over the past 50 years. Large amounts of forestland within the
watershed was converted to cropland and other agricultural uses followed by the
construction of over 50 miles of drainage ditches from adjacent pastureland. This
3
The above-referenced and all subsequent scientific plant nomenclature are derived from Lichvar et. al.
(2014).
Page 4 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
resulted in siltation, nutrient loading, and pollutants entering the False River from
adjacent agricultural lands (Earth Consulting Group 2007, Earth Consulting Group
et al. 2009; Chustz 2012). Of particular concern are the high levels of sediment
deposition into False River (Jones 2012, LDNR 2012 and Thibaut 2012).
2. Watershed Benefits
Restoration4 of forested habitat on the Island through programs such a mitigation
banking have been recognized as beneficial components to achieve the goals of
the FRAER Project (Chustz 2012; False River Watershed Council 2013). LDNR
and LDWF (20122) purported that the establishment of the Bank would further
address the sedimentation issues associated with runoff from agricultural lands.
Elimination of the artificial drains within the Bank described in Section VI of this
Mitigation Work Plan (MWP) is consistent with the mid-term goal of the FRAER
Project. This goal calls for action to reduce siltation and turbidity in False River
through hydromodification of the drainage network (LDNR and LDWF 2012 2).
The restoration and protection of forested wetlands within the Bank will provide
additional wetland functions and values that are currently not realized. Improved
water quality will be achieved by ceasing hay/livestock production, reestablishing natural drainage patterns, and afforestation. The increase in water
quality will result from removing the cattle and eliminating the agricultural
practices utilized for producing grazing forage and hay. Agricultural practices
such as seasonal tilling for mechanical vegetation control and the application of
herbicides, pesticides and fertilizers will no longer be necessary and will reduce
potential, non-point source pollution (e.g., soil erosion and chemical runoff).
The long-term goals of the FRAER Project are to develop and implement a
watershed management strategy, establish best management practices (BMPs),
develop a watershed conservation plan and investigate the acquisition of
conservation easements (LDNR and LDWF 20122). A House Concurrent
Resolution (No. 123) was presented to the Louisiana Legislature during the 2012
session to establish the False River Watershed Council to implement a
comprehensive watershed conservation plan for the False River Watershed
(Thibaut 2012). The long-term protection of the Bank with a perpetual
conservation servitude, as described in Section X.A of this MBI and Section IV of
this MWP, is consistent with the long-term strategies of acquiring conservation
easements identified by LDNR and LDWF (20122).
BTNEP in conjunction with local stakeholders developed the Comprehensive
Conservation and Management Plan (CCMP) which outlined 12 goals to
accomplish its objective to preserve, protect and restore the Barataria4
Restoration is defined in 33 CFR 332.2 as the manipulation of the physical, chemical, or biological characteristics of a site with the
goal of returning natural/historic functions to a former or degraded aquatic resource. For the purpose of tracking net gains in aquatic
resource area, restoration is divided into two categories: re-establishment and rehabilitation.
Page 5 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
Terrebonne estuary complex. The restoration of the PRPCMB1 is in solidarity
with three of the goals set forth in the BTNEP CCMP which are 1) preservation
and restoration of wetlands, 2) support for diverse, natural biological
communities; 3) to develop and meet water quality standards which protect
estuary resources; and 4) to work in conjunction with natural processes (Moore
and Rivers 1996).
III. Site Selection
The PRPCMB1 is ecological suitable for providing the desired resource functions
described in Section II per the requirements of 33 CFR § 332.3 (c). Soils, hydrologic
conditions and elevations are suitable to provide for the restoration of bottomland
hardwood and swamp wetland habitat as described in Section II.A. This project will
provide additional wetland and ecological functions not currently realized under the
existing conditions and land use (e.g. flood storage, reduced run-off, NearcticNeotropical bird habitat, threatened and endangered species habitat and habitat for
other aquatic fauna). Localized and downstream water quality will improve by retiring
the land from agricultural use (i.e., hay/livestock production) and increasing surface
water retention time. The surrounding land use and cover within one mile of the
PRPCMB1 perimeter is hay/pasture (39%), woody wetlands (31%), cultivated crops
(17%), Ponderosa Ranch of Pointe Coupee Mitigation Bank and Permittee-Responsible
Mitigation Areas conservation servitudes (13%), scrub-shrub (1%), emergent
herbaceous wetlands (<1%) and development (<1%) (Figure 4). These land uses are
compatible with the intended habitat to be restored at the PRPCMB1.
The restoration and afforestation of the Bank near larger, extant tracts of bottomland
hardwoods will provide benefit to various species of wildlife such as NearcticNeotropical migrant birds and threatened species such as the Louisiana black bear
(Ursus americanus luteolus) (Natural Resources Conservation Service [NRCS] 2005).
Approximately 107 bird species, excluding wading birds, nest regularly within the MAV
with 70 species utilizing bottomland hardwoods as primary habitat (Twedt et al 1999 1).
The Partners in Flight (PIF) Bird Conservation Plan (BCP) for the MAV recommends
increasing the interior area of forested fragments to increase habitat for forest-dwelling
(silvicolous) bird species (Twedt et al. 19991). Twedt and Loesch (19992) list fourteen
forest breeding species as species of high concern. Three of these species are highest
priority species for conservation. These are Swainson's warbler (Limnothlypis
swainsonii), Cerulean warbler (Dendroica creulea) and swallow-tailed kites (Elanoides
forficatus). The planting of densely-spaced seedlings and the management of such
species to provide a diversity of structure in areas within largely forested landscapes is
an identified strategy to encourage the recruitment of breeding populations of scrubdwelling (thamnic) and silvicolous bird species (Twedt et al. 19991; Twedt et al. 2010).
The macrohabitat and microhabitat of the Bank (i.e. ridges and swales; meander scrolls,
ridge top depressions) are important to bird conservation because of the high priority
forest breeding bird species of importance that are dependent on forested wetlands but
vary in microhabitat requirements. The ridge habitats are vital to the three highest
Page 6 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
priority breeding bird species while the swales are important in providing habitat for
migratory waterfowl, wading birds and shorebirds thus integrating all facets of the
PIFBCP for the MAV (Twedt et al 19991). Promotion of reforestation efforts and the
protection of habitat with conservation easements is a documented strategy for bird
conservation on private lands in the Barataria and Terrebonne basins (Wiedenfield et al.
1996). Using the spatial analysis model developed by Twedt et al. (2006), the Bank is
in a high priority area for the restoration of bird habitat (Figure 5).
The Bank is located in an area designated as a primary conservation zone for the
Louisiana black bear (Figure 5). The Bank is located approximately six miles east of
extant bottomland hardwoods that are designated as critical habitat by the United States
Fish and Wildlife Service (USFWS) for this species5. The afforestation of existing
agricultural lands within the Bank will provide for larger contiguous forested habitat
located near extant forests within the critical habitat area. This would potentially provide
for the establishment of a larger forested corridor and potential habitat for bears which
may disperse from other forested areas. Corridor conservation and restoration is
identified as a strategy to facilitate wildlife and plant migration in response to transitions
anticipated with predicted climate change (National Fish, Wildlife and Plants Climate
Adaptation Strategy Management Team [Strategy] 2012). In addition to the importance
to migratory bird species and the Louisiana black bear, the MMNS (2005) purports that
old-growth bottomland hardwood forests are critical habitat for 11 of the 18 species of
bats known to the Southeast. Southern myotis (Myotis austroriparius) and Rafinesque's
big-eared bat (Corynorhinus rafinesquii) prefer large, hollow trees in mature bottomland
hardwood and swamp habitats, respectively (LMVJV 2007; Taylor 2006). The unique
topography of the Bank offers the opportunity to provide habitat with a diversity of
hydrological regimes which are critical to the life cycles of many species of reptiles and
amphibians. The large size of the Bank in proximity to a larger, extant forested tract
also coincides with the large home ranges that most of these species require (Dundee
and Rossman 1989; LMVJV 2007).
IV. Site Protection Instrument
A conservation servitude will be utilized as the site protection instrument as described in
Section X of the Mitigation Bank Instrument (MBI).
V. Baseline Information
This section contains both the historical and current ecological and physical
information about the Bank site.
5
Federal Register Vol. 74, No. 45 titled Endangered and Threatened Wildlife and Plants; Designation of Critical Habitat of the
Louisiana Black Bear (Ursus americanus luteolus) promulgated as a Final Rule by the US Fish and Wildlife Service on March 10,
2009
Page 7 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
A. Land Use
1. Historical Land Use
The PRPCMB1 is located within the approximately 24 million-acre lower Mississippi
Alluvial Valley (MAV). Prior to European settlement and colonization, the MAV
consisted of mostly contiguous bottomland hardwoods and swamps. Today,
approximately 20% of the original forested acreage remains in fragmented blocks
which, on average, total 158 acres in size (Twedt et al 1999 1). Much of the
deforestation stemmed from the need to convert these lands to agricultural uses.
The rate of deforestation increased in the 20th Century due to major flood control
projects (i.e. major levee construction), advancements in land clearing technology
and spikes in the price of agricultural commodities such as soybeans during the
1960s and 1970s (Lower Mississippi River Joint Venture [LMRJV] 2007). The
Coastal Wetlands Planning, Protection, and Restoration Act Task Force (CWPPRA
1993) estimates that the historic wetland loss within the Barataria-Terrebonne
estuary complex from 1932 to 1990 was 446,971 acres with 45% being in the
Terrebonne Basin.
The property was historically a bottomland hardwood and baldcypress wetland
forest typical of those associated with ridge and swale formation within the alluvial
plain of the lower Mississippi River. Prior to its conversion to agricultural uses, the
PRPCMB was located in an area known as "Grand Swamp". A review of historic
aerial photography (Figures 6 through 14) reveals that the PRPCMB1 was a
functional wetland forest as recently as 1952. By 1966, the PRPCMB1 was cleared
for agricultural production. Significant changes in land use occurred in the early
1970's when a drainage canal associated with the Gross Tete Watershed
Management Project (M-1 Canal) was excavated on the Island by the United States
Soil Conservation Service (SCS) (LDNR and LDWF 2012 1). The M-1 Canal
traversed the Island and smaller artificial drains were constructed within the Bank
and on surrounding property for the purpose of draining the site into the M-1 Canal.
These smaller drains were constructed in the bottoms of naturally occurring swales
in order to move water into the M-1 Canal via culverts installed within the spoil
depositional area of the M-1 Canal. By 1983, approximately 72% of the Island was
cleared and in crop production. Since that time, much of the cultivated cropland
was replaced by pasture (LDNR and LDWF 20121).
3. Current Land Use
Currently, the PRPCMB1 is managed for livestock production. The land use is
improved pasture with scattered individual trees occurring throughout the
PRPCMB1.
Page 8 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
B. Soils
The soils within the PRPCMB1 and the overall 2,131-acre Jumonville property in
which it is located is mapped as Dundee-Alligator complex (De), undulating (NRCS
20141, Figure 15). The De map unit is listed as partially hydric (NRCS2). The Alligator
component of this map unit is listed as hydric and the Dundee component is listed as
nonhydric. The Alligator soils are estimated to comprise 40% of this map unit while
Dundee soils are estimated to comprise 50% of this map unit. The remaining 10% are
associated soil types such as Commerce, Sharkey and Tunica soils (SCS 1982, NRCS
20141). The Alligator soil series was established in 1950 in Quitman County,
Mississippi and was updated in 1986. The Dundee soil was established in 1949 in
Tunica County, Mississippi and was updated in 2004. The Alligator soils are described
as being ponded in depressional areas for brief to very long duration. Dundee soils are
described having an apparent water table at 18 inches to 42 inches in undrained
conditions and 42 inches to 72 inches when under drainage (NRCS 20143).
The Sponsor conducted field verifications for hydric soils at six (6) locations
within the Bank site for the purpose of obtaining the wetland determination described in
Section IV of this MWP. The soil descriptions recorded at these locations showed that
the soils were hydric in accordance with the AGCP Regional Supplement (USACE
2010).
C. Hydrology
1. Historical Hydrology and Drainage Patterns
The proposed PRPCMB1 possesses a unique, ridge and swale topography shaped by
the historical meandering of the Mississippi River (Figures 16 and 17) (Hodges 1998).
Leopold et al (1964) identified these fluvial geomorphological features as meander
scrolls. Meander scrolls form from the meandering course of a river within a floodplain
when point bars are reworked into low ridges and troughs (i.e. swales or chutes). The
swales are distinctly wetter than ridges but ridges differ distinctly from natural levees in
that the soils trend from course-textured soils below to fine-textured soils above (Lindo
and Richardson 2001). In areas subject to high precipitation such as Pointe Coupee
Parish, these swales typically do not have well defined natural drainage outlets and
exist as depressional wetlands (Collins and Kuehl 2001; Schumacher et al. 1998). The
property was historically a bottomland hardwood and baldcypress wetland forest typical
of those associated with ridge and swale formation within the alluvial plain of the lower
Mississippi River.
2. Existing Hydrology and Drainage Patterns
Hydrology on the PRPCMB1 is primarily from a combination of rainfall and water table
levels associated with high water events on the nearby Mississippi River. Cumulative
annual precipitation is 62.13 inches per year with the highest rainfall occurring in the
Page 9 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
months of December, January, April and July and the lowest rainfall occurring in
October6. Nearby river gage data show the Mississippi River's average stage was 27.3
feet NAVD since March 20097 with a high of 53.32 feet (May 18, 2011) and a low of
6.27 feet (December 8, 2012). Although the PRPCMB1 no longer receives surface
flows from the Mississippi River due to the mainline levee, it is likely that the river levels
and discharges affect the subsurface hydrology of the PRPCMB1 through hydrostatic
pressure. At high flows, water can move through underlying courser-textured sediments
which may elevate the subsurface water tables and provide a hydrological connection in
riparian floodplain systems (Ritter 1986; Cabezas et al [2011]). This is especially
common on fine-textured features located in close proximity to course-textured features
such as point bars and natural levees (Gee 2012). These events are known to this area
as evidenced by the numerous artesian wells that have been installed at the base of the
protected side of the western mainline levee along LA Hwy 415. These wells are to
prevent saturation of the soils beneath the levee which are associated with these
subsurface flows.
The unique topography and meander scroll features found on the PRPCMB1 can
influence site hydrology. The ridges in this system are typically convergent in nature
and tend to accumulate water and infiltration within the swale features which maximizes
ground water recharge. The result is typically higher water tables with hydric zones
extending further upslope especially in areas subject to high precipitation
(Schoeneberger et al. 1998; Richardson et al. 2001). Jenkinson et al (2002) noted
water table patterns in an undulating site with randomly arranged swales in a forested
till plain site in western central Indiana which had seasonal high water tables. The
wetter and more poorly drained sites were located at higher elevations and better
drained sites at low elevations. Jenkinson et al (2002) theorized that the wetter sites
had dense, impervious layers which perched water and caused it to move laterally
toward the hill slopes. At that point subsurface water moved down the slope and
discharged as a hill side seep and accumulated in the low positioned swales. Brinson
et al. 1995 quantify meander scroll macrotopography as having the highest functional
value (1.0) within the riverine Hydrogeomorphic Model (HGM) for its ability to detain
long-term surface water for long durations. This result is replenished soil moisture,
sediment and nutrient removal, habitat for pool-dependent species, and vegetation
composition maintenance.
During the conversion from a forested wetland to agricultural uses, hydrologic
modifications such as ditching, culverts and channelization of natural swales were
implemented for efficiently moving water off the site and into the M-1 Canal. These
ditches and drains remain in place to move water off-site to limit the horizontal, vertical
and temporal extent of ponding and saturation of the site. These on-site ditches and
drains carry water into the M-1 Discharge Canal (Figure 18). The Canal carries these
6
Based on Port Allen, Louisiana average rainfall data obtained from the Louisiana State University Southern Regional Climate
Center and SCS (1982) data from Old River Control Structure.
7
River levels from a US Army Corps of Engineers gage mounted on intake platform at Tembec Pulp and Paper mill at river mile
260.3 approximately 5 miles south of St. Francisville, Louisiana.
Page 10 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
waters to Discharge Bayou and eventually into False River. The thalweg of the M-1
Canal at this location is approximately 10 feet below the average natural elevation of the
PRPCMB1 at its deepest part and is approximately 60 feet in width between the tops of
bank (Figure 19). The Canal has a left descending bank slope of 2.4:1 and has a crosssectional area of approximately 395.7 square feet8.
D. Vegetation
1. Historical Plant Community
Historically, the site was forested and dominated by species similar to extant forested
areas that are adjacent to the Bank. The adjacent forested reference area is dominated
by facultative (FAC) and FACW species on the ridges; FAC, FACW and OBL species in
transitional areas; and FACW and OBL species in the swales9. The ridges consist of
tree species such as water oak (Quercus nigra), sugarberry (Celtis laevigata), American
elm (Ulmus americana), deciduous holly (Ilex decidua) and box elder (Acer negundo)10.
The swales are dominated by baldcypress, green ash (Fraxinus pennsylvanica), Nuttall
oak (Quercus texana), Drummond red maple (Acer rubrum var. drummondii) and planer
tree (Planera aquatica). Transitional areas are dominated by sweetgum (Liquidambar
styraciflua), sugarberry, green ash and persimmon (Diospyros virginiana). The area is
mapped as a Dundee-Alligator complex (NRCS 20141, SCS 1982). The NRCS (20142)
describes the Alligator soils in wooded conditions as being in bottomland hardwoods or
swamps with species such as baldcypress, ash (Fraxinus spp.), tupelo gum (Nyssa
biflora), Drummond red maple, oaks (Quercus spp.), hickories (Carya spp.), sweetgum
and eastern cottonwood (Populus deltoides). The Dundee soils under wooded
conditions are bottomland hardwoods dominated by cherrybark oak (Quercus pagoda),
eastern cottonwood, sweetgum and water oak.
2. Existing Plant Community
Existing vegetation within the pasture areas on-site is typical of managed pastureland
and is managed for and dominated primarily by bermudagrass (Cynodon dactylon), a
facultative upland (FACU) species (Figure 20). Other species occurring within the
pasture are spinyfruit buttercup (Ranunculus muricatus), southern dewberry (Rubus
trivialis), Carolina geranium (Geranium carolinianum), and curly dock (Rumex crispus).
Vegetation in existing wetland areas was comprised of species such as smartweed
(Polygonum punctatum) and common spike-rush (Eleocharis smallii). Many of the
artificial drains were colonized by giant cutgrass (Zizaniopsis miliacea) and common
rush (Juncus effusus) and in some areas the banks of these drains are lined with tree
8
The dimensions were measured by DLS biologists on March 23, 2012.
The indicators utilized from data points collected are from USFWS (1988) as the data was collected prior to June 1, 2012. All plant
indicators utilized after June 1, 2012 will be in accordance with the 2014 National Wetland Plant List (Lichvar et. al. 2014) in
accordance with the final notice Publication of the Final National Wetland Plant List published in the Federal Register on May 9,
2012 (Vol. 77 No. 90).
9
Page 11 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
species dominated by black willow (Salix nigra) and Chinese tallowtree (Triadica
sebifera).
VI. Description of Work
This Bank will provide 374.0 acres of BLH and 12.4 acres of Swamp to
compensate for unavoidable wetland impacts for the Lower Grand Watershed area
(Figure 2). In order to accomplish this task, the Sponsor shall complete the following
soils/hydrologic and habitat work.
A. Soils/Hydrologic Work Plan
To restore wetland hydrology on the PRPCMB1, approximately 41,740 linear feet of
drainage ditches designed to carry surface water off site will be swaled with approximately
148,000 cubic yards of in situ earthen fill material to restore natural swale conditions.
Areas that range from 28 feet to above 29 feet NAVD will be excavated to below 28 feet
NAVD by removing approximately 18 inches of material. Approximately 6 inches of topsoil
from these excavated areas will be stockpiled on-site and returned to the excavated areas.
Approximately 12 inches of the excavated material will be used as earthen fill material to
swale the existing agriculture drains within the PRPCMB1.
The nine culverts allowing the drainage of these ditches into the M-1 Canal will be
removed and backfilled (Figures 21 through 35).
B. Vegetation
The proposed Bank involves the cessation of livestock operations, restoration of
surface hydrology, afforestation, and implementing effective short and long-term
management strategies. The implementation of the Bank will restore 386.4 acres of BLH
and Swamp habitat as described by LNH (2009) and Lester et al. (2005) (Figure 36 and
Table 1). Areas below 24 feet NAVD will be restored as baldcypress swamp. Areas
between 24 and 25 feet NAVD will be restored as an overcup-water hickory (Type 1)
bottomland hardwood described by LNH (2009). Areas between 25 and 28 feet NAVD and
the excavated areas below 28 feet NAVD will both be restored as a hackberry-American
elm-green ash (Type 2) and sweetgum-water oak (Type 3) bottomland hardwoods.
All livestock will be removed from the Bank prior to site preparation activities in late
summer and early fall. Fencing within the interior of Bank will be removed and new fencing
will be constructed between the boundary of the Bank and adjacent pasture where
livestock grazing will continue as a land use. This fence will consist of four strand barbedwire fencing with the top strand approximately 54 inches above ground level. Site
preparation activities within existing pasture areas will be accomplished by preparing the
site as needed through herbicide treatments, cultivation, and ripping the soil at equidistant
intervals to a depth of approximately 18 inches (Allen et al. 2001). Site preparation efforts
Page 12 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
will consist of herbicide treatment and subsequent removal of invasive and noxious tree
species through mechanized clearing, cutting, shredding or combination thereof.
Afforestation activities will include the planting of native BLH and Swamp species
during the first planting season (December 15, 2015 through March 15, 2016) following
site preparation. BLH species will be planted on approximate 9-foot centers for a rate of
538 stems per acre (spa) while Swamp species will be planted at a spacing of no more
than 12 feet for a minimum rate of 302 spa (Table 2). The species selected will be siteappropriate in terms of habitat design, soil-moisture regime, and species richness and is
based upon literature review (LNH 2009, Lester et al. 2005, Burns and Honkala 1990).
Ten or more species may be represented in the planting assemblage to insure
adequate species richness (Twedt and Best 2004). The distribution of stems will create
a mosaic of hard and soft mast species that will provide seasonally available forages for
a wide range of indigenous wildlife including the Louisiana black bear (Barrow et al.
2005). The availability of soft mast species is important during the summer and hard
mast is critical in the fall and early winter for the build-up of fat reserves in black bears
preparing for denning (Black Bear Conservation Committee [BBCC] 2005).
Hard mast species should account for at least 50 to 70% of all BLH plantings with
the remaining percentage accounted for by soft mast tree species. The exact species
and quantities for planting will be determined by the availability of such species from
commercial nurseries providing localized ecotype seedlings. Seedlings will be mixed
upon planting so that areas are not comprised of a single species (Twedt and Best
2004).
VII. Maintenance Plan
The Sponsor will use all prudent efforts, physical, chemical, or mechanical, to
eliminate existing undesirable/exotic vegetation present such as Chinese tallow on the
site during site preparation activities. The Sponsor will continue to monitor the site
through annual inspections to document
1.
the effectiveness of control efforts and
2.
record the extent and degree of invasive species present
3.
record the extent and degree of any herbivory damage
4.
record the condition and functionality of any hydrological structures
Following such monitoring, invasive species, weed and herbivore control will be
implemented as necessary and hydrological structures will be replaced if determined
necessary. The Sponsor will maintain boundary lines by mowing.
Page 13 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
VIII. Performance Standards
In order for the Bank to be considered acceptable for mitigating wetland impacts
associated with DA permits, the Property will be restored in accordance with the MWP
such that it meets wetland criteria as described in the 1987 Corps of Engineers Wetland
Delineation Manual (the 1987 Manual) as well as the November 2010 Regional
Supplement for the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf
Coastal Plain Region Version 2.0. Performance standards (success criteria) used to
measure the success of the Bank are provided below.
A. Initial Success Criteria
1. Hydrology: Ground surface elevations must be conducive to establishment and
support of hydrophytic vegetation, and re-establishment and maintenance of hydric soil
characteristics. To that end, all alterations of the natural topography (ditching, spoil
banks, land leveling, bedding, fire breaks, etc) that have affected the duration and
extent of surface water have been removed or otherwise rendered ineffective in
accordance with this MWP.
2. Vegetation: A minimum of 250 planted seedlings per acre must survive through the
end of the second spring following the planting (i.e., Year 1). Those surviving seedlings
must be representative both in species composition and percentage identified in this
MWP. This criterion will apply to initial plantings, as well as, any subsequent replanting
that may be needed to meet this requirement.
B. Interim Success Criteria
1. Hydrology: By Year 3 (two years following attainment of the one-year survivorship
criteria) site hydrology will be restored such that the Bank meets the wetland criterion as
described in the 1987 Manual as well as the November 2010 Regional Supplement to
the Corps of Engineers wetland Delineation Manual: Atlantic and Gulf Coastal Plain
Region Version 2.0. Data demonstrating that wetland hydrology has been reestablished is to be collected by the Sponsor and submitted to CEMVN in the
monitoring report for the interim success criteria
2. Vegetation and Vegetative Plantings: a. For a given planting, a minimum of 250
seedlings/sapling spa must be present (with a 70: 30 or 50: 50 hard mast to soft mast
ratio in BLH) at the end of the fourth year (i.e. Year 5) following successful attainment of
the one-year survivorship criteria. Trees established through natural recruitment may
be included in this tally; however, no less that 125 hard mast-producing spa must be
present in BLH areas while no less than 125 baldcypress spa must be present in
Swamp areas. Surviving hard mast seedlings must be representative of the species
composition and percentage identified in this MWP. Exotic/invasive species may not be
included in this tally.
Page 14 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
b. By Year 5 (four years following successful attainment of the one-year survivorship
criteria) the Bank and the perimeter will be virtually free (approximately 5% or less on an
acre-by-acre basis) of exotic/invasive vegetative species.
c. Developing plant community must exhibit characteristics and diversity indicative of a
viable native forested wetland community commensurate with stand age and site
conditions by Year 5. Achievement of wetland vegetation dominance is defined as a
vegetation community where more than 50% of all dominant species are facultative
(FAC) or wetter, excluding FAC- plants, using "routine delineation methods" as
described in the 1987 Manual as well as the November 2010 Regional Supplement to
the Corps of Engineers wetland Delineation Manual: Atlantic and Gulf Coastal Plain
Region Version 2.0.
C. Long-Term Success Criteria
1. Forest canopy coverage exceeds eighty percent of forested land mass as measured
by an approved method. Forest canopy species abundance and composition is
consistent with the restoration goals identified in the restoration plan and credit
assessment methodologies. The long term species composition should fall within the
range of 50:50 to 40:60 soft mast to hard mast ratio.
2. When forest canopy coverage exceeds eighty percent, the Bank will be essentially
void of exotic/invasive vegetation (all seed-producing trees removed from Bank and
perimeter and less than 3% of the understory on an acre per acre basis). An active
treatment program will continue as part of the long-term maintenance program.
3. If thinning to maintain or enhance the ecological value of the Bank is determined
necessary by the IRT at this time, the Sponsor/Steward will develop a thinning plan in
coordination with the IRT. Thinning operations shall be performed by the
Sponsor/Steward per the requirements of the thinning plan.
4. The Sponsor will provide documentation that the "Long-Term Maintenance and
Protection" escrow account is fully funded.
IX. Monitoring Requirements
The Sponsor agrees to perform all work necessary to monitor the Bank to
demonstrate compliance with the success criteria established in this MWP. The
Sponsor will monitor the Bank in the spring of each monitoring year using the guidelines
in Section VIII of this MWP.
Surveys of permanent monitoring stations will occur in the following time frame:
1. Immediately following planting of the Bank to establish baseline information.
Page 15 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
2. In Year 1, 3, 5 and after achieving interim success criteria, monitoring will occur
every 3 years until an average canopy coverage of 80% is established.
3. If thinning is required after successfully achieving the long-term success criteria,
the site will be surveyed prior to and following the first thinning operation
following plantings.
If monitoring for any given year determines that the Bank is not progressing as
expected, monitoring will continue on an annual basis until the Bank successfully meets
or exceeds established milestones. After achieving the interim success criteria,
monitoring will occur every 3 years until average canopy coverage of 80% is obtained.
If thinning is required after successfully achieving the long-term success criteria, the site
will be surveyed prior to and following the first thinning operation following plantings.
The survey of the permanent monitoring stations will collect data to evaluate the
survival rate of planted vegetation; number, species and growth rates (average heights
and diameter). In addition to planted seedlings, surveys will include the number by
species of volunteering trees, shrubs and woody vines. Surveys will also collect
information regarding colonizing plant species, the wetland plant status (scaled from
obligate (OBL) to upland (UPL) of each and the number by species of exotic/noxious
specimens.
A. Permanent circular monitoring stations
Immediately following initial planting of the Bank, the Sponsor will randomly
establish a permanent circular monitoring station for every 20 acres on the Bank. Each
station will have a minimum area of 1/20th acre (radius=26 feet). Stations will be
identified with a permanent marker (e.g., an 8-foot PVC pipe anchored with a metal T
post at plot center) and GPS coordinates will be recorded for each station. A map will
be provided to CEMVN (See Reporting Protocols below) that depicts the location of the
monitoring stations as well as a coordinating list containing the coordinates for each
station. All individual planted seedlings/saplings falling within each monitoring station
will be marked with a numbered tag that uniquely identifies each seedling. A document
providing seedling information shall be presented (to CEMVN) for each monitoring
station and this document shall not only list the specific tag number for each seedling
within the monitoring station, but also the species (by scientific and common name),
height, diameter, wetland rating, hard mast or soft mast categorization, and general
condition of each stem.
To establish baseline information this data will be obtained immediately following
the initial planting of the Bank site or phase of the Bank.
B. Transects
The Sponsor shall establish transects along planted rows to be used to determine
overall survivorship of planted seedlings. Transects shall make up approximately 3% of
Page 16 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
the total number of rows and arranged so that a representative sample of the entire
track is obtained. The beginning and ending points of each transect shall be marked
with a permanent marker (e.g., an 8-foot PVC pipe anchored with a metal T post) and
GPS coordinates shall be recorded for these points.
To establish baseline information transects will be surveyed to determine the
number by species of planted seedlings within 60 days of planting. Transects will be
surveyed until successful attainment of the interim success criteria. Initial and interim
transect surveys shall record the species present, the number of living seedlings for
each species, the wetland indicator status of each species, the mast type of each
species and describe the general condition of the seedlings. Any failed areas of
plantings should be noted along with an explanation for the failure.
C. Soil Profile
The Sponsor will collect data on the hydrologic conditions of the Bank as
necessary. Sufficient data shall be provided to accurately demonstrate variations in soil
conditions. Information to demonstrate hydric properties within the soil shall be
provided as a description of the upper 12 inches of the soil profile. Such data will be
presented as points with GPS coordinates for each point, a hydric indication for each
point, and an explanation to support the information for each point. This information
shall also be provided on a referenced map included as an attachment.
The Sponsor will be required to submit a Corps issued JD (at year 3) to show
that the Property meets the wetland criterion as described in the 1987 Manual as well
as the Regional Supplement of the Corps of Engineers Wetland Delineation Manual:
Atlantic and Gulf Coastal Plain Region Version 2.0.
D. Floristic Survey
To document the attainment of the long-term success criteria the Sponsor will
complete a comprehensive floristic survey for the Bank as part of the monitoring
requirements.
A floristic survey should be comprehensive over the entire site, and should be
conducted using systematic field techniques. This survey should provide a list of plants
and communities existing on the site. If adverse conditions such as disease, drought,
predation, or herbivory, etc. exist and have impacted the plantings then this information
and these conditions need to be discussed in the report.
E. Photographs
Digital images shall be taken from ground level at each monitoring station and
from elevated positions throughout the Bank to document overall conditions. These
Page 17 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
ground level images should provide a North, South, East and West image for each
station.
F. Qualitative Analysis
The Sponsor shall evaluate the entire extent of the Bank (or phase of the Bank
that this report represents) and provided observations concerning overall seeding
survivorship, colonization of the Bank by volunteer plant species, wildlife utilization and
any other information that is pertinent to achievement of initial success criteria.
G. Hydrologic Conditions
A description of the condition of any applicable hydrology altering features
(culverts, ditches, plugs, etc.) and a general discussion of hydrologic conditions at
monitoring stations shall be provided.
H. Ledgers
The Sponsor will utilize the Regulatory In-Lieu Fee and Bank Information
Tracking System (RIBITS) as a ledger to show all transactions. The Sponsor will input
the following information: transaction date, permittee name, credits/acres sold and DA
permit number. No other reporting measures are required.
X. Monitoring Reports
Independent of the As-built report the Sponsor will submit monitoring reports
documenting monitoring efforts at the Bank to the CEMVN by July 31st of the year
monitoring occurs. Besides monitoring results for that monitoring year, reports will
include a financial assurance report documenting withdrawals and deposits. The
monitoring reports will follow the guidelines listed below:
The monitoring report will include data sufficient for comparison to the
performance standards found in Section VIII. of this Work Plan. The Sponsor shall also
include, in these reports, a discussion of all activities which took place at the Bank.
A. As-Built Report
An as-built report will be submitted to CEMVN within 60 days following
completion of all work required to restore or enhance special aquatic sites. The as-built
report will describe in detail the work performed and provide a list of species planted,
the number of each species, the hard or soft mast categorization, and the wetland
rating. No deviation from the MWP may occur without prior approval from the IRT. The
as-built report will include a discussion of the coordination with IRT members, a
description of and reasons for any approved deviation. The as-built report shall provide:
Page 18 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
a. A survey showing finished grades and plantings with written documentation,
plan view and cross sectional drawings of all construction and establishment
work implemented on the bank.
b. Survey data collected from the permanent monitoring stations and the transects.
This survey data should include the number and species of the seedlings planted,
timing of all work events, and maps showing the location (including latitude/longitude) of
all monitoring stations as described in this Work Plan.
c. Detailed descriptions of site preparation, planting procedures, etc.
B. Initial Success Criteria Report
The Sponsor shall monitor the Bank in the spring (March 15-May 31) of its
second growing season following initial planting of the Bank. The Sponsor will provide
an Initial Success Criteria Report by July 31st of that year.
The Sponsor shall provide details in accordance with this MWP, on any
maintenance/management work conducted on the Bank after submission of the As-Built
Report. The Sponsor shall provide a brief description of any anticipated
maintenance/management work to be conducted prior to attainment of interim success
criteria.
1. Vegetation
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings
falling within each permanent circular monitoring plot as described and as established in
accordance with Section IX. of this MWP. A description of the general condition of the
seedlings, including the number and species of surviving seedlings in each monitoring
station, the tag number and a discussion of likely causes of mortality for the nonsurvivors shall be provided. A number (by species) of exotic/invasive species,
including, a description of the generalized degree of distribution and whether they are
seed bearing trees or seedlings will also be provided.
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in Section IX.B of this MWP. A description of the general
condition of the seedlings and the discussion of likely causes of mortality, if appropriate
shall also be provided. Exotic/invasive species should be noted along with information
on the generalized amount of each and whether they are seed bearing trees or
seedlings.
Page 19 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
2. Hydrologic Data
The Sponsor shall provide a description of the condition of any applicable
hydrology altering features (culverts, ditches, plugs, etc.) and a general discussion of
hydrologic conditions at monitoring stations.
3. Photographs
The Sponsor must submit digital photographs in accordance with Section IX.E. of
this MWP.
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in IX.F.
of this MWP.
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial
account statements for both the financial assurance accounts and the Long-term
Maintenance and Protection Fund. If any escrowed funds were used, the Sponsor will
include a narrative describing that use, the justification for that use and supporting
documentation (e.g. receipts). The Sponsor shall also provide any justification for any
requested release from financial assurance accounts.
C. Interim Success Criteria Report
The Sponsor shall monitor the Bank in the spring (March 15-May 31) of its third growing
season following attainment of the one-year survivorship criteria for the Bank. The
Sponsor will provide an Interim Success Criteria Report by July 31 st of that year.
1. Vegetation
Note: For a given planting, a minimum of 250 seedlings/saplings per acre must be
present at the end of the fourth year (i.e. Year 5) following successful attainment of the
one-year survivorship criteria. Trees established through natural recruitment may be
included in this tally; however, no less than 125 hard mast-producing seedlings per acre
must be present. Surviving hard mast seedlings must be representative of the species
composition and percentage identified in this MWP. Exotic/invasive species may not be
included in this tally.
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings
falling within each permanent circular monitoring plot as described and as established in
Page 20 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
accordance with Section IX. of this MWP. A description of the general condition of the
seedlings, including the number and species of surviving seedlings in each monitoring
station, the tag number and a discussion of likely causes of mortality for the nonsurvivors shall be provided. A number (by species) of exotic/invasive species,
including, a description of the generalized degree of distribution and whether they are
seed bearing trees or seedlings will also be provided.
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in IX.B of this MWP. A description of the general condition of
the seedlings and the discussion of likely causes of mortality, if appropriate shall also be
provided. Exotic/invasive species should be noted along with information on the
generalized amount of each and whether they are seed bearing trees or seedlings.
2. Hydrologic Data
By Year 3, two years following attainment of the one-year survivorship criteria,
the Sponsor must provide a Corps of Engineers issued wetland determination to
prove that site hydrology has been restored such that the Property meets the
wetland criterion as described in the 1987 Manual as well as the November 2010
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic
and Gulf Coastal Plain Region Version 2. The Sponsor shall submit a wetland
delineation report and a request for a jurisdictional determination to CEMVN.
3. Photographs
The Sponsor must submit digital photographs in accordance with section IX.E. of
this MWP.
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in IX.F.
of this MWP. The Sponsor shall provide details on any maintenance/management
work conduction on the Bank after submission of the Initial Success Criteria Report.
The Sponsor shall provide a brief description of any anticipated
maintenance/management work to be conducted prior to attainment of long-term
success criteria. Note: By year 5, four years following successful attainment of the oneyear survivorship criteria, the developing community must exhibit characteristics and
diversity indicative of a viable native forested wetland community commensurate with
stand age and site conditions; the Bank and the perimeter will be virtually free
(approximately 5% or less on an acre-by-acre basis) of exotic/invasive vegetation.
Page 21 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial
account statements for both the financial assurance accounts and the Long-term
Maintenance and Protection Fund. If any escrowed funds were used, the Sponsor will
include a narrative describing that use, the justification for that use and supporting
documentation (e.g. receipts). The Sponsor shall also provide any justification for any
requested release from financial assurance accounts.
D. Long Term Success Criteria Report
1. Vegetation
Note: For a given planting, a minimum of 250 seedlings/saplings per acre must be
present at the end of the fourth year (i.e. Year 5) following successful attainment of the
one-year survivorship criteria. Trees established through natural recruitment may be
included in this tally; however, no less than 125 hard mast-producing seedlings per acre
must be present. Surviving hard mast seedlings must be representative of the species
composition and percentage identified in this MWP. Exotic/invasive species may not be
included in this tally.
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings
falling within each permanent circular monitoring plot as described and as established in
accordance with Section IX. of this MWP. A description of the general condition of the
seedlings, including the number and species of surviving seedlings in each monitoring
station, the tag number and a discussion of likely causes of mortality for the nonsurvivors shall be provided. A number (by species) of exotic/invasive species,
including, a description of the generalized degree of distribution and whether they are
seed bearing trees or seedlings will also be provided.
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in IX.B of this MWP. A description of the general condition of
the seedlings and the discussion of likely causes of mortality, if appropriate shall also be
provided. Exotic/invasive species should be noted along with information on the
generalized amount of each and whether they are seed bearing trees or seedlings.
2. Hydrologic Data
Note: By Year 3, two years following attainment of the one-year survivorship
criteria, the Sponsor must provide a Corps of Engineers issued wetland
determination to prove that site hydrology has been restored such that the
Page 22 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
Property meets the wetland criterion as described in the 1987 Manual as well as the
November 2010 Regional Supplement to the Corps of Engineers wetland Delineation
Manual: Atlantic and Gulf Coastal Plain Region Version 2. The Sponsor shall submit a
wetland delineation report and a request for a jurisdictional determination to CEMVN.
Provide supporting documentation that the hydrology achieved at year three still
exists on the site.
3. Photographs
The Sponsor must submit digital photographs in accordance with section IX.E. of
this MWP.
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in IX.F.
of this MWP. The Sponsor shall provide details on any maintenance/management
work conduction on the Bank after submission of the Initial Success Criteria Report.
The Sponsor shall provide a brief description of any anticipated
maintenance/management work to be conducted prior to attainment of long-term
success criteria. Note: By year 5, four years following successful attainment of the oneyear survivorship criteria, the developing community must exhibit characteristics and
diversity indicative of a viable native forested wetland community commensurate with
stand age and site conditions; the Bank and the perimeter will be virtually free
(approximately 3% or less on an acre-by-acre basis) of exotic/invasive vegetation.
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial
account statements for both the financial assurance accounts and the Long-term
Maintenance and Protection Fund. If any escrowed funds were used, the Sponsor will
include a narrative describing that use, the justification for that use and supporting
documentation (e.g. receipts). The Sponsor shall also provide any justification for any
requested release from financial assurance accounts.
XI. Bank Credits
A. Credit Determination
To determine the amount of acres required to offset a particular impact to
wetlands, CEMVN will use either best professional judgment or a CEMVN approved
assessment method to determine the number of credits per acre available at the bank
and the number of credits lost as a result of an impact. The same assessment method
will be used to calculate both credits available and credits lost.
Page 23 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
B. Schedule of Credit Availability
Upon submittal of all appropriate documentation by the Sponsor, and
subsequent approval by CEMVN in consultation with the IRT, CEMVN will release
credits for use by the Sponsor according to the following schedule:
1. Thirty percent (30%) of total anticipated project credits will be available for debiting
upon confirmation that all items in Section XI. F (1-7) of the MBI have been completed.
2. An additional twenty percent (20%) of total anticipated credits will be available for
debiting upon providing documentation that the vegetative plantings have been
conducted and completion of the work necessary to restore site topography and wetland
hydrology of the Bank as outlined in Section VI. of this Work Plan.
3. An additional twenty percent (20%) of the total anticipated credits would be released
upon successfully completing the initial success criteria (Section VIII. A.)
4. An additional twenty percent (20%) of the total anticipated credits would be released
upon successfully completing the interim success criteria (Section VIII B.).
5. The remaining ten percent (10%) of the total anticipated credits would be released
once the long-term success criteria (Section VIII. C.) are met.
XII. Adaptive management plan
An adaptive management strategy, contingency, and remedial responsibilities shall be
in place, and will be implemented in the event monitoring reveals that certain success
criteria have not been met. In the event of a deficiency, the Sponsor shall provide a
notice to the CEMVN. This notice shall include an explanation for the deficiency, and
will outline specific practices and measures that will guide decisions for revising
compensatory mitigation plans if needed.
A.
Seedling Survivorship
1.
If performance standards are not met as specified in Section VIII of this MWP the
Sponsor shall take appropriate actions, as recommended by the CEMVN, to address
the causes of mortality and shall replace seedlings of the appropriate species during the
following planting season. Replanting, monitoring and reporting, as previously
described, shall occur as needed to achieve and document the required survival rate.
2.
If the performance standard is not met after three unsuccessful attempts, the
CEMVN will convene a meeting with the Sponsor to decide if replanting should
continue. Should the CEMVN determine that achieving the required survival rate would
not be likely; the Sponsor shall be required to provide replacement mitigation for the
Page 24 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
increment of value that did not accrue within the unsuccessful areas within one year of
this decision.
B.
Contingencies for Hydrology
If wetland hydrology is not documented by Year 5, the Sponsor shall document in
the monitoring report those areas where attention is needed. The CEMVN may require
the Sponsor to conduct adaptive management measures in order to obtain adequate
hydrology. With approval of the CEMVN, the Sponsor would establish a means of
increasing the amount of available water to the site.
XIII. Long Term Protection and Maintenance
To ensure long-term sustainability of the resource, the Sponsor shall burden the
property with a perpetual conservation servitude as described in Section X of this MBI.
XIV. Funding
Section IX. A of this MBI provides specific details about the funding for the Construction
and Establishment (C & E) Activities for the Bank.
A. Construction and Establishment (C&E) Funds
1. Estimate of C & E Funds Required
The amount required for a third-party to construct and manage the Bank as specified in
this MWP through the first 15 years is estimated at $579,209.90. The construction cost
(Year 0) is estimated at $446,504.57 and the establishment costs over the first 15 years
(Years 1-15) are estimated at $132,705.33. Attachment MWP-B is an estimate of work
and costs requirements for constructing and establishment of the Bank.
2. C&E Funding Mechanism
To fund this account the Sponsor proposes to establish the Ponderosa Ranch of
Pointe Coupee Mitigation Bank Amendment One Construction and Establishment Fund
by means of an escrow account.
3. C & E Release Schedule
The Financial assurances shall be reduced as success criteria are achieved and
the probability decreases that those funds would be needed according to the following
schedule:
1. Upon verification that all hydrologic modifications, construction, and planting as
describe in this MWP (Attachment C of the MBI) have been completed to the
Page 25 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
satisfaction of CEMVN, in consultation with the IRT, CEMVN shall advise the Sponsor
and the financial institution that the C & E financial assurance may be reduced to
$132,705.33 ($579,209.90 $446,504.57).
2. Upon verification by CEMVN, in consultation with the IRT, that the initial success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall advise the Sponsor and the financial institution that the C & E
financial that assurance may be reduced to $72,347.79 ($132,705.33 - $55,226.91).
3. Upon verification by CEMVN, in consultation with the IRT, that the interim success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall advise the Sponsor and the financial institution that the C&E
financial assurance may be reduced to $22,537.95 ($72,347.79 - $49,809.84).
4. Upon verification by CEMVN, in consultation with the IRT, that the long-term success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall notify the Sponsor and the financial institution that the remaining
C&E financial assurance may be released to the Sponsor.
B. Long Term Maintenance/Management Funds
1. Long-term Management Needs
Long-term management activities will include, but is not limited to, boundary
maintenance approximately every 10 years, annual property tax payment, annual
monitoring/inspections.
2. Annual Cost Estimates for Long-Term Needs
The cost of long-term management is $81,377.80 from year 16 to year 50. This
amounts to $130,643.94 when adjusted for inflation every five years. Attachment B
contains a description of the necessary work and an itemization of costs to perform the
work for long term management and protection of the Bank.
3. Long-Term Maintenance and Protection Funding Mechanism
To ensure that sufficient funds are available to provide for the perpetual
maintenance and protection of the Bank, the Sponsor is establishing the "Long-Term
Maintenance and Protection" escrow account. This account will be administered by a
federally-insured depository that is "well capitalized" or "adequately capitalized" as
defined in Section 38 of the Federal Deposit Insurance Act. The account will be
incrementally funded by deposit a minimum of $347.99 into the account per credit /acre
sold at the time of credit sale. The deposit value per credit/acre must reflect, at a
minimum, the total fund value divided by no more than 90% of anticipated credits. Once
the account is fully funded ($94,124.28), no incremental fund per credit sale is required.
Page 26 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
The account shall be fully funded by the time 70% of the total number of credits are sold
or upon successful achievement of the Long-term Success Criteria, whichever occurs
first. If the Long-term Success Criteria are met prior to fully funding the escrow account
then the Sponsor must deposit into the escrow account the difference between the
amount determined to be full funding and the account balance difference between the
amount determined to be full funding and the account balance. Documentation that the
account is fully funded is a pre-requisite for release of the remaining credits following
attainment of the Lon-term Success Criteria as identified in this MWP. Accrued interest in
excess of the value of the fully funded account may only be used for the administration,
operation, maintenance and/or other purposed that directly benefit the Bank. The
principal shall not be used and shall remain as part of the Bank's assets to ensure that
sufficient funds are available should perpetual maintenance responsibilities be assumed
by a third party. The Sponsor or Long-term Steward may withdraw the accumulated
interest only with written approval from CEMVN and only to be used to maintain the Bank.
The Sponsor shall provide copies of depository account statements to CEMVN upon
request and in their monitoring reports.
XV. Citations
Allen, J.A., Keeland, B.D., Stanturf, J.A., Clewell, A.F., and H.E. Kennedy (2001 [rev.
2004]). A guide to bottomland hardwood restoration: US Geological Survey,
Biological Resources Division Information and Technology Report
USGS/BRD/ITR-2000-0011. USDA Forest Service, Southern Forest Research
Station, General Technical Report SRS-40, 132 pp.
Atchafalaya National Heritage Area (2012) The Atchafalaya National Heritage Area
(Website). Available URL: http://www.atchafalaya.org. Accessed July 20, 2012.
Black Bear Conservation Committee (2005) Black Bear Management Handbook for
Louisiana, Mississippi, Southern Arkansas, and East Texas. March 2005.
Brinson, M. M., Hauer, F. R., Lee, L. C., Nutter, W. L., Rheinhardt, R. D., Smith, R. D.,
and Whigham, D. (1995). "A guidebook for application of hydrogeomorphic
assessments to riverine wetlands," Technical Report WRP-DE-11, U.S. Army
Engineer Waterways Experiment Station, Vicksburg, MS. NTIS No. AD A308
365.
Burns, Russell M., and Barbara H. Honkala (1990) Silvics of North America: 1. Conifers;
2. Hardwoods. Agricultural Handbook 654. U.S. Department of Agriculture,
Forest Service, Washington, DC. Vol. 2., 877 pages.
Cabezas, A., M. Gonzalez-Sanchís, B. Gallardo, and F.A. Comín (2011) Using
Continuous Surface Water Level and Temperature Data to Characterize
Hydrological Connectivity in Riparian Wetlands. Environmental Monitoring and
Assessment. DOI 10.1007/s10661-011-1934-9.
Page 27 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
Chustz, S. (2012) False River Ecosystem Restoration Status Update and Alternative
Action Plan [PowerPoint® Slide]. Presentation at a public stakeholder meeting in
New Roads, Louisiana, June 22, 2012. Retrieved from the Louisiana
Department of Natural Resource's Website
http://dnr.louisiana.gov/index.cfm?md=pagebuilder&tmp=home&pid=924
Accessed July 15, 2012.
Coastal Wetlands Planning, Protection and Restoration Act [CWPRA] (1993) Louisiana
Coastal Wetlands Restoration Plan. Main Report and Environmental Impact
Statement prepared by the Louisiana Coastal Wetlands Conservation and
Restoration Task Force.
Collins, M.E. and R.J. Kuehl (2001) Organic Matter Accumulation and Organic Soils In
Richardson, J.L and M.J. Vepraskas (eds.) Chapter 6, Wetland Soils. Genesis,
Hydrology, Landscapes and Classification. Pp. 137-162. Boca Raton, London,
New York: CRC Press.
Dundee, H.A. and D.A. Rossman (1989) The Amphibians and Reptiles of Louisiana.
Louisiana State University Press, Baton Rouge, Louisiana.
Earth Consulting Group, Inc. (2007) Atchafalaya East Watershed Initiative, Iberville,
Pointe Coupee, and West Baton Rouge Parishes, Louisiana. A report prepared
for the Louisiana Department of Natural Resources Atchafalaya Basin Program,
February 28, 2007.
Earth Consulting Group, Providence, Taylor Engineering, Stanley Consultants, G.E.C.,
Inc. (2009) Atchafalaya East Watershed (Upper Terrebonne Basin) Phase 2A,
Detailed Problem Identification and Technical Evaluation; Iberville Parish, Pointe
Coupee Parish and West Baton Rouge Parish, Final Report.
Environmental Protection Agency [EPA] (2003) Level III ecoregions of the continental
United States (revision of Omernik 1987): Corvallis, Oregon, U.S. Environmental
Protection Agency National Health and Environmental Effects Research
Laboratory, Map M-1, various scales.
False River Watershed Council (2013) Managing False River Watershed Resources.
An Interim Report to the Louisiana Legislature, April 2013.
Gee, H. (2012). The Effects of Hydrologic Modifications on Floodplain Forest Tree
Recruitment and Growth in the Mississippi River Alluvial Valley, USA. A
Dissertation Submitted to the Louisiana State University A&M College, May
2012.
Page 28 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
Hodges, J.D. (1998) Minor Alluvial Floodplains. In Chapter 13, Southern Forested
Wetlands Ecology and Management. Pp. 325-341. Boca Raton, Boston, New
York, Washington, London: CRC Press.
Homer, C.H., J.A. Fry, and C.A. Barnes (2012) The National Land Cover Database,
U.S. Geological Survey Fact Sheet 2012-3020, 4 p.
Jenkinson, B.J., D.P. Franzmeir, W.C. Lynn (2002) Soil Hydrology on an End Moraine
and a Dissected Till Plain in West-Central Indiana. Soil Science Society of
America Journal, Volume 66: 1367-1376.
Jones, T. L. (2012) False River Plan Revitalization Plan Unveiled. The Advocate:
Saturday Edition Newspaper. Baton Rouge, Louisiana. Website
http://theadvocate.com/home/2970343-125/false-river-revitalization-planunveiled#main-photo-caption . Accessed 2 June 2012.
Leopold, L.B., M.G. Wolman, and J.P. Miller (1964) Fluvial Processes in
Geomorphology. San Francisco, CA. W.H. Freeman.
Lester G., S. Sorenson, P. Faulkner, C. Reid, and I. Maxit (2005) Louisiana
Comprehensive Wildlife Strategy (Wildlife Action Plan). Louisiana Department of
Wildlife and Fisheries.
Lichvar, R.W., M. Butterwick, N.C. Melvin, and W.N. Kirchner. 2014. The National
Wetland Plant List: 2014 Update of Wetland Ratings. Phytoneuron 2014-41: 142.
Lindo, D.L. and J.L. Richardson (2001) Hydric Soils and Wetlands in Riverine Systems
In Richardson, J.L and M.J. Vepraskas (eds.) Chapter 8, Wetland Soils. Genesis,
Hydrology, Landscapes and Classification. Pp. 283-299. Boca Raton, London,
New York: CRC Press.
Louisiana Department of Natural Resources [LDNR] (2012) False River Ecosystem
Restoration Status Update and Alternative Action Plan [PowerPoint Slides].
Public presentation of the False River Aquatic Resources Ecosystem Restoration
Project, May 30, 2012. Retrieved from Louisiana Department of Natural
Resources Website.
http://dnr.louisiana.gov/index.cfm?md=pagebuilder&tmp=home&pid=924 on
June 2, 2012.
Page 29 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
Louisiana Department of Natural Resources [LDNR] and Louisiana Department of
Wildlife and Fisheries [LDWF] (2012)1 False River Watershed. Interim Report on
HCR 168 of 2011 Regular Legislative Session, March 2012.
Louisiana Department of Natural Resources [LDNR] and Louisiana Department of
Wildlife and Fisheries [LDWF] (2012)2 Draft Alternative Action Plan, False River
Ecosystem Restoration Project. Final Draft Report on HCR 168 of 2011 Regular
Legislative Session, May 2012.
Louisiana Natural Heritage Program [LNHP] (2009) The Natural Communities of
Louisiana. Louisiana Department of Wildlife and Fisheries.
http://www.wlf.louisiana.gov/wildlife/louisiana-natural-heritage-program Accessed
July 20, 2012.
Lower Mississippi Valley Joint Venture [LMVJV] (2007) Restoration, Management and
Monitoring of Forest Resources in the Mississippi Alluvial Valley:
Recommendations for Enhancing Wildlife Habitat, Version 5.2 (FINAL REPORT).
Wilson, R., K. Ribbeck, S. King, and D. Twedt. Lower Mississippi Valley Joint
Venture Forest Resource Conservation Working Group.
Mississippi Museum of Natural Science [MMNS] (2005) Mississippi's Comprehensive
Wildlife Conservation Strategy. Mississippi Department of Wildlife, Fisheries and
Parks, Mississippi Museum of Natural Sciences, Jackson, Mississippi.
Moore, D.M. and R.D. Rivers (1996) Executive Summary: Program Objectives, Action
Plans, and Implementation Strategies at a Glance. Comprehensive and
Conservation Management Plan, Part 1. Barataria-Terrebonne National Estuary
Program, Thibodeaux, Louisiana.
Natural Resources Conservation Service [NRCS] (2005) Bird Use of Restoration Sites:
Influences of Location and Vertical Structure. USDA NRCS Technical Notes 19034, December 2005.
Natural Resources Conservation Service [NRCS] (2006) Land Resource Regions and
Major Land Resource Areas of the United States, the Caribbean, and the Pacific
Basin. United States Department of Agriculture Handbook 296.
Natural Resources Conservation Service [NRCS] (2007) Hydrology Tools for Wetland
Determination. Chapter 19, Engineering Field Handbook. Fort Worth, Texas: US
Department of Agriculture.
1
Natural Resources Conservation Service [NRCS] (2014) Web Soil Survey [website].
U.S. Department of Agriculture, Natural Resources Conservation Service, Soil
Survey Staff. Accessed October 6, 2014. Available URL:
http://websoilsurvey.nrcs.usda.gov/app/
Page 30 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
2
Natural Resources Conservation Service [NRCS] (2014) National Hydric Soils List by
State [website]. U.S. Department of Agriculture, Natural Resources Conservation
Service, Soil Survey Staff. Accessed July 16, 2014. Available URL: http://
http://soils.usda.gov/use/hydric/
Natural Resources Conservation Service [NRCS] (2014)3 Official Soil Series
Descriptions [website]. U.S. Department of Agriculture, Natural Resources
Conservation Service, Soil Survey Staff. October 6, 2014. Available URL:
http://soils.usda.gov/technical/classification/osd/index.html
National Fish, Wildlife and Plants Climate Adaptation Strategy Management Team
(2012) National Fish, Wildlife and Plants Climate Adaptation Strategy. Public
Review Draft, January 2012.
Omernik, J.M. (1987) Ecoregions of the Conterminous United States (map supplement):
Annals of the Association of American Geographers, v. 77, no. 1, p. 118-125,
Richardson, J.L., J.L. Arndt, and J.A. Montgomery (2001) Hydrology of Wetland and
Related Soils In Richardson, J.L and M.J. Vepraskas (eds.) Chapter 3, Wetland
Soils. Genesis, Hydrology, Landscapes and Classification. Pp. 35-84. Boca
Raton, London, New York: CRC Press.
Ritter, D.F. (1986) Process Geomorphology. 2nd edition, Wm. C. Brown Publishers,
Dubuque, Iowa.
Schoeneberger, P.J., D.A. Wysock, E.C. Benham, and W.D. Broderson (1998) Field
Book for Describing and Sampling Soils. USDA NRCS National Soil Survey
Center, USDA, Linkcoln, NE.
Schumacher, B.A., W.J. Day, M.C. Amacher and B.J. Miller (1988) Soils of the
Mississippi River Alluvial Plain in Louisiana. Louisiana Agricultural Experiment
Station, Louisiana State University Agricultural Center.
Society of American Foresters [SAF] (2011) The Dictionary of Forestry [website].
Copyright 1988 by the Society of American Foresters. Accessed December 1,
2011. Available URL: http://dictionaryofforestry.org
Soil Conservation Service [SCS] (1982) Soil Survey of Point Coupee and West Baton
Rouge Parishes, Louisiana. United States Department, Soil Conservation
Service in cooperation with the Louisiana Agricultural Experiment Station and
Louisiana Soil and Water Conservation Committee.
Taylor, D. (2006) Forest Management and Bats. Bat Conservation International
Publication.
Page 31 of 32
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD AND BALDCYPRESS SWAMP HABITAT
PONDEROSA RANCH OF POINTE COUPEE MITIGATION BANK AMENDMENT ONE
Thibaut, M. (2012) House Concurrent Resolution123: To establish the False River
Watershed Council. 18th Congressional District. 2012 Regular Session of the
Louisiana House of Representatives. Baton Rouge, Louisiana.
Twedt, D., D. Pashley, C. Hunter, A. Mueller, C. Brown and B. Ford (1999) 1 Partners in
Flight Bird Conservation Plan for the Mississippi Alluvial Valley, Version 1.0.
Twedt, D.J. and C.R. Loesch (1999)2 Forest area and distribution in the Mississippi
Alluvial Valley: implications for breeding bird conservation. Journal of
Biogeography. 26:1215-1224.
Twedt, D.J. (2004) Stand development on reforested bottom lands in the Mississippi
Alluvial Valley. Plant Ecology 172: 251-263
Twedt, D.J. and C. Best (2004) Restoration of floodplain forests for conservation of
migratory land birds. Ecological Restoration 22 (3): 194-203.
Twedt, D.J, W.B. Uihlein III, and A. B. Elliott (2006) A spatially explicit decision support
model for restoration of forested bird habitat. Conservation Biology Vol. 20, No.
1: 100-110.
Twedt, D.J, S.G. Somershoe, K.R. Hazler, R.J. Cooper (2010) Landscape and
vegetation effects on avian reproduction on bottomland forest restorations.
Journal of Wildlife Management 74(3): 423-436, 2010; DOI: 10.2193/2008-563.
Tiner (1999) Wetland Indicators: A Guide to Wetland Identification, Delineation,
Classification, and Mapping. Boca Raton: CRC Press.
U.S. Army Corps of Engineers [USACE] (1987) Corps of Engineers Wetland Delineation
Manual. USACE Waterways Experiment Station Technical Report Y-87-1.
U.S. Army Corps of Engineers [USACE] (2010) Regional Supplement to the Corps of
Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region
(ver 2.0). ERDC/EL TR-10-20. U.S. Army Corps of Engineers, Environmental
Laboratory, Vicksburg, MS, November 2010.
Wiedenfield, D.A, M. Swan, and D.P. Muth (1996) Migratory Bird (Neotropical and
Shorebirds) Management Plan for the Barataria and Terrebonne Basins of
Louisiana. Barataria-Terrebonne National Estuary Program Publication 30,
August 1996.
Page 32 of 32
ATTACHMENT MWP-A
Tables and Figures
Table 1. Baseline Condition and Proposed Mitigation Habitat and Type at Ponderosa Ranch of
Pointe Coupee Mitigation Bank Amendment One, Pointe Coupee Parish, Louisiana.
Baseline
Condition
Wetland Pasture
Nonwetland
Pasture
Wetland Pasture
Nonwetland
Pasture
Wetland Pasture
Nonwetland
Pasture
Proposed Mitigation Habitat and Type1
Baldcypress Swamp Rehabilitation (<24 feet NAVD)
Baldcypress Swamp Re-establishment (<24 feet
NAVD)
Type 1 Bottomland Hardwood Rehabilitation (24-25
feet NAVD)
Type 1 Bottomland Hardwood Re-establishment (2425 feet NAVD)
Type 2 and 3 Bottomland Hardwood Rehabilitation
(25-28 feet NAVD)
Type 2 and 3 Bottomland Hardwood Re-establishment
(25-28 feet NAVD)
Subtotal: Baldcypress Swamp Restoration
Subtotal: Bottomland Hardwood Restoration
Total Mitigation Credit Acreage
Total Conservation Servitude Acreage
Acres
5.8
6.6
8.1
52.7
4.0
309.2
12.4
374.0
386.4
386.4
Table 2. Average Rainfall Records (Inches) and 2014 Rainfall Records for Pointe Coupee Parish,
Louisiana.
Month
January
February
March
April
May
June
July
August
September
October
November
December
Total
Average1
5.84
4.80
5.18
5.87
5.42
4.26
5.69
5.05
5.22
3.78
4.90
6.16
62.17
20142
1.57
8.95
4.03
3.11
11.2
6.54
3.08
5.66
5.57
1.57
3.15
4.67
59.1
Deviation
4.27
-4.15
1.15
2.76
-5.78
-2.28
2.61
-0.61
-0.35
2.21
1.75
1.49
--
Rainfall records from New Roads, Louisiana data obtained from the Louisiana State University
Southern Regional Climate Center and SCS (1982) data from Old River Control Structure.
2 January to October 2014 Rainfall records from New Roads, Louisiana data obtained from the
Louisiana State University Southern Regional Climate Center.
1
Table 3. Conceptual Species Planting Composition at Ponderosa Ranch of Pointe Coupee Mitigation
Bank Amendment One, Pointe Coupee Parish, Louisiana.
Swamp Species
Common Name
Scientific Name
Indicator Status1
Taxodium distichum
baldcypress
OBL
Nyssa biflora
swamp tupelo
OBL
Cephalanthus occidentalis
buttonbush
OBL
Acer rubrum
red maple
OBL
Crataegus opaca
Mayhaw
OBL
Fraxinus caroliniana
Carolina ash
OBL
Fraxinus profunda
pumpkin ash
OBL
Quercus lyrata
overcup oak
OBL
Quercus texana
Nuttall oak
FACW
Type 1 Bottomland Hardwood Hard Mast Species (approximately 40 to 70%)
Common Name
Scientific Name
Indicator Status2
Composition2
50-80%
10-20%
<10%
<10%
<10%
<10%
<10%
<10%
<5%
Composition
Quercus lyrata
overcup oak
OBL
10-30%
Quercus texana
Nuttall oak
FACW
10-30%
Quercus phellos
willow oak
FACW
10-30%
Quercus similis
Delta post oak
FACW
10-30%
Carya aquatica
water hickory
OBL
10-30%
Type 1 Bottomland Hardwood Soft Mast Species (approximately 30 to 60%)
Common Name
Scientific Name
Indicator Status
Composition
Acer rubrum
red maple
OBL
<10%
Cephalanthus occidentalis
buttonbush
OBL
<10%
Crataegus opaca
mayhaw
OBL
<10%
Fraxinus pennsylvanica
green ash
FACW
<10%
Taxodium distichum
baldcypress
OBL
50-80%
Type 2 and 3 Bottomland Hardwood Hard Mast Species (approximately 40-70%)3
Common Name
Scientific Name
Indicator Status
Composition
Quercus michauxii
cow oak
FACW
10-30%
Quercus pagoda
cherrybark oak
FACW
10-30%
Quercus phellos
willow oak
FACW
10-30%
Quercus texana
Nuttall oak
FACW
10-30%
Quercus nigra
water oak
FAC
5-20%
Quercus similis
delta post oak
FACW
5-20%
Carya illinoinensis
sweet pecan
FACU4
0-5%
Type 2 and 3 Bottomland Hardwood Soft Mast Species (approximately 30-60%)3
Common Name
Scientific Name
Indicator Status
Composition
Celtis laevigata
sugarberry
FACW
<10%
Diospyros virginiana
common persimmon
FAC
<10%
Fraxinus pennsylvanica
green ash
FACW
<10%
Liquidambar styraciflua
sweetgum
FAC
<10%
Platanus occidentalis
American sycamore
FACW
<10%
Ulmus americana
American elm
FAC
<10%
Morus rubra
red mulberry
FACU4
<5%
1 Indicator
status from 2012 National Wetland Plant List
species and quantities to be determined by seedling availability from commercial sources
3 The composition does not include eastern cottonwood (Populus deltoides), a FAC species, which will constitute 50% of
the total planting as part of the integrated planting method.
4 Upland species which are native to the site and will provide habitat value
2 Exact
Cat Island
National Wildlife
Refuge
Atchafalaya
National Wildlife
Refuge
Sherburne Wildlife Management Area
I
5
2.5
0
Miles
5
Sources: Esri, DeLorme, USGS, NPS, Esri, HERE, DeLorme, MapmyIndia, ©
OpenStreetMap contributors, and the GIS user community
Legend
Ponderosa Ranch of Pointe Coupee Mitigation Bank Amendment One (386.4 Acres)
Ponderosa Ranch of Pointe Coupee Mitigation Bank (323.8 Acres)
National Wildlife Refuges
State Lands
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
VICINITY MAP
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/06/2014
Map : F01_Vicinity_5mi.mxd
FIGURE 1
Site Location
Sources: Esri, DeLorme, USGS, NPS, Sources: Esri, USGS, NOAA
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
Legend
Primary Service Area (Lower Grand River Watershed: 08070300)
SERVICE AREA MAP
Secondary Service Area (West Central LA Coastal Watershed: 08090302)
I
14
7
0
Miles
Pointe Coupee Parish, LA
14
Created :
Approved :
Date :
Map No. :
LJW/ArcView
DEB
12/05/2014
F02_ServiceArea.mxd
FIGURE 2
Site Location
Sources: Esri, DeLorme, USGS, NPS, Sources: Esri, USGS, NOAA
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
Legend
I
Barataria-Terebonne Basins
18
9
0
Miles
BARATARIA-TERREBONNE
COMPLEX
Pointe Coupee Parish, LA
18
Created :
Approved :
Date :
Map No. :
LJW/ArcView
DEB
12/06/2014
F02_BTNEP.mxd
FIGURE 3
I
2,000 1,000
0
2,000
Feet
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
Legend
Project Area (386.4 Acres)
Conservation Area (13%)
Hay/Pasture (39%)
Shrub/Scrub (1%)
Woody Wetlands (31%)
Developed (<1%)
Cultivated Crops (17%)
Emergent Herbaceuous Wetlands (<1%)
*Based on National Land Cover Dataset
SURROUNDING LAND USE WITHIN
ONE-MILE RADIUS
Pointe Coupee Parish, LA
Created : LJW/ArcView
Approved : DEB
Date : 12/16/2014
Map No. : F04_LandUse.mxd
FIGURE 4
BLACK BEAR CONSERVATION PRIORITY
AREAS FOR REFORESTATON
Secondary Zones
Primary Zones
Tertiary Zones
Project Area
Project Area
Copyright:© 2013 ESRI, NAVTEQ, DeLorme, Sources: Esri, DeLorme, USGS,
NPS
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
Legend
Louisiana Black Bear Critical Habitat
<80% Priority Restoration
80-90% Priority Restoration
>90% Priority Restoration
FOREST BIRD AND LOUISIANA BLACK BEAR
PRIORITY RESTORATION AREAS AREAS
I
Forest Bird Priority Restoration
5
2.5
0
Miles
Pointe Coupee Parish, LA
5
Created :
Approved :
Date :
Map No. :
LJW/ArcView
DEB
12/06/2014
F5_BlackBear.mxd
FIGURE 5
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
1941 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F06_1941 Aerial.mxd
FIGURE 6
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
1952 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F07_1952 Aerial.mxd
FIGURE 7
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
1966 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F08_1966 Aerial.mxd
FIGURE 8
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
1972 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/19/2014
Map : F09_1972 Aerial.mxd
FIGURE 9
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
1983 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F10_1983 Aerial.mxd
FIGURE 10
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
1998 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F11_1998 Aerial.mxd
FIGURE 11
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
2004 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F12_2004 Aerial.mxd
FIGURE 12
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
2010 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F13_2010 Aerial.mxd
FIGURE 13
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
2013 AERIAL PHOTOGRAPH
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F14_2013 Aerial.mxd
FIGURE 14
Legend
I
Project Area (386.4 Acres)
Dundee-Alligator complex, undulating
1,000
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
500
0
Feet
NRCS SOILS MAP
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/05/2014
Map : F15_NRCS Soils.mxd
FIGURE 15
Copyright: © 2013 National Geographic Society
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
2,000 1,000
0
Feet
USGS 7.5-Minute Quadrangle
2,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/04/2014
Map : F16_USGS Quad.mxd
FIGURE 16
Elevation (NAVD FT)
13.5 - 14
14 - 15
15 - 16
16 - 17
17 - 18
18 - 19
19 - 20
20 - 21
21 - 22
22 - 23
23 - 24
24 - 25
25 - 26
26 - 27
27 - 28
28 - 29
29 - 30
30 - 31
31 - 32
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
1,000
500
0
Feet
LIDAR Digital Elevation Model
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 08/28/2014
Map : F17_LIDAR DEM.mxd
FIGURE 17
#
*
*
#
* #
#
*
#
*
M-1 Canal
#
*
#
*
#
*
#
*
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
Legend
I
Project Area (386.4 Acres)
Flow Direction
#
*
Existing Culvert
1,000 500
0
Feet
EXISTING DRAINAGE PATTERNS
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/04/2014
Map : F18_Existing Drainage.mxd
FIGURE 18
0
5
10
15
20
0
P
P
10
20
Thalweg
30
Left Descending Bank
50
60
70
Notes:
1. Depth from Ground Surface Plane to Ditch Thalweg= 10.2 feet
2. Depth from Ground Surface Plane to Water Level in Discharge Canal= 8.4 feet
3. Top Bank to Top Bank Width=66 feet
4. Ditch Bottom at Thalweg= 16.7 feet NAVD
5. Ground Surface Plane= 26.9 feet NAVD
6. Right Descending Bank Slope= 1.8:1 (54%)
7. Left Descending Bank Slope= 2.4:1 (42%)
8. Cross Sectional Area Below Ground Surface Plane= 395.7 square feet
40
Water Level
in Canal
Ground Surface Plane
Copyright:© 2013 National
Geographic Society, i-cubed
P'
Existing Cross-Section On March 23, 2012
FEET
1 inch= 2000 feet
FEET
80
90
100
Right Descending
Bank
110
P'
130
150
160
15
25
35
FIGURE 19
Created : TSC/ArcView
Approved : DEB
Date : 12/12/2014
Map No. : F19_M1Canal.mxd
Pointe Coupee Parish, LA
DIMENSIONS OF M-1 CANAL
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
140
P'
Source: Esri, DigitalGlobe, GeoEye,
i-cubed, USDA, USGS, AEX,
Getmapping, Aerogrid, IGN, IGP,
P
Photo taken 3/10/2012
120
Mitigation Bank
Boundary
1 inch= 100 feet
NAVD
Legend
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
I
Project Area (386.4 Acres)
Improved Pasture
1,000
500
0
Feet
EXISTING PLANT COMMUNITY
1,000
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 12/19/2014
Map : F20_Plant Community.mxd
FIGURE 20
'
4
E
F
F'
O
4
D'
E'
D'
'
4
C'
C
'
4
B
B'
'
4
N'
O'
N
M
O'
O
M'
A'
A
G'
G
H
I
H'
I'
K
P'
J'
'
4
P
K'
'
4
J
'
4
L'
L
'
4
I
800
400
0
800
Feet
Legend
Project Area (386.4 ac)
Areas to be Excavated (See Cross Section O-O' for typical excavation)
'
4
Culverts to be Removed (See Cross Section L-K for typical culvert removal and backfilling)
Notes:
All culverts are to be removed and backfilled.
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
PRE AND POST RESTORATION
PLAN VIEW
Pointe Coupee Parish, LA
Created :
Approved :
Date :
Map No. :
TSC/ArcView
LJW
12/18/2014
F21_ExistingPlanView.mxd
FIGURE 21
A
15
20
25
30
FEET
A
15
20
Proposed Excavation
0
Re-established
Wetland Forest
Proposed Earthen Fill
25
30
0
Non-wetland
Pasture
20
40
40
Proposed Final Grade
Rehabilitated Wetland Forest
20
Existing Grade
Wetland Pasture
FEET
Proposed Cross-Section A
FEET
Existing Cross-Section A
60
60
80
15
20
25
30
A'
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
100
100
15
20
25
30
A'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 22
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Re-established Wetland Forest
80
Non-wetland Pasture
NAVD
NAVD
FEET
B
0
Re-established Wetland Forest
20
FEET
40
60
60
30
FEET
Proposed Earthen Fill
Proposed Excavation
20
25
30
20
FEET
40
Re-established Wetland Forest
Proposed Final Grade
Rehabilitated
Wetland Forest
Proposed Cross-Section B
NAVD
B'
B'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 23
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
20
25
30
20
Existing Grade
Non-wetland Pasture
20
Agricultural
Canal
25
0
Non-wetland Pasture
Existing Cross-Section B
25
30
FEET
B
NAVD
C
C
FEET
0
Re-established Wetland Forest
40
30
FEET
Proposed Earthen Fill
Proposed Excavation
FEET
20
C'
C'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 24
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
20
Proposed Final Grade
Rehabilitated
Wetland Forest
40
20
25
30
20
Re-established
Wetland Forest
Proposed Cross-Section C
FEET
20
Existing Grade
Non-wetland Pasture
25
0
Agricultural
Canal
NAVD
25
30
20
25
30
Non-wetland Pasture
Existing Cross-Section C
NAVD
D
D
FEET
0
Proposed Excavation
FEET
Proposed Final Grade
80
Re-established Wetland Forest
80
100
100
30
35
20
25
30
35
Proposed Earthen Fill
60
D'
D'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 25
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
20
20
60
Proposed Cross-Section D
Rehabilitated Wetland
Forest
FEET
Existing Grade
Non-wetland Pasture
20
40
40
Agriculture Drain
25
0
Re-established Wetland Forest
20
Non-wetland Pasture
Existing Cross-Section D
25
30
35
20
25
30
35
FEET
NAVD
NAVD
E
0
Re-established Wetland Forest
FEET
40
60
30
FEET
Proposed Earthen Fill
Proposed Excavation
20
25
30
20
FEET
40
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
60
20
25
30
E'
E'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 26
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Re-established Wetland Forest
Proposed Final Grade
Rehabilitated Wetland
Forest
Proposed Cross-Section E
20
Existing Grade
Non-wetland Pasture
20
20
Existing Cross-Section E
Wet Pasture
25
0
Non-wetland Pasture
25
30
FEET
E
NAVD
NAVD
FEET
40
FEET
60
80
60
80
30
35
Proposed Earthen Fill
Proposed Excavation
F'
F'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 27
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
20
40
FEET
Proposed Final Grade
Re-established Wetland Forest
20
20
Rehabilitated Wetland
Forest
25
0
Re-established Wetland Forest
NAVD
25
30
35
Proposed Cross-Section F
20
20
20
25
35
25
0
Non-wetland Pasture
30
Existing Grade
Non-wetland Pasture
Existing Cross-Section F
Agriculture Drain
30
35
Proposed Cross-Section F
F
FEET
Existing Cross-Section F
F
NAVD
G
FEET
Proposed Earthen Fill
Proposed Excavation
FEET
G
Re-established
Wetland Forest
10
24
26
28
30
0
10
FEET
Proposed Final Grade
Rehabilitated Wetland Forest
Proposed Cross-Section G
Re-established
Wetland Forest
20
20
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
G'
G'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 28
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
24
26
28
30
24
24
FEET
26
30
26
Existing Grade
Non-wetland
Pasture
28
0
Agriculture Drain
Existing Cross-Section G
28
30
Non-wetland
Pasture
NAVD
NAVD
H
H
FEET
FEET
20
FEET
40
60
20
25
30
Proposed Earthen Fill
Proposed Excavation
0
20
FEET
Proposed Final Grade
40
20
25
30
H'
H'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 29
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
60
Proposed Cross-Section H
Re-established Wetland Forest
Rehabilitated Wetland Forest Re-established Wetland Forest
20
30
20
Existing Grade
Non-wetland Pasture
25
0
Agriculture Drain
25
30
Non-wetland Pasture
Existing Cross-Section H
NAVD
NAVD
I
0
40
FEET
60
80
100
25
30
Proposed Excavation
20
Re-established Wetland Forest
Proposed Earthen Fill
15
20
25
30
40
FEET
Proposed Final Grade
Rehabilitated Wetland
Forest
Proposed Cross-Section I
60
80
I'
I'
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
100
15
20
25
30
NAVD
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 30
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Re-established Wetland Forest
15
Existing Grade
Non-wetland Pasture
15
20
Existing Cross-Section I
Agriculture Drain
20
0
Non-wetland Pasture
20
25
30
FEET
I
NAVD
FEET
J
J
0
Re-established Wetland Forest
Re-established Wetland Forest
40
40
Proposed Earthen Fill
Proposed Excavation
J'
J'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 31
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
20
20
20
FEET
Proposed Final Grade
26
24
FEET
24
26
Rehabilitated
Wetland Forest
Proposed Cross-Section J
20
26
20
20
FEET
Non-wetland Pasture
24
0
Existing Grade
Wet Pasture
Existing Cross-Section J
24
26
Non-wetland Pasture
NAVD
NAVD
FEET
K
L
K
15
25
35
15
25
35
NAVD
L
0
0
20
Planted Seedlings
20
FEET
40
36" Culvert
40
FEET
80
15
25
35
NAVD
80
15
K'
LJW
9/15/2014
addendum1_xsections.dwg
Date:
Dwg. No.:
Figure 32
TSC/AutoCAD
Created:
Approved:
Pointe Coupee Parish, Louisiana
CROSS-SECTION L-K
Average linear distance between L and K is approximately 156'
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
60
Pre-Construction Grade
25
35
L'
K'
L'
Average linear distance between L and K is approximately 156'
60
Pasture Surface
(Pre-Construction Grade)
Culvert Removed
and Backfilled to Grade
of Road Surface
Post Construction Grade
Proposed Cross-Section L-K
Road Surface (No Change)
Road Surface
Existing Cross-Section L-K
NAVD
NAVD
M
FEET
FEET
Re-established Wetland Forest
40
Re-established Wetland Forest
60
60
30
Proposed Excavation
20
FEET
40
Proposed Earthen Fill
M'
M'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 33
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
20
20
30
25
0
Proposed Final Grade
25
30
Rehabilitated Wetland Forest
Proposed Cross-Section M
20
FEET
Existing Grade
Non-wetland Pasture
20
20
Agriculture Drain
25
0
Non-wetland Pasture
25
30
Existing Cross-Section M
NAVD
M
NAVD
N
N
FEET
FEET
Re-established Wetland Forest
FEET
40
Re-established Wetland Forest
60
Proposed Excavation
FEET
40
60
Proposed Earthen Fill
N'
N'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 34
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
20
30
20
20
Proposed Final Grade
25
0
Rehabilitated Wetland Forest
25
30
Proposed Cross-Section N
20
30
20
20
Existing Grade
Non-wetland Pasture
25
0
Wet Pasture
25
30
Non-wetland Pasture
Existing Cross-Section N
NAVD
NAVD
24
30
24
28
0
0
FEET
Final Grade
Re-established Wetland Forest
Proposed Cross-Section O
FEET
40
40
Proposed Excavation (To be used as Earthen Fill Material on-site)
60
60
24
30
24
28
O'
O'
LJW
9/15/2014
addendum1_xsections.dwg
Approved:
Date:
Dwg. No.:
Figure 35
TSC/AutoCAD
Created:
Pointe Coupee Parish, Louisiana
EXISTING CONDITION WITH PROPOSED SWALE
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
Existing Grade
Existing Grade
Overburden Excavation (Approximately 6" Depth) (Topsoil to be Excavated and Returned to Area)
20
20
Non-wetland Pasture
Existing Cross-Section O
NOTE: 1) Topsoil in excavated areas will be removed and stockpiled on-site in non-wetland areas during excavation.Topsoil will be returned to
excavated areas upon completion of excavation. Excavated areas will be approximately 6-12" lower in elevation than existing elevations.
2) Total Excavation = Approximately 18"
O
O
FEET
FEET
NAVD
NAVD
.
!
.
!
.
!
.
!
.
!
.
!
.
!
.
!
.
!
I
1,000
500
0
1,000
Feet
Legend
Project Area (386.4 Acres)
Type 1-2 BLH Rehabilitation (8.1 Acres)
Type 2-3 BLH Re-establishment (309.2 Acres)
Baldcypress Swamp Re-establishment (6.6 Acres)
Type 2-3 BLH Rehabilitation (4.0 Acres)
Baldcypress Swamp Rehabilitation (5.8 Acres)
Type 1-2 BLH Re-establishment (52.7 Acres)
Areas to be Excavated to Below 29'
.
!
Culvert to be Removed and Backfilled
Ponderosa Ranch of Pointe Coupee
Mitigation Bank Amendment One
MITIGATION FEATURES
Pointe Coupee Parish, Louisiana
Created : LJW/ArcView10
Approved : DEB
Date : 08/28/2014
Map : F36_Mitigation Features.mxd
FIGURE 36
Legend
Project Area (386.4 Acres)
ATTACHMENT MWP-B
Cost Analysis Report
Cost Reference for Ponderosa Ranch of Pointe Coupee Mitigation Bank Amendment One
ver 1.1
Item
Boundary Maintenance
Invasive Species Control
Units
Miles
Acre
Unit Values
3.4
386.4
Price Per Unit
$
150.00
$
90.00
$
$
Invasive Species Control Mobilization
Inspections (rate and per diem)
Taxes on Project Acreage
Planted Acreage
Planting Rate
Seedling Cost (BRS)
Seedling Installation Rate
Planting Cost (BRS and Installation)
Earth Moving
Culvert Removal
Site Prep and Preemergent Spray
Credit Acreage
Conservation Servitude Acreage
Access Road Maintenance
Fixed
Day
Acre
Acre
Trees/Acre
Seedling
Seedling
Seedling
Cubic Yards
Culvert
Acres
Acres
Acres
Acres
Fixed
1.0
386.4
386.4
538.0
538.0
538.0
538.0
148000.0
9.0
386.4
386.4
386.4
0.0
Fixed
$
$
NA
NA
$
$
$
$
$
$
NA
NA
$
$
$
$
NA
NA
$
$
$
$
$
$
NA
NA
$
BRS= bare-root seedlings
790.00
3.00
0.22
0.17
0.39
2.00
200.00
120.00
10.00
Total Cost
510.00
34,776.00
100.00
790.00
1,159.20
118.36
91.46
209.82
296,000.00
1,800.00
46,368.00
-
Estimated Construction Costs for
Ponderosa Ranch of Pointe Coupee Mitigation Bank Amendment One
Year 0
Item
Units
Unit Values Price Per Unit
Hydrology Restoration
Cubic Yards 148,000.0 $
2.00
Culvert Removal
Culvert
9 $
200.00
Site Prep and Preemergent Spray
Acres
386.4 $
120.00
Planting Costs
Acres
386.4 $
209.82
Subtotal
Construction Cost with 5% Contingency
Cost Per Credit Acre
$
$
$
$
$
$
$
Cost
296,000.00
1,800.00
46,368.00
81,074.45
425,242.45
446,504.57
1,155.55
Estimated Establishment Costs for
Ponderosa Ranch of Pointe Coupee Mitigation Bank Amendment One
Year 1 to 15
Year
1
1
1
1
1
1
1
2
2
2
2
2
2
2
3
3
3
3
3
3
4
4
4
4
4
4
5
5
5
5
5
5
6
6
6
7
7
7
8
8
8
9
9
9
10
10
10
10
10
10
10
11
11
11
12
12
12
13
13
13
14
14
14
15
15
15
15
15
15
15
Event
Monitoring/ Inspection
Replant (30%)
Invasive Species Control (100%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Replant (10%)
Invasive Species Control (25%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Invasive Species Control (20%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Invasive Species Control (10%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Invasive Species Control (5%)
Invasive Species Mobilization
Wildlife Opening and Access Road Maintenance
Property Taxes
Subtotal
Access Road Maintenance
Property Taxes
Subtotal
Access Road Maintenance
Property Taxes
Subtotal
Access Road Maintenance
Property Taxes
Subtotal
Access Road Maintenance
Property Taxes
Subtotal
Monitoring/ Inspection
Invasive Species Control (2%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Boundary Maintenance
Subtotal with Year 10 Adjusted Inflation (2.49%)
Access Road Maintenance
Property Taxes
Subtotal with Year 11 Adjusted Inflation (2.49%)
Access Road Maintenance
Property Taxes
Subtotal with Year 12 Adjusted Inflation (2.49%)
Access Road Maintenance
Property Taxes
Subtotal with Year 13 Adjusted Inflation (2.49%)
Access Road Maintenance
Property Taxes
Subtotal with Year 14 Adjusted Inflation (2.49%)
Monitoring/ Inspection
Invasive Species Control (2%)
Invasive Species Mobilization
Access Road Maintenance
Property Taxes
Boundary Maintenance
Subtotal with Year 15 Adjusted Inflation (2.49%)
Total
Total Per Credit Acre
Event Cost
$
790.00
$ 81,074.45
$ 34,776.00
$
100.00
$
$
1,159.20
Percent
100%
30%
100%
100%
100%
100%
$
$
$
$
$
$
790.00
81,074.45
34,776.00
100.00
1,159.20
100%
10%
25%
100%
100%
100%
$
$
$
$
$
790.00
34,776.00
100.00
1,159.20
100%
20%
100%
100%
100%
$
$
$
$
$
790.00
34,776.00
100.00
1,159.20
100%
10%
100%
100%
100%
$
$
$
$
$
790.00
34,776.00
100.00
1,159.20
100%
5%
100%
100%
100%
$
$
1,159.20
100%
100%
$
$
1,159.20
100%
100%
$
$
1,159.20
100%
100%
$
$
1,159.20
100%
100%
$
$
$
$
$
$
790.00
34,776.00
100.00
1,159.20
510.00
100%
2%
100%
100%
100%
100%
$
$
1,159.20
100%
100%
$
$
1,159.20
100%
100%
$
$
1,159.20
100%
100%
$
$
1,159.20
100%
100%
$
$
$
$
$
$
790.00
34,776.00
100.00
1,159.20
510.00
100%
2%
100%
100%
100%
100%
Occurences Inflation
Per Year
Factor
0
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
5
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
5
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
5
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
5
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
1
1.0000 $
$
1
1.0000 $
1
1.0000 $
$
1
1.0000 $
1
1.0000 $
$
1
1.0000 $
1
1.0000 $
$
1
1.0000 $
1
1.0000 $
$
5
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
$
1.0249 $
1
1
1.0249 $
$
1
1.0249 $
1
1.0249 $
$
1
1.0249 $
1
1.0249 $
$
1
1.0249 $
1
1.0249 $
$
5
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
1
1.0249 $
$
Years 10-15 adjusted using an inflation rate of 2.49%. This is the average Consumer Price Index (CPI) from 1983-2012.
Cost
24,322.33
34,776.00
100.00
1,159.20
60,357.53
3,950.00
8,107.44
8,694.00
100.00
1,159.20
22,010.64
3,950.00
6,955.20
100.00
1,159.20
12,164.40
3,950.00
3,477.60
100.00
1,159.20
8,686.80
3,950.00
1,738.80
100.00
1,159.20
6,948.00
1,159.20
1,159.20
1,159.20
1,159.20
1,159.20
1,159.20
1,159.20
1,159.20
4,048.36
712.84
102.49
1,188.06
522.70
6,574.45
1,188.06
1,188.06
1,188.06
1,188.06
1,188.06
1,188.06
1,188.06
1,188.06
4,048.36
712.84
102.49
1,188.06
522.70
6,574.45
$ 132,705.33
$
343.44
Percent of
Cost
45.5%
Release Milestone
$132,705.33
Initial Success
$60,357.53
$72,347.79
16.6%
9.2%
6.5%
5.2%
0.9%
Interim Success
$49,809.84
$22,537.95
0.9%
0.9%
0.9%
5.0%
0.9%
0.9%
0.9%
0.9%
5.0%
Long-Term Success
$22,537.95
100.0%
$132,705.33
Estimated Long-Term Annualized Cost Summary
Ponderosa Ranch of Pointe Coupee Mitigation Bank Amendment One
Item
Units
Unit
Values
Price Per
Unit
Boundary Maintenance (5-year event)
Miles
3.4 $
0.5% Invasive Species Control (annual event)
Acre
386.4 $
Fixed
Fixed Fixed
Acre
Day
Acre
0.0 $
5.0 $
386.4 $
Invasive Species Control Mobilization (annual
event)
Access Road Maintenance
Inspection (annual event)
Taxes (annual event)
Average Annual Cost (Starting at Year 16)
Unit
Percent
Cost
Years
Annualized
Cost
150.00 100.0%
$
510.00
5
$
102.00
90.00 0.5%
$
173.88
1
$
173.88
$
100.00
1
$
100.00
$
$ 790.00
$ 1,159.20
1
1
1
$
$ 790.00
$ 1,159.20
NA
10.00 100.0%
790.00 20.0%
3.00 100.0%
$ 2,325.08
Estimated Long-Term Costs and Projected Account Activity for
Ponderosa Ranch of Pointe Coupee Mitigation Bank Amendment One Utilizing Investments In Direct Obligations of the USA
Year 16 to 50
Year
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Inflation
Interest
Per Credit
Acre
70%
Item
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Annual Cost
Total
Average
Total Cost
$
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
2,325.08
$
81,377.80
$
2,325.08
Inflationary Adjustment1
$
$
2,382.97
$
2,442.31
$
2,503.12
$
2,565.45
$
2,629.33
$
2,694.80
$
2,761.90
$
2,830.67
$
2,901.16
$
2,973.40
$
3,047.43
$
3,123.32
$
3,201.09
$
3,280.79
$
3,362.48
$
3,446.21
$
3,532.02
$
3,619.97
$
3,710.11
$
3,802.49
$
3,897.17
$
3,994.21
$
4,093.66
$
4,195.60
$
4,300.07
$
4,407.14
$
4,516.88
$
4,629.35
$
4,744.62
$
4,862.76
$
4,983.84
$
5,107.94
$
5,235.13
$
5,365.48
$
5,499.08
$
130,643.94
$
3,732.68
Beginning Balance2
$
94,124.28
$
97,540.99
$
98,612.25
$
99,660.91
$
100,684.61
$
101,680.89
$
102,647.13
$
103,580.60
$
104,478.41
$
105,337.55
$
106,154.83
$
106,926.92
$
107,650.32
$
108,321.33
$
108,936.11
$
109,490.60
$
109,980.57
$
110,401.56
$
110,748.90
$
111,017.71
$
111,202.87
$
111,299.02
$
111,300.54
$
111,201.55
$
110,995.90
$
110,677.15
$
110,238.58
$
109,673.12
$
108,973.41
$
108,131.76
$
107,140.09
$
105,990.00
$
104,672.68
$
103,178.95
$
101,499.18
$
99,623.35
Ending Balance3
$
94,124.28
$
95,158.02
$
96,169.94
$
97,157.79
$
98,119.16
$
99,051.56
$
99,952.33
$
100,818.69
$
101,647.74
$
102,436.39
$
103,181.44
$
103,879.49
$
104,527.00
$
105,120.24
$
105,655.32
$
106,128.12
$
106,534.36
$
106,869.54
$
107,128.93
$
107,307.61
$
107,400.39
$
107,401.85
$
107,306.33
$
107,107.88
$
106,800.30
$
106,377.09
$
105,831.44
$
105,156.24
$
104,344.07
$
103,387.14
$
102,277.33
$
101,006.16
$
99,564.74
$
97,943.82
$
96,133.70
$
94,124.27
0.0249
0.0363
$
$
243.59
347.99
1. Adjusted using an inflation rate of 2.49%. This is the average Consumer Price Index (CPI) from 1983-2012.
2. Adjusted using an interest rate of 3.63% applied to the previous years' ending balance. The rate of return is based on a 30-year Treasury Bond rate as of August 13, 2013
3. The ending balance is the begining balance less the estimated, inflated cost.
ATTACHMENT D
Acceptance Letter
US Army Corps of Engineers
Regulatory Branch
PO Box 60267
New Orleans, LA 70160
ATTN: {CORPS PROJECT MANAGER}
Gentlemen:
{MITIGATION BANK NAME} has made arrangements with {PERMITTEE'S NAME} to
purchase {NUMBER OF ACRES OR CREDITS} {ACRES OR CREDITS} of {HABITAT TYPE} for
unavoidable impacts associated with work authorized by the Department of the Army permit
number {MVN-XXXX-XXXXX-XX}. The {MITIGATION BANK NAME} assumes the responsibility
for the permittee's compensatory mitigation requirements (i.e., to implement, assure performance,
and provide long-term management of the compensatory mitigation project) in accordance with
provisions of the Mitigation Banking Instrument governing this bank.
{CLOSING}