Proposed Dirt Pit Expansion in the Batture of the Mississippi River in West Baton Rouge Parish

NAME OF APPLICANT: Perrault’s Trucking, c/o Morris P. Hebert, Inc., Attn: Timothy Robertson, 10343 Siegen Lane, Suite 4B, Baton Rouge, Louisiana 70810. LOCATION OF WORK: In the batture of the Mississippi River on the right descending bank at mile point 226.5, Section 5, T8S-R12E, approximately 3 miles south of Port Allen, Louisiana, in West Baton Rouge, within the Lower Mississippi-Baton Rouge River Basin in hydrologic unit (HUC 08070100), as shown on the attached drawings. The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear and excavate an area of the Mississippi River batture for dirt to be sold and used as building base for local construction projects. Part of this area is already in operation as dirt pit. The current proposal is for permission to expand the operation for excavation of more area and to deepen the existing pits to 12 feet. Approximately 100,402.52 cubic yards of native sand material would be excavated and hauled offsite to other construction areas and used as fill. The proposed project is situated on an approximately 38-acre tract that has been determined to include forested wetlands, other waters of the US, and herbaceous wetlands. Of this, approximately 0.45 acre of forested wetlands and 0.26 acre of herbaceous wetlands would be permanently impacted and 5.21 acres of other waters of the US will be temporarily impacted. It is anticipated that the proposed action would have minimal impact on adjacent wetlands. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and function, therefore deeming the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed. The applicant may be required to fully or partially restore the site to pre-project conditions if issuance of a permit is determined to be contrary to the public interest.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas