You can copy from here when filling out the rest of the page.
Proposed Pipeline Installation in the Gulf of Mexico, Across Ewing Bank,within Blocks 790, 746, and 745, near Lafourche Parish
NAME OF APPLICANT: Walter Oil & Gas Corporation, Attn: Judy G. Archer, 1100 Louisiana, Suite 200, Houston, Texas 77002.
LOCATION OF WORK: Crossing a Shipping Fairway, in the Gulf of Mexico, across Ewing Bank in Blocks 790, 746 and 745, near Lafourche Parish, Louisiana, as shown on the attached drawings.
CHARACTER OF WORK: Install and maintain a 10-inch, 60,188-foot oil pipeline and associated right-of-way (ROW), originating at Platform ‘A’ Ewing Bank Area crossing a shipping fairway and ending at Block 115 SSTI/Hot Tap Grand Isle Area, South Addition. The pipeline will be laid on the seafloor. No special aquatic sites will be affected by this project; no mitigation is anticipated.