Home

New Orleans District

Run scraper

Proposed Pipeline Installation in the Gulf of Mexico

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Proposed Pipeline Installation in the Gulf of Mexico, Across Ewing Bank,within Blocks 790, 746, and 745, near Lafourche Parish

NAME OF APPLICANT: Walter Oil & Gas Corporation, Attn: Judy G. Archer, 1100 Louisiana, Suite 200, Houston, Texas 77002. LOCATION OF WORK: Crossing a Shipping Fairway, in the Gulf of Mexico, across Ewing Bank in Blocks 790, 746 and 745, near Lafourche Parish, Louisiana, as shown on the attached drawings. CHARACTER OF WORK: Install and maintain a 10-inch, 60,188-foot oil pipeline and associated right-of-way (ROW), originating at Platform ‘A’ Ewing Bank Area crossing a shipping fairway and ending at Block 115 SSTI/Hot Tap Grand Isle Area, South Addition. The pipeline will be laid on the seafloor. No special aquatic sites will be affected by this project; no mitigation is anticipated.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas