Install a new 20-inch pipeline

NAME: GENESIS PIPELINE USA, L.P. c/o MORRIS P. HEBERT, INC. 10343 SIEGEN LANE, BUILDING 4-B BATON ROUGE, LA 70810 Attn: Timothy Robertson

LOCATION: Lafourche, Terrebonne Parishes, LA; POB- Existing Genesis Raceland Facility@ Lat. 29° 44' 36.37"N I Long.- 90° 36' 14.50"W; POE - Existing Shell Houma Station @ Lat. 29° 37' 15.06"N I Long. -90° 41' 27.45"W; Raceland to Houma, LA. 90° 36' 14.50"W; POE - Existing Shell Houma Station @ Lat. 29° 37' 15.06"N I Long. -90° 41' 27.45"W; Raceland to Houma, LA.

DESCRIPTION: Proposed installation of approximately 11.3 miles of 20-inch pipeline, (± 59,697 feet in length), from the Genesis Raceland Facility to the Shell Pipeline Company Houma station. The pipeline will be installed via open cuts and eleven horizontal directional drills. Approximately 43,682 cubic yards of material will be excavated, stockpiled and used as backfill upon successful installation of the pipeline. Approximately 297 cubic yards of limestone will be hauled in for construction of four valve sites. Approximately 33,082 cubic yards of sand may be hauled in for construction of access roads and temporary workspaces. Approximately 53.24 acres of upland habitat and approximately 46.28 acres of vegetated wetlands may be impacted as a result of this proposed activity.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas