Home

New Orleans District

Run scraper

David John Skansi at 4978 Pontchartrain Drive

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

BOATHOUSE ON BOGUE FALAYA RIVER IN ST. TAMMANY PARISH

NAME OF APPLICANT: David John Skansi at 4978 Pontchartrain Drive, Slidell, Louisiana 70458.

LOCATION OF WORK: On the Bogue Falaya River, at 830 South New Hampshire Street, Covington, in St. Tammany Parish, Louisiana, as shown on the attached drawings.

HUC: 08090201; Liberty Bayou – Tchefuncte River

The work described below was completed prior to obtaining a Department of the Army permit and was in violation of Section 10 of the Rivers and Harbors Act and Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have been deferred.

CHARACTER OF WORK: To install and maintain a 15' x 30' boat house, 10' x 50' deck, and 337.5' of bulkheading with backfill, and to dredge a boatslip. The structures will extend 16’ into the river, which is approximately 125’ wide at this location. Part of this project was authorized under a NOD-128 on October 22, 2013, and additional unauthorized work has since been completed. Project implementation will require dredging of 0.05 acre and fill of 0.052 acre of non-vegetated water bottom. No adverse impacts to special aquatic sites are proposed; no compensatory mitigation is anticipated at this time.

The applicant may be required to fully or partially restore the project site to pre-project conditions, if issuance of a permit is determined not to be in the overall public interest.

JOINT PUBLIC NOTICE March 9, 2015 United States Army Corps of Engineers New Orleans District Regulatory Branch Post Office Box 60267 New Orleans, Louisiana 70160-0267

State of Louisiana Department of Environmental Quality ATTN: Water Quality Certifications Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-2045 jennifer.e.burkett@usace.army.mil Project Manager Jennifer Burkett Permit Application Number MVN 2013-1853 EBB

(225) 219-3225 Project Manager Elizabeth Johnson WQC Application Number WQC 150309-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). BOATHOUSE ON BOGUE FALAYA RIVER IN ST. TAMMANY PARISH NAME OF APPLICANT: David John Skansi at 4978 Pontchartrain Drive, Slidell, Louisiana 70458. LOCATION OF WORK: On the Bogue Falaya River, at 830 South New Hampshire Street, Covington, in St. Tammany Parish, Louisiana, as shown on the attached drawings. HUC: 08090201; Liberty Bayou ­ Tchefuncte River The work described below was completed prior to obtaining a Department of the Army permit and was in violation of Section 10 of the Rivers and Harbors Act and Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have been deferred. CHARACTER OF WORK: To install and maintain a 15' x 30' boat house, 10' x 50' deck, and 337.5' of bulkheading with backfill, and to dredge a boatslip. The structures will extend 16' into the river, which is approximately 125' wide at this location. Part of this project was authorized under a NOD-128 on October 22, 2013, and additional unauthorized work has since been completed. Project implementation will require dredging of 0.05 acre and fill of 0.052 acre of non-vegetated water bottom. No adverse impacts to special aquatic sites are proposed; no compensatory mitigation is anticipated at this time. The applicant may be required to fully or partially restore the project site to pre-project conditions, if issuance of a permit is determined not to be in the overall public interest.

-2The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources.

-3Our initial finding is that the proposed work would neither affect any species listed as endangered by the U.S. Departments of Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Our initial finding is that the proposed work have "no effect" on either the dusky gopher frog (Rana sevosa) or the gopher tortoise (Gopherus polyphemus) listed as endangered by the U.S. Department of Interior, nor affect any habitat designated as critical to the survival and recovery of this species. Concurrence has been received from the US Fish and Wildlife Service per the Standard Local Operating Procedure for Endangered Species in Louisiana, dated October 22, 2014. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 0.1 acre of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Michael V. Farabee Chief, Eastern Evaluation Section Enclosure

135'

125'

140'

Bogue Falaya River 50'-0"

71'-0"

23'-6"

18'-0"

55'-0"

6'-0"

Completed Corregated Steel sheet pile 5.5' above mean river

60'-0"

Completed work with reductions in scope. (single boat shed vs double & location)

40'-0"

5'-0"

Slip Area

Completed Bulkhead pressure treated wood & pilings

55'-0" Unauthorized completed bulkhead work

54'-0"

10'-0"

35'-0"

10'-0"

15'-0"

36'-0"

St .

Unauthorized bulkhead work with out tie back system

Proposed fill area

Am

er

ic a

35'-0"

41'-6"

D ra

in

Pi

pe

Fr

om

S.

Skansi Property

Skansi Residence 830 New Hampshire Scale: 3/32" = 2'

Property line with Bob Mack

Proposed bulkhead

N

Property line with Tom Favrot

Proposed dredge area

Down river

Up river

Bob Mack property line

Tom Favrot property line

Boat Shed 15'-0"

16'-0" 50'-0" Unauthorized Bulkhead 60' from river bank Mean high water

41'-6"

Mean water 2.5' + -

Mean low water

23'-6"

Completed bulkhead 120' to property line

Proposed dredge area in existing slip area 1,996 sq. ft. None of the slip area is in the Bogue Falaya River.

Skansi Property 830 S. New Hampshire Scale 3/32"=1' Slip area 1996 sq. ft.

30'-0"

Unauthorized bulkhead work with out tie back system

Bogue Falya River

35'-0" 4'-0"

Proposed fill area

35'-0"

Proposed dredge Area None of this is in the river

Distance to outer most boat shed/deck Distance to bulkhead area up river side Distance to bulkhead area down river side

Deck

5'-0"

Mean high water Mean water 2.5' Mean low water + -

70'-0" 60'-0"

10'-0"

Boat shed and Dock extend into the river

54'-0"

Skansi Property 830 S. New Hampshire Scale 3/32"=2' Slip area 1787 aq. ft. Mean River 2.5'

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas