You can copy from here when filling out the rest of the page.
24-INCH BI-DIRECTIONAL OIL PIPELINE IN THE GULF OF MEXICO
NAME OF APPLICANT: Shell Pipeline Company, LP, 910 Louisiana, 41080B, Houston, Texas 77002.
LOCATION OF WORK: Within the Gulf of Mexico, beginning at 27.94715°N, 90.99644°W, crossing the Gulf Safety Fairway, and ending at 28.16155°N, 90.66551°W.
CHARACTER OF WORK: The applicant proposes to install 30.24 miles of 24-inch bi-directional oil pipeline in the Gulf of Mexico from Green Canyon 19A Platform to a subsea piggable wye in South Timbalier 301. The pipeline will be laid on top of the sea floor using a Dynamically Positioned lay vessel. No special aquatic sites will be impacted by the proposed activity.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
P.O. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
REPLY TO
ATTENTION OF
March 16, 2015
Operations Division
Central Evaluation Section
Project Manager
Jamie Crowe
(504) 862-2675
Jamie.M.Crowe@usace.army.mil
SUBJECT: MVN 2015-0126 CO
PUBLIC NOTICE
Interested parties are hereby notified that a permit application has been received
by the New Orleans District of the U.S. Army Corps of Engineers pursuant to:
[X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [ ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
24-INCH BI-DIRECTIONAL OIL PIPELINE IN THE GULF OF MEXICO
NAME OF APPLICANT: Shell Pipeline Company, LP, 910 Louisiana, 41080B,
Houston, Texas 77002.
LOCATION OF WORK: Within the Gulf of Mexico, beginning at 27.94715°N,
90.99644°W, crossing the Gulf Safety Fairway, and ending at 28.16155°N,
90.66551°W.
CHARACTER OF WORK: The applicant proposes to install 30.24 miles of 24-inch bidirectional oil pipeline in the Gulf of Mexico from Green Canyon 19A Platform to a
subsea piggable wye in South Timbalier 301. The pipeline will be laid on top of the sea
floor using a Dynamically Positioned lay vessel. No special aquatic sites will be
impacted by the proposed activity.
The comment period for the Department of the Army Permit will close 15 days
from the date of this public notice. Written comments, including suggestions for
modifications or objections to the proposed work, stating reasons thereof, are being
solicited from anyone having interest in this permit must be mailed so as to be received
before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
-2-
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing or
e-mailing the Corps of Engineers Project Manager listed above. Any request must be
specific and substantively supportive of the requested extension, and received by this
office prior to the end of the initial comment period. The Section Chief will review the
request and the requestor will be promptly notified of the decision to grant or deny the
request. If granted, the time extension will be continuous to the initial comment period
and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.
The decision as to whether a permit will be issued will be based on an evaluation
of the impact of the proposed work on navigation and national security.
The U.S. Army Corps of Engineers is soliciting comments from the public,
federal, state, and local agencies and officials, Indian Tribes, and other interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the U.S. Army Corps of Engineers to
determine whether to make, modify, condition, or deny a permit for this proposal. To
make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest
factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National
Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register
of Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would neither affect any species
listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any
habitat designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of N/A acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
-3-
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
John M. Herman
Chief, Central Evaluation Section
Enclosures