You can copy from here when filling out the rest of the page.
Michael LaDouceur is the Regulatory point-of-contact for this permit application from Tri-County Center Trust for work impacting some wetlands and an unnamed tributary to Red Rock Creek in Tigard, Oregon.
UPDATED
PUBLIC NOTICE for Permit Application
Issue Date: March 13, 2015
Expiration Date: April 13, 2015
US Army Corps of Engineers No: NWP-2014-43
30-Day NoticeOregon Department of State Lands No: 57482
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Regulatory Branch
Mr. Michael LaDouceur; michael.a.ladouceur@usace.army.mil
P.O. Box 2946
Portland, Oregon 97208-2946
Applicant: Mr. Stephen Martin, Tri-County Center Trust, 8565 SW Barbur Boulevard, Portland, Oregon 97219
Location: The project is located at 11985 SW 72nd Avenue, Tigard, Washington County, Oregon in Section 1 of Township 2 South, Range 1 West (Latitude 45.432948, Longitude -122.752149)
Waterway: Wetlands A, B, C, D, E, F, and G and an unnamed perennial tributary to Red Rock Creek are located within the permit area.
Project Description: The proposed project will construct two commercial buildings and an associated surface parking lot permanently impacting Wetlands A, B, C, D, E, F, and G. A total of 1,180 cubic yards of soil, gravel and rock will be discharged into 0.143 acre of wetlands. The project also involves placing 372 linear feet of an unnamed tributary to Red Rock Creek into a 48-inch pipe. The proposed project does not qualify for a general permit because it exceeds the 300 linear foot of impact to streambed threshold of Nationwide Permit No. 39 (Commercial and Institutional Developments).
Mitigation: The applicant has provided a proposed compensatory wetland mitigation plan for the purchase of wetland mitigation credits from the Tualatin Valley Environmental Mitigation Bank and the Half Mile Lane In-Lieu Fee Site for impacts to wetlands and waters. The applicant believes the on-site wetlands may be an historic wetland compensatory mitigation site and has proposed to purchase credits at a 2 credit to 1 acre impact ratio. A total of 0.24 acre of wetland mitigation credit would be purchased from the Tualatin Valley Environmental Mitigation Bank, and 0.06 acre of mitigation credit would be purchased from the Half Mile Lane In-Lieu Fee Site. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: The project purpose is to construct commercial space with associated parking.
Drawing(s): Ten (10) drawings are attached and labeled Corps No.: NWP-2014-43
Additional Information: Additional information may be obtained from Mr. Michael LaDouceur, Project Manager, U.S. Army Corps of Engineers at (503) 808-4337, or by7 e-mail at michael.a.ladouceur@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95 217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
I
N ~~
Cl
-
z
N
CD
L....----11Project Area
- - Street
-
-
400
10 Foot Contour
I
I
greenbanks
NWP-2014-43
1 of 10
Enclosure
I
.
· I l1
'
I
'
c
,,.,
~~ ~
··~
..
~
.·
- 'I
j ·
... .
II '
I
·
i.
...
0
.
,..
ll'l
;Q
.,
L
1
JJ
l
.-
I·
~.
1.
J
~
Jl'
·,
I
I
rc
NWP-2014-43
z
I
I
2 of 10
..
Enclosure
Figure 3: USGS Beaverton, OR 7.5 Minute Quadrangle
~·
NWP-2014-43
3 of 10
Enclosure
Note: background image compliments of Google Earth
Enclosure
4 of 10
NWP-2014-43
.s,
--------~-~
Building
Proposed
Figure 5: Site Development Plan
Culvert
Wai-Mart
6,300
70x90
Building Plan Summary:
27 parking spaces
6,817 sqft Open Space on site
9,000 sqft Proposed Buildings
11985 SW 72nd Avenue Development Project
~ -----n - -- -
Scale is approximately 1" =54'
72"d Culvert Ends
Enclosure
5 of 10
NWP-2014-43
SW 72ND AVENUE
0
0
N
io
f-
ftJ
fE
'"
~
,w
<0
"'
'"
·,o
1o
(f)
(/)
...;
0
0
'H
jE
E--< 0
~
~
..,
.:::>
0
L[)
II
~ ,.q
()
~
-......-1=1
·.-<
0
......
L()
~- ,-g
d
L()
N
(f)
z
0
~
f-
0
u
w
(/)
(f)
(f)
(f)
0
0:::
u
0
0:::
L()
0
LL
-..;j(.[)
f-
w
w
I
(f)
w
w
(f)
w
f-
0
z
~'<
M
@
Portland
Vancouver
Seattle
503224.9560
360.695.7879
206.749.9993
www.mcknze.com
Architecture · Interiors
Planning · Engineering
~ACKENZIE 2015 ALL RIGHTS RESERVED
THESE DRAWINGS ARE THE PROPERTY Of MACKENZIE AND ARE NOT TO BE
N
z
11985 SW 72ND AVENUE
DEVELOPMENT PROJECT
ILl
u
DRAWN BY:
BMR
MWB
SHEET TITLE:
EXISTING CONDITlONS
EXHIBIT
USED OR REPRODUCED It/ ANY t.lAWIER, 'MTHOUT PRIOR 'nfllTTEN PERMJSS!Oil
NWP-2014-43
02/24/2015
CHECKED BY:
~
<
I:
SHEET:
DATE:
PROJECT:
IIi
6 of 10
6.2
JOB NO:
2140070.01
Enclosure
SW 72ND AVENUE
I
I-
::>
0
0
0
('.1
~
10:1-
~~ §
(/)(/)
~
0
0
0
l[)
l[)
('.1
(f)
z
0
I
I=
0
u
w
(f)
(f)
(f)
0
0::::
u
0
l[)
0::::
0
LL
..q-
c.o
f-
w
w
:r::
I
(f)
w
w
(f)
~I
DATE:
M
Portland
Vancouver
Seattle
503224.9560
360.695.7879
206.749.9993
www.mcknze.com
~
1:
THESE DRAWINGS ARE THE PROPERTY Of MACKENZIE AND AAE NOT TO BE
US£0 00 REPRODUCED ltl ANY t.4AtltiER, WITHOUT PRIOO 'MUTTEN PERJ.IISSION
NWP-2014-43
BMR
CHECKED BY:
~
Planning · Engineering
@ I.CACKEIIZIE 2015 ill RIGHTS RES£RVEO
DRAWN BY:
15
Architecture · Interiors
SHEET:
02/24/2015
LLi
N
MWB
SHEET TITLE:
PROPOSED CONDITIONS
EXHIBIT
7 of 10
6.3
JOB NO:
2140070.01
Enclosure
PROPERTY UNE
----~..- . -.. -.
PROPOSED
.- --:~ ftNISHW .
·
------~H-W
GROUND
orw
I .. .... "..................... .
-;·~_:_.:. :._:_.:. :. j.:··._:..;..~··~·:.:. .:..;.: :;,;::,.;,:~t,;,·;,;.·,.;·,,;,··:,:·,,;,·:,··:,,;,.:,.:·=, · ·=·
=·
l
=·
·=·
=·
PROPERTY LINE
. . . . . . . . · .
. . . . . . . . . . . - ..
=lt:::=:: =': ': ': :': ': ': :': ': ': :;: : ==:t=====;;:===o==~
. . . . . . . . .-.
·==·
WETLAND SECTION A
1"=40' HORIZONTAL
1"=20' VERTICAL
1:1
WETLAND SECTION B
1"=40' HORIZONTAL
1"=20' VERTICAL
1:1
WETLAND SECTION C
1"=40' HORIZONTAL
1"=20' VERTICAL
1: 1
PROJECT:
M
Portland
Vancouver
Seattle
503224.9560
360.695.7879
206.749.9993
www.mcknze.com
Architecture · Interiors
Planning · Engineering
@ I.!AOTHE~ DRAWINGS ARE THE PROPERTY ll'" MAONWP-2014-43
Lli
N
~
rl
<(
:r
SHEET:
DATE:
11985 SW 72ND AVENUE
DEVELOPMENT PROJECT
02/24/2015
DRAWN BY:
BMR
CHECKED BY:
MWB
SHEET TITLE:
CROSS SECTIONS
EXHIBIT
8 of 10
JOB NO:
6.4
2140070.01
Enclosure
NWP-2014-43
9 of 10
Enclosure
~
!0:
~
9
N
0
~:«
!::6
~~
<:)M
::l~
'li~
§'"
0
;li
·
-
CD
CD
N
:::>
s3
"'CD
"'"'
~;:!
);!co
::s
"'"'
~~
'-'C
~0
"'n
9:::>
~~
0
3~~a.
"'"'
!1>
Ul
::E
:s::::~
rn
(")
"'
"'"'0
~
(J1
-
Ul
N
0
...........
-1>-
N
-rno
~
}>
0
:;o
-i
om
~z
me
jJ~
~0
::::0
0>
a
~
~
~
:r:
~
(")
o:=:
-o...._.
s::::l\:1
mz
~~
c!':'
}>
(!l
"'"'::<
:r:
!"':'
--;
0
p:!(l.l~
~~~
()~
or:1
z---<
"
o::t"'
iMACKENZIE.
IC "'
::I
~-a·
...
CD
CD
5"5"
IC
::I
c:
~ m ...
n
CD
-·.
::::1"
-·
i=l
~>
llJ
::I
::I
::I
gJ"C
"'0
. ~~
~
3:
.,a~
>l"' ~ IC
~~I'
~~ ~
>!:'i:
z!:ti
g~
~;8 ~
~M!;!
Z:;t
8~
~~@
~~
2~
;q,
~J,SHOLE
TO lHE
ALL I'JPE CONNEC'tONS TO 1/..t.NHOLE SHALL BE WATERTID-IT.
CC..~NtCTIONS Ot 2'4~ OR ,:;RCA'itR SHA!.L RE OUI~ ..:.
.t" IAAXIM'J 1.4 ClEAR OF PIPE 'HALL
't.-JS DETAIL U ~ITED TO MAXL\IU\1 1NT8t0R DRoP OF 2A~
~
0
OR NO. 120
96" MANHOLE
REVjSED 02- 03
Oar ooaualtm·at J· oltlr.
~Services
N~-SHRlNK
Clean\¥.Jier
~~.::::::::~~~*;;}1
DRA'MNG NO. 0 10
~.:...:C:AS .
10. 1\'AiERTICHT[T.-,t.!PER PROOF 1-A:ANH OL..::: FRA..lro4E AN:>
COVER S ~ALL BE USED 1,~ All. EAS:::IJENT AND OFF
SANITARY CONN=:CTION AND ~ .. =OR STORY
CONNECTION.
=art
9.
MEASU~EO
8~-EAI1.,\A."':HCL.E WAll. B£TWIT.'I:l PIPE BRE.A:or
MA.'OHOI.( AND :::HANNEl. DETA'"-.
P"P( CO.'NtCMONS
fOUR OR IJORt:: MA INLINES So-fA LL
Rf: CUI.CI:!: A 1.4AAHC:.!: CONNECTI O.~ ANO Ct< ANNEL OETJI.J L
P ~DVID:;: J.. ~ .N I~U'-1 !F 8" OF INiACT ( UNJ lSO\fR!ITO)
?'1'>:
STRE..~ G.TH 0: JOOO P.SJ. AND SLUMP CF 2 · TO .(.·.
ALL ..:0.1-."TS SI'£Al.L BE £AL£D y.,r;:-r PRE FOR~:.D :;A.SKETS
SIJCH AS ~1-SE_.:.L NO. 2. RAM-N'::CK. OR ::...-.:. ;..= ~ROVEn
SOUJ..L CDNFCRMIN G iO ii=TI>ERAl SPECFlCATION SS-500210.
B.
7.
6.
.c.
~.
CONFO~M
SH.A!.!. -. AY£ .:.. 28 DA'f'
SECnCNS SHA!.L
AL!. FR'E-C"-ST
~ £0UI~Et.lfNTS 0: AS'TlJ C -"17B~
All POURED If~ ::~o~o.C£. CCN~£E
2...
NOTES.:
1.
==="'/
TANO""CUl FRAME A.'OD CO\'tR OR
WA.TERnGHT rR~E A"'D COVER.
·SEE SiD. ORAW:NG NO. 11G-SA/ST
w:."'t. OCl'WrtN
KNOOe·
_
/.SET FRAME: l...
12
·~/_j_CROUT
LOCAlE f'RAU£ 4.'110 COVER
0\I!R L.E!IGE at A. T LEAST
12· LN V.10 TM
RESTORATIO~
~
·
·
I
,.s- or
COVF.i.CTICl!l
DiTRENCH BACKFILL
DETAILS
AASHTO T -99 AND ODOT/AP'WA SP:::C OQ.iOS ·
NOTE I
ALL COMPACTTI ON REOUIREM8REVISED 12-05
c _ NAT1 vt:
~tr:
~Services
Clean"\Viirer
eur --==·t 1.a ol··~-
AN!l PLAC£n PR'IO~ 70 PLAC8.1ENT
OF EEOOINC MA ~.A L
SHALl BE SPECIRED SD£RATEl'1'
lRENCH STI..3 lJl.AliON :
It R£0l..!IR£0. iR:EN-:H ST 1\BIUZA nON
12." N ATIVE TOP SCU.
IF 'T"O? SOIL EXISTED
PPJOR TO EXCAVATlON.
!="OR stntEMENT
OVER TR£NC"H TO AllOW
lolOUNO EXCESS NATIVE MATERIAL
CLASS "A"
o-1;:~ !:MALLD< iHA~ ·e·
1/2 ?i?E {'1.0. PLUS 6" MIN. FOR ryE 18" AND U·..'~U:~
1/2 =:PE 0.0. ?LUS .._.. MIN . FOR
,. : .. '. -;~ ...·....t ..!.;:.~;;::
:- .~:~~.~~:.:~~
SUS'FACE
iHIN
. ..... ~ .::
-~;::·_~ t!~c~~::
~~~
:· 95;: cc,o.1p.-.cnoN
.._, -..· · .,
::~t,;t~:~::·<_:
AS SFECI=--1::0
SJFiFAC:::
CLASS "8"
--
0
0
N
N
0
N
<'i
N
Ol
... ··.................·~ ~~~}\ ...
.. .·"-C '\, .
~.
~C~'
v
Ol
0
.. ......... .... ... .
:r:;.:L ·. ·.· ·. ·.··. .··· ·.· ·. .·.·.····.·.·· ··. :'\;
·. ·. ··. ·. ,,
~~-·-~~·~-~~,._>-;·. ·.· .· ·.·· ······ ·..
··±··d·;·
~tEt~rffi·~·.i. P
. ]·~,__~-~-·§t§j~fu:>~·;_·~·~-~·it·" '~·
·
····.f··. ·[ i;w··~n.· \I r( ········
m&rzrl:~
··
······......rt: n~§rfil
.
............... r··
·····················/
50---u ~
T~ ·
0
It ··········
I H·······...·········
· ····J·
· ··F. ·············!. . · · .~~ ········· ~
0
. . .. . .. . . . ··········· ··· · · ·.····.··
'i . /
·················
···· ·· ··· ......... ··· ····· ·········
\
·. ···
·· .· · . · . . · .· ·
I')
, ·.······· ···.·.
~l\
·.·······
i\\ ··· ···.·· ·~····.
~ 4·~· ·~· ~· ~· ~·~· ~· ~· 4·~· ~· ·~· ~· ~·~· ~· ·~· ~·~·\+\ +\·~·M~·~s~· ·~·IH·~!~· ~· t·~~~g
. . .... ········· · · · · · HH
~ w
_J
············································ xw········r .
r·
············· ······ ····-·················· NY
Ll.
0
· · · ··· · · · · · · ;;·tt Ft
[ · · · ·· · · · ···
~k·~
· · · · ~· ~~IT=)H'-'··~r 8
············· ··············· ··· ···· ..\.
\
. . . . . . . . . . . . . . .. .. .... . ..
·t;; ·····
. . .., .. .
. . . .. .. . .
+
a:
(f)
z
0
0
CD
I--
~
u
II ·
L()
,__ II
w
(f)
a... z_j
w N~
cen
~~
<(
I-- ..
(f)
(f)
0<(
u
0
0:::
0:::
~I--
0
O:::o:::
ow
:r:>
LL
.,qCD
I--
w
w
I
(f)
w
w
(f)
~I
v
0
N
0
0
N
N
Ol
v
M
503224.9560
Vancouver
360.695.7879
Seattle
206.749.9993
www.mcknze.com
Architecture · Interiors
Planning · Engineering
@
MACKEPlZIE 2015 All RIGHTS RESERVED
THESE DRA'MNGS AAE THE PROPERTY Of MACKENZIE AHD AAE NOT TO BE
ll.i
N
~
11985 SW 72ND AVENUE
DEVELOPMENT PROJECT
l:
BMR
MWB
SHEET TITLE:
PROPOSED CONDITIONS-CULVERT PROFILE ;
EXHIBIT
USED OR REPRODUCED Itl ANY MAAtiER, WITHOUT PRIOR "nRITTEN PERUJSSJOil
NWP-2014-43
02/24/2015
DRAWN BY:
CHECKED BY:
~
~
SHEET:
DATE:
PROJECT:
Portland
~I
0
10 of 10
6.6
JOB NO:
2140070.01
Enclosure
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2014-43
Oregon Department of State Lands No: 57482
Notice Issued: March 13, 2015
Written Comments Due: April 13, 2015
WHO IS THE APPLICANT: Mr. Stephen Martin, Tri-County Center Trust, 8565 SW Barbur
Boulevard, Portland, Oregon 97219
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires
applicants for Federal permits or licenses to provide the Federal agency a water quality
certification from the State of Oregon if the proposed activity may result in a discharge to
waters of the state.
DESCRIPTION OF DISCHARGES:
notice on the proposed project.
See attached U.S. Army Corps of Engineers public
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues
as a result of the proposal are available for examination and copying at Oregon Department
of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are
available by contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are
readily accessible during your visit. To schedule an appointment please call DEQ Water
Quality at Northwest Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401
Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People
with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.
Corps No.: NWP-2014-43
Page 1 of 2
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the
Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper
right section on page one of this notice. Written comments may be emailed, mailed or faxed
as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through
version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to
conversion difficulties, DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon
Telecommunications Relay Service at 1-800-735-2900.
Corps No.: NWP-2014-43
Page 2 of 2