Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

EXCVATION AND FILL FOR THE PLACEMENT OF A PIPELINE AND DIFUSER IN THE MISSISSIPPI RIVER IN EAST BATON ROUGE PARISH

NAME OF APPLICANT: Georgia-Pacific Consumer Operations, LLC, c/o AquAeTer, Inc., Attn: John Michael Corn, 215 Jamestown Park, Ste100, Brentwood, Tennessee 37027. LOCATION OF WORK: In the Mississippi River and its batture at mile point 255, on the left descending bank, near Zachary, Louisiana, in East Baton Rouge Parish, within the Lower Mississippi-Baton Rouge and Bayou Sara Thompson Basins, in hydrologic units (HUC 08070201 and 08070100), as shown on the attached drawings. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to excavate and dredge native material for the installation and maintenance of a new diffuser and extension of its feeder pipe. The new pipe will start before the old diffuser and go around it approximately 1,140-feet to the river with varying widths from 48 to 63 inches. The pipe and diffuser will extend into the river approximately 830-feet. The Diffuser will be approximately 80 feet in length with 12-inch ports every 10 feet and will be supported in the river channel by pile bents which will be cut down to center line of the diffuser then covered with concrete mattress. Approximately 2,800 cubic yards of material excavated for the pipe installation will be hauled to a non-wetland area of the property and deposited for use in other applications. Approximately 10,700 cubic yards of material will be dredged in the river and discharged downstream. In addition approximately 5,800 cubic yards of bedding material will be placed under pipe in the trench and approximately 9,200 cubic yards of rip-rap material will be placed on top of the bedding material. Approximately 54 cubic yards of concrete will be placed as a blanket to cover and protect the diffuser. Work will be performed by barge mounted equipment from the river and with land based equipment by access road. The project will permanently impact approximately 0.93 acre of jurisdictional batture scrub shrub wetlands and temporarily impact 0.57 acre of jurisdictional batture scrub shrub wetlands and 1.1 acres of jurisdictional river water bottoms. It is anticipated that the proposed action would have minimal impact on adjacent wetlands. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas