Home

Alaska District

Run scraper

2003-473

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The existing Class 2 freezeback solid waste landfill is at capacity and requires expansion to maintain uninterrupted solid waste disposal services for Barrow. The Barrow Landfill was designed with the assumption that the Thermal Oxidation System (TOS), an incinerator, would be operational and reduce the volume of fill entering the landfill. Cell 1 of the landfill has prematurely filled due to the TOS explosion in 2009 with sporadic operation since. Large Barrow cleanup projects have also consumed space in the landfill earlier than expected. The existing landfill needs to formally transition to Phase II and Phase III of development. This includes closure of Active Cell 1, completion of Active Cell 2, construction of a supporting working pad (Cell 3), and construction of Cell 4. Supplemental activities include installation of thermal monitoring wells for Cell 2 and updating wells for Cell 1. The landfill perimeter fence has become damaged from drifting snow and will also need to be repaired.North Slope Borough proposes to place 62,000 cubic yards of clean gravel fill material into 8.5 acres of wetlands. Twelve phases of development exist for this landfill. This project would construct the infrastructure for Phase II and Phase III. Please contact Janet Post at (907) 753-2831, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at janet.l.post@usace.army.mil if further information is desired concerning this notice.

The existing Class 2 freezeback solid waste landfill is at capacity and requires expansion to maintain uninterrupted solid waste disposal services for Barrow. The Barrow Landfill was designed with the assumption that the Thermal Oxidation System (TOS), an incinerator, would be operational and reduce the volume of fill entering the landfill. Cell 1 of the landfill has prematurely filled due to the TOS explosion in 2009 with sporadic operation since. Large Barrow cleanup projects have also consumed space in the landfill earlier than expected. The existing landfill needs to formally transition to Phase II and Phase III of development. This includes closure of Active Cell 1, completion of Active Cell 2, construction of a supporting working pad (Cell 3), and construction of Cell 4. Supplemental activities include installation of thermal monitoring wells for Cell 2 and updating wells for Cell 1. The landfill perimeter fence has become damaged from drifting snow and will also need to be repaired.North Slope Borough proposes to place 62,000 cubic yards of clean gravel fill material into 8.5 acres of wetlands. Twelve phases of development exist for this landfill. This project would construct the infrastructure for Phase II and Phase III. Please contact Janet Post at (907) 753-2831, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at janet.l.post@usace.army.mil if further information is desired concerning this notice. POA-2003-473-M1, Ikroavik Lake_PN POA-2003-473-M1, Ikroavik Lake_PN Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas